Task of Feb. 17, 2009
- continue ramp development in both blue and yellow with 28MHz. 9MHz development will be parasitic. Dedicated time will be given if RFG needs beam time to test.
- recover the ramp transmission efficiency to ramp 10084. Understand the difference between 100108 and 10084
- increase bunch intensity
- increase # of bunches
- continue store setup
- time in DX bpms: Rob
- investigate the Yellow Artus problem: Rob
- investigate the q89 swing problem: Steve
- Yellow CNI polarimeter setup, 2 hours around 1pm. Please contact Todd to see whether he can also perform BBA for Yellow snake bpms at the same time. If not, BBA will be scheduled to EVE shift
- Test the new pp91 ramp which Steve retuned Q89 trim current to avoid the overflow issue. For this, tune feedback system is needed.