U.S. Foreign-Trade Zones Board


  FTZ Home
  FTZ Act
  FTZ Regulations
  Annual Report to Congress
  Site Map
  Contact Us
  Glossary
  Links

FTZ logo
Notices and Board Orders
  (1980-1997)   (1998 to Present)  
 
  FTZ Home   Commerce
  Treasury   CBP
 
A p p l i c a t i o n s  -   I n f o r m a t i o n   a n d   F o r m a t s

To prepare any FTZ-related application, use the formats provided on this web site. These formats have been crafted to minimize burden on applicants and enable faster processing of applications by the FTZ Board.

Submit any draft FTZ application to our dedicated e-mail address: ftz@ita.doc.gov.

Required Number of Copies: As of February 2009, we require an original, three paper copies (reduced from eight copies) and an electronic copy (Adobe PDF format preferred). If you cannot submit a PDF-format copy, you may submit a MS Word-format copy. Note that, in either case, the electronic copy must include color maps and scans of the signed versions of all letters. If you have any questions, please contact Elizabeth Whiteman at elizabeth_whiteman@ita.doc.gov or (202) 482-0473.

Authority Available:
  New General-Purpose Zones
  New Subzones (Manufacturing & Distribution)
  Manufacturing within a General-Purpose Zone
  Expansion of Manufacturing Authority
  Temporary/Interim Manufacturing Authority (Includes T/IM Database)
  Reorganizations/Expansions of Existing FTZs (includes ASF)
  Minor Boundary Modifications
  Reissuance of a Grant of Authority (Grant Transfer)

Procedures and Information:
What goes into an application and why?

Adjacency Requirements
Application Process Summary
General Instructions
Common Deficiencies

Reference List: State Enabling Legislation

As part of the Department of Commerce's initiative to assist U.S. manufacturers, the FTZ staff has committed to expedited processing for manufacturing applications (within 6 to 8 months from docketing, which is significantly faster than the 12 month regulatory standard). This expedited processing time depends on applicants' use of the application formats provided here and no case issues arising. For non-manufacturing applications, we will make every effort to act upon public-interest based requests for expedited processing relative to the 10 month regulatory standard. It is important to note that the time frames cited here are from the date when the FTZ Board officially dockets the application in question. Thus, where applicable, time spent requesting from the applicant (or awaiting) additional information/documentation needed for the application to meet the docketing standard inherently does not fall within the time frames discussed here. (Also note that minor boundary modifications and temporary/interim manufacturing requests have their own shorter processing times.)

What to do while an application is being reviewed

Lapse Provision

Here you can find the guidelines used by zones
to submit their annual reports to the FTZ Board.

National Export Directory | Export.gov | ITA Privacy Policy