FED/MAC Data

Airborne Laser Polarization Experiment (ALPS)


These data are for the Airborne Laser Polarization Experiment (ALPS) for the FED MAC 90 experiment. The file tabulation below refers to data files taken on September 9 and 11. A standard VHS video tape is available (the master tapes are recorded at the SP speed on Super-VHS). The first half of this tape is from a camera coaxial with the laser transmission. Time on the tape correspond to file times below. Oral comments on the tape supplement the general comments below. The second half of the tape consists primarily of site descriptive narration on the ground and some pictures of the helicopter setup.

A doubled Nd:YAG laser is used. Transmission was at 1060 and 532 nm. The 532 nm green wavelength can be seen near the center of the TV screen as it hits the surface in most cases. This is used for ground truth correlation. The spot is about 20 cm in diameter from 100 meters altitude.

Twelve PMT's were used corresponding to the 12 channels of data: Channels 1,2,3,4,9 & 10 have 1090 nm bandpass filters. The reminder are for 532 nm. Channels 9 and 11 have no polarization filters. Relative to the transmitted polarization, the other channels have polarization filters and retardation plates as follows [channel -- filter angle]:

  1 -- 90
  2 -- 0
  3 -- 150
  4 -- 150 and quarter wave plate
  5 -- 0
  6 -- 90
  7 -- 60
  8 -- 60 and quarter wave plate
  9 -- open
 10 -- 30
 11 -- open
 12 -- 120

Master bias PMT bias voltage adjustments may occur for one or the other wavelength, effecting all curves simultaneously. Relative calibration can be made using reflections backscattered from the calibration tarpaulin. Laboratory measurements show both wavelengths have nominal parallel/perpendicular ratios of 0.62 +/- .03.

The principle investigator is Dr. James E. Kalshoven, Jr., NASA/GSFC, Code 925, (301) 286-8506.

 
FILE           TIME                COMMENTS (helicopter height) 
------         --------            -----------------------------
AFED1          10:33:01            calibration tarpaulin (cal
                                   panal or tarp)
 
AFED2          10:36:39            - larch orchard
                                   south side of large larches   
                                   at seed orchard
 
AFED3          10:39:31            north side of seed orchard -  
                                   2 needle pine
                                   strip closest to road
 
AFED4          10:43:16            gravel pit- top -
                                   (300 ft.)
 
AFED5          10:46:12            Bog Site #4 - (up and
                                   down for thermal sensor       
                                   from 1000' down)
 
AFED6          10:54:24            South-most orange tarpaulin on road
                                   near cal site -
                                   maple site - (250 ft.
                                   then rises)
 
AFED7          11:02:04            next orange tarpaulin,        
                                   toward cal site - aspen               
                                   (200 ft.)
 
AFED8          11:05:20            third orange tarp/
                                   birch clump
 
AFED9          11:09:51            transit - across bog
                                   into woods
                                   (thermal) (500 ft.)
                                   North side of seed orchard 
 
AFED10         11:11:37            top of roof
 
AFED11         11:15:22            black spruce plantation       
                                   (low altitude - 200 ft.)  

AFED12         11:17:42            Balloon ( 750 ft.)
                                   Hemlock site
                                   75N 75W
 
AFED13         11:20:40            Balloon - spruce site
                                   (1000 ft.- 250 ft.)
                                   start at 11:22
 
AFED14         11:24:49            Big balloon - (300 ft.)       
                                   spruce site # 1 -
                                   125N 125W
                                   (no vegetation between trees) 

AFED15         11:28:00            Tower (400 ft.)
 
                      57 mins. total tape time
 
 St 12:08:08
 
BFED1          12:11:30            thermal transit -
                                   seed orchard
                                   (500 ft.)
 
BFED2          12:14:45            road intersection, asphalt    
                                   (500 ft.)
 
BFED3          12:17:53            bog near cal site (500 ft.)  

BFED4          12:22:00            cal panel (300 ft.-500 ft.)  
 
 
CFED1          11:18:04            bog near orange marker sites  
                                   (750 ft.)
 
CFED2          11:22:01            maple site - orange marker    
                                   furthest south (500 ft.) 
 
CFED3          11:25:40            marker - aspen site
                                   (500 ft.)

CFED4          11:29:22            grass site - southwest        
                                   corner of seed orchard 
 
CFED5          11:31:54            marker at birch site -        
                                   (500 ft.)
 
CFED6          11:35:11            larches - south side - bigger 

CFED7          11:40:22            cal panel - (300 ft. - 500 ft.)
  
CFED8          11:42:43            small bog (500 ft.)
                                   red sphagnum
 
CFED10         11:45:32            2-needle pine rows
 
CFED11         11:50:14            gravel - top
 
 
 
DFED1          12:46:00            - not good - test -
 
DFED2          12:48:11            asphalt road
 
DFED3          12:52:24            spruce plantation (500 ft.)  

DFED4          12:56:07            hemlock site (up to 750 ft.)  
                                   quantum sensor on -
 
no DFED5       --------            visited on ground  

DFED6          13:02:58            750 ft. (quantum sensor on)   
                                   balloon
 
DFED7          13:08:30            tower (500 ft.)
 
DFED8          13:18:04            pond 300 ft. (small)
 
      broke time sequence 13:24 (3 mins.)

DFED9          13:28:12            small pond (500 ft.)
 
      stop at 13:31:15 resumed at 13:43:15
 
DFED10         13:45:19            large lake (500 ft.)
 
      break - (no DFED 11)
 
DFED12         13:53:42            river near hanger

Return to FED Home Page