June 1995

1  June           GRU noise test - 152.04:00 SCET.
                  KEP EPAC detector 'C' off - 152.01:27 SCET.
                 *DSS 15 acquired with LCP, dropped uplink, DR J7317
                  - 152.08:15 ERT.
                 *DSS 15 transmitter controller switched off erroneously.
                 *Nutation reached 0.42 degrees.
                 *McElrath manoeuvre performed - 152.10:45 SCET.
                 *DSS 15 maser failure - 152.11:25 ETT.
                  Resumed nutation damping operations - 152.10:53 SCET.

2  June           Nutation damping operations.

3  June           Nutation damping operations.

4  June           Nutation damping operations.

5  June           KEP IFC - 156.02:02 SCET.

6  June           Nutation damping operations.
                  STO RAR to HI SEP, HI POLAR OFF - 157.01:47 SCET.
                  STO RAR return hi receiver to SUM/POLAR - 157.21:47 SCET.
                  Manual bit rate change to 2K interleaved, for DSS 24 test - 
                  157.16:17 SCET.
                  Return to 1K science - 157.23:19 SCET.

7  June           Nutation damping operations.
158.10:58-11:18   20m bad/lost data due to interference from DSS 14
                  affecting DSS 15.

8  June           Nutation damping operations.
159.10:00-10:30   30m data loss due to maser failure at DSS 12.

9  June           Nutation damping operations.

10 June           Nutation damping operations.

11 June           Nutation damping operations.     

12 June           KEP IFC - 163.03:28 SCET.
                  GRU2 heater 1 (0.4W) switch on - 163.03:32 SCET.

13 June           Nutation damping operations.
                  STO RAR to HI SEP, HI POLAR OFF - 164.02:57 SCET.
                  Thermal reconfiguration: EPD 10W.
                   Dump PT & BT                           
                   Deschedule REC                         - 164.19:50 SCET.
                   Deschedule WDQ
                   Arm watchdog
                   Reconfigure EPDs to 10W                - 164.20:30 SCET.
                   Update PT & BT
                   Disarm watchdog
                   Schedule WDQ, REC                      - 164.21:49 SCET.
                   Dump TT                           
                  STO RAR return hi receiver to SUM/POLAR - 164.22:57 SCET.     

14 June           HED calibration - 165.00:00 SCET.
                  BAM-E counting interval from 12ms to 16ms - 165.00:32 SCET.

15 June           Nutation damping operations.
166.12:30-13:45   1hr 15m of patchy data due to bungled uplink transfer
SCET              DSS 15 to DSS 12; transfer attempted with wrong predicts.
                  Discrepancy Report: J7436.
166.20:25-20:32   7m data loss due to late transmitter switch on at DSS 15.
SCET              Discrepancy Report: J7441.

16 June           Nutation damping operations.
                  KEP heater switch on - 167.03:22 SCET.
167.02:57-03:57   Approx. 30m data loss due to procedural error: DSS 15 did
SCET.             not unwrap cable during precalibration, cable had to be
                  partially unwrapped during track. Discrepancy Report: J7446.

17 June           Nutation damping operations.

18 June           Nutation damping operations.

19 June           KEP IFC - 170.03:47 SCET.

20 June           SIM HET calibration - 171.00:00 SCET.
                  KEP Det C on, T1 & T3 - 171 01:27 SCET.
                  KEP Det C on, T2 & T4 - 171.01:33 SCET.
                  KEP RAM Dump - 171.01:47 SCET.
                  STO RAR to HI SEP, HI POLAR OFF - 171.01:57 SCET.
                  STO RAR return hi receiver to SUM/POLAR - 171.21:57 SCET.
171.22:15-22:55   40m realtime data loss due to TCA problem, DSS 15. DR J7475.

21 June           Nutation damping operations.      
                  KEP CR #318: GAS NG-direct - 172.00:00 SCET.
172.21:40-22:03   20m realtime data loss from DSS 15 due to incorrect TSF 
                  being referenced by Ops Chief. DR J7483.
        
22 June           Nutation damping operations.
173.00:50-02:00   Total of 20m realtime data loss due to incorrect cable-wrap
                  configuration at DSS 15. DR J7484.

23 June           Nutation damping operations.

24 June           Nutation damping operations.

25 June           Nutation damping operations.
                  KEP CR #319: GAS off - 176.12:00 SCET.

176.18:37-19:03   26m realtime data loss from DSS 15 due to TGC problems.  Data
                  unrecoverable from station.

26 June           KEP IFC - 177.03:49 SCET.

27 June           STO RAR to HI SEP, HI POLAR OFF - 178.01:48 SCET.
                  STO RAR return hi receiver to SUM/POLAR - 178.21:48 SCET.

28 June           Nutation damping operations.
                  HED calibration - 179.00:00 SCET.

29 June           Nutation damping operations.
                  GRU Routine Noise Test - 180.04:00 SCET.

180.01:33-01:53   20m realtime data loss from DSS 15 due to TGC problems.  Data
                  unrecoverable from station.

30 June           Nutation damping operations.

181.13:00-15:30   Period of bad/patchy data due to TGC/GCF problems. Should be
                  fully recoverable.