These time-lapse movies were made by taking a picture every five minutes, using NetCams from StarDot. The movies are played at 12 frames per second. That works out to
Elapased Real Time
Video Duration
1 hour (12 pictures)
1 sec
1 day
24 sec
1 week
2 min 48 sec
1 month
12 min 12 sec
1 year
2 hrs 26 min 6 sec
Edited ShortMIPPCam00 Raw Movie Annotations
MIPPCam00_0205
MIPPCam00_0206
MIPPCam00_0207
MIPPCam00_0208
MIPPCam00_0209
MIPPCam00_0210
MIPPCam00_0211
MIPPCam00_0212
MIPPCam00_0301
MIPPCam00_0302
MIPPCam00_0303
MIPPCam01_0301
MIPPCam01_0302
MIPPCam01_0303
Short Edited ~4/3/03
2'38" duration.Full resolution (Quicktime, 640 x 480, 32 MB, 209 kB/s)
QuickTime Default Settings (320 x 240):
"High" settings (11 MB, 72 kB/s)
"LAN" settings (17 MB, 111 kB/s)
"Medium" settings (4.6 MB, 30 kB/s)
"Low" settings (2.1 MB, 14 kB/s)
MIPPCam00_0310 excerpt covering the 02-03 October 2003 TOF installation. Unfortunately, there is a 6 hour gap on 3 October when most of the TOF went up. C'est la vie!
MIPPCam00_0205
Start
Stop
Duration
Tue Apr 23 12:33:04 2002
Fri May 31 23:55:03 2002
4:26.17
Date
Scene and Action
Empty MC7.
Apr 23, skips to
Apr 26, skips to
May 06 - 09Light spots from empty roof holes move across the floor.
May 10 - 20
Roof removal.
May 16
Rain down the walls.
May 17
Dawn, clouds racing, sunset.
May 21 - 31
Magnet assembly.
JGG and Rosie bases placement. JGG grout pour.May 22
JGG bottom coils.
skip to May 28
JGG largely stacked, under wraps.
May 29
JGG top coils and pole tip.
May 30
Rosie assembly behind JGG.
May 31
Rosie assembly from side of JGG
MIPPCam00_0206
Start
Stop
Duration
Sat Jun 01 00:00:02 2002
Tue Jun 18 10:28:25 2002
6:57.00
Date
Scene and Action
View from under bus bar to Rosie.
MC7 roof removed, magnets in place under tarps.Jun 01 - 02
Weekend. Time passes.
Jun 03
Rosie mirror plate installation.
Jun 04 - 18
Rain delay, time passes, nice sun splashes at dawn.
MIPPCam00_0207
Start
Stop
Duration
Mon Jul 01 11:15:02 2002
Tue Jul 30 22:46:16 2002
4:34.13
Date
Scene and Action
View from under bus bar.
MC7 roof removed, magnets in place under tarps.Jul 01 - 19
Removing PPA blocks from MP.
Jul 20 - 24
Vehicles and people moving about (work not obvious).
Jul 25 - 29
Roof sections appearing on east road.
Jul 30
First arches go up.
MIPPCam00_0208
Start
Stop
Duration
Thu Aug 01 00:01:15 2002
Fri Aug 16 16:06:29 2002
6:15.02
Date
Scene and Action
View from under bus bar.
MC7 roof going up.Aug 01 - 04
Work downstream of Rosie - hard to see.
Aug 05 - 06
Arches between magnets go up.
Aug 07
People moving around.
Aug 08 - 14
Rosie welding behind screen, various roof work.
Aug 15 - 16
People moving around.
MIPPCam00_0209
Start
Stop
Duration
Wed Sep 11 13:34:51 2002
Tue Oct 01 00:00:07 2002
7:34.22
Date
Scene and Action
View from under bus bar towards Rosie.
CKOV cart and DC2 stand in place.Sep 11 - 23
People moving around.
Sep 17
West rollup door closed (gets very dim, since overhead lights not in yet). Flashes of light from JGG east door, just behind camera.
Sep 23 - Oct 01
Camera moved to adjacent Rosie, pointing to JGG.
People moving around.MIPPCam00_0210
Start
Stop
Duration
Tue Oct 01 00:05:10 2002
Fri Oct 04 08:40:08 2002
1:20.15
Date
Scene and Action
View from Rosie to JGG.
CKOV cart and DC2 stand in place.Oct 01 - 04
People moving around.
MIPPCam00_0211
Start
Stop
Duration
Fri Nov 08 15:11:01 2002
Initial picture timestamps incorrect:
Thu Jan 01 00:04:12 1970Sun Nov 10 11:36:01 2002
Fri Jan 02 20:29:12 19708:31.22
Date
Scene and Action
View from Rosie to JGG.
CKOV cart and DC2 stand in place.Nov 08 - 09
Jan 02 20:29:12 1970
timecode 00:00:44.12
Nov 11 - 15
People moving around cabling JGG.
Nov 15 - 30
People moving around.
MIPPCam00_0212
Start
Stop
Duration
Sun Dec 1 00:00:45 2002
Tue Dec 31 23:55:43 2002
11:12.25
Date
Scene and Action
Upstream of JGG.
Dec 01 - 10
People moving around, mostly electrical work.
Dec 09
Cleanup.
Dec 10 - 13
ZipTrack arrives at JGG, downstream first (very fast).
Dec 13 - 18
Beam and cart setup and test.
Dec 19 - 23
ZipTrack operation, JGG beam right.
Dec 24 - 26
No action, holidays.
Dec 27
Remaining beam right.
Dec 28 - 29
Weekend.
Dec 30 - 31
Move to beam left, setup and test
MIPPCam00_0301
Start
Stop
Duration
Wed Jan 01 00:00:42 2003
Jan 2003
9:05.10
Date
Scene and Action
Upstream of JGG.
ZipTrack in JGG beam left half.Jan 01 - 03
ZipTracking.
Jan 04 - 05
Weekend.
Jan 06 - 08
People moving around.
Jan 09 - 12
Beam left rescan.
Dismantle and move to Rosie.Jan 13 13:11:34
Last upstream frame.
Mar 06 22:09:51 1970
Timecode 04:59.07Switch to magnet gap, watching Rosie ZipTrack.
Mar 07 21:24:53 1970
Last gap frame.
Jan 14 12:36:40
Timecode 05:22.17Back to upstream JGG
Jan 14
TPC Stand installation (very quick).
Jan 17 - 22
Rosie ZipTrack, seen through JGG.
Mar 15 16:29:37 1970
Timecode 08:29.00Switch to magnet gap, watching Rosie ZipTrack.
Jan 22 14:50:48
Timecode 08:36.07Back to upstream JGG.
Jan 23
Finish TPC stand installation.
Mar 17 02:44:14 1970
Timecode 09:03.07Switch to magnet gap.
Jan 24 10:52:45
Timecode 09:03.17Single frame upstream JGG.
Jan 24 18:28:14
Timecode 09:03.20Switch to magnet gap, note corrected time stamp.
Rosie ZipTrack.MIPPCam00_0302
No pictures.
MIPPCam00_0303
Start
Stop
Duration
Tue Mar 04 15:04:35 2003
Wed Mar 05 04:28:58 2003
13.15
Date
Scene and Action
Magnet gap.
Overnight, nothing happens.
MIPPCam01_0301
Start
Stop
Duration
Fri Jan 24 09:26:08 2003
Fri Jan 24 20:00:50 2003
1.22
Date
Scene and Action
Jan 24
ZipTrack working in Rosie, seen through JGG.
MIPPCam01_0302
No pictures.MIPPCam01_0303
Start
Stop
Duration
Tue Mar 04 15:06:11 2003
Wed Mar 05 04:30:29 2003
13.15
Date
Scene and Action
Mar 04
Overnight - nothing happens.