Job Plan |
Issue Date |
Drawing Title |
PDF |
Terramodel (Sheet View) |
Excel |
Job Plan 1.0 |
04/73 |
Earth Dam |
970 KB |
|
|
Job Plan 2.0 |
08/80 |
C.M. Pipe Drop Inlet Principal Spillway |
451 KB |
|
|
Job Plan 2.1 |
08/80 |
Hood Inlet Principal Spillway |
449 KB |
|
|
Job Plan 3.0 |
|
Watertight Connecting Band For C.M. Pipe |
384 KB |
|
|
Job Plan 3.1 |
|
Two Piece C.M. Diaphragms (Rod Type) |
463 KB |
|
|
Job Plan 3.3 |
|
One Piece C.M. Diaphragms |
458 KB |
|
|
Job Plan 3.5 |
11/76 |
Butyl Rubber Diaphragm for 1" to 15" Dia. Pipe |
410 KB |
|
|
Job Plan 3.6 |
|
Cathodic Protection System |
551 KB |
|
|
Job Plan 3.7 |
|
Details of Two Piece Channel Coupling Band |
364 KB |
|
|
Job Plan 3.8 |
01/08 |
Drainage Diaphragms |
639 KB |
|
|
Guide Plan 4.0 |
|
Timber Pipe Support |
61.4
KB |
|
|
Job Plan 4.0 |
|
Timber Pipe Support (Double Support) |
360 KB |
|
|
Job Plan 4.1 |
|
Timber Pipe Support (Single Support) |
468 KB |
|
|
Job Plan 4.2 |
|
Pipe Support for Outlet Pipe |
379 KB |
|
|
Job Plan 4.3 |
|
C.M. Pipe Support |
439 KB |
|
|
Job Plan 4.4 |
01/02 |
Pipe Support for Plastic Pipe |
380 KB |
|
|
Guide Plan 5.0 |
|
Metal Base Pipe Riser |
75.3
KB |
|
|
Job Plan 5.0 |
|
Metal Base Pipe Riser |
498 KB |
|
|
Guide Plan 5.3 |
|
C.M. Pipe Riser With Fabricated Tee |
60.6
KB |
|
|
Job Plan 5.3 |
|
C.M. Pipe Riser With Fabricated Tee |
406 KB |
|
|
Guide Plan 5.4 |
|
Riser and Hood Inlet Combination |
79.5
KB |
|
|
Job Plan 5.4 |
|
Riser and Hood Inlet Combination |
492 KB
|
|
|
Job Plan 5.5 |
|
Canopy Inlet (For CMP) |
435 KB |
|
|
Guide Plan 6.0 |
|
12" to 36" Dia. Conical Trash Rack and Baffle Plate |
89
KB |
|
|
Job Plan 6.0 |
|
12" to 36" Dia. Conical Trash Rack |
508 KB |
|
|
Guide Plan 6.1 |
|
Hooded Inlet and Baffle |
81.5
KB |
|
|
Job Plan 6.1 |
|
Hood Inlet and Baffle - C.M. Pipe |
501 KB |
|
|
Job Plan 6.2 |
|
Hood Inlet for 8" Thru 12" ID Pipe |
432 KB |
|
|
Job Plan 6.3 |
|
Hood Inlet for 12" Thru 16" ID Pipe |
438 KB |
|
|
Job Plan 6.4 |
|
Trash Rack and Baffle for 36" Thru 60" Riser |
468 KB |
|
|
Job Plan 6.5 |
06/04 |
Trash Screen for Debris Basin Drain Pipe |
150 KB |
2.80
MB |
|
Job Plan 6.5A |
06/04 |
Waste Storage Facility - Trash Screen
for Sediment Basin Drain Pipe |
140 KB |
2.78
MB |
|
Guide Plan 6.6 |
|
Trash Rack for C.M. Canopy Inlet |
82.2
KB |
|
|
Job Plan 6.6 |
|
Trash Rack for C.M. Canopy Inlet |
475 KB |
|
|
Job Plan 7.0 |
05/79 |
Excavated Pond |
487 KB |
|
|
Job Plan 7.1 |
|
Excavated Pond (With As-Built Plot) |
936 KB |
|
|
Job Plan 8.0 |
|
Grassed Waterway |
1.12 MB |
|
|
Job Plan Combined 8.1 - 8.4 |
02/09 |
Grassed Waterway Design Software
8.1 Small Drainage Area Waterway Plan
8.2 Trapezoidal Waterway Plan
8.3 Rock Checks for Waterways
8.4 Fabric Checks for Waterways |
|
|
5.14 MB |
Job Plan 9.0 |
|
Terraces |
1.12 MB |
|
|
Job Plan 11.0 |
|
Irrigation Pipeline Appurtenances (Sprinkler) |
381 KB |
|
|
Job Plan 11.0B |
07/81 |
Gravity Irrigation Pipeline Appurtenances |
549 KB |
|
|
Guide Plan 11.1 |
|
C.M. Pipe Riser for Buried Irrigation Pipe |
66
KB |
|
|
Job Plan 11.1 |
|
C.M. Pipe Riser for Buried Irrigation Pipe |
505 KB |
|
|
Job Plan 11.2 |
|
Concrete Ditch Lining |
1.37 MB |
|
|
Job Plan 12B |
01/06 |
Stockwater Pipeline Appurtenances |
187 KB |
1.72
MB |
|
Job Plan 12.1 |
02/09 |
Pipeline - See Class II Pipeline on Engineering Tools and
Software Page |
|
|
|
Guide Plan 14.1 |
|
Steel Rim Storage Tank with Concrete Base |
75.3
KB |
|
|
Job Plan 14.1 |
08/80 |
Tank - Steel Rim with Concrete Base |
478 KB |
|
|
Job Plan 14.2 |
|
Tank - Stockwater Tank on Gravel Base |
552 KB |
|
|
Job Plan 14.3 |
|
Tank - Concrete Frost-free Storage Tank |
1.03 MB |
|
|
Job Plan 14.4 |
|
Tank - Stockwater Tank on Concrete Base |
499 KB |
|
|
Job Plan 14.5 |
05/08 |
Concrete Apron for Stockwater Tank |
174 KB |
2.98
MB |
|
Job Plan 14.5B |
|
Tank - Rubber Tire With Steel Bottom |
378 KB |
|
|
Job Plan 14.5C |
05/08 |
Used Heavy Equipment Tire Casing
Stockwater Tank with Bentonite and Concrete Bottom |
472 KB |
2.98
MB |
|
Job Plan 14.6 |
04/90 |
Guard Post Assembly for Stockwater Tanks |
374 KB |
|
|
Job Plan 14.7 |
05/08 |
Fiberglass Tank |
508 KB |
1.01 MB |
|
Job Plan 15.0 |
|
Gully Control Structure (Chain Link) |
457 KB |
|
|
Job Plan 15.1 |
01/80 |
Subsurface Drain Appurtenances |
452 KB |
|
|
Job Plan 16.1 |
|
Expansion Joint Detail |
546 KB |
|
|
Job Plan 17.0 |
|
Concrete Livestock Crossing |
355 KB |
|
|
Job Plan 17.1 |
|
Gabion Livestock Crossing |
349 KB |
|
|
Job Plan 17.2 |
|
Rock Aggregate Channel Crossing |
209 KB |
369 KB |
|
Job Plan 17.2C |
|
Rock Aggregate Channel Crossing |
241
KB |
|
|
Job Plan 18 |
08/05 |
Erosion Control Measures - Silt Fence and Straw Bales |
147 KB |
|
|
Job Plan 20 |
|
Electric Fence |
512 KB |
|
|
Job Plans 21.1, 21.3 -21.5 |
10/07 |
Fabricated Windbreaks |
1.31 MB |
|
|
Job Plan Combined 12B and 14.5C |
05/08 |
Stockwater Pipeline Appurtenances/Used Heavy Equipment Tire Casing
Stockwater Tank with Bentonite and Concrete Bottom |
292 KB |
629 KB |
|
Job Plan Combined 12B, 14.5, 14.5C, and Title Page |
05/08 |
All Stockwater Pipeline Appurtenances Drawings |
720 KB |
|
|