Number Block |
Group/Project/Contact/Date |
1-1,999 |
Main Accelerator |
2,000 - 2,999 |
Booster |
3,000 - 4,999 |
Linac |
5,000 - 5,999 |
Radio Frequency |
6,000 - 6,999 |
Beam Transfer |
7,000 - 7,999 |
Experimental Facilities |
8,000 - 11,999 |
Research Equipment |
12,000 - 12,999 |
Beam Transfer |
13,000 - 13,999 |
Physics Research |
14,000 - 16,999 |
Main Accelerator |
17,000 - 18,999 |
Radiation Physics |
19,000 - 20,999 |
Booster |
21,000 - 22,999 |
Radio Frequency |
23,000 - 24,999 |
Beam Transfer |
25,000 - 26,999 |
15 ft. Bubble Chamber |
27,000 - 28,999 |
Technical Services |
29,000 - 29,999
30,000 - 31,999 |
Neutrino Laboratory |
32,000 - 32,999 |
Experimental Facilities |
33,000 - 33,999 |
15 ft. Bubble Chamber |
34,000 - 35,999 |
Accelerator Operations Controls |
36,000 - 37,999 |
Booster |
38,000 - 39,999 |
Meson Laboratory |
40,000 - 41,999 |
30 in. Bubble Chamber |
42,000 - 44,999 |
Proton Laboratory |
45,000 - 47,999 |
Research Services and Physics Department
(H. Barber) |
48,000 - 49,999 |
Internal Target Lab |
50,000 - 51,999 |
Physics Department (Jon Blomquist) |
52,000 - 52,999 |
Meson Laboratory |
53,000 - 54,999 |
Energy Doubler |
55,000 - 59,999 |
Research Services (Ed Scofield) |
60,000 - 61,999 |
Linac (Peggy Crayton) |
62,000 - 63,999 |
Radio Frequency |
64,000 - 67,999 |
Plant Engineering (H. McGreer) |
68,000 - 68,999 |
Cryogenic Energy Storage System (L. Sobocki) |
69,000 - 69,999 |
Accelerator Switchyard (J. Friedl) |
70,000 - 70,999 |
Accelerator Switchyard (Schmitz) |
71,000 - 71,999 |
Tech Services -- Magnet Facility (H. Dixon) |
72,000 - 72,999 |
Muon MarkII Dipole Magnets (Art Skraboly) |
73,000 - 79,999 |
Proton (Dee Rae) |
80,000 - 82,000 |
Neutrino Laboratory |
80,000 - 81,999 |
Main Accelerator (L. Sobocki) |
83,000 - 83,999 |
Medical Facility |
84,000 - 85,999 |
Accelerator Division/Mechanical —
Main Ring (Dick Hauser) |
86,000 - 93,999 |
94,000 - 95,999 |
Meson (D. Nelson) |
96,000 - 97,999 |
98,000 - 99,999 |
Tech Services |
100,000 - 101,999 |
102,000 - 102,999 |
Neutrino--Remote Handling Manipulator
(J. Friede) |
103,000 - 103,999 |
Energy Doubler |
104,000 - 105,999 |
Beam Systems (Jim Krebs) |
106,000 - 107,999 |
Energy Doubler (A. Oleck) |
108,000 - 109,999 |
Neutrino (H. Clover) |
110,000 - 110,999 |
Colliding Beam Area (CBA) |
111,000 - 112,999 |
Switchyard Cryo. Equip. & Supercon. Devices (R. Andrews) |
113,000 - 114,999 |
Physics |
115,000 - 116,999 |
Magnet Facility (H. Dixon) |
117,000 - 118,999 |
Tech Services (John Kowalski) |
119,000 - 119,999 |
Accelerator Reverse Injection for Main Ring |
120,000 - 121,999 |
Meson (D. Nelson) |
122,000 - 128,999 |
Energy Doubler/Saver (H. Barber) |
129,000 - 133,999 |
Satellite Refrigerator Support — Accel. Div. - (R. Andrews) |
134,000 - 135,999 |
Colliding Beam Detector--Research Serv.
(M. Atac) |
136,000 - 137,999 |
Energy Doubler Extraction Channel [AØ]
(M. May) |
138,000 - 138,999 |
Energy Doubler Colliding Beam [BØ]
(M. May) |
139,000 - 140,999 |
Energy Doubler Beam Abort [CØ] (M. May) |
141,000 - 141,999 |
Energy Doubler Extraction [DØ] (M. May) |
142,000 - 142,999 |
Energy Doubler Injection [EØ] (M. May) |
143,000 - 143,999 |
Energy Doubler RF [FØ] (M. May) |
144,000 - 144,999 |
Energy Doubler Magnet Measurement
(R. Bossart) |
145,000 - 145,999 |
Tevatron Cryogenics Systems Group
(Nick Augerenos) |
146,000 - 147,999 |
Precooling Ring and pbar Transport (Michelassi) |
148,000 - 148,999 |
Energy Saver Dipole Cordword Production
(A. Oleck) |
155,000 - 155,999 |
Technical Services Central Shops (G. Biallas) |
156,000 -156,999 |
Research Services Cryogenics (L. Mapalo) |
157,000 - 157,999 |
Accelerator Drafting--Energy Saver (D. Bryan) |
158,000 - 159,999 |
Energy Doubler/Saver (Gus Rehbein) |
160,000 - 160,999 |
Energy Saver Magnet Support (Ed Barczak) |
161,000 - 161,999 |
Physics Department (Don Tousignant) |
162,000 - 166,999 |
Neutrino Department (H. Clover) |
167,000 - 168,999 |
Tevatron Cryogenics System Group (H. Barber) |
169,000 - 170,999 |
Pbar source [TeV I] (L. Sobocki) |
171,000 - 171,999 |
Switchyard Cryogenic Components
(Rob Reilly) |
172,000 - 173,999 |
Experimental Area Cryogenics (Norm Cuny) |
174,000 - 175,999 |
Meson Laboratory (D. Nelson) |
176,000 - 176,999 |
Tevatron Magnets (Ed Barczak) |
177,000 - 179,999 |
Const. and Planning Coordination Group [EAD] (D. Johnson) |
180,000 - 182,999 |
RF (Gus Rehbein) |
180,000 - 183,999 |
Central Helium Liquefier (Rick Bossert) |
183,000 - 184,999 |
Research Services Cryogenics (Lee Mapalo) |
185,000 - 186,999 |
Tevatron I Magnets (Ed Barczak) |
187,000 - 189,999 |
Tevatron I--Collider Detector (Don Breyne) |
190,000 - 191,999 |
Tevatron II--Switchyard to Experimental Areas |
192,000 - 192,999 |
Cold Iron Magnets 20 TeV (Ed Barczak) |
193,000 - 194,999 |
Research Services--Cryogenics (Jim Krebs) |
195,000 - 195,999 |
Switchyard Quench Protection System
(Ray Fuja) |
196,000 - 197,999 |
Technical Support (Don Olson) |
198,000 - 198,999 |
Tevatron I [Tooling] (Clare Miller) |
199,000 - 199,999 |
CDF (Mike Neumann) |
200,000 - 200,999 |
3T SSC Magnets (H. Hinterberger) |
201,000 - 203,999 |
Experimental Areas Dept. (Vivian Jacobson) |
204,000 - 204,999 |
CDF (Bob Kephart) |
205,000 - 205,999 |
Advanced Computer Program (Art Cook) |
206,000 - 206,999 |
CDF PIG Group (Tom Wesson) |
207,000 - 207,999 |
Colliding Beam Detectors (Dick Wegforth) |
208,000 - 208,999 |
Antiproton Source TeV I (Larry Sobocki) |
209,000 - 209,999 |
Physics (Carl Lindenmeyer) |
210,000 - 210,999 |
Tevatron I (Jerry Davis) |
211,000 - 211,999 |
Experimental Areas Cryogenics (K. Kaczor) |
212,000 - 212,999 |
SSC Cryostat (Jerry Davis) |
213,000 - 213,999 |
Magnet Measurements (Roger Bossert) |
214,000 - 214,999 |
Bubble Chamber--Cryogenics (Kelly Dixon) |
215,000 - 215,999 |
Research Services (Mark Averett) |
216,000 - 216,999 |
Tevatron I pbar Source (Chuck Nila) |
217,000 - 217,999 |
SSC Dipoles (Ed Barczak) |
218,000 - 219,999 |
Accelerator Operations Controls (Gus Rehbein) |
220,000 - 221,999 |
Tech. Supt. Engineering Magnet Facility
(L. Sobocki) |
222,000 - 224,999 |
Accel. Dept.--Experimental Support Group
(H. Stredde) |
225,000 - 225,999 |
Technical Support Conventional Magnet
(H. Dixon) |
226,000 - 226,999 |
Technical Support/Engineering (Jerry Davis) |
227,000 - 227,999
(SC#0102) |
Tech. Supt./Tooling
(Roger Bossert & John Carson) |
228,000 - 238,999 |
DØ Central Calor./Brookhaven Design
(Herm Stredde) |
239,000 - 239,999 |
TS/Engineering - SSC Cryostat (Gerry Davis) |
240,000 - 249,999 |
Mechanical Support (Denis Farnum) |
250,000 - 253,999 |
Central Helium Liq. (Mark Mondragon) |
254,000 - 254,999 |
Mech. Supt./Antiproton Source (B. Haring) |
255,000 - 255,999 |
DØ Project (John Morrison) |
256,000 - 256,999 |
Switchyard (D. Breyne) |
257,000 - 258,999 |
Accelerator Cryogenics (D. Richardson) |
259,000 - 259,999 |
Fac. Dept. "Detectors R Us" (B. Kross) |
260,000 - 260,999 |
Main Accelerator (Don Breyne) |
261,000 - 261,999 |
TeV I/ Collider Detector (Don Breyne) |
262,000 - 262,999 |
Tech. Serv./BØ/CDF (D. Wegforth) |
263,000 - 263,999 |
SSC Cryostat (A. Oleck) |
264,000 - 264,999 |
RD/Mechanical Dept. (Vivian Jacobson) |
265,000 - 265,999 |
Loma Linda Medical Accel. (M. Palmer) |
266,000 - 266,999 |
Antiproton Source E/E Support (G. Rehbein) |
267,000 - 268,999 |
KTeV Project (Chuck Nila) |
269,000 - 270,000 |
Data Systems Group (Mike Neumann) |
271,001 - 271,999 |
Ports Tooling (Ed Barczak) |
272,000 - 272,999 |
RD Mechanical (Ed Black) |
273,000 - 273,999 |
DØ (John Morrison ) |
274,000 - 274,999 |
Ind., #2 MF, TSS (Howard Dixon) |
275,000 - 275,999 |
Ind., #2 MF, TSS (Howard Dixon) |
276,000 - 276,999 |
PBar Source Tevatron I (Don Brian) |
277,000 - 277,500 |
E/E Support Group/AD (R. Divelbiss) |
277,501 - 278,500 |
Tech. Support 5B (Ed Barczak) |
278,501 - 279,499 |
DØ/Accelerator Division (Tom Schmitz) |
279,500 - 280,499 |
Accel. Div./Mech. Support (Steve Wesseln) |
280,500 - 281,999 |
Linear Accelerator (Gus Rehbein) |
282,000 - 282,999 |
Booster Accelerator (Gus Rehbein) |
283,000 - 283,999 |
Main Accelerator (Gus Rehbein) |
284,000 - 285,999 |
RD/Mechanical (Frank Carrera) |
286,000 - 287,999 |
DØ Accel Div./EE Support (Gus Rehbein) |
288,000 - 289,999 |
SSC (Gus Rehbein) |
290,000 - 291,000 |
Tech. Support (Bill Robotham) |
291,001 - 291,999 |
Accel. Div./Mech. (Dick Hauser) |
292,000 - 292,999 |
SSC - 50 mm. - Cold Mass - Parts (Howard Fulton) |
293,000 - 293,999 |
SSC - 50 mm. - Cold Mass - Tools (Howard Fulton) |
294,000 - 294,999 |
Tech. Support (Donald E. Arnold) 5/17/90 |
295,000 - 295,999 |
DØ (John Morrison) 7/90 |
296,000 - 296,999 |
Accel. Div./Mech. (Richard Hauser) 9/90 |
297,000 - 297,999 |
CDF (John Rauch) 10/11/90 |
298,000 - 298,999 |
SSC Quality Assurance Traveler/TS Super. Cond. Mag. Fac. |
299,000 - 299,999 |
400 MeV Transport/400 MeV Injection Guirder/(Stewart Mitchell Accel. Mech. Support) 11/90 |
300,000 - 300,999 |
Linac/Accel. Div./Mech. Supp.
(Richard Hauser) 11/21/90 |
301,000 - 301,999 |
SSC - 50 mm. - Cold Mass - Tools
(Howard Fulton) 1/11/91 |
302,000 - 302,999 |
RD/SDC Department (Larry Bartoszek) 1/28/91 |
303,000 - 303,999 |
Physics Department (Angelo Cotta-Ramusino) 3/5/91 |
304,000 - 304,999 |
Magnet Test Facility (Clark Reid) 4/4/91 |
305,000 - 305,999 |
Accelerator Division—Main Injector
(Dick Hauser) |
306,000 - 306,999 |
Moyses Kuchnir (Individual) 4/30/91 |
307,000 - 307,999 |
Tech. Support/MTF Div. 50 (Jim Garvey)
SSC 50mm Power Supply Upgrade
Main Injector Ring Power Supply Upgrade |
308,000 - 308,999 |
Mech. Research Division (Don Carpenter) 9/3/91 |
309,000 - 309,999 |
EE Support - Main Injector (Gus Rehbein) 9/12/91 |
310,000 - 310,999 |
EE Support - Main Injector (Gus Rehbein) 9/12/91 |
311,000 - 311,999 |
Data Acquisition Electronics (Dan Moline)
MS 222, x2738 9/23/91 |
312,000 - 312,999 |
DES Group (Dorothy Van Leesten) 9/23/91 |
313,000 - 313,999 |
SDC (Mike Banas) 1/20/92 |
314,000 - 314,999 |
TS/Design & Drafting (Don Arnold) 4/2/92 |
315,000 - 315,999 |
TS/Drafting (Harry Brown) 4/28/92 |
316,000 - 316,999 |
TS/Lab 2 (Harry Brown) 5/5/92 |
317,000 - 317,999 |
RD/DØ (Jack Mateski) 5/6/92 |
318,000 - 318,999 |
TS/Mag Facility (Howard Dixon) 5/15/92 |
319,000 - 319,999 |
AD/EE Support TESLA Machine
(Gus Rehbein) 7/15/92 |
320,000 - 320,999 |
AD/EE Support TESLA Machine
(Gus Rehbein) 7/15/92 |
321,000 - 321,999 |
CD/Central Computing Facility (Jack MacNerland) 8/14/92 |
322,000 - 322,999 |
Antiproton Source - Cross Gallery (Steve Wesseln) |
323,000 - 323,999 |
Tech Support Eng. - ICB (Gerry Davis) |
324,000 - 324,999 |
CDF/Collider Detector Facility (John Rauch) October 1992 (Prefix 2563) |
325,000 - 325,999 |
SDC/Technical Support (Nancy Bartlett) November 1992 |
326,000-326,999 |
Tevatron (Peggy Crayton) |
327,000-327,999 |
RD Design & Drafting Group Mech. Support (Vivian Villegas) |
328,000-328,999 |
RD Design & Drafting Group Mech. Support (Vivian Villegas) |
329,000-329,999 |
MTF Measurement Group
(Jim Garvey) 9/93 |
330,000-330,999 |
RD/DØ Dept. Electronics Group
(Rick Hance) 12/93 |
331,000-331,999 |
Technical Support
(Andy Oleck and Don Rissman 1/94 |
332,000-332,999 |
CDF/Collider Dtector Facility
(Simmie Meredith) 3/94 |
333,000-333,099 |
Accelerator Division-Main Injector-Eng. Specs. (Dick Hauser) 11/28/94 |
333,100-334,000 |
Technical Support MDF-Main Injector
(Terry Skweres) 12/12/94 |
335,000-335,999 |
Technical Support/Engineering (Jeff Brandt) |
336,000-336,999 |
Technical Support CMS Detector Superconducting Magnet R&D (Rodger Bossert) |
337,000-337,999 |
Accelerator Division/Mechanical Support Main Injector (Peggy Crayton) March 1995 |
338,000-338,999 |
Technical Support
Arnie Knauf
June 1995 |
339,000-339,999 |
CDF Mechanical Support
Hary Carter X2458
Sept. 1995 |
340,000-340,999 |
Accel. Div. Mechanical Support (Electron Cooling)
Peggy Crayton X3058, MS 340 |
341,000-341,999 |
Accelerator Div. Recycler Ring
Gerry Jackson
Sept. 1995 |
342,000-342,999 |
EE Accelerator Div. - Energy Doubler Saver
R. Divelbiss X4046, MS 306
Oct. 1995 |
343,000-343,999 |
Accelerator Div. - Mechanical Support A0
Glenn Waverly X3728, MS 340
November 1995 |
344,000-344,999 |
Technical Support - Design & Drafting
Don Arnold X2871, MS 316
November 1995 |
345,000-345,999 |
Accelerator Division - TESLA
Peggy Crayton X3058, MS 340
November 1995 |
346,000-346,999 |
Accelerator Div. - EE Mechanical
Peggy Crayton X3058, MS 340
November 1995 |
347,000-347,999 |
Tech. Support Section - Low Cost Hadron Collider
Don Arnold X2871, MS 316
March 1996 |
348,000-348,999 |
Accelerator Div. - EE Support for PET Project
Rick Divelbiss, X4046, MS 306
April 1996 |
349,000-349,999 |
Technical Services - ES&H
Nancy Bartlett X2902, MS 316
April 1996 |
350,000-350,999 |
RD Design & Drafting Group, Mechanical Support
Vivian Villegas X4161, MS 219
April 1996 |
351,000-351,999 |
Technical Support Services, FMI
Gerry Davis X3103, MS 316
|
352,000-353,999 |
Tevatron
Rick Divelbiss X4046, MS 306
|
354,000-354,999 |
Linac AC Mechanical Support
Peggy Crayton X3058, MS 340
|
355,000-355,999 |
Technical Support - SDSS
Bob Andree X3703, MS 316
|
356,000-356,999 |
Beams Div. - EE Support(Recycler)
Rick Divelbiss X4046, MS 308
|
357,000-357,999 |
Magnet Facility Equip. (Tech. Div.)
Bob Andree X3703, MS 316
|
358,000-358,999 |
DØ Eng. Particle Physics (DØ Upgrade)
Jack Mateski X2812, MS 357
|
359,000-359,999 |
Beam Division - Mech. Support(M.I. Project)
Peggy Crayton X3058, MS 340
|
360,000-360,999 |
Technical Division- (General)
Bob Andree X3703, MS 316 |
361,000-361,999 |
PPD Mechanical Support(Group K TeV)
Vivian Villegas X4161, MS 219 |
362,000-362,999 |
Technical Division – Pipetron conventional magnet
Bob Andree X3703, MS 316 |
363,000-363,999 |
Beams Division – NuMI - Mechanical Project
Glen Waver X3728, MS 340 |
364,000-364,999 |
Technical Division- LHC high gradient quadrupoles
Simmi Meredeth X4938, MS 316 |
365,000-365,999 |
Beams-Switchyard, experimental beam lines
Peggy Crayton X3058, MS 340 |
366,000-366,999 |
Technical Division - A0 SCRF
Arnie Knauf, x3715, MS 316, 1/21/98 |
367,000-367,999 |
PPD Design and Drafting Group
Vivian Villegas, x4161, MS 219, 3/25/98 |
368,000-368,999 |
Technical Division - CMS Muon Chamber
Bob Andree, x3703, MS 316, 4/15/98 |
369,000-369,999 |
Technical Division - LHC IR Quad Magnet - Tooling & Product
Don Arnold, x2871, MS 316, 5/18/98 |
370,000-370,999 |
NuMI-Beams Division - Electrical Project
Rick Divelbiss, x4046, MS 306, 5/21/98 |
371,000-371,999 |
Technical Division - Specifications
Marianne Battista, x4304, MS 316, 6/3/98 |
372,000-373,999 |
PPD - D0 Upgrade
Jack Mateski, x2812, MS 357, 6/3/98 |
374,000-374,999 |
Beams Division Mech. Support - Main Injector Project
Peggy Crayton, x3058, MS 340, 8/13/98 |
375,000-375,999 |
Beams Division Mech. Support - Pbar
Peggy Crayton, x3058, MS 340, 8/13/98 |
376,000-376,999 |
TD - High Field Magnet
Makarov, x4734, MS 314, 8/13/98 |
377,000-379,999 |
Beams Division - Safety Systems
Rick Divelbiss, x4046, MS 306, 12/16/98 |
380,000-380,999 |
Beams Division - Mini Boone
Rick Divelbiss, x4046, MS 306, 1/21/99 |
381,000-381,999 |
Beams Division - Cryogenic Systems/Beams Cryogenics
David Richardson, x3354, MS 347, 1/21/99 |
382,000-382,999 |
CDF - Mechanical Support
John Rauch, x4963, MS 219, 1/29/99 |
383,000-383,999 |
Beams Division/Muon Collider
Rick Divelbiss, x4046, MS 306, 4/23/99 |
384,000-384,999 |
PPD/Data Supt. Group/PPD Design & Drafting Group
Vivian Villegas, x4161, MS 221, 7/12/99 |
385,000-385,999 |
Beams Division - Electron Cooling
Rick Divelbiss, x4046, MS 306, 9/15/99 |
386,000-386,999 |
PPD/DSG - D0 Mechanical
Vivian Villegas, x4161, MS 219, 11/9/99 |