ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5413-9]

Environmental Impact Statements and Regulations; Availability of EPA Comments

Availability of EPA comments prepared February 12, 1996 through February 16, 1996 pursuant to the Environmental Review Process (ERP), under Section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at (202) 564-7167.
An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 14, 1995 (60 FR 19047).

Draft EISs

ERP No. D-DOE-A09825-00 Rating EC2, Disposition of Surplus WeaponsUsable Highly Enriched Uranium (HEU) to Low Enriched Uranium (LEU), Site Selection, Y-12 Plant Oak Ridge, TN; Savannah River Site, Aiken, SC; Babcock & Wilcox Naval Nuclear Fuel

[[Page 8060]]
Division, Lynchburg, VA and Nuclear Fuel Services Plant, Erwin, TN. Summary: EPA requested additional information concerning the highly enriched uranium and the preferred alternative to strenghten the final EIS and provide more clarity to the public. ERP No. D-FHW-D40272-PA Rating EC2, PA-0322 (Section B01) Transportation Corridor, Improvements from PA-0655 to Mt. Pleasant, Funding and COE Section 404 Permit, Mifflin County, PA. Summary: EPA expressed concerns for the potential impacts to wetlands, farmlands, and the Anabaptist community in the project area. In addition, there is insufficient information provided to determine the potential indirect impacts of the project. ERP No. D-FHW-D40273-PA Rating EO2, US 220 Transportation Improvements Project, Bald Eagle Village to Interstate 80 (I-80), Funding and COE Section 404 Permit, Blair and Centre Counties, PA. Summary: EPA expressed objections to the potential impacts to high quality streams, terrestrial and wildlife habitat, wetlands productive agricultural lands and farm operations. ERP No. D-FHW-D40274-PA Rating EC2, US 222 Relocation/ Reconstruction Project, Construction of the Warren Street Extension, Funding, Berks County, PA.
Summary: EPA expressed concerns with the potential impacts to streams and wetlands from both the limited and controlled access alternatives. The project alternatives also have the potential to significantly impact floodplains and wetlands. ERP No. D-FHW-D40276-PA Rating EC2, US 22 (S.R. 0022--Section C02) Highway Improvement, US 22 west of the Strodes Mills Area to US 322 near Lewistown. Funding and COE Section 404 Permit Issuance, Mifflin County, PA.
Summary: EPA expressed concerns for secondary impacts, air quality, and for the 200 acres of forested habitat impacted by the proposed project.
ERP No. D-FHW-D40277-WV Rating EC2, Merrick Creek Connector Improvements Project, between US 60 to WV-2 also a New Interchange at I-64, Funding and COE Section 404 Permit, Cabell County, WV. Summary: EPA's rating is based, in part, on the potential impacts to area streams resulting from various stream channel relocations, pipes and/or culverts and bridging which EPA believes will adversely affect the quality of the existing environment. ERP No. D-FHW-D40278-PA Rating LO, PA-26 Transportation Improvements, (College Avenue) between State College and Pleasant Gap, Funding, Appalachian Mountain, Centre County, PA. Summary: Based on our review and due to the diligent efforts of PADOT project team to avoid impacts to environmental resources, EPA has assigned a rating of LO. EPA supports the selection of Yellow-Green Option I as the environmentally preferable alternative. ERP No. D-ICC-D53008-WV Rating EC2, Elk River Railroad Railline (Docket No. 31989), Construction Exemption and Operation, NPDES Permit and Approval of Permits, Clay and Kanawha Counties, WV. Summary: The ICC should propose adequate mitigation for noise impacts in the final EIS as well as a clear statement of purpose and need.
ERP No. D-NPS-D61042-VA Rating LO, Richmond National Battlefield Park General Management Plan and Land Protection Plan, Implementation, Hanover, Henrico and Chesterfield Counties, VA. Summary: EPA expressed lack of objections with the proposed action. EPA recommends that the final EIS include an impact assessment of the proposed action on visitor use.
ERP No. D1-NAS-A12038-00 Rating LO, International Space Station, Assembly and Operation, Space Station Freedom (SSF). Summary: EPA's abbreviated review revealed no concerns with the proposed project.

Final EISs

ERP No. F-NPS-E61071-FL, Timucuan Ecological and Historic Preserve, General Management Plan and Development Concept Plans, Implementation, Fort Caroline National Memorial Area, Duval County, FL. Summary: EPA expressed concerns regarding impacts due to off-road vehicular use. It is proposed that impacts will be mitigated by the development of off-road vehicular use guidelines.

Dated: February 26, 1996
B. Katherine Biggs,
Associate Director, NEPA Compliance Division, Office of Federal Activities
[FR Doc. 96-4846 Filed 2-29-96; 8:45 am] BILLING CODE 6560-50-U

 
 