June 1995 1 June GRU noise test - 152.04:00 SCET. KEP EPAC detector 'C' off - 152.01:27 SCET. *DSS 15 acquired with LCP, dropped uplink, DR J7317 - 152.08:15 ERT. *DSS 15 transmitter controller switched off erroneously. *Nutation reached 0.42 degrees. *McElrath manoeuvre performed - 152.10:45 SCET. *DSS 15 maser failure - 152.11:25 ETT. Resumed nutation damping operations - 152.10:53 SCET. 2 June Nutation damping operations. 3 June Nutation damping operations. 4 June Nutation damping operations. 5 June KEP IFC - 156.02:02 SCET. 6 June Nutation damping operations. STO RAR to HI SEP, HI POLAR OFF - 157.01:47 SCET. STO RAR return hi receiver to SUM/POLAR - 157.21:47 SCET. Manual bit rate change to 2K interleaved, for DSS 24 test - 157.16:17 SCET. Return to 1K science - 157.23:19 SCET. 7 June Nutation damping operations. 158.10:58-11:18 20m bad/lost data due to interference from DSS 14 affecting DSS 15. 8 June Nutation damping operations. 159.10:00-10:30 30m data loss due to maser failure at DSS 12. 9 June Nutation damping operations. 10 June Nutation damping operations. 11 June Nutation damping operations. 12 June KEP IFC - 163.03:28 SCET. GRU2 heater 1 (0.4W) switch on - 163.03:32 SCET. 13 June Nutation damping operations. STO RAR to HI SEP, HI POLAR OFF - 164.02:57 SCET. Thermal reconfiguration: EPD 10W. Dump PT & BT Deschedule REC - 164.19:50 SCET. Deschedule WDQ Arm watchdog Reconfigure EPDs to 10W - 164.20:30 SCET. Update PT & BT Disarm watchdog Schedule WDQ, REC - 164.21:49 SCET. Dump TT STO RAR return hi receiver to SUM/POLAR - 164.22:57 SCET. 14 June HED calibration - 165.00:00 SCET. BAM-E counting interval from 12ms to 16ms - 165.00:32 SCET. 15 June Nutation damping operations. 166.12:30-13:45 1hr 15m of patchy data due to bungled uplink transfer SCET DSS 15 to DSS 12; transfer attempted with wrong predicts. Discrepancy Report: J7436. 166.20:25-20:32 7m data loss due to late transmitter switch on at DSS 15. SCET Discrepancy Report: J7441. 16 June Nutation damping operations. KEP heater switch on - 167.03:22 SCET. 167.02:57-03:57 Approx. 30m data loss due to procedural error: DSS 15 did SCET. not unwrap cable during precalibration, cable had to be partially unwrapped during track. Discrepancy Report: J7446. 17 June Nutation damping operations. 18 June Nutation damping operations. 19 June KEP IFC - 170.03:47 SCET. 20 June SIM HET calibration - 171.00:00 SCET. KEP Det C on, T1 & T3 - 171 01:27 SCET. KEP Det C on, T2 & T4 - 171.01:33 SCET. KEP RAM Dump - 171.01:47 SCET. STO RAR to HI SEP, HI POLAR OFF - 171.01:57 SCET. STO RAR return hi receiver to SUM/POLAR - 171.21:57 SCET. 171.22:15-22:55 40m realtime data loss due to TCA problem, DSS 15. DR J7475. 21 June Nutation damping operations. KEP CR #318: GAS NG-direct - 172.00:00 SCET. 172.21:40-22:03 20m realtime data loss from DSS 15 due to incorrect TSF being referenced by Ops Chief. DR J7483. 22 June Nutation damping operations. 173.00:50-02:00 Total of 20m realtime data loss due to incorrect cable-wrap configuration at DSS 15. DR J7484. 23 June Nutation damping operations. 24 June Nutation damping operations. 25 June Nutation damping operations. KEP CR #319: GAS off - 176.12:00 SCET. 176.18:37-19:03 26m realtime data loss from DSS 15 due to TGC problems. Data unrecoverable from station. 26 June KEP IFC - 177.03:49 SCET. 27 June STO RAR to HI SEP, HI POLAR OFF - 178.01:48 SCET. STO RAR return hi receiver to SUM/POLAR - 178.21:48 SCET. 28 June Nutation damping operations. HED calibration - 179.00:00 SCET. 29 June Nutation damping operations. GRU Routine Noise Test - 180.04:00 SCET. 180.01:33-01:53 20m realtime data loss from DSS 15 due to TGC problems. Data unrecoverable from station. 30 June Nutation damping operations. 181.13:00-15:30 Period of bad/patchy data due to TGC/GCF problems. Should be fully recoverable.