Search Johnson

Go

News Releases

Text Size

1966-1968 News Releases

+ 1966   + 1967   + 1968

+ 1966 News Releases (6.6 Mb PDF file)
Date Title
Jan. 6, 1966 66-001 -- EVALUATION OF APPLICATIONS FOR ASTRONAUT PROGRAM
Jan. 7, 1966 66-002 -- ACCEPTANCE OF 65-FT DIAMETER VACUUM CHAMBER BY MSC
Jan. 10, 1966 66-003 -- CHECKOUT OF HOMING APOLLO EQUIPMENT
Jan. 12, 1966 66-004 -- VERIFICATION TESTS ON APOLLO FUEL CELLS
Jan. 21, 1966 66-005 -- S&ISD CONTRACT CHANGED TO COST-PLUS-INCENTIVE AGREEMENT
Jan. 17, 1966 66-006 -- D.K. SLAYTON TO RECEIVE HONORARY DOCTOR OF ENGINEERING DEGREE FROM MICHIGAN TECHNOLOGICAL UNIVERSITY
Jan. 26, 1966 66-007 -- MOON SURFACE EXPERIMENTS CHOSEN FOR APOLLO
Jan. 27, 1966 66-012 -- EISELE TO HAVE OPERATION ON LEFT SHOULDER
Feb. 1, 1966 66-010 -- LAUNCH DATE FOR SATURN IB
Feb. 2, 1966 66-008 -- CONTRACT AWARDED TO RODANA RES. CORP. FOR DEVELOPMENT OF EMERGENCY MEDICAL KITS FOR APOLLO
Feb. 2, 1966 66-009 -- LUNAR TOOLS
Feb. 3, 1966 66-011 -- DEMONSTRATION TEST ON SATURN IB
Feb. 11, 1966 66-013 -- APOLLO-SATURN SLIPS TO Feb. 23, 1966
Feb. 15, 1966 66-014 -- CONVERSION OF GRUMMAN LEM CONTRACT
Feb. 18, 1966 66-015 -- ACOUSTICS IN SPACECRAFT ACOUSTIC LABORATORY
Feb. 17, 1966 66-016 -- LAUNCH DATE OF GEMINI 8 ANNOUNCED
March 7, 1966 66-017 -- APOLLO LANDING
March 7, 1966 66-018 -- ACCOMPLISHMENT OF TEST OBJECTIVES ON AS-1B
March 10, 1966 66-019 -- NASA/DOD EXPERIMENT D-16
March 21, 1966 66-020 -- GEMINI AND APOLLO CREWS SELECTED
March 30, 1966 66-021 -- FLIGHT DIRECTOR ASSIGNMENTS
April 4, 1966 66-022 -- NINETEEN NEW ASTRONAUTS NAMED
April 4, 1966 66-023 -- CHANGE IN SEQUENCE OF NEXT TWO APOLLO SATURN IB LAUNCHES
April 12, 1966 66-024 -- TRAFFIC AND PARKING
April 12, 1966 66-025 -- ROBERT SMYLIE TO RECEIVE SLOAN FELLOWSHIP
April 14, 1966 66-026 -- FIRST PRODUCTION-LINE APOLLO COMMAND MODULE
April 18, 1966 66-027 -- T-30 GEMINI 9 RELEASE
April 21, 1966 66-028 -- SPENT SATURN S-IVB STAGE CONTRACT
April 28, 1966 66-029 -- RESULT OF GEMINI 8 - CHARLES MATHEWS
April 28, 1966 66-030 -- PLANS FOR MSC BUSINESS CONFERENCE
May 10, 1966 66-031 -- FIRST MAN TO RIDE THE MSC CENTRIFUGE
May 18, 1966 66-033 -- RE-SCHEDULING OF GT-9
May 20, 1966 66-034 -- 38 GRADUATE STUDENTS OFFERED STUDY & WORK AT MSC
May 20, 1966 66-035 -- FIRST MSC AEROSPACE ANALYSIS & WRITING PROGRAM - 25 GRADUATE STUDENTS OFFERED JOBS FOR SUMMER
May 20, 1966 66-036 -- ANTENNA & ANECHOIC CHAMBER FACILITY & THE OPTICAL FREQUENCY RANGE FACILITY
May 20, 1966 66-037 -- APOLLO SATURN 500-F
June 2, 1966 66-038 -- LUNAR OPTICAL RENDEZVOUS SYSTEM (LORS)
June 10, 1966 66-039 -- TANKS
June 10, 1966 66-040 -- CONTRACT FOR CENTRAL ELECTRONIC SHOP SUPPORT SERVICES AT MSC
June 10, 1966 66-041 -- EDUCATIONAL SYMPOSIUM ON TEACHER EDUCATION
June 14, 1966 66-042 -- DOCKING SIMULATION
June 15, 1966 66-043 -- RESCHEDULING OF AS-203
June 17, 1966 66-044 -- REGIONAL EDUCATION SYMPOSIUM
June 19, 1966 66-045 -- GEMINI 10 SCHEDULE
June 17, 1966 66-046 -- PRIME CREWMEN FOR GEMINI 12
June 23, 1966 66-047 -- OPEN HOUSE TO BE HELD ON A LIMITED BASIS, JUNE 26, 1966
July 7, 1966 66-048 -- SATURN APOLLO APPLICATIONS PROGRAM OFFICE ESTABLISHED
July 6, 1966 66-049 -- FINAL TEST ON APOLLO SATURN 203 COMPLETED
July 7, 1966 66-050 -- ZIA CORP. CONTRACT AWARDED
July 11, 1966 66-051 -- AS 202 LAUNCH DATE ANNOUNCED
July 15, 1966 66-052 -- MSC CANCELS TWO CONTRACTS
July 20, 1966 66-053 -- CONFERENCE FOR SCIENCE FAIR WINNERS
July 28, 1966 66-054 -- FIRST MAJOR TEST OF MANNED APOLLO SPACECRAFT AT MSC
Aug. 1, 1966 66-055 -- GRADUATION OF 3 SCIENTIST-ASTRONAUTS FROM FLIGHT SCHOOL
Aug. 1, 1966 66-056 -- AWARD OF CONTRACT TO WARRIOR CONSTRUCTORS
Aug. 1, 1966 66-057 -- BIDS ON CONSTRUCTION OF LUNAR RECEIVING LABORATORY
Aug. 3, 1966 66-058 -- APOLLO COMPLEX TO BE CONVERTED IN IBM CONTRACT
Aug. 4, 1966 66-059 -- 14-DAY STATIC FIRING SIMULATION OF APOLLO MISSION
Aug. 9, 1966 66-060 -- EIGHT-DAY MANNED APOLLO SYSTEMS TEST IN VACUUM CHAMBER
Aug. 10, 1966 66-061 -- RESCHEDULING OF THE AS-202 MISSION
Aug. 10, 1966 66-062 -- ANNOUNCEMENT OF GT-11 LAUNCH DATE
Aug. 12, 1966 66-063 -- FIRST MANNED APOLLO FLIGHT
Aug. 12, 1966 66-064 -- AS-202 SLIPS FROM Aug. 22 TO Aug. 25, 1966
Aug. 15, 1966 66-065 -- DEATH OF GEORGE LEMKE
Aug. 19, 1966 66-066 -- NASA SELECTS CONTRACTOR FOR AIRLOCK EXPERIMENTS
Aug. 19, 1966 66-067 -- CONTRACT AWARDED FOR CONSTRUCTION OF LUNAR RECEIVING LABORATORY
Aug. 22, 1966 66-068 -- HALT OF HARDWARE DEVELOPMENT & FABRICATION OF APOLLO PALLET
Sept. 8, 1966 66-069 -- RESIGNATION OF DR. WINSTON E. KOCK
Sept. 22, 1966 66-070 -- REQUEST FOR MORE SCIENTIST-ASTRONAUTS
Sept. 23, 1966 66-071 -- FIRST APOLLO LUNAR MODULE (LM) ARRIVES AT KSC
Sept. 27, 1966 66-071A -- REVISED GEMINI 12 EVA
Sept. 29, 1966 66-072 -- SECOND MANNED APOLLO CREW NAMED
Oct. 13, 1966 66-073 -- FIRST NASA INTER-CENTER COMPUTER NETWORK
Oct. 9, 1966 66-074 -- APOLLO ORBITAL WORKSHOP
Oct. 5, 1966 66-075 -- LOUIS NIZER TO REPLACE HARRY BATTEN
Oct. 13, 1966 66-076 -- MAN'S WIERDEST FLYING MACHINE (LLRV)
Oct. 5, 1966 66-077 -- REEFING CUTTER
Oct. 10, 1966 66-078 -- GEMINI 12, T-30 RELEASE
Oct. 28, 1966 66-079 -- UNIVERSITY OF HOUSTON GRANTED CONTRACT FOR "A CHRONOLOGY OF PROJECT GEMINI" AND "A HISTORY OF PROJECT GEMINI"
Oct. 27, 1966 66-080 -- DEVELOPMENT OF 4 HIGH-FREQUENCY TRANSMITTERS IN WORLDWIDE COMMUNICATIONS TESTS
Oct. 28, 1966 66-081 -- DELAY IN THE LAUNCHING OF AS 204
Nov. 2, 1966 66-082 -- SPACECRAFT 008 TEST COMPLETION
Nov. 2, 1966 66-083 -- AWARD OF CONTRACT TO LINK, GENERAL PRECISION
Nov. 8, 1966 66-084 -- RESULTS OF APOLLO SERVICE MODULE PRESSURE FAILURE TEST
Nov. 14, 1966 66-085 -- PATENTS AWARDED TO MSC PERSONNEL
Nov. 17, 1966 66-086A -- RESCHEDULING OF APOLLO-SATURN FLIGHTS
Nov. 29, 1966 66-086 -- F. JOHN BAILEY AWARD
Nov. 29, 1966 66-087 -- RICHARD R. CARLEY AWARD
Nov. 29, 1966 66-088 -- HENRY E. CLEMENTS AWARD
Nov. 29, 1966 66-089 -- DUNCAN COLLINS AWARD
Nov. 29, 1966 66-090 -- HOMER DOTTS AWARD
Nov. 29, 1966 66-091 -- W.H. GRAY AWARD
Nov. 29, 1966 66-092 -- DICK JOHNSTON AWARD
Nov. 29, 1966 66-093 -- EUGENE KRANZ AWARD
Nov. 29, 1966 66-094 -- JOHN MAYER AWARD
Nov. 29, 1966 66-095 -- ANDRE MEYER AWARD
Nov. 29, 1966 66-096 -- WILLIS MITCHELL AWARD
Nov. 29, 1966 66-097 -- WARREN NORTH AWARD
Nov. 29, 1966 66-098 -- ROBERT PILAND AWARD
Nov. 29, 1966 66-099 -- JOHN E. ROBERTS - NORFOLK AWARD
Nov. 29, 1966 66-100 -- JOHN E. ROBERTS - LEXINGTON PARK, MD AWARD
Nov. 29, 1966 66-101 -- SCOTT SIMPKINSIN AWARD
Nov. 29, 1966 66-102 -- SIG SJOBERG AWARD
Nov. 29, 1966 66-103 -- HOWARD TINDALL AWARD
Nov. 29, 1966 66-104 -- JAMES GARREPY AWARD
Nov. 29, 1966 66-105 -- CLYDE TEAGUE AWARD
Nov. 29, 1966 66-106 -- ALLEN ROCHFORD AWARD
Nov. 29, 1966 66-107 -- JOSEPH SCHMITT AWARD
Nov. 30, 1966 66-108 -- CHARLES W. MATHEWS NAMED DIRECTOR OF SATURN APOLLO APPLICATIONS OFFICE
Nov. 30, 1966 66-109 -- LTV AEROSPACE (LING-TEMCO-VOUGHT) GRANTED CONTRACT
Dec. 22, 1966 66-110 -- NAMING OF SECOND AND THIRD APOLLO CREWS
Dec. 22, 1966 66-111 -- AWARD RESCUE - CSD
+ 1967 News Releases (3.8 Mb PDF file)
Date Title
Jan. 3, 1967 66-112 -- APPLICATIONS FOR SCIENTISTS & ENGINEER ASTRONAUTS
Jan. 6, 1967 67-001 -- SCHOLARSHIP FUND FOR MSC EMPLOYEES' CHILDREN
Jan. 6, 1967 67-002 -- 6-DAY TEST OF APOLLO S&C AND RCS ENGINES
Jan. 6, 1967 67-003 -- AWARDS FOR EMPLOYEES FOR ROLES IN APOLLO TEST PROGRAMS IN SPACE ENVIRONMENT SIM. LAB & VIBRATION & ACOUSTIC TEST FACILITY
Jan. 16, 1967 67-004 -- NEW DIRECTORATE SCIENCE & APPLICATIONS DIRECTORATE
Jan. 23, 1967 67-005 -- T-30 ANNOUNCEMENT OF A/S 204 MISSION
Jan. 27, 1967 67-006 -- GEMINI SUMMARY CONFERENCE
Jan. 27, 1967 67-007 -- SATURN V S-4B EXPLOSION
Feb. 13, 1967 67-008 -- DR. HESS APPOINTED DIRECTOR OF SCIENCE & APPLICATIONS DIRECTORATE
March 15, 1967 67-009 -- NASA ORDERS MOON LANDING JET TRAINER (LLTV)
March 16, 1967 67-010 -- 1ST LUNAR SAMPLE SET FOR EXPERIMENTS BY 110 SCIENTISTS
March 24, 1967 67-011 -- SCIENCE FAIR WINNERS
March 30, 1967 67-012 -- 5 MSC EMPLOYEES GET PATENT AWARDS
March 27, 1967 67-013 -- WARREN J. NORTH TO PRESENT TECHNICAL PAPER
April 5, 1967 67-014 -- SHEA/LOW PERSONNEL CHANGES
April 12, 1967 67-015 -- DR. GILRUTH TO RECEIVE AAS AWARD, MAY 3
April 13, 1967 67-016 -- HEAVY LIFT RECOVERY HELICOPTER TESTS FOR APOLLO
April 24, 1967 67-017 -- CONTRACT AWARDED TO MIT
April 27, 1967 67-018 -- "ROLLING STONE" ON SURFACE OF MOON
May 2, 1967 67-019 -- INTERAGENCY DATA EXCHANGE PROGRAM (IDEP) WORKSHOP
May 5, 1967 67-020 -- EVA CONTRACT AWARD TO ROCKET RESEARCH CORP.
May 8, 1967 67-021 -- CERTIFICATE OF ACHIEVEMENT GIVEN TO LEMUEL S. MENEAR
May 9, 1967 67-022 -- 1ST MANNED APOLLO CREW PRESS CONFERENCE ANNOUNCEMENTS
May 19, 1967 67-023 -- CONTRACT GIVEN TO WACKENHUT SERVICES, INC.
May 22, 1967 67-024 -- MEMBERS SELECTED FOR INTERAGENCY DATA EXCHANGE
May 23, 1967 67-025 -- LAND AND WATER IMPORT FACILITY
May 25, 1967 67-026 -- MSC OPERATION, SPAN
May 25, 1967 67-027 -- APOLLO BOILERPLATE SUNK AFTER BREAKING OF TOWLINE
May 26, 1967 67-028 -- THREE WESTHEIMER RIGGING CO. EMPLOYEES INJURED (ONE KILLED) AT MSC BY ELECTRICAL SHOCK
June 1, 1967 67-029 -- JOHN DORNBACH RECEIVES DOCTORATE DEGREE
June 6, 1967 67-030 -- DEATH OF ASTRONAUT EDWARD G. GIVENS, JR.
June 7, 1967 67-031 -- FUNERAL ARRANGEMENT FOR ASTRONAUT GIVENS
June 13, 1967 67-032 -- ROBERT A. GARDINER NAMED CHIEF OF GUIDANCE & CONTROL
June 14, 1967 67-033 -- CHANGED IN APOLLO LM HARDWARE, MATERIALS PROCEDURES & TASKS
June 14, 1967 67-034 -- CONTRACT AWARD TO MELPAR, INC.
June 16, 1967 67-035 -- CONTRACT AWARD TO BOEING COMPANY
June 21, 1967 67-036 -- DOCTORATE DEGREES HELD BY ASTRONAUTS
June 22, 1967 67-037 -- TOUR & BRIEFING OF LRL
June 29, 1967 67-038 -- EXTENSION OF CONTRACT FOR PHILCO-FORD ON MCC
June 29, 1967 67-039 -- CONFERENCE AT SANTA CRUZ, CALIFORNIA
July 7, 1967 67-040 -- PATENTS AWARDED NASA MSC PERSONNEL
July 11, 1967 67-041 -- CONTRACT-AWARD TO GRAHAM & LTV
July 11, 1967 67-042 -- CONTRACT AWARD TO BROWN & ROOT-NORTHRUP
July 25, 1967 67-043 -- GEN. BOLENDER OF NASA HQ. NAMED MANAGER OF LM
Aug. 4, 1967 67-044 -- SELECTION OF 11 SCIENTIST-ASTRONAUTS
July 26, 1967 67-045 -- CONTRACT AWARD TO BOEING
July 26, 1967 67-046 -- CONTRACT AWARD TO MARTIN MARIETTA
July 31, 1967 67-047 -- W.C. SCHNEIDER NAMED APOLLO MISSION DIRECTOR
Aug. 2, 1967 67-048 -- CONTRACT AWARD TO NORTH AMERICAN AVIATION ROCKETDYNE
Aug. 3, 1967 67-049 -- SCOTT CARPENTER DETACHED FROM MSC
Aug. 10, 1967 67-050 -- CONTRACT TO RCA DEFENSE ELECTRONICS DIVISION FOR DUAL SPACE SUIT COMMUNICATIONS SYSTEM
Aug. 11, 1967 67-051 -- FIRST APOLLO SATURN 5 ROLLED OUT OF VAP
Aug. 11, 1967 67-052 -- PRESS CONFERENCE AT DOUGLAS SACRAMENTO
Aug. 17, 1967 67-053 -- ARRIVAL OF APOLLO SPACE SUITS IN Sept.
Sept. 19, 1967 67-054 -- BIOLOGICAL ISOLATION GARMENT FOR APOLLO CREW
Sept. 5, 1967 67-055 -- 3-DAY LRL BRIEFING AT MSC
Sept. 29, 1967 67-056 -- LTV AWARDED MAINTENANCE CONTRACT
Oct. 5, 1967 67-057 -- AN ASTRONAUT WAS REPORTED KILLED IN CRASH
Oct. 5, 1967 67-058 -- MAJOR C.C. WILLIAMS WAS NAMED AS ASTRONAUT KILLED
Oct. 6, 1967 67-059 -- FUNERAL SERVICES ANNOUNCED FOR ASTRONAUT WILLIAMS
Oct. 6, 1967 67-060 -- REQUIEM SERVICES SET FOR ASTRONAUT WILLIAMS
Oct. 9, 1967 67-061 -- 200 MEMBERS OF JETS TO PARTICIPATE IN FIELD TRIP AT MSC
Oct. 12, 1967 67-062 -- MAJOR CHANGES IN TOP NASA POSITIONS ANNOUNCED
Oct. 13, 1967 67-063 -- GRUMMAN AIRCRAFT TO DELIVER LM-2 TO NASA
Oct. 20, 1967 67-064 -- NASA SELECTS BENDIX CORP., DETROIT FOR LONG DURATION CRYOGENIC GAS STORAGE TANKS
Oct. 20, 1967 67-065 -- NASA EXTENDED ITS CONTRACT WITH FEDERAL ELECTRIC
Nov. 7, 1967 67-066 -- NASA EXTENDED CONTRACT WITH TRW, REDONDO BEACH
Nov. 20, 1967 67-067 -- FLIGHT CREWS FOR SECOND & THIRD FLIGHTS
Dec. 4, 1967 67-068 -- APOLLO 4 RESULTS
Dec. 4, 1967 67-069 -- MAN RATING APOLLO SUITS
Dec. 7, 1967 67-070 -- NEGOTIATION CONTROL AWARDED TO CONTROL DATA
Dec. 7, 1967 67-071 -- CONTINUATION OF NA ROCKWELL CONTRACT
Dec. 7, 1967 67-072 -- DELIVERY OF THREE LUNAR LANDING TRAINING VEHICLES (LLTV)
Dec. 8, 1967 67-073 -- ROBERT THOMPSON APPOINTED MANAGER AAP
Dec. 21, 1967 67-074 -- SUCCESSFUL PARACHUTE TEST AT EL CENTRO, CALIFORNIA
Dec. 22, 1967 67-075 -- RESIGNATION OF J. THOMAS MARKLEY, ASSISTANT MANAGER ASPO
Dec. 26, 1967 67-076 -- APOLLO 5 SCHEDULE
+ 1968 News Releases (4.8 Mb PDF file)
Date Title
Jan. 15, 1968 68-001 -- FLAMMABILITY TESTING
Jan. 19, 1968 68-002 -- TWO TOP-LEVEL MANAGEMENT POSITIONS MANNED AT MSC
Jan. 27, 1968 68-003 -- FLAMMABILITY TESTING
Jan. 27, 1968 68-004 -- APOLLO 5 QUICK-LOOK RELEASE
Jan. 30, 1968 68-005 -- SHIPMENT OF SECOND APOLLO LM
Feb. 5, 1968 68-006 -- ANTHONY J. CALIO NAMED DEPUTY DIRECTOR FOR PROJECTS FOR THE SCIENCE & APPLICATIONS DIRECTORATE
Feb. 7, 1968 68-007 -- THIRD SERIES OF FLAMMABILITY TESTS ANNOUNCED
Feb. 8, 1968 68-008 -- FIVE LANDING AREAS SELECTED BY NASA APOLLO SITE SELECTION BOARD
Feb. 15, 1968 68-009 -- RELOCATION OF MSC NEWS CENTER
Feb. 20, 1968 68-010
(missing) -- T-30 APOLLO 6 NEWS RELEASE
Feb. 28, 1968 68-011 -- SLIP IN APOLLO 6 LAUNCH DATE
Feb. 28, 1968 68-012 -- FLIGHT TRAINING TO START FOR SCIENTIST ASTRONAUTS
March 1, 1968 68-013 -- PRESIDENT JOHNSON'S VISIT TO MSC
March 11, 1968 68-014 -- ANOTHER SLIP IN APOLLO 6 LAUNCH
March 12, 1968 68-015 -- NASA NSTA YOUTH SCIENCE CONGRESS - OKLAHOMA CITY
March 12, 1968 68-016 -- NASA NSTA YOUTH SCIENCE CONGRESS - HOUSTON
March 11, 1968 68-017 -- NASA NSTA YOUTH SCIENCE CONGRESS - ENID, OKLAHOMA
March 11, 1968 68-018 -- NASA NSTA YOUTH SCIENCE CONGRESS - EL CAMPO, TEXAS
March 11, 1968 68-019 -- NASA NSTA YOUTH SCIENCE CONGRESS - SAN ANTONIO, TEXAS
March 11, 1968 68-020 -- NASA NSTA YOUTH SCIENCE CONGRESS - BRECKENRIDGE, TEXAS
March 12, 1968 68-021 -- NASA NSTA YOUTH SCIENCE CONGRESS - SAGINAW, TEXAS
March 14, 1968 68-022 -- 60/40 LAUNCH PAD ATMOSPHERE ANNOUNCED
March 15, 1968 68-023 -- LAUNCH SLIP TO APRIL 1 ANNOUNCED
March 21, 1968 68-024 -- LAUNCH SLIP TO APRIL 3 ANNOUNCED
March 22, 1968 68-025 -- WILLIAM A. PARKER APPOINTED MANAGER, CENTER SUPPORT PLANNING & CONTROL
  -- KEY PERSONNEL ASSIGNMENT
March 25, 1968 68-026 -- $929,000 CONTRACT TO UNIVERSITY OF CALIFORNIA FOR DEVELOPMENT AND TESTING OF HAPPE ANNOUNCED
March 27, 1968 68-027 -- NASA MSC AWARDS $649,249 CONTRACT TO SPACE INCORPORATED
April 3, 1968 68-028 -- KRAFT APPOINTS 3 NEW FLIGHT DIRECTORS
April 3, 1968 68-029 -- ICELAND MISSION "SEA STATE"
April 9, 1968 68-030 -- APOLLO 6 QUICK LOOK MISSION EVALUATION
April 11, 1968 -- NASA HQ: EVALUATION OF SATURN V VEHICLE
April 8, 1968 68-031 -- SPACECRAFT 2TV-1 SERVICE MODULE (LUSK)
April 22, 1968 68-032 -- WITHDRAWAL OF SCIENTIST-ASTRONAUT BRIAN T. O'LEARY FROM ASTRONAUT PROGRAM
May 3, 1968 68-033 -- BOEING CONTRACT ANNOUNCED
May 10, 1968 68-034 -- DAVID CLARKE SUIT CONTRACT
May 14, 1968 68-035 -- REASSIGNMENT OF THREE MSC OFFICIALS
May 21, 1968 68-036 -- CHANGES IN GRUMMAN AIRCRAFT ENGINEERING CORP. CONTRACT
May 22, 1968 68-037 -- SOUTH ATLANTIC ANOMALY PROBE
May 24, 1968 68-038 -- LTA-8 TESTS
May 31, 1968 68-039 -- ASTRONAUT TRAINING AT PERRIN AFB
May 31, 1968 68-040 -- JOB FAIR PROGRAM
June 4, 1968 68-041 -- ROCKETDYNE INJECTOR TO BE USED IN BELL ASCENT ENGINE OF FIRST MANNED LM
June 10, 1968 68-042
(missing) -- 2TV-1 TESTS BEGIN
June 10, 1968 68-043 -- LOCKHEED EARTH ORBITAL ESCAPE DEVICE STUDY
June 12, 1968 68-044 -- SAAP IS SUCCESSFUL
June 19, 1968 68-045 -- PARTIAL GRAVITY SIMULATOR
June 19, 1968 68-046 -- NASA-ASEE SUMMER FACULTY FELLOWSHIP PROGRAM
July 11, 1968 68-047 -- APOLLO APPLICATIONS FLAMMABILITY EXPERIMENT, M-479
July 16, 1968 68-048 -- JOHN BULL LEAVES ASTRONAUT PROGRAM
July 17, 1968 68-049 -- FACILITY INSTALLED IN GULF OF MEXICO FOR LRD
July 18, 1968 68-050 -- SATURN 5 POGO PROBLEM TESTS
July 18, 1968 68-051 -- ALSEP - BENDIX CORPORATION
July 18, 1968 68-052 -- DR. JERRY MODISETTE APPOINTED SENIOR STAFF SCIENTIST
July 22, 1968 68-053 -- ASTRONAUT MICHAEL COLLINS TO UNDERGO SURGERY
July 23, 1968 68-054 -- REPORT ON ASTRONAUT MICHAEL COLLINS
July 25, 1968 68-055 -- REPORT ON ASTRONAUT MICHAEL COLLINS
July 25, 1968 68-056 -- MSC DUCKS VACCINATED AGAINST BOTULISM
July 31, 1968 68-057 -- WATER EGRESS TRAINING FOR FIRST MANNED APOLLO CREWS
Aug. 2, 1968 68-058 -- $10,651,200 CONTRACT MODIFICATION AWARDED TO HAMILTON STANDARD DIVISION, UNITED AIRCRAFT CORPORATION
Aug. 7, 1968 68-059 -- NASA INVITES 23 AEROSPACE FIRMS TO SUBMIT PROPOSALS FOR ONE-MAN LUNAR FLYING MACHINE (LLTV)
Aug. 8, 1968 68-060 -- COLLINS AND BULL REPLACEMENTS
Aug. 9, 1968 68-061 -- MANNED CHECKOUT OF 2TV-1
Aug. 15, 1968 68-062 -- NASA MODIFIES IBM CONTRACT FOR RTCC
Aug. 19, 1968 68-148 -- NASA HQ: LUNAR MODULE OPERATIONS DROPPED
Aug. 23, 1968 68-063 -- WITHDRAWAL OF LLEWELLYN FROM ASTRONAUT PROGRAM
Aug. 27, 1968 68-064 -- BELL AEROSYSTEMS EMPLOYEE INJURED IN LUNAR LANDING TRAINING VEHICLE (LLTV) ACCIDENT
Aug. 29, 1968 68-065 -- PRATT AND WHITNEY FUEL CELL TEST COMPLETED
Sept. 4, 1968 68-066 -- 2TV-1 MANNED TESTING BEGINS
Sept. 4, 1968 68-067 -- NASA CONTRACTS WITH SPERRY RAND CORP. FOR CCATS PROCESSORS
Sept. 6, 1968 -- ITINERARY OF RICHARD M. NIXON'S VISIT TO MANNED SPACECRAFT CENTER
Sept. 11, 1968 68-068 -- PAUL PURSER GRANTED A ONE YEAR LEAVE OF ABSENCE
Sept. 13, 1968 68-069 -- INTERMEDIATE WORKSHIP BY STONEY
Sept. 24, 1968 68-070 -- TWO-DAY PROGRAM MARKS 10TH ANNIVERSARY OF NASA
Sept. 25, 1968 68-071 -- NASA SELECTS ROCKETDYNE INJECTOR FOR USE IN ASCENT ENGINE OF APOLLO LUNAR MODULE
Sept. 27, 1968 68-072 -- GILRUTH ANNOUNCES ESTABLISHMENT OF AN ADVANCE MISSIONS PROGRAM OFFICE
Sept. 27, 1968 68-073 -- KARL HENIZE SUFFERS A FRACTURED COLLAR BONE
Sept. 30, 1968 68-074 -- TENTH ANNIVERSARY HAD AN ESTIMATED 25,000 PERSONS ATTENDING
Oct. 1, 1968 68-075 -- WILLIAM E. STONEY NAMED DEPUTY DIRECTOR (ENGINEERING) OF APOLLO MANNED LANDING PROGRAM
Oct. 3, 1968 68-076 -- LLTV AIRCRAFT TEST RUN
Oct. 17, 1968 68-182 -- NASA HQ: LUNAR LANDING RESEARCH VEHICLE REPORT
Oct. 23, 1968 68-077 (missing) -- $436,000 STUDY CONTRACT AWARDED MCDONNELL DOUGLAS
Oct. 28, 1968 68-078 -- STEP THAT WILL LEAD TO FINAL DECISION ON NEXT APOLLO OUTLINED BY ADMINISTRATION
Oct. 28, 1968 ITINERARY OF SPIRO AGNEW'S VISIT TO MANNED SPACECRAFT CENTER
Oct. 31, 1968 NASA HQ: RUBY LUNAR SCIENCE INSTITUTE HEAD
Nov. 12, 1968 NASA HQ: APOLLO 8 MISSION ORBITAL FLIGHT AROUND MOON ANNOUNCED
Nov. 15, 1968 68-079 -- PLANS CALL FOR U.S. ASTRONAUTS TO PLACE THREE SCIENTIFIC EXPERIMENTS ON LUNAR SURFACE
Nov. 15, 1968 68-080 -- COMPLETION OF MANNED VACUUM TESTING
Nov. 13, 1968 68-081 -- PRIME CREWMEN FOR APOLLO 10
Nov. 15, 1968 68-000 -- ANNUAL AWARDS CEREMONY
Nov. 15, 1968 68-082 -- NASA AWARDS CONTRACT TO LINK GROUP, GENERAL PRECISION FOR MAINTENANCE & MODIFICATION OF MSC'S SIMULATOR COMPLEX
Dec. 3, 1968 68-083 -- NASA AWARDS $3,500,000 CONTRACT TO ALLIS CHALMERS
Dec. 4, 1968 68-084 -- NASA SIGNS SUPPLEMENTAL AGREEMENT WITH GRUMMAN
Dec. 10, 1968 68-085 -- NASA AWARDS 1-YEAR CONTRACT EXTENSION TO LOCKHEED
Dec. 17, 1968 68-086 -- NASA AWARDS 2-YEAR CONTRACT TO TRW
Dec. 19, 1968 68-087 -- WILLIAM SCHNEIDER NAMED AAP DIRECTOR
Dec. 31, 1968 68-088 -- AWARD OF NORTH AMERICAN CONTRACT