Skip to:
Content
NAS 6 Toolset
click to hide/show the navigation bar
Home
<
Mechanism View
< Mechanism
{D}
< print >
< comment >
< help >
Home
Return to the NAS Architecture Home Page
Site Search
Search the NAS Architecuture website
FAQ
Frequently Asked Questions about NAS Architecture
Reference & Tutorial
Reference Documents relating to NAS Architecture
Downloads
NAS Architecture Downloads
Submit Comment
Submit a comment about the NAS Architecture Tool
VIEWS
Executive
The NAS Architecture Executive Views
NAS
The NAS Architecture Overview Tool
Financial
Review NAS Architecture Financial and Programmatic information
Location
NAS Architecture Facility and Location information
Mechanisms
The NAS Architecture Mechanism View
Services
FAA Services and Operational Improvements
Mechanism Data Report: Processor
Mechanism Hierarchy
Systems
Air Traffic Control Systems
Air Traffic Control Automation
Processor
Legend:
Hierarchy Element -
Mechanism
Mechanism Data
Name (acro/abbrev)
Processor (Processor...)
Description
none
Mechanism Type
System
Attachments
No attachments found for this mechanism.
Children for Processor
Processor
(Processor...)
Advanced Technologies & Oceanic Procedures/Offshore
(ATOP/Offshore)
Advanced Technologies and Oceanic Procedures
(ATOP)
Advanced Technologies and Oceanic Procedures-NextGen
(ATOP-NG)
Aeronautical Information Management Modernization Segment 1
(AIM Mod'zn Seg 1)
Aeronautical Information Management Modernization Segment 2
(AIM Mod'zn Seg 2)
Aeronautical Information Management Modernization Segment 3
(AIM Mod'zn Seg 3)
Aeronautical Information System Replacement
(AISR)
Airport Movement Area Safety System
(AMASS)
Airport Resource Management Tool
(ARMT)
Alaska Flight Service Modernization Seg 1
(AFSM Seg 1)
Automated Radar Terminal System - Model IIE
(ARTS IIE)
Automated Radar Terminal System - Model IIIA
(ARTS IIIA)
Automated Radar Terminal System - Model IIIE
(ARTS IIIE)
Collaborative Air Traffic Management Technologies Work Package 3
(CATMT WP3)
Collaborative Air Traffic Management Technologies Work Package 4
(CATMT WP4)
En Route Automation Modernization Post-Release 3
(ERAM Post-R3)
En Route Automation Modernization Release 1
(ERAM R1)
En Route Automation Modernization Release 2
(ERAM R2)
En Route Automation Modernization Release 3
(ERAM R3)
En Route Automation Modernization Release 4
(ERAM R4)
En Route Automation Modernization Release 5
(ERAM R5)
En Route Automation Modernization Release 6
(ERAM R6)
En Route Automation Modernization Release 7
(ERAM R7)
En Route Automation Modernization Release 8
(ERAM R8)
En Route Automation Modernization Release 9
(ERAM R9)
En Route Automation NextGen Far-Term WP
(TBD)
En Route Automation NextGen Mid-Term WP
(TBD)
Enhanced Back-up Surveillance
(EBUS)
Evaluator
(Evaluator)
FAA Information Superhighway for Training
(FIST)
Flight Data Processing 2000
(FDP2000)
Flight Information System
(FIS)
Flight Services Automation (FSA) Work Package (WP) 1
(FSA WP1)
Flight Services Automation (FSA) Work Package (WP) 2
(FSA WP2)
Flight Services Automation (FSA) Work Package (WP) 3
(FSA WP3)
Flight Services Evolution Integrated Services and Capabilities
(TBD)
Host Computer System/Oceanic Computer System Replacement
(HOCSR)
Instrument Flight Procedures Automation
(IFPA)
Microprocessor-En Route Automated Radar Tracking System
(MEARTS)
Military Airspace Management System
(MAMS)
NOTAM Distribution System
(NDS)
NextGen Automation Platform Release 1
(NAP R1)
NextGen Mid-Term Work Package
(TBD)
Operational and Supportability Implementation System
(OASIS)
Power Systems (Technology Refresh)
(Pwr Sys Tech Refresh)
Special Use Airspace Management System
(SAMS)
Standard Terminal Automation Replacement System
(STARS)
Surface Management System Prototype
(SMS Proto)
Surface Movement Advisor (Atlanta)
(SMA (Atlanta))
Surface Movement Advisor (Free Flight Phase 1)
(SMA (FFP1))
Surface Traffic Management System
(STMS)
Terminal Automation Moderization and Replacement Phase 2
(TAMR P2)
Terminal Automation Modernization and Replacement Phase 1
(TAMR P1)
Terminal Automation Modernization and Replacement Phase 2
(TAMR P2)
Terminal Automation Modernization and Replacement Phase 3
(TAMR P3)
Time Based Flow Management
(TBFM)
Time Based Flow Management - Integrated Enterprise Solution
(TBFM-IES)
Traffic Flow Management System - Enhanced Traffic Management System Hardware Upgrade
(TFMS - ETMS HW Up)
U.S. Notice to Airmen System
(USNS)
Legend:
Hierarchy Element -
Mechanism
Mechanism ID
100086
Last Update
10 / 07 / 2003
Data Last Updated On: 05-Mar-2009
NAS Toolset Version:
20090312 6.8.4
processing time: 0.188 seconds