Jump to main content.

WIPP Oversight
Waste Management: 

Docket A-98-49 Index

WIPP

WIPP Docket No. A-98-49 contains information about EPA's oversight activities since the certification decision. These documents will be reviewed and considered in making the decision whether to recertify that the Department of Energy has complied with the conditions of certification or whether to modify, suspend, or revoke the certification. It is one of three EPA WIPP dockets.

EPA's oversight responsibilities are assigned to EPA in the WIPP Compliance Criteria (40 CFR 194). They include a wide range of activities:

What information on the docket can I find in the index?

The index for Docket A-98-49 is a listing of the categories under which we arrange docket contents. There are items in only a few categories at this time.You can view a list of the items by clicking on the hyperlinked categories in the index below.

Docket A-98-49 Index

  1. Notices of Availability, Notice of Intent or ANPRM (If Any)
    1. Conditions of Compliance Certification
    2. Recertification
    3. Modification, Suspension or Revocation, if required
  1. Items Considered in Determining Compliance with Conditions of Certification, Recertification Decision, or Developing Proposal for Modification, Suspension or Revocation (If Required)
    1. Conditions of Compliance Certification

      A1. EPA reports, studies, contractor reports, other miscellaneous reports, or other factual memorandum (including memos of meetings and/or telephone conversations with outside persons)

      A2. DOE information submitted to EPA

      A3. EPA correspondence to persons outside the Agency and correspondence received from persons outside the Agency

      A4. EPA Waste Generator Site Inspection Decision Letters and Reports

    1. Recertification Activities and Continuing Compliance

      B1.EPA maintenance audit reports and other miscellaneous reports, studies, contractor reports, or other factual memorandum (including memos of meetings and/or telephone conversations with outside persons)

      B2.DOE information submitted to EPA

      B3.EPA correspondence to persons outside the Agency and correspondence received from persons outside the Agency

      B4.EPA Recertification Decision

    1. Modification, Suspension, or Revocation, If required

      C1.EPA reports, studies, contractor reports, other miscellaneous reports, or other factual memorandum (including memos of meetings and/or telephone conversations with outside persons)

      C2.DOE information submitted to EPA

      C3.EPA correspondence to persons outside the Agency and correspondence received from persons outside the Agency

    1. Interagency Review Materials: Drafts sent to other Government agencies for comment, a copy of each document accompanying such drafts, all comments by such agencies, and EPA's written response to each of these comments, if any.
  1. Proposal:Proposed Rule
    (If Required for Modification, Suspension or Revocation)

  2. Additional Items Considered After Proposal in
    Developing the Final Rule for Modification, Suspension, or Revocation (If Required)
    1. Additional EPA inspection reports, studies, contractor reports, other miscellaneous reports, or other factual memorandum
    2. Additional DOE information submitted to EPA for public review and comment
    3. Additional EPA correspondence to persons outside EPA
    4. Additional comments received (including any correspondence from persons outside EPA, whether or not labeled public comments)
    5. EPA memoranda of meetings and of telephone conversations with outside persons
    6. Transcripts of hearings
    7. Post-Hearing comments
    8. Interagency Review Materials (drafts sent to other Government agencies for comment, a copy of each document accompanying such drafts, all comments by such agencies, and any written responses of EPA to these comments)
  1. Final Action: Final Rule for Modification, Suspension or Revocation (If Required)
    1. Notice of Rulemaking
    2. Final Support Document
    3. Response to Comments Document
  1. Items Considered for Proposal of the Alternative Provisions to the Compliance Criteria, 40 CFR Part 194
    1. Notice of Proposed Rulemaking
    2. Reports, Studies, or other Factual Documentation
    3. Correspondence, including Memoranda, Meetings, and Telephone Conversations
    4. Transcripts of Hearings
    5. Notice of Final Rulemaking
    6. Final Support Document
    7. Response to Comments Document

Top of page

 


Local Navigation


Jump to main content.