FY 2002 Intended Submittals Project Description
Project descriptions for CORBOR grant applications that states are intending to submit are listed below.
STATE |
DESCRIPTION |
AMOUNT ($) |
Arizona (Lead) w/NV |
Hoover Dam Bypass. |
20,000,000 |
Arkansas (Lead) w/ IN, KY, TN, MS, LA and TX |
I-69: Sarnia and Windsor, Ontario, Canada to Laredo and the Lower Rio Grande Valley (U.S./Mexico Border) - Environmental and Location Studies |
23,240,000 |
Arkansas (Lead) w/ MS |
I-69: US 65 - Mississippi Highway 1 (Design, ROW and Construction) |
75,000,000 |
Kentucky (Lead) w/OH |
Development of a public involvement program to determine logical alternatives to rehabilitate the Bridge, provide additional capacity, review new bridge locations, or a combination of the above. |
2,500,000 |
Maine (Lead) w/NH and VT |
Reconstruction of US2 ($6M for ME, $5M for NH, $0.5M for VT) and construction of Rest Area/CVO/ITS facility in VT ($4.5M). |
16,000,000 |
Maryland (Lead) w/WV |
The Appalachian North-South Corridor Project Planning Study from I-68 in Maryland to Corridor H in West Virginia. |
3,200,000 |
Missouri (Lead) w/ KS, MN, IA, OK, TX, IL, ND and SD |
I-35, I-29 and I-80 Corridors. Four (4) areas for the development of ITS which includes Institutional Framework Development, Advanced Corridor Information Systems, Integrated Federal and State Systems, and Freight Facility Integration and Interoperability. |
12,250,000 |
Oklahoma (Lead) w/ OK, TX and CO |
National High Priority Corridor 38: US 287 Ports-to-Plains |
86,500,000 |
Alabama |
Additional lanes and relocation of SR-171 and US-43 from Tuscaloosa in Tuscaloosa County to Spruce Pine in Franklin County a distance of approximately 96 miles. |
3,516,000 |
Alabama |
Anniston Evacuation Corridor: STPAA-7442, Widening from 2 lanes to 5 lanes along Calhoun County Road 109 from SR-202 to US-431 a distance of 6.2 miles. |
2,637,000 |
Alaska |
Dalton Highway MP 175-209 Reconstruction. |
10,100,000 |
Alaska |
Seward and Sterling Highway Corridor Management Plan. |
363,900 |
Alaska |
Hatcher Pass, Phase 2 MP 18-25, Rehabilitations Paving. |
6,367,900 |
Alaska |
Municipality of Anchorage, Grade Separated Port Access Ramps. |
8,000,000 |
Arizona |
Nogales Intelligent Bi-National (CANAMEX) Truck Corridor: Safety, ITS & CVISN |
1,000,000 |
Arizona |
Nogales Federal-State Southbound Commercial Port |
2,500,000 |
Arizona |
Douglas Strategic Weigh-Inspection Facility and Commercial Vehicle Access Road (Chino) |
2,400,000 |
Arizona |
Tucson/Nogales Freight Corridor Study |
900,000 |
Arizona |
Naco-Bisbee Commercial Vehicle Corridor Improvement |
350,000 |
Arizona |
San Luis Connector Road to Port of Entry |
1,075,000 |
Arizona |
San Luis Port of Entry Pre-Design |
800,000 |
Arizona |
Nogales North-South Inter-connector Study |
1,250,000 |
Arkansas |
I-55 - Marked Tree Interchanges and Frontage Roads (Right-of-Way and Construction) |
34,400,000 |
Arkansas |
I-69: Pine Bluff - Highway 278 Connector (I-530 Extension) - Right of Way |
7,200,000 |
Arkansas |
US 71: Texarkana - South (Construction) |
30,700,000 |
Arkansas |
US 71: Texarkana - DeQueen (Design) |
8,000,000 |
Arkansas |
US 71: Alma - Mena (Design and Right-of-Way) |
32,000,000 |
Arkansas |
US 71: Bella Vista Bypass (Right-of-Way - Arkansas) |
3,200,000 |
Arkansas |
US 412: Springdale Bypass (Design) |
4,000,000 |
Arkansas |
US 412: US 65 Interchange (Bear Creek Springs) ROW and Construction |
14,400,000 |
Arkansas |
US 412: Mountain Home - Highway 101 (ROW) |
8,000,000 |
Arkansas |
US 412: Paragould - Highway 141 Widening and St. Francis River Relief Structures (ROW and Construction) |
18,400,000 |
California |
Construction of six-lane freeway from I-805 to the Otay Mesa POE. |
74,000,000 |
California |
Realignment of freeway lanes near the San Ysidro POE to facilitate the efficient movement to cross-border passenger traffic. |
35,000,000 |
California |
Widening of existing facility to accommodate commercial and passenger traffic from the Calexico East POE to the state highway system. |
38,000,000 |
California |
Alameda Corridor East - Remaining grade separation project in Phase 1 of the Jump Start Safety improvement portion of the Alameda Corridor-East. |
10,000,000 |
California |
Continued preliminary engineering for the Orange County Gateway railroad lowering project in northern Orange County: design/hydrology, geology, utility relocation to prepare design-build procedure documents. |
5,000,000 |
California |
Feasibility study to examine ways to improve operation and reduce delays on the SR 57 and adjacent freeway and identify goods movement and multimodal strategies. |
2,000,000 |
California |
Study to examine and identify goods movement and multimodal strategies, intermodal linkages, ITS, applications and other safety and mobility enhancements of national and regional economic development. |
5,500,000 |
California |
Study to develop a multi-purpose intermodal/safety inspection facility at the California / Mexico Border in Calexico. |
2,300,000 |
California |
Feasibility Study: Southern California portion of an intermodal and multimodal interstate trade corridor management plan and study bounded by I-5, I-8, I-10, State Route 60 and other major rail and truck corridors. |
2,400,000 |
California |
Feasibility Study: Feasibility of implementing the Southern California portion of and intermodal and multimodal interstate trade corridor. |
2,400,000 |
Colorado |
Replacement of the I-25 viaduct in Denver, over Broadway, light rail transit, and consolidated heavy rail corridor including construction of a new structure, demolition of two existing structures, and reconnection of approaching roadways. |
44,469,900 |
Colorado |
Complete reconstruction of the Eagleridge Interchange on I-25 at the north edge of Pueblo, including mainline I-25 reconstruction, ramp modification and widening a segment of Eagleridge Blvd. |
14,000,000 |
Colorado |
9.1 miles of concrete pavement overlay on US 287 north of Wiley Junction in southeastern Colorado, including intersection and other safety improvements and rehabilitation of major structures. |
12,000,000 |
Colorado |
Environmental assessment (or perhaps EIS) to address right-of-way preservation and actual corridor improvements on I-25 corridor from State Highway 66 north of Longmont to Wellington in north Front Range area. |
3,000,000 |
Connecticut |
Design Phase of the Pearl Harbor Memorial Bridge. |
14,800,000 |
Florida |
Preliminary design for Port of Miami Tunnel. |
9,500,000 |
Florida |
Preliminary design for I-95, Brevard County (4 lanes to 6 lanes) widening from SR 514 to SR 50. |
13,300,000 |
Florida |
Preliminary design for I-4/SR 46 Reconfigure interchange in Seminole Co. |
3,100,000 |
Florida |
Preliminary design for I-95 Volusia County, Systems Interchange from I-4 to US 92. |
8,600,000 |
Florida |
Preliminary design for I-4, SR 408 to Lee Road, widening by 2 lanes. |
40,000,000 |
Florida |
Preliminary design for I-4 widening by 2 lanes from US 441 to SR 408, including SR 408 interchange. |
111,000,000 |
Florida |
Corridor plan for SR 80, LaBelle to US 27. |
2,600,000 |
Florida |
ROW acquisition and construction of improvements to Capital Circle from the Tallahassee Regional Airport to I-10. |
16,000,000 |
Florida |
Preliminary engineering construction and construction engineering and inspection for I-95 ITS Phase 3 of the I-95 system, from SR 44 to US 1 in Volusia County. |
8,900,000 |
Florida |
Preliminary engineering construction and construction engineering and inspection for I-95 ITS Phase 4 of the I-95 system in St. John's County. |
23,800,000 |
Florida |
Preliminary design for US 301, Widening in Sumter and Marion Counties from Wildwood to just south of Belleview at US 27/441. |
3,900,000 |
Florida |
Project development and environmental studies for Lake Griffin Bridge from US 441 to CR 44. |
2,000,000 |
Georgia |
Widening of Georgia's HPC 6 corridor in the immediate vicinity of the Garden City Terminal at the Port of Savannah along SR 307 from Miller Road to SR 21 in Chatham County. |
480,000 |
Georgia |
Improve access of HPC 6 Corridor is in the immediate vicinity of the Ocean Terminal at the Port of Savannah at the I-16 and I-516 interchange. |
400,000 |
Georgia |
Safety related to interchange improvements to Georgia's HPC 6 Corridor, located east of Macon at the interchanges of I-16/SR 112 in Bleckley County and I-16/SR 26 in Laurens County. |
3,200,000 |
Georgia |
Safety related interchange and bridge improvements to HPC 6 corridor, at the interchanges of I-16 with SR 15, SR 56, SR 297 and SR 4 in Emmanuel County. |
5,760,000 |
Georgia |
Safety related interchange and bridge improvements to HPC 6 corridor located east of Macon at the interchanges of I-16/SR 199 in Laurens County and I-16/SR 29 in Treutlen County. |
6,880,000 |
Georgia |
Safety related interchange and bridge improvements to HPC 6 corridor located east of Macon at the interchanges of I-16 with SR 338, SR 257 and SR 19 in Laurens County. |
10,000,000 |
Georgia |
ROW and construction of HPC 6 corridor, located east of Columbus along SR 96 from the Flint River on the Taylor/Crawford County line to Ft. Valley (SR 49) in Peach County. |
15,298,400 |
Idaho |
Relocation and widening of US-95, Junction Idaho SH-1 Northeast, Milepost (MP) 522-527, Stage 1 Construction Project. |
11,675,000 |
Illinois |
Construction of Alton Bypass from IL 143 to IL 140, a distance of 6.5 miles. |
15,000,000 |
Illinois |
Interchange reconstruction and bridge rehabilitation at I-55 (Stevenson Expressway) and Central Avenue. |
24,000,000 |
Indiana |
Design and ROW acquisition activities for a new East End Bridge across the Ohio River at Louisville, KY. |
33,000,000 |
Indiana |
Comprehensive corridor planning activities along the future route of I-69 in Southwestern Indiana, between Evansville and Indianapolis, Indiana. |
4,400,000 |
Indiana |
Upgrade existing alignment to new 4-lane facility on US 24 from 0.7 kilometers east of I-469 to Indiana/Ohio state line. |
2,400,000 |
Indiana |
Protective land acquisition, preliminary design, and utility relocation from Lafayette to Logansport, Indiana along SR 25. |
15,000,000 |
Iowa |
To augment previously allocated funding to carry out the North American International Trade Corridor - ITS/CVO Intelligent Infrastructure Study. |
500,000 |
Iowa |
Purchase and install three dynamic message signs on I-29 and I-80 in Council Bluffs. |
600,000 |
Iowa |
Conduct preliminary engineering location studies and EIS document development work on the I-29 and I-80 system reconstruction project in the Council Bluffs metro area. |
2,500,000 |
Iowa |
Fund the construction of the Iowa 394 - Avenue of the Saints bridge over the Des Moines River between Iowa and Missouri. |
6,100,000 |
Iowa |
Conduct preliminary engineering, location studies and EIS on the I-29 reconstruction project on the downtown Sioux City segment. |
2,000,000 |
Kansas |
Preliminary engineering for construction of 4-lane improvement and 3 bypasses on US-54 in Southwest Kansas (East-West Transamerica Corridor) |
20,000,000 |
Kansas |
Purchase of ROW for reconstruction of I-35 (High Priority Corridor #23) that parallels Turkey Creek in the Kansas City area and movement of the creek channel in cooperation with a U.S. Corp of Engineers' project to reduce flooding. |
4,000,000 |
Louisiana |
Preliminary and final construction plan preparation, right-of-way acquisition, utility relocation, and construction of I-49 in northwestern Louisiana (Caddo Parish). |
90,000,000 |
Louisiana |
Line and grade studies and environmental studies and documentation for I-69 in north central and northwestern Louisiana (Caddo, Bossier, Webster, and Clairborne Parishes). |
2,000,000 |
Louisiana |
Line and grade studies, environmental studies and documentation, preliminary and final construction plan preparation, right-of-way acquisition, utility relocation, and construction for US-90. |
125,000,000 |
Michigan |
Construction on roads and bridges approaching the Ambassador Bridge. |
10,000,000 |
Michigan |
Blue Water Bridge Plaza Study to accommodate customs, immigration, and toll collection. |
1,000,000 |
Michigan |
Development of a framework for binational; transportation infrastructure decision making for joining projects such as coordinated road improvements at borders. |
50,000 |
Michigan |
PE for a study of widening of the I-94 bridge over the Black River, adjacent to the Blue Water Bridge to Canada. |
2,000,000 |
Michigan |
PE for developing a track connection in the northeast quadrate of the West Detroit Junction, track crossing between the Canadian National (CN) Railroad and the Conrail Shared Assets railroad north of the Detroit-Windsor rail tunnel. |
500,000 |
Michigan |
Design and right of way acquisition for widening a 6.7 mile section of I-94 in the City of Detroit. |
10,000,000 |
Michigan |
I-94 (Corridor 18) corridor study in Detroit, Ann Arbor, Jackson, Battle Creek, and Kalamazoo. |
350,000 |
Michigan |
Design for widening of approximately 6 miles of I-94 in the Kalamazoo/Portage urban area from 4 lanes to 6 lanes including the reconstruction of the I-94/US-131 interchange. |
12,000,000 |
Michigan |
Interchange improvement to add construction of a new EB I-94 on ramp from Zeeb Road, widen the existing bridge in Washtenaw County. |
4,000,000 |
Michigan |
Construct a new EB I-94 ramp from Baker Road, widen the existing bridge, accommodate non-motorized transportation options, and improve geometrics and signalization at the existing interchange in Washtenaw County. |
4,000,000 |
Michigan |
I-69/I-75 Intermodal Project to improve the safety and efficiency including interchange improvements; rail crossing grade separations; border crossing improvements; intermodal freight distribution improvements; and intelligent transportation systems. |
4,000,000 |
Minnesota |
US 53 from Virginia, MN to Cook, MN: Expansion from two-lane to four-lane expressway. |
11,000,000 |
Minnesota |
I-35W from 66th Street to 46th Street: Reconstruction of interchange with TH 62. |
96,800,000 |
Minnesota |
I-35 from Iowa Border to 0.1 miles North of I-90. Unbonded Concrete Overlay. |
7,800,000 |
Mississippi |
Construction of 4 lanes on new location to Interstate standards extending from Odom Road to I-55 in DeSoto and Tunica Counties, as part of Corridor 18 (I-69). |
17,900,000 |
Mississippi |
Endorse AR submitted I-69 multistate project. |
N/A |
Mississippi |
Endorse AR submitted Great River Bridge Project (US 65, I-69) |
N/A |
Mississippi |
ROW acquisition and construction of 4 lanes on new location or add two lanes to existing facility on portions of Corridor V of the Appalachian Development Highway System (ADHS) from State Route (SR) 9 to an existing interchange (Green Street Interchange) on US 45 at Tupelo. |
47,600,000 |
Missouri |
U.S. Route 61 (Avenue of the Saints) Iowa Sate line south. Lewis and Clark Counties. Preliminary Engineering, ROW and Construction of 4-lane expressway. |
23,159,000 |
Missouri |
MARC - ITS Study to develop detailed user requirements, project architecture and deployment plans for multimodal ITS applications for inland port development at various locations in the Kansas City region. |
750,000 |
Missouri |
U.S. Route 71 Arkansas State line north. Preliminary Engineering, ROW, and Construction of 4-lane expressway. |
57,861,000 |
Missouri |
U.S. Route 60 Transamerica Corridor. Preliminary Engineering, ROW, and Construction consisting of grading and paving to add lanes for dual. |
37,502,000 |
Montana |
Completion of an environmental document and preliminary engineering through final design for the Billings North Bypass. |
7,000,000 |
Nebraska |
Construction of a 4-lane expressway from Scottsbluff to Minatare on US-26. |
6,085,000 |
Nebraska |
Deploy changeable message signs on I-80 statewide. |
2,000,000 |
New Jersey |
Reconstruction of 1.5-mile section of Doremus Avenue and related work (e.g., utility relocation, ROW) as part of the international Intermodal corridor known as the Portway. Serving Newark and Jersey City, Hudson and Essex Counties, CSX, NS, the Port of Elizabeth, Newark International Airport and the Port Authority of New York and New Jersey). |
25,050,000 |
New Mexico |
Construction of NM 273 (McNutt Road) from Sunland Park to Artcraft Road to provide four-lane access between I-10 and the Santa Teresa Port of Entry. |
7,200,000 |
New Mexico |
Construction of the Sunland Park Drive Extension of FL6301, which begins at the Texas state line and continues to NM 273. |
8,800,000 |
New York |
Champlain/I-87 Border Crossing Facility Modernization and Improvements - Construction of the queuing area and primary inspection area expansion, truck staging area, and signage. |
4,800,000 |
New York |
I-87 International Corridor Study - a comprehensive corridor study of the I-87 corridor from Montreal to NYC. |
2,400,000 |
New York |
Intergrated ITS/CVO Intermodal Information System - Development of a statewide pilot system to assemble and disseminate commercial vehicle and traveler information. |
800,000 |
New York |
Continental One - Pennsylvania and New York - an Economic Impact Study to provide a comprehensive analysis of the economic impact provided by the development of this major corridor (US 219). |
1,000,000 |
New York |
Peace Bridge NEXUS - Implementation of a joint US/Canadian passenger vehicle clearance system. |
240,000 |
New York |
Peace Bridge WIM - Implementation of a weigh-in-motion technology for US and Canada bound commercial vehicles. |
240,000 |
New York |
CP Vertical Clearance - Improvements of the CP Main Line from Whitehall to Rouses Point - To accommodate rail growth and double-stacked containers. |
2,760,000 |
New York |
Peace Bridge Shared Border Initiative - Facilitation of US and Canadian Border Planning Initiatives. |
800,000 |
New York |
I-86 Chemung County Airport Access Elimination/Replacement - Elimination and replacement of the at-grade intersections at Kalher and Lowe Roads as required for interstate designation. |
1,200,000 |
New York |
Rochester and Monroe County/Port of Rochester. Construction of the Customs and Immigrations Inspection Facilities, electronic data interchange equipment and misc. inspection features for Lake Ontario Fast Ferry Service. |
5,600,000 |
New York |
A framework for improved communications between U.S. and Canada agencies at the Niagara Frontier ($0.225M). High speed RR infrastructure assessment ($0.300M) |
420,000 |
New York |
US Route 15 (Future I-99) Pennsylvania State Line to Presho - Final design and real estate acquisition for this planned corridor. |
7,590,000 |
New York |
New York and Ogdensburg Railway Improvements - Rehabilitating the track, culverts and structures on the 25.4 miles of the New York and Ogdensburg railway. |
2,000,000 |
New York |
I-87 Corridor Exit 21A New York State Thruway to the Canadian Border - a study to identify the physical requirements, including the engineering feasibility and costs. |
200,000 |
New York |
Peace Bridge OGA Process Improvements Initiative - study of the approval processes of the Other US Governmental Agencies (OGA) which impact the movement of people and trade across the border. |
72,000 |
New York |
Expanded Railway Opportunities within the Whirlpool Rapids Bridge Corridor - evaluate the expanded railway opportunities and facilities within the Whirlpool Rapids Bridge Corridor and land side intermodal road/rail facilities. |
120,000 |
New York |
Stewart Airport Connector Study - a study to assess improvement access to the airport to alleviate congestion at the major NYC metropolitan airports and assess potential for greater international air cargo service. |
350,000 |
New York |
Niagara Falls International Train Station - Provides for a new international passenger rail station. |
8,000,000 |
New York |
NY Harbor Rail Freight Tunnel - conduct EIS and Preliminary Design to examine alternatives to enhance cross-harbor freight movements. |
2,500,000 |
New York |
NYS Thruway's Tandem Lot Relocation in Albany County - Provides for the preliminary design for one or two new tandem truck lots I the vicinity of the I-90 (Thruway) Exits 23 and 24. |
2,400,000 |
New York |
Gateway JFK:Van Wyck Expressway Corridor - Corridor study of improvement to the Van Wyck Expressway interchanges and access to AirTrain station to facilitate traffic flows to JFK airport. |
4,180,000 |
New York |
Infrastructure Improvement Study - Study of Niagara County's infrastructure improvements to support international trade and encourage economic redevelopment of the Niagara/Niagara Falls area. |
240,000 |
New York |
City of Buffalo's Corridor Management Plan - a coordinated comprehensive approach and design treatment for the various transportation corridors in Buffalo area. |
8,000,000 |
North Carolina |
Construction of a new high rise bridge over the Cape Fear River in the vicinity of the North Carolina State Port in Brunswick and New Hanover Counties. |
800,000 |
North Dakota |
I-29 Reconstruction Project in Fargo. |
10,000,000 |
Ohio |
A comprehensive feasibility study regarding the Cleveland Trans-Erie Ferry Service between Cleveland, Ohio and Ontario, Canada. |
800,000 |
Oklahoma |
National High Priority Corridor 23: I-35 (Construction related work). |
212,000,000 |
Oklahoma |
National High Priority Corridor 8: US 412 (Construction related work). |
40,400,000 |
Oregon |
Right-of-Way Acquisition for the construction of the North and South Medford, Oregon interchanges on Interstate 5 (I-5) |
8,000,000 |
Pennsylvania |
Construction for MonFayette and/or Southern Beltway |
Unspecified |
Pennsylvania |
Planning for RAPID agile port system. Port of Philadelphia & Letterkenny freight facilities. |
200,000 |
Pennsylvania |
Construction of US Customs and Immigration Facility. Erie-Western PA Port Authority. |
3,000,000 |
Pennsylvania |
Corridor Coalition/Coordination to/from Pittsburgh to east coast ports. |
Unspecified |
Pennsylvania |
Corridor Coalition/Coordination along inland waterways. |
Unspecified. |
Pennsylvania |
Study of Intermodal transfer area in South Philadelphia. |
Unspecified. |
Pennsylvania |
Study of alternative transportation routes between the Port of Wilmington, DE and the vicinity of Harrisburg, PA. |
200,000 |
South Carolina |
Feasibility study of the I-526 port terminal freight corridor in Berkeley and Charleston counties in South Carolina that will integrate freight movements from existing and proposed facilities into the regional transportation planning process. |
450,000 |
South Dakota |
Reconstruction of I-29 to a 6-lane section plus auxiliary lanes from on-ramp to off ramp. Russell/Maple Street interchange reconstruction and construction of a new interchange at Benson Road. |
27,469,000 |
South Dakota |
Construction of an enclosed and heated facility for year-round safety inspection of commercial vehicles at a new port of entry to be built on northbound I-29 near Jefferson, SD (north of Sioux City, Iowa). The port of entry will also include Electronic Screening and Safety Information Exchange components of the Commercial Vehicle Information Systems and Networks (CVISN) program, funded from other sources. |
950,000 |
Tennessee |
Right-of-Way and Utilities in Obion County on I-69 |
12,000,000 |
Texas |
PE, environmental, ROW and construction of rail bypass and new bridge in Brownsville City to Mexico. |
1,600,00 |
Texas |
SH 48/FM 511 (Old SH 48 to Drainage ditch D). Replace bridges and rehabilitate approaches in Pharr County. |
500,000 |
Texas |
Reconstruct to standards Mile 2 West (Mile 12 North to US 83) in Hildalgo County. |
1,200,000 |
Texas |
Widen Mile 6 West (SH 107 to US 83) to 4 lanes in Hildalgo County. |
6,200,000 |
Texas |
Pedestrian, ADA accessibility and intersection improvements for Spur 115 at Bridge Street in McAllen-Hildalgo Bridge. |
1,541,000 |
Texas |
Reconstruct and widen to 4 lanes FM 1016 extension (Bryan Road to US 83) in Pharr Country. |
13,000,000 |
Texas |
Pharr/Reyonsa Bridge: Construct truck lane along bridge 4 lanes for north bound traffic, additional inspection booths widening egress area and ITS equipment. |
1,920,000 |
Texas |
Route study, environmental study and PE at Anzalduas Bridge road (US 83 to Rio Grande) in Mission City. |
240,000 |
Texas |
Widen Trenton Road (SH 336 to FM 2061) to 4 lanes |
500,000 |
Texas |
Widen Trenton Road (FM 676 to Ware Road). |
1,750,000 |
Texas |
Construct 4-lane facility at Bicentennial Blvd (Trenton Road to Nolana Avenue). |
2,500,000 |
Texas |
Reconstruction of US 281 to Freeway with frontage roads in Pharr County. |
5,000,000 |
Texas |
Construct interchanges at US 281 (interchanges @ SH 186, FM 490 & FM 162) in Pharr County. |
3,000,000 |
Texas |
Reconstruct and widen FM 1016 (US 83 - Madero) to 4 lanes in Pharr County. |
1,500,000 |
Texas |
Reconstruct and widen FM 494 to 4 lanes in Pharr County. |
1,250,000 |
Texas |
Reconstruct and widen North "I" Road (FM 3461 to FM 495) to 4 lane urban section in Hidalgo County. |
2,254,432 |
Texas |
Reconstruct and widen South "I" Road (Moore Road to US 281) to 4 lane urban section in Hidalgo County. |
3,803,000 |
Texas |
Reconstruct and widen McColl Road (Dicker Road to US 281) to 4 lane urban section in Hidalgo County. |
1,819,052 |
Texas |
Reconstruct and widen Sugar Road (Sioux Road to Owassa Road) to 4 lane urban section. |
2,049,264 |
Texas |
Construct 4-lane road at Airport Drive (US 83 to Bus 83) in Weslaco City. |
Not Specified |
Texas |
Construct US 77 interchanges at Bus 77N, FM 3168, FM 490, Sp 112, FM 498, FM 1018, Sp 413 in Pharr County. |
5,000,000 |
Texas |
Construction of border inspection stations (Eagle Pass II, Laredo-Columbia, El Paso BOTA, Zaragosa, Pharr-Reyonsa, Los Indios, Laredo-World Trade). |
25,000,000 |
Texas |
Feasibility study (La Entrada al Pacifico) |
200,000 |
Texas |
Construction of CP&L Road extension and Calton Road separation. |
11,000,000 |
Texas |
PE, Environmental study, ROW and construction at El Portal Heritage Riverfront Road. |
2,300,000 |
Texas |
Deployment of ITS technologies. I-35 NAFTA corridor (Dallas-Fort Worth region). |
3,822,000 |
Texas |
Construct new INS checkpoint at I-35 north of Laredo. |
5,000,000 |
Texas |
Identify, assess and eliminate bottlenecks at I-35 NAFTA corridor (Dallas area assumed). |
10,640,000 |
Texas |
Implement dedicated commuter lane with incidental equipment at Zaragoza POE. |
1,600,000 |
Texas |
PE and schematics for northbound pedestrian improvements. |
400,000 |
Texas |
Corridor study (Ascension Road - Montana Avenue to Fabens Cutoff). |
Not Specified |
Texas |
Expand Sunland Park Drive (Doniphan Dirave to NM SL) to 4 lanes. |
1,600,000 |
Texas |
Riverbend Road: Construct 4 lanes, drainage improvements and ADA ramps and bridge over Montoya lateral. |
2,750,000 |
Texas |
Extend and expand Lee Blvd, phase 2 (Pratt Avenue to Montana Avenue) to 4 lanes. |
3,000,000 |
Texas |
Reconstruct Santa Fe Streeet (Border Hwy. To Paisano) to state standards. |
1,760,000 |
Texas |
Reconstruction of Texas Avenue (SH 20 - Campbell St to Cotton St) and new connection to I-10. |
4,200,000 |
Texas |
Railroad Drive (McCombs to NM SL): Feasibility study to reconstruct and modify alignment to state standards. |
5,120,000 |
Texas |
Rehabilitate SH 20, Alameda (Piedras Street to Boone Street). |
4,878,614 |
Texas |
Adding two lanes at US 54 (Van Buren Avenue to Hondo Pass). |
13,662,000 |
Texas |
Rehabilitation of I-10 Culberson County. |
10,000,000 |
Texas |
Rehabilitation with improved drainage at US 85, paisano (Sante Fe Street to Campbell Street). |
3,158,000 |
Texas |
Ramp relocation at I-410 San Antonio. |
4,000,000 |
Texas |
STARR COUNTY: Camargo Bridge: Construction of inspections facility, road to US 83 to FM 755. Roma Bridge: ROW purchase, Security enhancement, bus lane and scales. |
2,680,000 |
Utah |
Corridor Study and Environmental Impact Statement for I-15 from Kaysville City to 31st Street in Ogden City. |
1,500,000 |
Utah |
Corridor Study for I-15 from the northern Utah County Line to 100600 South in Salt Lake County. |
500,000 |
Utah |
Study the feasibility of locating a transportation facility from the I-15 around the West side of Utah Lake in Utah County and into southern Salt Lake County. |
1,500,000 |
Washington |
Construct the second phase of SR 519, providing improved access to the Port of Seattle and the South Seattle industrial area. |
8,800,000 |
Washington |
Purchase ROW, for the completion of SR 167 from SR 161 west of Sumner to SR 509 at the Port of Tacoma. |
4,700,000 |
Washington |
Improve East Marginal Way in Seattle to separate truck traffic from the Union Pacific Harbor Island lead rail tracks, allowing the development of increased "on-dock" rail capacity at two Port of Seattle terminals. |
5,300,000 |
Washington |
Improve the South Spokane Street Viaduct in Seattle, to include widening, shoulders, and median barrier. |
2,700,000 |
Washington |
Extend Canyon Road in Pierce County northerly over the BNSF mainline, increasing capacity for roadway freight movement and providing a more direct route in the Port of Tacoma. |
2,500,000 |
Washington |
Complete design, widening, and re-alignment of commercial vehicle lanes and also improve intersections along SR 543. |
12,939,000 |
Washington |
Provide preliminary engineering for I-5 and arterial feeder improvements between Bellingham and the Canadian Border. |
2,803,000 |
Washington |
Widen SR 539 in Lynden, to include ROW acquisition, utility relocation, realignment, and reconstruction to five lanes with a two-way center turn lane. |
5,176,000 |
Washington |
Reconstruction of the existing British Columbia Highway 15 profile to include one southbound dedicated commuter lane and the required overhead lane use signing. |
160,000 |
Washington |
Construct a southbound truck staging area to improve British Columbia Highway 11 cross-border operations and reduce delays for southbound traffic into the U.S. |
780,000 |
Washington |
Construction of a new SR 9 alignment from its current intersection with SR 546 (Badger Road) to the southern boundary of Sumas, WA (Cherry Street). |
5,115,000 |
Washington |
Analyze the feasibility of a 235-mile Cascade Foothills Corridor from Mission, B.C. across the Canada-U.S. border, along the Cascade foothills to Tenino, WA, where it would intersect I-5 and the Northwest Rail Corridor. |
862,600 |
Washington |
Perform an access study for modifying theI-5 interchange at milepost 274 in Blaine. |
172,520 |
Washington |
Construct a northbound truck climbing lane on British Columbia Highway 13 to reduce delay to northbound traffic by providing a separate lane for slow moving vehicles. |
500,000 |
Washington |
Develop a system to provide pre-approved clearance or advanced driver information to federal border inspection agencies and/or commercial carriers involved with border shipments. |
258,780 |
Washington |
Add an additional curb lane for use by trucks traveling southbound on B.C. Highway 15. |
600,000 |
Washington |
Extend the existing southbound PACE lane and park access road lane on British Columbia Highway 99. |
235,000 |
Washington |
Provide planning for a non-motorized trail system to link the planned Coast Millennium Trail from the U.S. border at Blaine, WA, through Lower Mainland B.C., to Point Roberts, WA. |
125,000 |
Washington |
Modify the Interstate 5 interchange at Exit 276 to allow for remodeling and expansion of the U.S. port-of-entry facility at Peach Arch. |
4,313,000 |
Washington |
Develop an institutional framework for a west-coast corridor coalition. The coalition will coordinate plans for sustained mobility along the west-coast transportation corridor as well as promote a programmed response to corridor planning and development needs in the reauthorization of TEA-21. |
180,000 |
Washington |
Widen US 395 from Halfmoon Road to Hamilton Road in the vicinity of north Spokane/Deer Park, WA. |
15,200,000 |
Washington |
North Spokane Corridor effort that includes a number of projects that will link I-90 east of Spokane's Central Business District with US-2 and US-395 north of Spokane city limits. |
65,400,000 |
West Virginia |
King Coal Highway (I-73/74). Construct 4-lane highway between Airport Road and John Nash Blvd., in Mercer County. |
42,400,000 |
West Virginia |
Coalfields Expressway. Construct 4-lane highway and Coalfields Expressway/King Coal Hwy interchange in McDowell County (1.5 miles). |
26,000,000 |
West Virginia |
TOLSIA Highway (I-73/74). Construct 4-lane highway in Wayne County: 14 projects totaling 18.5 miles with total construction cost ranging from $6.7 to $29.5 million ($321 million total) |
256,800,000 |
West Virginia |
Mon/Fayette Expressway. Construct Morgans Run Bridge and 4-lane highway in Monongalia County |
13,840,000 |
West Virginia |
Mon/Fayette Expressway. Construct 4-lane highway between CR 69/17 and CR 88/3 in Monongalia County |
30,000,000 |
West Virginia |
Mon/Fayette Expressway. Construct remainder of 4-lane highway: 4 projects totaling 1.9 miles) |
39,840,000 |
West Virginia |
WV10. Construct 4-lane highway between Rita and Taplin: 2 projects totaling 1.1 miles |
28,480,000 |
West Virginia |
WV-10. Construct 4-lane highway between Taplin and Man: 3 projects totaling 1.1 miles |
40,800,000 |
Wisconsin |
I-794 Hoan Bridge, Milwaukee - Design and construction to replace damaged portions of the northbound span and retrofit superstructure elements. |
14,000,000 |
Wisconsin |
STH 29 between Chippewa Falls and I-94 - ROW acquisition and construction of roadway and structures. |
26,400,000 |
Wisconsin |
US 10 between Freemont and US 41 - RPOW acquisition and construction of roadway structures. |
31,500,000 |
Wisconsin |
US 10 between Stevens Point and Waupaca - ROW acquisition and construction of roadway and structures. |
10,500,000 |
Wisconsin |
ROW acquisition and construction of safety and weight facility and reconstruction of County Highway ML bridge over I-94, $9.4 million US 151 between Dickeyville and Dodgeville. |
9,400,000 |
Wisconsin |
US 151 between Dickeyville and Dodgeville - ROW acquisition and construction of roadway and structures. |
34,800,000 |
To provide Feedback, Suggestions or Comments for this page contact Stefan Natzke at stefan.natzke@dot.gov or 202-366-5010.
|