Main Content
Mechanism Data Report: Facility - Operational
Mechanism Hierarchy
Systems
Air Traffic Control Systems
Air Traffic Control Facility
Facility - Operational
Legend: Hierarchy Element - Mechanism

Mechanism Data
Name (acro/abbrev) Facility - Operational (Facility - Operational...)
Description none
Mechanism Type System
 

Attachments
No attachments found for this mechanism.

Children for Facility - Operational
Mechanism  Facility - Operational (Facility - Operational...)
Mechanism  Air Route Traffic Control Center Facility (ARTCC Facility)
Mechanism  Air Traffic Control System Command Center (ATCSCC)
Mechanism  Airport Traffic Control Tower Facility (ATCT Facility)
Mechanism  Anchorage Air Route Traffic Control Center Facility (Anchorage ARTCC Facility)
Mechanism  CAP WP Stage 2 (CAP)
Mechanism  CAP WP Stage 3 (CAP)
Mechanism  Combined Center and Radar Approach Control Facility (CERAP Facility)
Mechanism  HAAM (HAAM)
Mechanism  Heating, Ventillation and Air Conditioning-Beacon Only Site (HVAC-BOS)
Mechanism  High Altitude Generic Airspace Concept (Airspace)
Mechanism  High Altitude Generic Airspace Operational Test Phase 1 (Airspace)
Mechanism  High Altitude Generic Airspace Operational Test Trial Phase 2 (Airspace)
Mechanism  Houston Area Air Traffic System (HAATS)
Mechanism  Houston Area Air Traffic System Phase 3A (HAATS P3A)
Mechanism  Houston Area Air Traffic System Phase 3B (HAATS P3B)
Mechanism  Houston Area Air Traffic System Phase 3C (HAATS P3C)
Mechanism  Initial HAAM Phase 1 - Implementation of Q-Routes (HAAM)
Mechanism  New York Integrated Control Complex (NYICC)
Mechanism  New York, New Jersey, Philadelphia Airspace Project (NY TRACON)
Mechanism  New York, New Jersey, Philadelphia Airspace Project (NY TRACON)
Mechanism  NextGen Facilities (NextGen Facilities)
Mechanism  Power System - Long-Range Radar (Pwr Sys - LRR)
Mechanism  Power Systems (Pwr Sys)
Mechanism  Terminal Radar Approach Control Facility (TRACON Facility)
Mechanism  WestCar (Airspace)
Mechanism  Wide Area Augmentation System (WAAS) Master Station (WMS)
Mechanism  Wide Area Reference Station (WRS)
Mechanism  Work Package Stage 1 (NY TRACON)
Mechanism  Work Package Stage 2 (NY TRACON)
Mechanism  Work Package Stage 3 (NY TRACON)
Mechanism  Work Package Stage 4 (NY TRACON)

Legend: Hierarchy Element - Mechanism
 

Mechanism ID 100089
Last Update 10 / 07 / 2003


Data Last Updated On: 05-Mar-2009
NAS Toolset Version: 20090312 6.8.4
processing time: 0.219 seconds