July 2001 1 July Nutation damping operations. As a result of above unscheduled command mod. changes, McElrath Man. with CLC enabled initiated at 182.00:49 SCET. Nutation went from 0.31 to 0.09 deg. 182.14:03-15:04 1h 1m realtime data lost due to complex-wide power failure at DSCC Goldstone. DR G10040 refers. Maximum nutation 0.31 deg. half-cone. 2 July Nutation damping operations. KEP IFC - 183.15:33 SCET. Maximum nutation 0.16 deg. half-cone. 3 July Nutation damping operations. KEP GAS CR#643: NG direct - 184.00:00 SCET. BAM-I CR#649: BAM-I aperture to motor position 2 - 184.00:17 SCET. 184.06:30-06:41 DSS63, 11m realtime data lost due to keyhole. Maximum nutation 0.25 deg. half-cone. 4 July Nutation damping operations. HED calibration - 185.01:00 SCET. McElrath Man. with CLC enabled initiated at 185.16:17 SCET. Nutation went from 0.24 to 0.06 deg. CLC wide deadband (0.23deg) selected - 185.20:55 SCET. CLC narrow deadband (0.125deg) selected - 185.21:58 SCET. Maximum nutation 0.28 deg. half-cone. Independence Day Holiday at JPL. 5 July Nutation damping operations. 186.22:07-22:29 DSS63; 22m realtime data lost as antenna stowed in order to investigate transmitter interlock problem, DR M100043 refers. Maximum nutation 0.26 deg. half-cone. 6 July Nutation damping operations. CLC wide deadband (0.23deg) selected - 187.16:13 SCET. CLC narrow deadband (0.125deg) selected - 187.17:13 SCET. Maximum nutation 0.27 deg. half-cone. 7 July Nutation damping operations. Maximum nutation 0.25 deg. half-cone. 8 July Nutation damping operations. Maximum nutation 0.22 deg. half-cone. 9 July Nutation damping operations. CLC wide deadband (0.23deg) selected - 190.01:14 SCET. CLC narrow deadband (0.125deg) selected - 190.01:51 SCET. KEP IFC - 190.15:27 SCET. CLC wide deadband (0.23deg) selected - 190.17:33 SCET. GAS CR#644: FSS UV mode Part 1 - 190.20:00 SCET. CLC off - 190.21:16 SCET. CLC wide deadband (0.23deg) selected - 190.22:34 SCET. CLC narrow deadband (0.125deg) selected - 190.23:52 SCET. Maximum nutation 0.28 deg. half-cone. 10 July Nutation damping operations. CLC wide deadband (0.23deg) selected - 191.02:09 SCET. CLC off - 191.05:41 SCET. McElrath Man. with CLC enabled initiated at 191.11:08 SCET. Nutation went from 0.29 to 0.08 deg. X wing heater switch on - 191.18:11 SCET. CLC wide deadband (0.23deg) selected - 191.18:35 SCET. CLC narrow deadband (0.125deg) selected - 191.20:37 SCET. Maximum nutation 0.29 deg. half-cone. 11 July Nutation damping operations. SIM HET calibration - 192.05:00 SCET. GAS CR#645: FSS UV mode Part 2 - 192.12:00 SCET. 192.14:16-14:45 DSS24; 29m realtime data lost due to SCP failure. DR G9100070 refers. CLC wide deadband (0.23deg) selected - 192.23:56 SCET. Maximum nutation 0.27 deg. half-cone. 12 July Nutation damping operations. CLC narrow deadband (0.125deg) selected - 193.01:29 SCET. CLC wide deadband (0.23deg) selected - 193.03:23 SCET. CLC narrow deadband (0.125deg) selected - 193.06:37 SCET. CLC wide deadband (0.23deg) selected - 193.09:05 SCET. CLC narrow deadband (0.125deg) selected - 193.11:29 SCET. Maximum nutation 0.20 deg. half-cone. 13 July Nutation damping operations. CLC wide deadband (0.23deg) selected - 194.01:06 SCET. CLC narrow deadband (0.125deg) selected - 194.05:27 SCET. CLC wide deadband (0.23deg) selected - 194.16:51 SCET. CLC narrow deadband (0.125deg) selected - 194.18:28 SCET. GAS CR#646: FSS UV mode Part 3 - 194.04:00 SCET. Maximum nutation 0.27 deg. half-cone. 14 July Nutation damping operations. GAS CR#647: FSS UV mode Part 4 - 195.20:00 SCET. Maximum nutation 0.32 deg. half-cone. 15 July Nutation damping operations. Maximum nutation 0.30 deg. half-cone. 16 July Nutation damping operations. KEP IFC - 197.16:16 SCET. GAS CR#648: FSS UV mode Part 5 - 197.12:00 SCET. Maximum nutation 0.19 deg. half-cone. 17 July Nutation damping operations. 198.00:00-00:30 DSS63; ~30m patchy data due to Predicts problem. DR M100070 refers. McElrath Man. with CLC enabled initiated at 198.01:26 SCET. Nutation went from 0.40 to 0.07 deg. GAS CR#650: NG Indirect - 198.19:00 SCET. Maximum nutation 0.40 deg. half-cone. 18 July Nutation damping operations. HED calibration - 199.01:00 SCET. McElrath Man. with CLC enabled initiated at 199.14:38 SCET. Nutation went from 0.25 to 0.06 deg. Maximum nutation 0.27 deg. half-cone. 19 July Nutation damping operations. Maximum nutation 0.32 deg. half-cone. 20 July Nutation damping operations. 201.02:46-02:56 DSS14; 10m realtime data lost - late AOS due to Predicts problem. DR G100102 refers. 201.03:23-03:43 DSS14; 20m realtime data lost - bad receiver Predicts, hard reset. DRs G100103-4 refer. Maximum nutation 0.32 deg. half-cone. 21 July Nutation damping operations. Maximum nutation 0.31 deg. half-cone. 22 July Nutation damping operations. 203.14:14-17:43 DSS14; 29m realtime data lost due to antenna halt; DR G100108 refers. 203.23:48-00:16 DSS24; 28m realtime data lost due to problems with planetary Predicts reload. Antenna halt & resweep. DR 100110 refers. Maximum nutation 0.16 deg. half-cone. 23 July Nutation damping operations. Maximum nutation 0.18 deg. half-cone. 204.00:34-00:52 DSS24; 18m realtime data lost due to resweep. DR 100110 refers. KEP IFC - 204.15:17 SCET. GAS CR#651: NG direct - 204.18:00 SCET. 24 July Nutation damping operations. Maximum nutation 0.20 deg. half-cone. 205.23:49-00:25 DSS54; 35m realtime data lost due to problems with predicts reload. Antenna halt & resweep. DR M100087 refers. 25 July Nutation damping operations. 206.00:51-01:07 DSS54; 17m realtime data lost due to problems reacquiring signal following Tx resweep. Earlier antenna pointing problems and Tx resweep caused nutation to grow. Maximum nutation 0.45 deg. half-cone. McElrath Man. with CLC enabled initiated at 206.02:24 SCET. Nutation went from 0.41 to 0.1 deg. BAM-E calibration - 206.15:26 SCET. BAM-I calibration - 206.15:36 SCET. 26 July Nutation damping operations. GRU noise test - 207.19:00 SCET. BT Part C update operation - 207.15:34 SCET. Maximum nutation 0.16 deg. half-cone. 27 July Nutation damping operations. 208.00:08-00:11 DSS24; 3m plus 10m realtime 1024bps data lost due to Rx lock loss, Tx off 208.00:43-00:53 and Tx resweep. Predicts problems suspected. DR G100122 refers. 208.23:58-00:30 DSS24; 32m realtime data lost due to problems with predicts reload. Antenna halt & resweep. DR G100125 refers. Maximum nutation 0.24 deg. half-cone. 28 July Nutation damping operations. 209.01:02-01:10 DSS24; 8m realtime 1024bps data lost due to 1-way to 2-way transition due to earlier predicts problems and subsequent Tx resweep. 209.23:22-23:33 12m realtime 1024bps data lost due to exciter interface problems at DSS24. DR G100130 refers. Maximum nutation 0.36 deg. half-cone. McElrath Man. with CLC enabled initiated at 209.03:14 SCET. Nutation went from 0.27 to 0.09 deg. 29 July Nutation damping operations. 210.23:59-00:14 DSS54; 15m realtime 1024pbs data lost due to suspected problems with predicts reload. DR M100095 refers. Maximum nutation 0.26 deg. half-cone. 30 July Nutation damping operations. 211.00:23-00:28 DSS54; 5m plus 12m realtime 1024bps data lost due to earlier predicts problems, 211.00:34-00:47 antenna halt and subsequent Tx resweep. KEP IFC - 211.15:16 SCET. Maximum nutation 0.27 deg. half-cone. 31 July Nutation damping operations. 212.07:19-08:04 DSS14; 46m realtime 1024pbs data 85% degraded due to UPS problems at SPC10. DSS65 came up to provide downlink and confirm U/L status. DR G100153 refers. Maximum nutation 0.15 deg. half-cone.