ER 12051 |
Estimated Weight and Balance Report |
March 3, 1962 |
ER 12209 |
Description of Launch Vehicle |
March 30, 1962 |
ER 12211 |
Activation Plan for Launch Complex and Launch Vehicle Support Area Volumes I & II |
Oct. 1962 |
ER 12251 |
Gemini Program Activation Plan for Vertical Test Site Volume I & II |
March 30, 1962 |
ER 12254 |
Gemini Launch Vehicle Quality Assurance Plan |
April 1962 |
ER 12255 |
Gemini Launch Vehicle Program Plan |
April 1962 |
ER 12259 |
Gemini Launch Vehicle Facilities Plan |
April 1962 |
ER 12260- 1-25 |
Gemini Launch Vehicle Systems Program and Facilities Monthly Progress Reports |
Jan. 1962 March 1964 |
ER 12260-26-46 |
Gemini Launch Vehicle Systems Program and Facilities Monthly Progress Reports |
April 1964-Dec. 1965 |
ER 12260-47 |
Gemini Launch Vehicle Systems Program and Facilities Monthly Progress Reports |
Jan. 1966 |
ER 12327 |
System Test Plan |
May 1962 |
ER 12328 |
Program Support Plan |
May 1962 |
ER 12710 |
Calculated Weight & Balance Report |
Nov. 11, 1962 |
ER 12715C |
Basic Trajectory and Aerodynamic Data for AFMTC |
July 27, 1964 |
ER 12717 |
GT-2 Specific Trajectory and Aerodynamic Data for AFMTC Planning |
July 27, 1964 |
ER 127947 |
Reliability Monthly Progress Report: Vol. 1 - Program Activity & Status |
Oct. 20, 1963 |
Vol. II - Reliability Measurement Summary |
Jan. 20, 1964 |
ER 12794-11-13 |
Reliability Monthly Progress Reports |
February- March 1964 |
ER 12794- 14-19 |
Reliability Monthly Progress Reports |
April- September 1964 |
ER 12794 20-27 |
Reliability Monthly Progress Reports |
October 1964- May 1965 |
ER 12794 28-37 |
Reliability Monthly Progress Reports |
June 1965- March 1966 |
ER 12794-38 |
Reliability Monthly Progress Reports |
April 1966 |
ER 13026 |
Final Structural Loads and Stiffness Data Report |
April 8, 1966 |
ER 132261 |
Launch Vehicle No. 1 Sequenced Compatibility Firing |
February 20, 1964 |
ER 132276- ER 132279 |
Flight Evaluations Launch Vehicles 6-9 |
1966 |
ER 13227-10-12 |
Flight Evaluations Launch Vehicles 10-12 |
1966 |
ER 13374 |
Longitudinal Oscillation Instability Study: Pogo |
December 1964 |
ER 13983 |
Rail Transportation of GLV-9 Propellant Tanks |
October 1965 |
MB 1040 |
General Development Specification for Gemini Launch Vehicle System |
May 18, 1962 |
MB 1046 |
Gemini Launch Vehicle Performance Specifications |
Nov. 30, 1962 - Oct. 7, 1966 |
MB 1047 |
Model Specification for Gemini Vehicle; Specification Revised Page Index |
April 9, 1963 - August 3, 1966 |
T 2356G |
Dynamic Characteristics of a Pulse Ratio Modulator |
April 1962 |
Man-Rating the Gemini Launch Vehicle |
June 29, 1964 | |
Improved Gemini Launch Vehicle for the NASA-USAF Gemini Program; vol. II: Engineering |
April 1963 |
LV-22 - LV-22-4 |
Launch Vehicle Trajectory Data |
March 5, 1962- September 1962 |
LV-22-5 |
Current Performance Status of GLV |
November 1962 |
LV-22-6, 10, 14, 16 |
Current Performance Status of GLV |
1963 |
LV-22-17, 21, 23, 26 |
GLV Performance Status Reports |
1964 |
LV-22-38 - LV-22-44 |
GLV Performance Status Reports |
1966 |
LV-25B |
Malfunction Event Analysis Data |
March 26, 1962 |
LV-54 |
Preliminary Study of Escape from Failure Modes in the Region of High Dynamic Pressure |
May 3, 1962 |
LV-58-17, 20, 22, 31, A, 18, 24 |
GLV Analysis of Titan II Flight; Effects of Titan II Flight Results on GLV; Postflight Malfunction Detection and Abort Analysis for Titan II N-2 |
1963 |
LV-65-I, III |
Flight Control System Analog Study |
May-July 1962 |
LV-90-I-90-10 |
Monthly Weight Status Reports Launch Vehicle Systems |
June 1962- April 1963 |
LV-90-11 - 90-19 |
Monthly Weight Status Reports Launch Vehicle Systems |
May 1963- June 1964 |
LV-90-20 - 90-29 |
Monthly Weight Status Reports Launch Vehicle Systems |
October 1964- November 1965 |
LV-90-30 - 90-39 |
Monthly Weight Status Reports Launch Vehicle Systems |
February- June 1966 |
LV-95A-I, 95A-II |
Reliability Analysis Airborne and AGE Systems |
December 1962 |
LV-97A, A3, A7 |
Integrated Abort Program Status Reports and Revisions |
1962-63 |
LV-97A, A3, A7 |
Integrated Abort Program Status Reports and Revisions |
1962-63 |
LV-103B |
Failure Mode Analysis of Electrical Controls and Hydraulic Systems |
October 1962 |
LV-115 |
GLV Dispersion Study |
September 1962 |
LV-164 |
Space/Launch Vehicle Interface Structural Analysis & Compartment Pressure Determination |
June 1963 |
LV-165-1-165-12 |
GLV Flight Weight Coordinating Reports |
1963-66 |
LV-166-169 |
Weight Analysis and Reports |
1963 |
LV-170-2,170-4, 170-8, 170-12 |
Actual Weight and Balance Reports |
1964-66 |
LV-214 |
GLV Performance Resulting from Use of Cold Propellants |
March 1963 |
LV-223 |
Summary Report of Vehicle Motions Following Rapid Malfunctions during Power Flight |
July 1963 |
LV-224 |
Analysis of the Gemini Launch Vehicle Escape Environment |
1965 |
LV-225C |
Astronaut Training Data |
February 1965 |
LV-226-4 |
Flight Analysis Piggyback Program Flight N-31 |
February 1964 |
LV-250 |
Structural Breakup of GLV Following Rapid Malfunction |
May 1966 |
LV-274, 274-2,274-4 |
Revised GLV Trajectory Dispersion Analysis |
1964-65 |
LV-296 |
Flight Control System Study Attitude Control Selection |
October 1963 |
LV-326-2, 326-4 |
GLV Preflight Test Reports |
1964-65 |
LV-326-6, 326-7, 326-8 |
GLV Preflight Test Reports |
1965-66 |
LV-326-9 |
GLV Preflight Test Reports |
April 1966 |
LV-328-1 |
Preliminary SCF Report |
January 1964 |
LV-329-1 |
Preliminary Flight Report |
April 1964 |
LV-333 |
GLV Reliability Survey of Critical Component Suppliers |
March 1964 |
LV-376, 376-10, 376-12 |
Guidance Monitor Operations |
1965-66 |
LV-337A |
Countdown Hazard Analysis |
May 1965 |
LV-378 |
Flight Hazard Analysis |
February 1965 |
LV-390 |
GLV Reevaluation of Mode I Abort |
1965-66 |