E907 MIPPCams

These time-lapse movies were made by taking a picture every five minutes, using NetCams from StarDot.  The movies are played at 12 frames per second.  That works out to

Elapased Real Time

Video Duration

1 hour (12 pictures)

1 sec

1 day

24 sec

1 week

2 min 48 sec

1 month

12 min 12 sec

1 year

2 hrs 26 min 6 sec

Contents

Edited Short

MIPPCam00_0310 for TOF

MIPPCam00 Raw Movie Annotations

MIPPCam00_0205
MIPPCam00_0206
MIPPCam00_0207
MIPPCam00_0208
MIPPCam00_0209
MIPPCam00_0210
MIPPCam00_0211
MIPPCam00_0212
MIPPCam00_0301
MIPPCam00_0302
MIPPCam00_0303

MIPPCam01 Raw Movies

MIPPCam01_0301
MIPPCam01_0302
MIPPCam01_0303


Edited Short

Short Edited ~4/3/03

2'38" duration.

Full resolution (Quicktime, 640 x 480, 32 MB, 209 kB/s)

QuickTime Default Settings (320 x 240):

"High" settings (11 MB, 72 kB/s)
"LAN" settings (17 MB, 111 kB/s)
"Medium" settings (4.6 MB, 30 kB/s)
"Low" settings (2.1 MB, 14 kB/s)

MIPPCam00 02-03 October 2003 for TOF

MIPPCam00_0310 excerpt covering the 02-03 October 2003 TOF installation. Unfortunately, there is a 6 hour gap on 3 October when most of the TOF went up. C'est la vie!

MIPPCam00 Raw Movie Annotations

MIPPCam00_0205

Start

Stop

Duration

Tue Apr 23 12:33:04 2002

Fri May 31 23:55:03 2002

4:26.17


Date

Scene and Action

Empty MC7.

Apr 23, skips to
Apr 26, skips to
May 06 - 09

Light spots from empty roof holes move across the floor.

May 10 - 20

Roof removal.

May 16

Rain down the walls.

May 17

Dawn, clouds racing, sunset.

May 21 - 31

Magnet assembly.
JGG and Rosie bases placement.  JGG grout pour.

May 22

JGG bottom coils.

skip to May 28

JGG largely stacked, under wraps.

May 29

JGG top coils and pole tip.

May 30

Rosie assembly behind JGG.

May 31

Rosie assembly from side of JGG

MIPPCam00_0206

Start

Stop

Duration

Sat Jun 01 00:00:02 2002

Tue Jun 18 10:28:25 2002

6:57.00


Date

Scene and Action


View from under bus bar to Rosie.
MC7 roof removed, magnets in place under tarps.

Jun 01 - 02

Weekend.  Time passes.

Jun 03

Rosie mirror plate installation.

Jun 04 - 18

Rain delay, time passes, nice sun splashes at dawn.

MIPPCam00_0207

Start

Stop

Duration

Mon Jul 01 11:15:02 2002

Tue Jul 30 22:46:16 2002

4:34.13


Date

Scene and Action


View from under bus bar.
MC7 roof removed, magnets in place under tarps.

Jul 01 - 19

Removing PPA blocks from MP.

Jul 20 - 24

Vehicles and people moving about (work not obvious).

Jul 25 - 29

Roof sections appearing on east road.

Jul 30

First arches go up.

MIPPCam00_0208

Start

Stop

Duration

Thu Aug 01 00:01:15 2002

Fri Aug 16 16:06:29 2002

6:15.02


Date

Scene and Action


View from under bus bar.
MC7 roof going up.

Aug 01 - 04

Work downstream of Rosie - hard to see.

Aug 05 - 06

Arches between magnets go up.

Aug 07

People moving around.

Aug 08 - 14

Rosie welding behind screen, various roof work.

Aug 15 - 16

People moving around.

MIPPCam00_0209

Start

Stop

Duration

Wed Sep 11 13:34:51 2002

Tue Oct 01 00:00:07 2002

7:34.22


Date

Scene and Action


View from under bus bar towards Rosie.
CKOV cart and DC2 stand in place.

Sep 11 - 23

People moving around.

Sep 17

West rollup door closed (gets very dim, since overhead lights not in yet). Flashes of light from JGG east door, just behind camera.

Sep 23 - Oct 01

Camera moved to adjacent Rosie, pointing to JGG.
People moving around.

MIPPCam00_0210

Start

Stop

Duration

Tue Oct 01 00:05:10 2002

Fri Oct 04 08:40:08 2002

1:20.15


Date

Scene and Action


View from Rosie to JGG.
CKOV cart and DC2 stand in place.

Oct 01 - 04

People moving around.

MIPPCam00_0211

Start

Stop

Duration

Fri Nov 08 15:11:01 2002
Initial picture timestamps incorrect:
Thu Jan 01 00:04:12 1970

Sun Nov 10 11:36:01 2002
Fri Jan 02 20:29:12 1970

8:31.22


Date

Scene and Action


View from Rosie to JGG.
CKOV cart and DC2 stand in place.

Nov 08 - 09
Jan 02 20:29:12 1970
timecode 00:00:44.12


Nov 11 - 15

People moving around cabling JGG.

Nov 15 - 30

People moving around.

MIPPCam00_0212

Start

Stop

Duration

Sun Dec 1 00:00:45 2002

Tue Dec 31 23:55:43 2002

11:12.25


Date

Scene and Action


Upstream of JGG.

Dec 01 - 10

People moving around, mostly electrical work.

Dec 09

Cleanup.

Dec 10 - 13

ZipTrack arrives at JGG, downstream first (very fast).

Dec 13 - 18

Beam and cart setup and test.

Dec 19 -  23

ZipTrack operation, JGG beam right.

Dec 24 - 26

No action, holidays.

Dec 27

Remaining beam right.

Dec 28 - 29

Weekend.

Dec 30 - 31

Move to beam left, setup and test

MIPPCam00_0301

Start

Stop

Duration

Wed Jan 01 00:00:42 2003

Jan 2003

9:05.10


Date

Scene and Action


Upstream of JGG.
ZipTrack in JGG beam left half.

Jan 01 - 03

ZipTracking.

Jan 04 - 05

Weekend.

Jan 06 - 08

People moving around.

Jan 09 - 12

Beam left rescan.
Dismantle and move to Rosie.

Jan 13 13:11:34

Last upstream frame.

Mar 06 22:09:51 1970
Timecode 04:59.07

Switch to magnet gap, watching Rosie ZipTrack.

Mar 07 21:24:53 1970

Last gap frame.

Jan 14 12:36:40
Timecode 05:22.17

Back to upstream JGG

Jan 14

TPC Stand installation (very quick).

Jan 17 - 22

Rosie ZipTrack, seen through JGG.

Mar 15 16:29:37 1970
Timecode 08:29.00

Switch to magnet gap, watching Rosie ZipTrack.

Jan 22 14:50:48
Timecode 08:36.07

Back to upstream JGG.

Jan 23

Finish TPC stand installation.

Mar 17 02:44:14 1970
Timecode 09:03.07

Switch to magnet gap.

Jan 24 10:52:45
Timecode 09:03.17

Single frame upstream JGG.

Jan 24 18:28:14
Timecode 09:03.20

Switch to magnet gap, note corrected time stamp.
Rosie ZipTrack.

MIPPCam00_0302

No pictures.

MIPPCam00_0303

Start

Stop

Duration

Tue Mar 04 15:04:35 2003

Wed Mar 05 04:28:58 2003

13.15


Date

Scene and Action


Magnet gap.
Overnight, nothing happens.



MIPPCam01 Raw Movie Annotations

MIPPCam01_0301

Start

Stop

Duration

Fri Jan 24 09:26:08 2003

Fri Jan 24 20:00:50 2003

1.22


Date

Scene and Action

Jan 24

ZipTrack working in Rosie, seen through JGG.

MIPPCam01_0302

No pictures.

MIPPCam01_0303

Start

Stop

Duration

Tue Mar 04 15:06:11 2003

Wed Mar 05 04:30:29 2003

13.15


Date

Scene and Action

Mar 04

Overnight - nothing happens.


PDB, 4/16/03