New Proposed Permits

Old Proposed Permits
EPA Comments
EPA Objections
Final Permits
Facility List
All Documents
U.S. EPA Region 9 Electronic Permit Submittal System
Document Filer
Use "Back" key in your browser to return
Main EPSS Home
Air Permit Home
Region 9 Home

Note: * indicates required field. Updated:04/01/2004
Hide details for Detailed InformationDetailed Information
Permitting Authority: MOJAVE DESERT AQMD

County: SAN BERNARDINO AFS Plant ID: 06-071-M0504

Facility: CEMEX RIVER PLANT AND BLACK MOUNTAIN QUARRY PLANT (FORMERLY S.W. PORTLAND CEMENT)

*Document Type: Proposed Title V Permit
-----------------------------------------------------------------
1
Mojave Desert
Air Quality Management District






Federal Operating Permit Number: 100005

For: CEMEX California Cement LLC

Facility: CEMEX River Plant and Black Mountain Quarry Plant

Issued Pursuant to MDAQMD Regulation XII
Effective Date: February xx, 2004

This Federal Operating Permit Expires On:
February xx, 2009
Issued By: Charles L. Fryxell
Air Pollution Control Officer


_________________________


14306 Park Avenue, Victorville, California 92392
Phone (760) 245-1661
FAX (760) 245-2022


MDAQMD Federal Operating Permit
CEMEX California Cement LLC
River Plant and Black Mountain Quarry Plant
Permit Number: 100005

2
TABLE OF CONTENTS

Page

Part I Introductory Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-3 through I-9

Part II Applicable Requirements and Emissions Limitations . . . . . . . II-10 through II-34

Part III Monitoring, Recordkeeping, Reporting and Testing Requirements . . III-35 through III-269

Part IV Standard Federal Operating Permit Conditions . . . . . . . . . . . . . IV-270 through IV-272

Part V Operational Flexibility Provisions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . V-273

Part VI Conventions, Abbreviations, Definitions . . . . . . . . . . . . . . . . VI -274 through VI -276























PART I
INTRODUCTORY INFORMATION

A. Facility Identifying Information:

Owner/Company Name: CEMEX California Cement LLC


Owner Mailing Address: CEMEX California Cement LLC
16888 North “E” Street
Victorville, California 92394-2999

Facility Name: CEMEX California Cement LLC

Facility Location(s): River Plant – Victorville
Black Mountain Quarry Facility - Apple Valley


MDAQMD Federal Operating Permit Number: 100005
MDAQMD Company Number: 0001
MDAQMD Facility Number: 00005

Responsible Official: Don Kelly
Title: Plant Manager
Phone Number:

Facility “Site” Contacts: Pam Riggio
Title: Environmental Manager
Phone Number: (760) 381-7629

Facility “Off Site” Contacts: None Provided
Phone Number:
Nature of Business: Manufacturing Clinker for Cement
SIC Code: 3241 Cement Manufacturing
Facility Location: UTM (km) 3831 N / 491 E

B. Description of Facility:

Federal Operating Permit (FOP number: 00100005) is for CEMEX California Cement LLC - River Plant and the Black Mountain Quarry Plant. CEMEX California Cement LLC - Black Mountain Quarry Facility is a Clinker Producer for Cement Manufacturing. The basic processes of the facility are the calcining of limestone, which is mixed with other raw materials. Calcining takes place in a pre-calciner and the rotary kiln. Ancillary processes are the cooling of the clinker, milling and loading for shipping to the River Plant of Cemex in Victorville, California about 17 miles away. Once at the River Plant, other materials are added to the clinker, additional crushing is effected and the finished cement is packaged and/or dispatched in bulk containers, by rail and truck.

It should be mentioned that the River Plant and the Black Mountain Quarry Plant are considered a single source for Title V Operating Permit status. These plants are connected by, a company-owned haul road and railroad on land owned in fee, and are thus contiguous and owned by the same corporate entity.

For this Operating Permit, the entire facility is called the River & Black Mountain Quarry Facilities and will be referred to as such throughout the entire document. It is noted that the District considers this to be two separate facilities for their permitting actions on the local level.

Subsequent to receiving the Application for a Federal Operating Permit, Cemex through its predecessor company Southdown, Inc. submitted an application for a major expansion for the facility described above. The expansion was evaluated in conjunction with the District’s Regulation XIII, New Source Review (NSR). Cemex shut down equipment at both the River and the Black Mountain Quarry Plants. Additionally, a new kiln and ancillary equipment, including control equipment was installed at the latter facility, while older control equipment was shut down and new control equipment added at the River Plant.

As part of the NSR, Cemex agreed to apply to amend the Federal Operating Permit once the new Authorities to Construct were issued, equipment designed and finalized and installed. This has been accomplished. All of these new pieces of equipment are included in this Operating Permit. The NSR equipment and other ancillary equipment have been added. Equipment that has been shut down as a result of the NSR action are not a part of this Operating Permit.


CEMEX - River Plant

Permit #Permit StatusPermit TypePermit Desc.
B000004PTOBasicCLINKER AND GYPSUM TRANSFER SYSTEM
B000007PTOBasicCLINKER AND GYPSUM TRANSFER SYSTEM
B000009PTOBasicHANDLING AND STORAGE SYSTEM
B000011PTOBasicCLINKER AND GYPSUM RECLAIM SYSTEM
B000045PTOBasicFINISH MILL (KFM7)
B000047PTOBasicFINISH MILL (KFM8)
B000049PTOBasicFINISH MILL (KE9)
B000051PTOBasicFINISH MILL (KFM10)
B000053PTOBasicFINISH MILL (KFM11)
B000059PTOBasicCEMENT TRANSFER TO STORAGE (DEPT. 60)
B000066PTOBasicSHIPPING - BULK, CEMENT
B001092PTOBasicCLINKER RECEIVING AND STORAGE SYSTEM (1203)
B001093PTOBasicFINISH MILL - (KFM - 12)
B001280PTOBasicCLINKER AND GYPSUM RECLAIM SYSTEM (1204)
B001287PTOBasicR/R RAW MATERIAL RECLAIM SYSTEM (1201)
B001288PTOBasicRECEIVING SYSTEM - RAW MATERIAL
B001480PTOBasicCEMENT WITHDRAWAL SYSTEM - NORTH PACKOUT
B001482PTOBasicCEMENT WITHDRAWAL SYSTEM
B001484PTOBasicPACKAGING SYSTEM
B001486PTOBasicPACKAGING SYSTEM
B001640PTOBasicSHIPPING - BULK CEMENT
B001683PTOBasicCEMENT, BULK LOADOUT
B001784PTOBasicTRANSFER EQUIPMENT
B001788PTOBasicTRANSFER SYSTEM
B001954PTOBasicSHIPPING, BULK CEMENT
B005192ATCBasicFINISH MILL KM1
B007633PTOBasicGYPSUM UNLOADING AND CONVEYING SYSTEM
B007785PTOBasicPLANT CLEANUP HOPPER
C000003PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (JBH 11)
C000005PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (JBH 1)
C000006PTOAir Pollution Control DeviceBAGHOUSE (JBH 2)
C000046PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (KBH 7)
C000048PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (KBH 8)
C000050PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (KBH 9)
C000052PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (KBH 10)
C000054PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (KBH 13)
C000055PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (KBH 15)
C000056PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (KBH 11)
C000057PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (JBH 14)
C000058PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (JBH 15)
C000060PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (LBH 1)
C000061PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (LBH 2)
C000062PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (LBH 3)
C000063PTOAir Pollution Control DeviceBAGHOUSE (LBH 4)
C000065PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (LBH 6)
C000068PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (MBH 2)
C000071PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (MBH 5)
C000075PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (MBH 6)
C001276PTOAir Pollution Control DeviceBAGHOUSE (JBH 5)
C001277PTOAir Pollution Control DeviceBAGHOUSE (JBH 4)
C001278PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (JBH3)
C001279PTOAir Pollution Control DeviceBAGHOUSE (KBH 16)
C001281PTOAir Pollution Control DeviceBAGHOUSE (JBH 6)
C001282PTOAir Pollution Control DeviceBAGHOUSE (JBH 7)
C001283PTOAir Pollution Control DeviceBAGHOUSE (JBH 8)
C001284PTOAir Pollution Control DeviceBAGHOUSE (JBH 9)
C001285PTOAir Pollution Control DeviceBAGHOUSE (KBH 17)
C001286PTOAir Pollution Control DeviceBAGHOUSE (KBH 18)
C001481PTOAir Pollution Control DeviceBAGHOUSE ( NBH 1)
C001483PTOAir Pollution Control DeviceBAGHOUSE (NBH 2)
C001485PTOAir Pollution Control DeviceBAGHOUSE (NBH 3)
C001487PTOAir Pollution Control DeviceBAGHOUSE (NBH 4)
C001569PTOAir Pollution Control DeviceBAGHOUSE (LBH 9)
C001684PTOAir Pollution Control DeviceBAGHOUSE (MBH 1)
C001911PTOAir Pollution Control DeviceBAGHOUSE (JBH 10)
C002011PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (KBH 14)
C002012PTOAir Pollution Control DeviceAIR POLLUTION OCNTROL EQUIPMENT (KBH 12)
C004854PTOAir Pollution Control DeviceBAGHOUSE (JBH17)
C004855PTOAir Pollution Control DeviceBAGHOUSE (JBH18)
C004856PTOAir Pollution Control DeviceBAGHOUSE (JBH19)
C004857PTOAir Pollution Control DeviceBAGHOUSE (JBH20)
C004858PTOAir Pollution Control DeviceBAGHOUSE (JBH21)
C004859PTOAir Pollution Control DeviceBAGHOUSE (JBH22)
C004860PTOAir Pollution Control DeviceBAGHOUSE (JBH23)
C004861PTOAir Pollution Control DeviceBAGHOUSE (JBH24)
C004862PTOAir Pollution Control DeviceBAGHOUSE (JBH25)
C004863PTOAir Pollution Control DeviceBAGHOUSE (JBH26)
C004864PTOAir Pollution Control DeviceBAGHOUSE (MBH4)
C004865PTOAir Pollution Control DeviceBAGHOUSE (MBH3)
C004867PTOAir Pollution Control DeviceBAGHOUSE (JBH28)
C004868PTOAir Pollution Control DeviceBAGHOUSE (JBH29)
C004869PTOAir Pollution Control DeviceBAGHOUSE (JBH27)
C005193ATCAir Pollution Control DeviceBAGHOUSE KBH23
C005194ATCAir Pollution Control DeviceBAGHOUSE KBH20
C005195ATCAir Pollution Control DeviceBAGHOUSE KBH22
C005196ATCAir Pollution Control DeviceBAGHOUSE KBH21
C007370ATCAir Pollution Control DeviceBAGHOUSE- MG3SB1BH1
C007371ATCAir Pollution Control DeviceBAGHOUSE- MG3LS11BH1
C007372ATCAir Pollution Control DeviceBAGHOUSE- MG3LS12BH1
C007634PTOAir Pollution Control DeviceBAGHOUSE (JBH 30)
C007672PTOAir Pollution Control DeviceBAGHOUSE JBH31
C007783PTOAir Pollution Control DeviceBAGHOUSE JBH32
C008185ATCAir Pollution Control DeviceBAGHOUSE (MG3BH10)
C008190ATCAir Pollution Control DeviceBAGHOUSE (MG3LS13BH1)
C008191ATCAir Pollution Control DeviceBAGHOUSE (MG3LS14BH1)
C008192ATCAir Pollution Control DeviceBAGHOUSE (MG3LS15BH1)
C008193ATCAir Pollution Control DeviceBAGHOUSE (MG3LS16BH1)
C008245ATCAir Pollution Control DeviceBAGHOUSE (JBH16)
C008246ATCAir Pollution Control DeviceBAGHOUSE (LBH10)
C008247ATCAir Pollution Control DeviceBAGHOUSE (LBH8)
C008438ATCAir Pollution Control DeviceBAGHOUSE (MBH5B)
C008565ATCAir Pollution Control DeviceBAGHOUSE (LBH11)
C008566
C008660
ATC
ATC
Air Pollution Control Device
Air Pollution Control Device
BAGHOUSE (LBH12)
BAGHOUSE- KBH19, WHICH SERVES FINISH MILL #12 SKS AIR SEPARATOR PROCESS UNDER DISTRICT PERMIT B001093
E004731PTOEmergency I C EIC ENGINE, DIESEL EMERGENCY COMPRESSOR
E004746PTOEmergency I C EEMERGENCY ELECTRICAL GENERATOR
N001452PTOGasoline Service Station - Non-RetailGASOLINE DISPENSING FACILITY (NON RETAIL)
T002049ATCTanks (or Silos)SILO - GROUP I LIME AND CEMENT STORAGE
T002050PTOTanks (or Silos)SILO - GROUP II CEMENT STORAGE
T002051PTOTanks (or Silos)SILO - GROUP III CEMENT STORAGE
T002052PTOTanks (or Silos)SILO - GROUP IV CEMENT STORAGE
T002053PTOTanks (or Silos)SILOS - CLINKER AND GYPSUM STORAGE
T007369ATCTanks (or Silos)CEMENT STORAGE BIN, SCALES & LOADOUT

CEMEX - Black Mountain Quarry Plant

Permit #Permit Description
B000001ATCBasicCOAL UNLOADING SYSTEM
B000080PTOBasicCRUSHER - PRIMARY LIMESTONE
B000081PTOBasicCRUSHER - SECONDARY LIMESTONE
B000082PTOBasicLIMESTONE SHIPPING
B000083ATCBasicRAW MATERIAL SYSTEM - NO. 1
B000085PTOBasicCLINKER LOADOUT SYSTEM - RAIL
B001083PTOBasicKILN (Q2) AND CLINKER COOLER SYSTEM
B001084PTOBasicRAW MILL NO. 2 SYSTEM
B001085PTOBasicCOAL/COKE TRANSFER EQUIPMENT
B001264PTOBasicCOAL UNLOADING SYSTEM
B001289PTOBasicLIMESTONE RECLAIM SYSTEM
B001666ATCBasicLIMESTONE STACKING SYSTEM - STORAGE
B001672PTOBasicCLINKER TRANSFER SYSTEM TO OUTSIDE STORAGE
B001673PTOBasicCLINKER TRANSFER SYSTEM - STORAGE SILO NO. 1
B001674PTOBasicCLINKER TRANSFER SYSTEM - STORAGE SILO NO. 2
B001675PTOBasicCLINKER TRANSFER SYSTEM - STORAGE DOME
B001676PTOBasicCLINKER RECLAIM SYSTEM - OUTSIDE STORAGE
B001677PTOBasicCLINKER RECLAIM SYSTEM - STORAGE DOME
B001678PTOBasicCLINKER RECLAIM SYSTEM - STORAGE SILO NO. 1
B001679PTOBasicCLINKER RECLAIM SYSTEM - STORAGE SILO NO. 2
B002709PTOBasicBULK TRUCK & SUPER SACK LOADOUT FACILITY
B005344PTOBasicCOAL STACKER & RECLAIM SYSTEM
B005362ATCBasicKILN (Q3) AND CLINKER COOLER SYSTEM
B007336ATCBasicROLL PRESS No. 1, RAW MATERIAL GRINDING
B007340ATCBasicKILN Q3 PRE-HEATER FEED SYSTEM
B007364ATCBasicROLL PRESS No. 2, RAW MATERIAL GRINDING
B007709PTOBasicCLINKER OUTSIDE STORAGE RECLAIM SYSTEM
C000087PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (DBH3)
C000092PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (HBH 6)
C000093PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (HBH 17)
C000095PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (EBH1)
C001090PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (GBH2)
C001091PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (GGF 2)
C001290PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (CBH1)
C001291PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (CBH2)
C001292PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (DBH5)
C001293PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (DBH2)
C001294PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (EBH3)
C001295PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (EBH4)
C001296PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (DBH4)
C001297PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (HBH 1)
C001298PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (HBH 2)
C001299PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (EBH 5)
C001300PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (HBH 19)
C001301PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (HBH 3)
C001302PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (HBH 4)
C001303PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT
C001308PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (HBH 18)
C001660PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (HBH 20)
C001667PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (DBH1)
C001668PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (EBH2)
C001669PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (HBH 22)
C001670PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (HBH 21)
C002081PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT
C002082PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT
C002710PTOAir Pollution Control DeviceAIR POLLUTION CONTROL EQUIPMENT (GWDBH)
C003249PTOAir Pollution Control DeviceBAGHOUSE (QBH1)
C004870PTOAir Pollution Control DeviceBAGHOUSE (HBH24)
C004871PTOAir Pollution Control DeviceBAGHOUSE (HBH23)
C005190PTOAir Pollution Control DeviceK2 G-COOLER DUST COLLECTOR (GGC BH)
C007337PTOAir Pollution Control DeviceBAGHOUSE, CBH3, at Drop Tube from CBC8 (B001666), RAW MATERIAL TRANSPORT SYSTEM
C007347PTOAir Pollution Control DeviceBAGHOUSE- HBH25, WHICH SERVES THE KILN Q-3 CLINKER PAN CONVEYOR
C007348PTOAir Pollution Control DeviceBAGHOUSE- EBH6, WHICH SERVES THE KILN Q-3 PRE-HEATER SYSTEM
C007350PTOAir Pollution Control DeviceBAGHOUSE- EBH7, CONTROL DEVICE FOR KILN Q-3 PRE-HEATER FEED SYSTEM
C007351PTOAir Pollution Control DeviceBAGHOUSE- EBH8, WHICH SERVES KILN Q-3 PRE-HEATER FEED SYSTEM
C007353PTOAir Pollution Control DeviceBAGHOUSE- DBH13, WHICH SERVES RAW MATERIAL TRANSPORT SYSTEM
C007355PTOAir Pollution Control DeviceBAGHOUSE-DBH14, CONTROLLING EMISSIONS FROM THE RAW MATERIAL TRANSPORT SYSTEM
C007356PTOAir Pollution Control DeviceBAGHOUSE-DBH15
C007358ATCAir Pollution Control DeviceBAGHOUSE- (FPFB4DC), WHICH SERVES THE NEW PULVERIZED COAL BIN
C007359ATCAir Pollution Control DeviceBAGHOUSE-FBH4P1
C007360ATCAir Pollution Control DeviceBAGHOUSE- DBH 9, WHICH SERVES ROLL PRESS 1(MATERIAL GRINDING)
C007361ATCAir Pollution Control DeviceBAGHOUSE DBH 7, WHICH SERVES ROLL PRESS No. 1
C007362ATCAir Pollution Control DeviceBAGHOUSE-DBH 8, WHICH SERVES ROLL PRESS No.1
C007363ATCAir Pollution Control DeviceBAGHOUSE- DBH 13, WHICH SERVES ROLL PRESS No.1
C007365ATCAir Pollution Control DeviceBAGHOUSE-DBH 12, WHICH SERVES ROLL PRESS No. 2
C007366ATCAir Pollution Control DeviceBAGHOUSE-DBH 10, WHICH SERVES ROLL PRESS No.2
C007367ATCAir Pollution Control DeviceBAGHOUSE-DBH 11, WHICH SERVES ROLL PRESS No. 2
C007368ATCAir Pollution Control DeviceMAIN BAGHOUSE, (GBH 3) WHICH SERVES KILN (Q3) AND CLINKER COOLER SYSTEM 3Q
C008244ATCAir Pollution Control DeviceBAGHOUSE (DBH6)
C008253PTOAir Pollution Control DeviceBAGHOUSE (EBH9)
C008473ATCAir Pollution Control DeviceBAGHOUSE - EBH10
C008474ATCAir Pollution Control DeviceBAGHOUSE - EBH11
C008567ATCAir Pollution Control DeviceBAGHOUSE (GBH3)
E001910PTOEmergency I C EIC ENGINE, EMERGENCY DIESEL GENERATOR
E004732PTOEmergency I C EIC ENGINE AIR COMPRESSOR, EMERGENCY
N002209PTOGasoline Service Station - Non-Retail GASOLINE DISPENSING FACILITY (NON RETAIL)
T001997PTOTanks (or Silos)SILO - CLINKER STORAGE (1104)
T001998PTOTanks (or Silos)SILO - STORAGE
T002210PTOTanks (or Silos)KILN FUEL
T002211PTOTanks (or Silos)KILN FUEL
T002212PTOTanks (or Silos)KILN FUEL
T004582PTOTanks (or Silos)TANK - WASTE OIL
T007339ATCTanks (or Silos)RAW MEAL TRANSPORT SYSTEM
T007357ATCTanks (or Silos)NEW PULVERIZED COAL BIN (FPFB 4)
T008472ATCTanks (or Silos)SILO-RAW MEAL ES4









PART II

FACILITYWIDE APPLICABLE REQUIREMENTS; EMISSIONS LIMITATIONS; MONITORING, RECORDKEEPING,
REPORTING AND TESTING REQUIREMENTS; COMPLIANCE CONDITIONS; COMPLIANCE PLANS

A. REQUIREMENTS APPLICABLE TO ENTIRE FACILITY AND EQUIPMENT:

1. A permit is required to operate this facility.
[Rule 203 - Permit to Operate; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 11/09/78 43 FR 52237; Current Rule Version = 07/25/77]

2. The equipment at this facility shall not be operated contrary to the conditions specified in the District permit to operate.
[Rule 203 - Permit to Operate; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 11/09/78 43 FR 52237; Current Rule Version = 07/25/77]

3. The Air Pollution Control Officer may impose written conditions on any permit.
[Rule 204 - Permit Conditions; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 11/09/78 43 FR 52237; Current Rule Version = 07/25/77]

4 Commencing work or operation under a permit shall be deemed acceptance of all the conditions so specified.
[Rule 204 - Permit Conditions; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 11/09/78 43 FR 52237; Current Rule Version = 07/25/77]

5. Posting of the permit to operate is required on or near the equipment or as otherwise approved by the APCO/District.
[Rule 206 - Posting of Permit to Operate; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 11/09/78 43 FR 52237; Current Rule Version = 07/25/77]

6. Owner/Operator shall not willfully deface, alter, forge or falsify any permit issued under District rules.
[Rule 207 - Altering or Falsifying of Permit; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) and 52.220(c)(31)(vi)(C) - 11/09/78 43 FR 52237; Current Rule Version = 07/25/77]

7. Permits are not transferable.
[Rule 209 - Transfer and Voiding of Permit; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 11/09/78 43 FR 52237; Current Rule Version = 07/25/77]

8. The equipment at this facility shall not require a District permit or be listed on the Title V permit if such equipment is listed in Rule 219 and meets the applicable criteria contained in Rule 219 (B). However, any exempted insignificant activities/equipment are still subject to all applicable facility-wide requirements.
[SIP Pending: Rule 219 - Equipment Not Requiring a Written Permit as Amended 12/21/94; Prior version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 11/09/78 43 FR 52237]

9. The Owner/Operator of this facility shall obtain a Federal Operating Permit for operation of this facility.
[Rule 221 - Federal Operating Permit Requirement; Version in SIP = Current, 40 CFR 52.220(c)(216)(i)(A)(2) - 02/05/96 61 FR 4217]

10. Owner/Operator shall pay all applicable MDAQMD permit fees.
[Rule 301 - Permit Fees; Applicable Version = 10/23/94, Applicable via Title V Program interim approval 02/05/96 61 FR 4217]

11. Owner/Operator shall pay all applicable MDAQMD Title V permit fees.
[Rule 312 - Fees for Federal Operating Permits; Applicable Version = 10/23/94, Applicable via Title V Program interim approval 02/05/96 61 FR 4217]

12. Stack and point source visible emissions from this facility, of any air contaminant (including smoke) into the atmosphere, shall not equal or exceed Ringelmann No. 1 for a period or periods aggregating more than three minutes in any one hour: [Rule 204 - Permit Conditions; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 11/09/78 43 FR 52237; Current Rule Version = 07/25/77]
[Rule 401 - Visible Emissions; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 09/08/78 43 FR 40011; Current Rule Version = 07/25/77]
[40 CFR 70.6 (a)(3)(i)(B) - Periodic Monitoring Requirements]

13. Owner/Operator shall not burn any PUC quality natural gas fuel at this facility containing sulfur compounds in excess of 800 ppm calculated as hydrogen sulfide at standard conditions, or any diesel fuel having a sulfur content in excess of 0.5 percent by weight. Compliance with Rule 431 sulfur limit for PUC quality natural gas fuel shall be by the exclusive use of utility grade/pipeline quality natural gas. Records of natural gas supplier fuel quality/sulfur content limit shall be kept on-site for review by District, state or federal personnel at any time. Compliance with Rule 431 sulfur limit for diesel fuel shall be determined by keeping records of the diesel fuel supplier’s fuel analysis guarantee showing fuel sulfur content. The sulfur content of diesel fuel shall be determined by use of ASTM method D 2622-82, or (ASTM method D 2880-71, or equivalent).
[40 CFR 70.6 (a)(3)(i)(B) - Periodic Monitoring Requirements]
[Rule 431 - Sulfur Content of Fuels; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 09/08/78 - 43 FR 40011; Current Rule Version = 07/25/77]

14. Emissions of fugitive dust from any transport, handling, construction or storage activity at this facility shall not be visible in the atmosphere beyond the property line of the facility.
[Rule 403 - Fugitive Dust; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 09/08/78 43 FR 40011; Current Rule Version = 07/25/77]

15. Owner/Operator shall comply with the applicable requirements of Rule 403.2 unless an “Alternative PM10 Control Plan” (ACP) pursuant to Rule 403.2(G) has been approved. Construction/Demolition activities shall comply with a District approved Dust Control Plan.
[SIP Pending: Rule 403.2 - Fugitive Dust Control for the Mojave Desert Planning Area as adopted 7/22/96 and SIP submitted 10/18/96]

16. Owner/Operator shall not discharge into the atmosphere from this facility, particulate matter except liquid sulfur compounds, in excess of the concentration at standard conditions, shown in Rule 404, Table 404 (a). [Rule 404 - Particulate Matter Concentration; Version in SIP = Current, 40 CFR 52.220(c)(42)(xiii)(A) - 12/21/78 43 FR 52489]

17. Owner/Operator shall not discharge into the atmosphere from this facility, solid particulate matter including lead and lead compounds in excess of the rate shown in Rule 405, Table 405(a). [Rule 405 - Solid Particulate Matter, Weight; Version in SIP = Current, 40 CFR 52.220(c)(42)(xiii)(A) - 12/21/78 43 FR 52489]

18. Owner/Operator shall not discharge into the atmosphere from this facility, from any single source of emissions whatsoever, Sulfur compounds, which would exist as a liquid or gas at standard conditions, calculated as sulfur dioxide (SO2) greater than or equal to 500 ppm by volume.
[40 CFR 70.6 (a)(3)(i)(B) - Periodic Monitoring Requirements]
[Rule 406 - Specific Contaminants; Version in SIP = 07/25/77, 40 CFR 52.220(c)(42)(xiii)(A) - 12/21/78 43 FR 52489, Subpart (a) only; Current Rule Version = 02/20/79]

19. Owner/Operator shall not discharge into the atmosphere from this facility, carbon monoxide (CO) exceeding 2000 ppm measured on a dry basis, averaged over a minimum of 15 consecutive minutes. [Rule 407 - Liquid and Gaseous Air Contaminants; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(C) - 09/08/78 43 FR 40011; Current Rule Version = 07/25/77]

20. Owner/Operator shall not build, erect, install or use any equipment at this facility, the use of which, without resulting in a reduction in the total release of air contaminants to the atmosphere, reduces or conceals an emission which would otherwise constitute a violation of Chapter 3 (commencing with Section 41700) of Part 4, of Division 26 of the Health and Safety Code or of District Rules. [Rule 408 - Circumvention; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(C) - 09/08/78 43 FR 40011; Current Rule Version = 07/25/77]

21. Owner/Operator shall not discharge into the atmosphere from this facility from the burning of fuel, combustion contaminants exceeding 0.23 gram per cubic meter (0.1 grain per cubic foot) of gas calculated to 12 percent of carbon dioxide (CO2) at standard conditions averaged over a minimum of 25 consecutive minutes.
[Rule 409 - Combustion Contaminants; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(C) - 09/08/78 43 FR 40011; Current Rule Version = 07/25/77]

22. APCO in his/her discretion, may refrain from enforcement action against an Owner/Operator of any equipment which has violated a technology-based emission limitation, including but not limited to conditions contained in any permit issued by the District establishing such emission limitation, provided that a Breakdown has occurred and: [SIP Pending: Rule 430 - Breakdown Provisions as amended 12/21/94 and submitted 02/24/95]

23. Owner/Operator of this facility shall not discharge organic materials into the atmosphere from equipment in which organic solvents or materials containing organic solvents are used, unless such emissions have been reduced by at least 85% or to the following: [Rule 442 - Usage of Solvents; Version in SIP = Current, 40 CFR 52.220(c)(51)(xii)(B) - 06/09/82 47 FR 25013]

24. Owner/Operator of this facility shall comply with the Organic Solvent Degreasing Operations requirements of Rule 1104 when engaged in wipe cleaning, cold solvent cleaning and/or vapor cleaning (degreasing) operations for metal/non-metal parts/products. These requirements are listed as follows:
(a) All degreasers shall be equipped with a cover which reduces solvent evaporation and minimizes disturbing the vapor zone.
(b) A permanent, conspicuous label summarizing the applicable operating requirements contained in Rule 1104. In lieu of a label, operating instructions may be posted near the degreaser where the operators can access the proper operating requirements of this rule.
(c) Cold Solvent Degreasers - Freeboard Requirements: (e) Cold Solvent Degreasers - Solvent Level Identification: (f) All Degreasers shall comply with the following operating requirements: (g) Rule 442 Applicability: (h) Solvent Usage Records: [Rule 1104 - Organic Solvent Degreasing Operations; Version in SIP = Current, 40 CFR 52.220(c)(207)(i)(D)(2) - 04/30/96 61 FR 18962, effective 11/30/94]

25. Owner/Operator’s use of Architectural Coatings at this facility shall comply with the requirements of Rule 1113, including the VOC limits specified in Rule 1113, part C, Table of Standards, as listed below:
Table of Standards
COATING: VOC (g/l)
Below Ground Wood Preservatives 600
Bond Breakers 350
Concrete Curing Compounds 350
Dry-Fog Coatings 400
Fire Retardant Coatings
Clear 650
Pigmented 350
Flat Coatings 250
General Primers, Sealers and Undercoaters 350
Graphic Arts (Sign) Coatings 500
Industrial Maintenance Coatings
Anti-Graffiti Coatings 600
General Coatings 420
High Temperature Coatings 550
Lacquer 680
Magnesite Cement Coatings 600
Mastic Texture Coatings 300
Metallic-Pigmented Coatings 500
Multi-Color Coatings 580
Opaque Stains 350
Opaque Wood Preservatives 350
Pretreatment (Wash) Primer 780
Quick Dry Enamels 400
Quick Dry Primers, Sealers and Undercoaters 450 Roof Coatings 300
Sanding Sealers 550
Semi-transparent Stains 350
Semi-transparent and Clear Wood Preservatives 350
Shellac
Clear 730
Pigmented 550
Swimming Pool Coatings 650
Swimming Pool Repair and Maintenance Coatings 650
Traffic Paints 250
For Other Surfaces 250
Black Traffic Coatings 650
Varnish 350
Waterproof Sealers 400
[Rule 1113 - Architectural Coatings; Version in SIP = 02/20/79, 40 CFR 52.220(c)(51)(xii)(B)-06/09/82 47 FR 25013; Current Rule Version = 09/02/92]

26. Owner/Operator shall apply coatings to metal parts and products subject to the provisions of Rule 1115 by using equipment properly operated according to manufacturer’s suggested guidelines using one or more of the following methods: (d) Hand Application Methods.
[Rule 1115 - Metal Parts and Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(239)(i)(A)(2) - 12/23/97 62 FR 67002, effective 2/23/98]

27. Owner/Operator shall not apply to metal parts and products any coatings, including any VOC-containing materials added to the original coating supplied by the manufacturer, which contain VOC in excess of the limits specified below unless emissions to the atmosphere are controlled to an equivalent level by air pollution abatement equipment with a capture and control system Combined Efficiency of at least 85 percent:
LIMITS
(Grams of VOC Per Liter of Coating, Less Water and Less Exempt Compounds)

Coating Air Dried Baked
g/L (lb/gal) g/L (lb/gal)

General 420 (3.5) 360 (3.0)
Military Specification 420 (3.5) 360 (3.0)
Etching Filler 420 (3.5) 420 (3.5)
Solar-Absorbent 420 (3.5) 360 (3.0)
Heat-Resistant 420 (3.5) 360 (3.0)
High-Gloss 420 (3.5) 360 (3.0)
Extreme High-Gloss 420 (3.5) 360 (3.0)
Metallic 420 (3.5) 420 (3.5)
Extreme Performance 420 (3.5) 360 (3.0)
Prefabricated Architectural
Component 420 (3.5) 275 (2.3)
Touch Up 420 (3.5) 360 (3.0)
Repair 420 (3.5) 360 (3.0)
Silicone-Release 420 (3.5) 420 (3.5)
High Performance
Architectural 420 (3.5) 420 (3.5)
Camouflage 420 (3.5) 420 (3.5)
Vacuum-Metalizing 420 (3.5) 420 (3.5)
Mold-Seal 420 (3.5) 420 (3.5)
High-Temperature 420 (3.5) 420 (3.5)
Electric-Insulating Varnish 420 (3.5) 420 (3.5)
Pan-Backing 420 (3.5) 420 (3.5)
Pretreatment Wash Primer 420 (3.5) 420 (3.5)
Clear Coating 520 (4.3) 520 (4.3)

[Rule 1115 - Metal Parts and Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(239)(i)(A)(2) - 12/23/97 62 FR 67002, effective 2/23/98]

28. The provisions of Part II, Condition A.26 shall not apply to the application of touch-up coatings, repair coatings, textured coatings, metallic coatings which have a metallic content of more than 30 grams per liter, mold-seal coatings, and to facilities that use less than three gallons of such coatings per day, as applied, including any VOC-containing materials added to the original coatings as supplied by the manufacturer.
[Rule 1115 - Metal Parts and Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(239)(i)(A)(2) - 12/23/97 62 FR 67002, effective 2/23/98]

29. The provisions of Part II, Conditions A.26 and A.27 shall not apply to: [Rule 1115 - Metal Parts and Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(239)(i)(A)(2) - 12/23/97 62 FR 67002, effective 2/23/98]

30. Owner/Operator of any facility classified as exempt or claiming to be exempt under Rule 1115, shall meet the record keeping requirements of Rule 1115 so as to be able to certify the exemption status.
[Rule 1115 - Metal Parts and Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(239)(i)(A)(2) - 12/23/97 62 FR 67002, effective 2/23/98]

31. Owner/Operator of any coating, coating operation, or facility which is exempt from all or a portion of the VOC limits of Rule 1115 shall comply with the provisions of Rule 442 unless compliance with the limits specified in Rule 1115 are achieved.
[Rule 1115 - Metal Parts and Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(239)(i)(A)(2) - 12/23/97 62 FR 67002, effective 2/23/98]

32. Owner/Operator shall comply with the following requirements when using solvent for surface preparation, cleanup, and paint removal, including paint spray equipment: [Rule 1115 - Metal Parts and Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(239)(i)(A)(2) - 12/23/97 62 FR 67002, effective 2/23/98]

33. Owner/Operator shall not specify the use in the District of any coating to be applied to any metal parts and products subject to the provisions of this Rule 1115 that does not meet the limits and requirements of Rule 1115. This requirement applies to all written or oral contracts.
[Rule 1115 - Metal Parts and Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(239)(i)(A)(2) - 12/23/97 62 FR 67002, effective 2/23/98]

34. Owner/Operator subject to Part II, Section A, conditions A.26 through A.39 shall comply with the following requirements: 2. mix ratio of components used. [Rule 1115 - Metal Parts and Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(239)(i)(A)(2) - 12/23/97 62 FR 67002, effective 2/23/98]

35. Owner/Operator shall obtain, and maintain records from the coating/ paint manufacturer regarding the VOC content of the coating/paint and any solvents contained therein.
[Rule 1115 - Metal Parts and Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(239)(i)(A)(2) - 12/23/97 62 FR 67002, effective 2/23/98]
[40 CFR 70.6 (a)(3)(i)(B) - Periodic Monitoring Requirements]

36. The Owner/Operator of any facility electing to engage in the mixing of coatings/ paints or solvents shall be required to obtain and maintain an analysis of the mixture from an independent testing laboratory.
[Rule 1115 - Metal Parts and Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(239)(i)(A)(2) - 12/23/97 62 FR 67002, effective 2/23/98]
[40 CFR 70.6 (a)(3)(i)(B) - Periodic Monitoring Requirements]

37. A violation of the limits contained in Part II, Conditions A.26 through A.39 as determined by any one of Part II, Conditions 38 and 39 Reference Method Tests shall constitute a violation of applicable Part II conditions.
[Rule 1114 - Wood Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(244)(i)(C)(1) - 08/18/98 63 FR 44132]
[Rule 1115 - Metal Parts and Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(239)(i)(A)(2) - 12/23/97 62 FR 67002, effective 2/23/98]

38. The following specified Reference Method Tests shall be used to determine compliance with the provisions of Part II, Conditions A.26 through A.39, as required by Rule 1114: [Rule 1114 - Wood Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(244)(i)(C)(1) - 08/18/98 63 FR 44132]
[40 CFR 70.6 (a)(3)(i)(B) - Periodic Monitoring Requirements]

39. The following specified Reference Method Tests shall be used to determine compliance with the provisions of Part II, Conditions A.26 through A.39, as required by Rule 1115: [Rule 1115 - Metal Parts and Products Coating Operations; Version in SIP = Current, 40 CFR 52.220(c)(239)(i)(A)(2) - 12/23/97 62 FR 67002, effective 2/23/98]
[40 CFR 70.6 (a)(3)(i)(B) - Periodic Monitoring Requirements]

40. Owner/Operator shall comply with all requirements of the District’s Title V Program, MDAQMD Rules 1200 through 1210 (Regulation XII - Federal Operating Permits).
[Applicable via Title V Program interim approval 02/05/96 61 FR 4217]



B. FACILITYWIDE MONITORING, RECORDKEEPING AND REPORTING REQUIREMENTS:

1. Any data and records generated and/or kept pursuant to the requirements in this federal operating permit (Title 5 Permit) shall be kept current and on site for a minimum of five (5) years from the date generated. Any records, data or logs shall be supplied to District, state or federal personnel upon request.
[40 CFR 70.6(a)(3)(ii)(B); Rule 1203(D)(1)(d)(ii)].

2. Any Compliance/Performance testing required by this Federal Operating Permit shall follow the administrative procedures contained in the District's Compliance Test Procedural Manual. Any required annual Compliance and/or Performance Testing shall be accomplished by obtaining advance written approval from the District pursuant to the District's Compliance Test Procedural Manual. All emission determinations shall be made as stipulated in the Written Test Protocol accepted by the District. When proposed testing involves the same procedures followed in prior District approved testing, then the previously approved Written Test Protocol may be used with District concurrence.
[Rule 204 - Permit Conditions; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 11/09/78 43 FR 52237; Current Rule Version = 07/25/77]

3. Owner/Operator of permit units subject to Comprehensive Emissions Inventory Report / Annual Emissions Determinations for District, State, and Federal required Emission Inventories shall monitor and record the following for each unit: [40 CFR 70.6(a)(3)(B) – Periodic Monitoring Requirements]
[Rule 204 - Permit Conditions; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 11/09/78 43 FR 52237; Current Rule Version = 07/25/77]
[Federal Clean Air Act: §110(a)(2)(F, K & J); §112; §172(c)(3); §182(a)(3)(A & B); §187(a)(5); § 301(a)] and in California Clean Air Act, Health and Safety Code §§39607 and §§44300 et seq.]

4 (a). Owner/Operator shall submit Compliance Certifications as prescribed by Rule 1203(F)(1) and Rule 1208. Compliance Certifications by a Responsible Official shall certify the truth, accuracy and completeness of the document submitted and contain a statement to the effect that the certification is based upon information and belief, formed after a reasonable inquiry; the statements and information in the document are true, accurate, and complete.
[40 CFR 70.6(c)(5)(i); Rule 1203(D)(1)(g)(vii); Rule 1203(F)(1); Rule 1208]
(b). Owner/Operator shall include in any Compliance Certification the methods used for monitoring such compliance.
[40 CFR 70.6(c)(5)(ii); Rule 1203(D)(1)(g)(viii)]
(c). Owner/Operator when submitting any Compliance Certification(s) to the MDAQMD shall contemporaneously submit such Compliance Certification(s) to USEPA.
[40 CFR 70.6(5)(iii); Rule 1203(D)(g)(ix)]
(d). Owner/Operator shall comply with any additional certification requirements as specified in 42 U.S.C §7414(a)(3), Recordkeeping, Inspections, Monitoring and Entry (Federal Clean Air Act §114(a)(3)) and 42 U.S.C. §7661c(b), Permit Requirements and Conditions (Federal Clean Air Act §503(b)), or in regulations promulgated thereunder.
[Rule 1203 (D)(1)(g)(x)]
(e). On an annual basis, of any given year, Owner/Operator shall submit a Compliance Certification Report, within 30 days of the anniversary of the date of the issuance or renewal of the Federal Operating Permit, to the APCO/District pursuant to District Rule 1203. Each report shall be certified to be true, accurate, and complete by “The Responsible Official” and a copy of this annual report shall also be contemporaneously submitted to the EPA Region IX Administrator.
[40 CFR 72.90.a and Rule 1203 (D)(1)(g)(v - x)]

5. Owner/Operator shall submit, on a semi-annual basis, a Monitoring Report to the APCO/District, with a copy to the EPA Region IX Administrator. Each Monitoring Report shall be submitted to correspond with the PCAMCT reporting deadlines. This Monitoring Report shall be certified to be true, accurate, and complete by “The Responsible Official” and shall include the following information and/or data: [1203(D)(1)(c)(i - iii); 1203(D)(1)(d)(i); Rule 1203(D)(1)(e)(i - ii); Rule 1203(D)(1)(g)(v - x)]

6. Owner/Operator shall promptly report all deviations from federal operating permit requirements including, but not limited to; any emissions in excess of permit conditions, deviations attributable to breakdown conditions, and any other deviations from permit conditions. Such reports shall include the probable cause of the deviation and any corrective action or preventative measures taken as a result of the deviation. [Rule 1203(D)(1)(e)(ii) and Rule 430(C)]
Prompt reporting shall be determined as follows: (b) For other deviations from permit conditions not involving excess emissions of air contaminants shall be submitted to the District with any required monitoring reports at least every six (6) months. [Rule 1203(D)(1)(e)(i)]

7. If any facility unit(s) should be determined not to be in compliance with any federally-enforceable requirement during the 5-year permit term, then owner/operator shall obtain a Schedule of Compliance approved by the District Hearing Board pursuant to the requirements of MDAQMD Regulation 5 (Rules 501 - 518). In addition, Owner/Operator shall submit a Progress Report on the implementation of the Schedule of Compliance. The Schedule of Compliance shall contain the information outlined in (b), below. The Progress Report shall contain the information outlined in (c), below. The Schedule of Compliance shall become a part of this Federal Operating Permit by administrative incorporation. The Progress Report and Schedule of Compliance shall comply with Rule 1201(I)(3)(iii) and shall include: [Rule 1201 (I)(3)(iii); Rule 1203 (D)(1)(e)(ii); Rule 1203 (D)(1)(g)(v)]



8. “CEMEX has determined that the transfer points from the clinker stacker to the clinker pile for outdoor storage and at the emergency pits frequently exceed the 10% opacity limit specified at 40 CFR 60 Subpart F, the 20% opacity limit of MDAQMD Rule 401 and the 40% limit allowed by Health & Safety Code §41701. The facility is currently operating under a Regular Variance granted by the MDAQMD Hearing Board March 13, 2003. CEMEX is developing a corrective action plan and Schedule of Compliance, which will be submitted by September 22, 2003 and presented at the next scheduled Hearing Board meeting for their approval pursuant to the requirements of MDAQMD Regulation 5. The corrective actions will include the submittal of a permit application request for an Authority to Construct. Cemex will also apply for a Conditional Use Permit, if required.”


C. FACILITYWIDE COMPLIANCE CONDITIONS:

1. Owner/Operator shall allow an authorized representative of the MDAQMD to enter upon the permit holder's premises at reasonable times, with or without notice.
[40 CFR 70.6(c)(2)(i); Rule 1203(D)(1)(g)(i)] 2. Owner/Operator shall allow an authorized representative of the MDAQMD to have access to and copy any records that must be kept under condition(s) of this Federal Operating Permit.
[40 CFR 70.6(c)(2)(ii); Rule 1203(D)(1)(g)(ii)] 3. Owner/Operator shall allow an authorized representative of the MDAQMD to inspect any equipment, practice or operation contained in or required under this Federal Operating Permit.
[40 CFR 70.6(c)(2)(iii); Rule 1203(D)(1)(g)(iii)] 4. Owner/Operator shall allow an authorized representative of the MDAQMD to sample and/or otherwise monitor substances or parameters for the purpose of assuring compliance with this Federal Operating Permit or with any Applicable Requirement.
[40 CFR 70.6(c)(2)(iv); Rule 1203(D)(1)(g)(iv)]

5. Owner/Operator shall remain in compliance with all Applicable Requirements / federally enforceable requirements by complying with all compliance, monitoring, record-keeping, reporting, testing, and other operational conditions contained in this Federal Operating Permit. Any noncompliance constitutes a violation of the Federal Clean Air Act and is grounds for enforcement action; the termination, revocation and re-issuance, or modification of this Federal Operating Permit; and/or grounds for denial of a renewal application.
[1203 (D)(1)(f)(ii)]

6. Owner/Operator shall comply in a timely manner with all applicable requirements / federally - enforceable requirements that become effective during the term of this permit.
[Rule 1201 (I)(2); Rule 1203(D)(1)(g)(v)]

7. Owner/Operator shall insure that all applicable subject processes comply with the provisions of 40 CFR 61, National Emission Standards for Hazardous Air Pollutants, subpart A, General Provisions, and subpart M, Asbestos.
[40 CFR 61, subparts A and M]

8. Owner/Operator shall notify APCO/District at least 10 working days before any applicable asbestos stripping or removal work is to be performed as required by section 61.145.b of 40 CFR 61 subpart M, National Emission Standard for Asbestos.
[40 CFR 61.145.b] 9. Owner/Operator shall notify the APCO/District, on an annual basis, postmarked by December 17 of the calendar year, of the predicted asbestos renovations for the following year as required by section 61.145.b of 40 CFR 61, subpart M [see cite for threshold triggering and applicability].
[40 CFR 61.145.b]






PART III

EQUIPMENT SPECIFIC APPLICABLE REQUIREMENTS; EMISSIONS LIMITATIONS; MONITORING, RECORDKEEPING,
REPORTING AND TESTING REQUIREMENTS; COMPLIANCE CONDITIONS; COMPLIANCE PLANS


RIVER PLANT


A. EQUIPMENT DESCRIPTION

GROUP #1 – CLINKER STORAGE & HANDLING

1. CLINKER AND GYPSUM TRANSFER SYSTEM – MDAQMD PERMIT # B000004; consisting of:
25.0 HP Belt Conveyor – JBC 18

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Materials processed shall contain sufficient natural or added moisture to ensure compliance with Rules 401, 402 and 403. Sufficient water and equipment to properly wet the material being processed shall be maintained in operable condition on the site and used as necessary to assure compliance.


2. R/R RAW MATERIAL RECLAIM SYSTEM (1201) – MDAQMD PERMIT # B001287; consisting of:
Controls: C000005 (JBH1) 253 hp; C000006 (JBH2) under permit B001288.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permits C000005 and C000006.


3. AIR POLLUTION CONTROL EQUIPMENT (JBH 1) – MDAQMD PERMIT # C000005; consisting of:
Serving Raw Material Receiving Conveyors (B001287).

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


4. RECEIVING SYSTEM - RAW MATERIAL – MDAQMD PERMIT # B001288; consisting of:
Control: C000006 (JBH2), C007672 (JBH - 31)
Belt Conveyor 36" x 576'; 505 FPM @ 1,000 TPH, contained within storage building - JBC4
Belt Conveyor 36" x 491'; 475 FPM @ 1,000 TPH, contained within storage building - JBC5

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permit C000006 & C007672 (JBH31).


5. BAGHOUSE (JBH 2) – MDAQMD PERMIT # C000006; consisting of:
Serves Raw Material Receiving Conveyors (B001288).
Reverse pressure cleaning SWPC type MK V fabric duster collector, two-compartment, with 144 6-1/8" dia x 150" long filament dacron sateen bags with American Standard 15 MH Series 106 exhauster - JBH2
A/C ratio: 1.74:1, 2,880 ft2, 5,000 cfm

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


6. BAGHOUSE (JBH 31) – MDAQMD PERMIT # C007672; consisting of:
Mikropul baghouse, Model No. 815-10-20, with 954 sqft of filter area, drawing 4710 acfm at 9 inches WG, driven by a 15 hp motor at 1800 rpm, filtering the exhaust from the drop point from belt conveyor JBC4 to belt conveyor JBC5 under permit B001288 ( Group #1).

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This baghouse shall be operated concurrently with conveyor belt JBC4 under permit B001288.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of data shall be required with the log kept on site for a minimum of five (5) years. This log shall be provided to District personnel on request.

5. This equipment does not require a regularly scheduled emission compliance test. However, emission compliance testing may be required at the discretion of the District.


7. CLINKER RECEIVING AND STORAGE SYSTEM (1203) – MDAQMD PERMIT # B001092; consisting of:
Control: C001277 (JBH4); C001278 (JBH3).

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment (and either of C001277 or C001278 depending on which silo is being filled).


8. BAGHOUSE (JBH 4)- MDAQMD PERMIT # C001277; consisting of:
Serves Clinker Conveyor to Storage (B001092).
Baghouse, Clinker Silo, Flex Kleen model 120 WRTC-64 (III), 979 ft2 cloth area, 4,500 cfm, 30 hp - JBH4

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of two years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


9. AIR POLLUTION CONTROL EQUIPMENT (JBH3) – MDAQMD PERMIT # C001278; consisting of:
Serves Clinker Conveyor to Storage (B001092).

Baghouse, Clinker Silo, Flex Kleen model 120 WRTC-48 (III), 734 ft2 cloth area, 4,000 cfm, 25 hp - JBH3

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of two years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


10. SILOS - CLINKER AND GYPSUM STORAGE – MDAQMD PERMIT # T002053; consisting of:
Control: under B001092: C001277 (JBH4) 30 hp; C001278 (JBH3) 25 hp.
Under B007633: C001276 JBH5) 25 hp; C007634 6 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. These silos shall not be filled unless vented to that functional air pollution control equipment covered by valid District permits:


11. GYPSUM UNLOADING AND CONVEYING SYSTEM – MDAQMD PERMIT # B007633; consisting of:
Conveyor belt J-BC-18 which unloads the two gypsum Truck Unloading Hoppers

Conveyor belt, JBC 19, fed by J-BC-18 and feeds gypsum silo, District permit T002053

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless vented to properly functioning baghouses under valid District permits C007634 and C001276.


12. BAGHOUSE (JBH 5) – MDAQMD PERMIT # C001276; consisting of:
Serves Gypsum unloading and conveying system (B007633).
Baghouse, Gypsum Silo, Flex Kleen model 120 WRTC-48(III), 734 ft2 cloth area, 4,000 cfm, 25 hp - JBH5

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


13. BAGHOUSE (JBH 30) – MDAQMD PERMIT # C007634; consisting of:
A Flex-Kleen model 120BVTS36, Arr. III. This unit has 36 bags, whose lengths are 120 in long. The unit is driven by a 6 hp fan rated to draw 2000 ACFM with an A:C ration of 3.6:1. The total area of the bags is 551 sq ft.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator, (o/o), shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This baghouse shall be operated concurrently with the Truck unloading system-gypsum train under valid District permit B007633.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of data shall be required with the log kept on site for a minimum of five (5) years. This log shall be provided to District personnel on request.

5. This equipment does not require a regularly scheduled emission compliance test. However, emission compliance testing may be required at the discretion of the District.


14. PLANT CLEAN-UP HOPPER – MDAQMD PERMIT # B007785; consisting of:
Hopper for front-end loader and truck unloading of miscellaneous plant materials (system includes an enclosed drop onto JBC1 (B001287)).
6 ton Clean-Up Hopper
Barber-Green Belt Conveyor 36" x 20' (10 tph) (JBC1RB)

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District Permit C007783 (JBH32).


15. BAGHOUSE (JBH 32) – MDAQMD PERMIT # C007783; consisting of:
An Arrestall single cotton cartridge baghouse with 132 sq ft of filter area, a fan of to be determined horsepower generating 1950 acfm through the cartridge (for an air-to-cloth ratio of 14 to 1) and expected emissions of 0.008 grain/cu ft.
This baghouse serves the Plant Cleanup Hopper (B007785). This unit vents the drop from the cleanup hopper belt to JBC1 (B001287).

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This baghouse shall operate concurrently with the equipment described as the Plant Clean-up Hopper (B007785) at the pickup point mentioned above.

2. The o/o shall maintain, on-site, an inventory of replacement bags sufficient to ensure compliance with applicable rules of District Regulation IV.

3. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required. The District may require emissions testing at its discretion.

4. The o/o shall operate and maintain this baghouse in strict accord with the recommendations of the manufacturer/supplier.



GROUP #2 CLINKER GYPSUM RECLAIM and STORAGE SYSTEM

16. CLINKER AND GYPSUM RECLAIM SYSTEM (1204) – MDAQMD PERMIT # B001280; consisting of:
Control: C001281 (JBH6); C001282 (JBH7); C001283 (JBH8); C001284 (JBH9) under B001788.
Bin Vibrator - JTS2VB2
Conveyor Vibratory - JVF3, 4, 5
Conveyor Belt - JBC9
Conveyor Belt - JBC10
Conveyor Belt - JBC11
Conveyor Belt - JBC12

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to the functioning air pollution control equipment covered by all three valid District permits C001281, C001282, and C001283. If flow is directed to system B000053, and to include an additional control (C001284), the flow is diverted to system B001788.


17. BAGHOUSE (JBH 6) – MDAQMD PERMIT # C001281; consisting of:
Serves Clinker and Gypsum Reclaim System (B001280).
Baghouse, FM-12, Flex Kleen model 120 WRTC-80 (III), 1,224 ft2 cloth area, 6,000 cfm, 30 hp - JBH6

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


18. BAGHOUSE (JBH 7) – MDAQMD PERMIT # C001282; consisting of:
Serves Clinker Conveyor to Storage (B001280).
Baghouse, Clinker and Gypsum Reclaim, Flex Kleen model 120 WRTC-48 (III), 734 ft2 cloth area, 3,500 cfm, 25 hp - JBH7

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


19. BAGHOUSE (JBH 8) – MDAQMD PERMIT # C001283; consisting of:
Serves Clinker Conveyor to Storage (B001280).
Baghouse, Clinker and Gypsum Reclaim, Flex Kleen model 120 WRTC-48 (III), 734 ft2 cloth area, 3,500 cfm, 25 hp - JBH8


PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


20. CLINKER AND GYPSUM RECLAIM SYSTEM – MDAQMD PERMIT # B000011; consisting of:
Control: C000003 (JBH11)

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment (C000003).


21. AIR POLLUTION CONTROL EQUIPMENT (JBH 11) – MDAQMD PERMIT # C000003; consisting of:
Serving Clinker & Gypsum Reclaim Conveyors (B000011). Baghouse, SWPC Mk V with 200 bags 6 1/8" dia x 149' 1, 5,650 ft2, 11,300 cfm, and A/C ratio 2:1. 25 hp - JBH11

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2 The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3 The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


22. CLINKER AND GYPSUM TRANSFER SYSTEM – MDAQMD PERMIT # B000007; consisting of:
Control: C004867 (JBH28); C004868 (JBH29); C004869 (JBH27); C000056 (KBH11) under B000053 and C001911 (JBH 10) under B001788.
Belt Conveyors (50, 15, 7.5 hp, 15hp) - JBC6, 7, 8, 13
Elevator - JE2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated without the baghouses with valid District permits (C000056, C004867, C004868 and C004869) in proper operation.


23. BAGHOUSE (JBH28) – MDAQMD PERMIT # C004867; consisting of:
Serving a transfer point on the conveyors which come from the clinker railroad unloading station with the following specifications:
Mfg. by Flex-Kleen
Model No.: 120-WSTS-36 Arr III
Exhaust Fan: 10 hp & 3,000 cfm
A/C: 5.4:1 & 551 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2, The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the conveyors which come from the clinker railroad unloading station covered in District permit B000007 and B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


24. BAGHOUSE (JBH29) – MDAQMD PERMIT # C004868; consisting of:
Serving a transfer point on the conveyors which come from the clinker railroad unloading station with the following specifications:
Mfg. by Flex-Kleen
Model No.: 120-WSTS-36 Arr III
Exhaust Fan: 10 hp & 3,000 cfm
A/C: 5.4:1 & 551 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2, The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the conveyors which come from the clinker railroad unloading station covered in District permit B000007 and B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


25. BAGHOUSE (JBH27) – MDAQMD PERMIT # C004869; consisting of:
Serving a transfer point on the conveyors which come from the clinker and gypsum transfer system with the following specifications:
Mfg. by Flex-Kleen
Model No.: 120-WSTS-49 Arr III
Exhaust Fan: 15 hp & 4,000 cfm
A/C: 5.3:1 & 750 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the conveyors which come from the clinker railroad unloading station covered in District permit B000007 and B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


26. HANDLING AND STORAGE SYSTEM – MDAQMD PERMIT # B000009; consisting of:
For Clinker Product serving Finish Mills 7, 8, 9, and 10. Controls: C008245 (JBH16); C004854 (JBH17); C004855 (JBH18); C004856 (JBH19); C004857 (JBH20); C004858 (JBH21); C004859 (JBH22); C004860 (JBH23); C004861 (JBH24); C004862 (JBH25); C004863 (JBH26); C004869 (JBH27); C004867 (JBH28); C004868 (JBH29);
Belt Conveyor - JBC7
Screw Conveyor - JBH12SC

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless all of the control equipment mentioned above are functioning and operating.


27. BAGHOUSE (JBH 17) – MDAQMD PERMIT # C004854; consisting of:
Serving a transfer point in the Handling and Storage System for Clinker Product serving Finish Mills 7, 8, 9 and 10 (B000009), with the following specifications:
Mfg. By DCE, Inc.
Model No.: C24H Pulse
Exhaust Fan: 3 hp & 1500 cfm
A/C: 5.8:1 & 258 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Handling and Storage System serving Finish Mills 7,8,9, and 10 covered in District permit B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


28. BAGHOUSE (JBH 18) – MDAQMD PERMIT # C004855; consisting of:
Serving a transfer point in the Handling and Storage System for Clinker Product serving Finish Mills 7, 8, 9 and 10 (B000009) with the following specifications:
Mfg. By DCE, Inc.
Model No.: C24H Pulse
Exhaust Fan: 3 hp & 1500 cfm
A/C: 5.8:1 & 258 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Handling and Storage System serving Finish Mills 7, 8, 9, and 10 covered in District permit B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


29. BAGHOUSE (JBH 19) – MDAQMD PERMIT # C004856; consisting of:
Serving a transfer point in the Handling and Storage System for Clinker Product serving Finish Mills 7, 8, 9, and 10 (B000009) with the following specifications:
Mfg. by DCE, Inc.
Model No.: C24H Pulse
Exhaust Fan: 3 hp & 1500 cfm
A/C: 5.8:1 & 258 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Handling and Storage System serving Finish Mills 7, 8, 9, and 10 covered in District permit B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


30. BAGHOUSE (JBH 20) – MDAQMD PERMIT # C004857; consisting of:
Serving a transfer point in the Handling and Storage System for Clinker Product serving Finish Mills 7, 8, 9, and 10 (B000009) with the following specifications:
Mfg by DCE, Inc.
Model No.: C24H Pulse
Exhaust Fan: 3 hp & 1500 cfm
A/C: 5.8:1 & 258 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Handling and Storage System serving Finish Mills 7, 8, 9, and 10 covered in District permit B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.

31. BAGHOUSE (JBH 21) – MDAQMD PERMIT # C004858; consisting of:
Serving a transfer point in the Handling and Storage System for Clinker Product serving Finish Mills 7, 8, 9 and 10 (B000009) with the following specifications:
Mfg. By DCE, Inc.
Model No.: C24H Pulse
Exhaust Fan: 3 hp & 1500 cfm
A/C: 5.8:1 & 258 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Handling and Storage System serving Finish Mills 7, 8, 9, and 10 covered in District permit B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


32. BAGHOUSE (JBH 22) – MDAQMD PERMIT # C004859; consisting of:
Serving a transfer point in the Handling and Storage System for Clinker Product serving Finish Mills 7, 8, 9 and 10 (B000009) with the following specifications:
Mfg. By DCE, Inc.
Model No.: C24H Pulse
Exhaust Fan: 3 hp & 1500 cfm
A/C: 5.8:1 & 258 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Handling and Storage System serving Finish Mills 7,8,9, and 10 covered in District permit B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


33. BAGHOUSE (JBH 23) – MDAQMD PERMIT # C004860; consisting of:
Serving a transfer point in the Handling and Storage System for Clinker Product serving Finish Mills 7, 8, 9 and 10 (B000009) with the following specifications:
Mfg. By DCE, Inc.
Model No.: C24H Pulse
Exhaust Fan: 3 hp & 1500 cfm
A/C: 5.8:1 & 258 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Handling and Storage System serving Finish Mills 7,8,9, and 10 covered in District permit B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


34. BAGHOUSE (JBH 24) – MDAQMD PERMIT # C004861; consisting of:
Serving a transfer point in the Handling and Storage System for Clinker Product serving Finish Mills 7, 8, 9 and 10 (B000009) with the following specifications:
Mfg. By DCE, Inc.
Model No.: C24H Pulse
Exhaust Fan: 3 hp & 1500 cfm
A/C: 5.8:1 & 258 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Handling and Storage System serving Finish Mills 7,8,9, and 10 covered in District permit B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


35. BAGHOUSE (JBH 25) – MDAQMD PERMIT # C004862; consisting of:
Serving a transfer point in the Handling and Storage System for Clinker Product serving Finish Mills 7, 8, 9 and 10 (B000009) with the following specifications:
Mfg. By DCE, Inc.
Model No.: C24H Pulse
Exhaust Fan: 3 hp & 1500 cfm
A/C: 5.8:1 & 258 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Handling and Storage System serving Finish Mills 7,8,9, and 10 covered in District permit B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


36. BAGHOUSE (JBH 26) – MDAQMD PERMIT # C004863; consisting of:
Serving a transfer point in the Handling and Storage System for Clinker Product serving Finish Mills 7, 8, 9 and 10 (B000009) with the following specifications:
Mfg. By DCE, Inc.
Model No.: C24H Pulse
Exhaust Fan: 3 hp & 1500 cfm
A/C: 5.8:1 & 258 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Handling and Storage System serving Finish Mills 7,8,9, and 10 covered in District permit B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


37. BAGHOUSE (JBH 16) – MDAQMD PERMIT # C008245; consisting of:
DCE Model C24H, Pulse-Jet, airflow of 1500 acfm at ambient temperature, 3 bhp motor, Polyester Bags, 258 ft2 of cloth area and Air-to-Cloth ratio of 5.8:1, maximum emission rate of 0.01 grains PM-10/dscf

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with the Clinker and Gypsum System under valid District permit number B000009 at Clinker bin JCH7.

7. This baghouse shall discharge no more than 0.13 lb/hour, at a maximum concentration of 0.01 grains/dscf of PM10, at the operating conditions described above.

8. Opacity measurements shall not exceed 10% aggregated for 3 minutes in any 1-hour period.

9. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required, however, an initial source test is required as noted below. The District may require additional emissions testing at its discretion.

10. Within Sixty days of initial start-up, the o/o shall conduct a compliance test in accordance with the District Compliance Test Procedural Manual to verify the PM-10 emission factor of 0.01 grains/DSCF, as submitted with the application. This test is required to show compliance with Permit conditions and Rules 404 and 405. The District shall be notified at least 10 working days prior to the test date. The test report shall be submitted to the District within 45 days following the tests.


38. TRANSFER SYSTEM – MDAQM D PERMIT # B001788; consisting of:
To Clinker/Gypsum Bins. Control: C001284 (JBH9); C001911 (JBH10).
Belt Conveyor - JBC13
Clinker Tripper - JBC13T

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permits C001284 and C001911.


39. BAGHOUSE (JBH 9) – MDAQMD PERMIT # C001284; consisting of:
Serves Clinker Conveyor to Storage (B001788).
Baghouse, Clinker and Gypsum Reclaim, Flex Kleen model 120 WRTC-48 (III), 734 ft2 cloth area, 3,500 cfm, 25 hp - JBH9

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


40. BAGHOUSE (JBH 10) – MDAQMD PERMIT # C001911; consisting of:
Serves Clinker Conveyor to Storage (B001788).
Pulse Jet type Dust Collector, Clinker/Gypsum Reclaim, DCE Vokes, 215 ft2, 1,500 cfm. Fan: 5 hp. - JBH10

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.



GROUP #3A – FINISH MILL #1 (FM #1)

41. FINISH MILL (KM 1) –MDAQMD PERMIT # B005192; consisting of:
A finish grinding system with the following equipment (as shown on diagram 9948-F-210):
Discharge Airslide Fan
Elevator Airslide Fan
SKS Rejects Airslide Fan
SKS Baghouse Airslide Fan
Product Airslide Gan #1
Cement Cooler Bypass Diverter Gate
SKS Separator (and related misc)
Feed Belt Conveyor
Feed Nuisance Baghouse
Feed Nuisance Baghouse Fan
Sweep Baghouse
Sweep Baghouse Rotary Airlock
Sweep Fan
Sweep Fan Damper
Sweep Baghouse Hopper Screw Conveyor
Sweep Baghouse Transport Screw Conveyor
SKS Baghouse
SKS Baghouse Rotary Airlocks (2, 7.5 hp each)
SKS Separator Fan
SKS Separator Fan Damper
Cement Bag Filter Fan
Cement Cooler (and related misc)
Bucket Elevator (and related misc)
Finish Mill #1 - KM1 (and related misc)
Ball Traps
Ball Trap Blower
SKS Rejects Flowmeter
Grinding Aid System (and related misc)
Floating Bearing Lube Oil System (and related misc)
Fixed Bearing Lube Oil System (and related misc)
MAAG Drive Lube System
Motor Bearing Lube System
Spray Water System
Plant Air Compressor/Air Dryer
Clinker Weighfeeder
Clinker Weighfeeder Cleanup Drag Conveyor
Gypsum Weighfeeder (and related misc)
Gypsum Weighfeeder Cleanup Conveyor
Feed Nuisance Baghouse Rotary Valve

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated without the concurrent operation of properly maintained air pollution control equipment covered by valid District permits, as follows: Finish Mill Sweep Dust Collector (C005196), Finish Mill Separator Dust Collector (C005195), Product Nuisance Dust Collector (C005194), and Feed Belt Dust Collector (C005193).

2. This equipment shall not be operated unless the following areas are stabilized with asphalt, concrete or asphaltic concrete sufficient to eliminate dust emissions from soil erosion: ~50,000 sq. ft. of employee parking lot northeast of the River Plant entrance; ~12,000 sq. ft. of access beneath and around the River Plant Truck Access Platform; ~5,000 sq. ft. of parking lot east of the River Plant main office building; ~15,000 sq. ft. of parking and access north of the Quarry Control Room; ~35,000 sq. ft. of access and operations area west of the Quarry maintenance building; ~60,000 sq. ft. of access and operations area south and east of the Quarry maintenance building; ~20,000 sq. ft. of access and operations area north of the K2 baghouse; ~7,000 sq. ft. of access around K2 pier six; ~10,000 sq. ft. of access and operations area around the Quarry Therminol Building; and ~3,000 square feet of access and operations area south of the K2 Preheater dust collectors.


42. BAGHOUSE (KBH 23) – MDAQMD PERMIT # C005193; consisting of:
Product Nuisance Dust Collector equipped with a 50 hp fan generating 10,000 acfm with an exhaust temperature of 100 deg F. Baghouse manufacturer, bag material, number of bags, bag dimensions and total filter surface area will be specified by the applicant when determined.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This baghouse shall operate concurrently with the equipment described as the Finish Mill KM1 (B005192).

2. The owner/operator (o/o) shall conduct a minimum program of inspection and maintenance (frequencies may be changed upon successful demonstration to the District that less frequent monitoring is equally effective). The o/o shall maintain current and on-site for five (5) years a log of this information which shall be provided to District personnel upon request:
a. Pressure differential across the bags (weekly);
b. Baghouse stack visible emissions determination (monthly);
c. Bags and bag suspension system inspection (quarterly); and
d. Bag replacements and repairs.

3. The o/o shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles which produce minimum emissions of air contaminants.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall discharge no more than 0.80 lb/hour of particulate at a maximum concentration of 0.010 grain/dscf at the operating conditions given in the above description.

7. Within 180 days from the initial start-up of this unit, the o/o shall conduct emissions testing in strict accord with all procedures described in the District's Compliance Test Procedural Manual. This testing is necessary to demonstrate compliance with permit conditions in 6 above and District Rules 404 and 405. The District shall be notified no less than 10 working days prior to the test and receive the final test report of emissions no later than 45 days subsequent to the final day of on-site sampling and measurement.


43. BAGHOUSE (KBH 20) – MDAQMD PERMIT # C005194; consisting of:
Feed Belt Dust Collector equipped with a 50 hp fan generating 5000 acfm with an exhaust temperature of 100 deg F. Baghouse manufacturer, bag material, number of bags, bag dimensions and total filter surface area will be specified by the applicant when determined.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This baghouse shall operate concurrently with the equipment described as the Finish Mill KM1 (B005192).

2. The owner/operator (o/o) shall conduct a minimum program of inspection and maintenance (frequencies may be changed upon successful demonstration to the District that less frequent monitoring is equally effective). The o/o shall maintain current and on-site for five (5) years a log of this information which shall be provided to District personnel upon request:
a. Pressure differential across the bags (weekly);
b. Baghouse stack visible emissions determination (monthly);
c. Bags and bag suspension system inspection (quarterly); and
d. Bag replacements and repairs.

3. The o/o shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles which produce minimum emissions of air contaminants.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall discharge no more than 0.40 lb/hour of particulate at a maximum concentration of 0.010 grain/dscf at the operating conditions given in the above description.

7. Within 180 days from the initial start-up of this unit, the o/o shall conduct emissions testing in strict accord with all procedures described in the District's Compliance Test Procedural Manual. This testing is necessary to demonstrate compliance with permit conditions in 6 above and District Rules 404 and 405. The District shall be notified no less than 10 working days prior to the test and receive the final test report of emissions no later than 45 days subsequent to the final day of on-site sampling and measurement.


44. BAGHOUSE (KBH 20) – MDAQMD PERMIT # C005194; consisting of:
Finish Mill #1 (KM1) Separator Stack Dust Collector filtering the exhaust stream from the separator generated by the separator 800 hp fan (173,000 acfm) with an exhaust temperature of 176 deg F. Baghouse manufacturer, bag material, number of bags, bag dimensions and total filter surface area will be specified by the applicant when determined.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This baghouse shall operate concurrently with the equipment described as the Finish Mill KM1 (B005192).

2. The owner/operator (o/o) shall conduct a minimum program of inspection and maintenance (frequencies may be changed upon successful demonstration to the District that less frequent monitoring is equally effective). The o/o shall maintain current and on-site for five (5) years a log of this information which shall be provided to District personnel upon request:
a. Pressure differential across the bags (weekly);
b. Baghouse stack visible emissions determination (monthly);
c. Bags and bag suspension system inspection (quarterly); and
d. Bag replacements and repairs.

3. The o/o shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles which produce minimum emissions of air contaminants.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall discharge no more than 12.12 lb/hour of particulate at a maximum concentration of 0.010 grain/dscf at the operating conditions given in the above description.

7. Within 180 days from the initial start-up of this unit, the o/o shall conduct emissions testing in strict accord with all procedures described in the District's Compliance Test Procedural Manual. This testing is necessary to demonstrate compliance with permit conditions in 6 above and District Rules 404 and 405. The District shall be notified no less than 10 working days prior to the test and receive the final test report of emissions no later than 45 days subsequent to the final day of on-site sampling and measurement.


45. BAGHOUSE (KBH 21) – MDAQMD PERMIT # C005196; consisting of:
Finish Mill #1 (KM1) Sweep Dust Collector, equipped with a 200 hp fan generating 45,000 acfm with an exhaust temperature of 221 deg F. Baghouse manufacturer, bag material, number of bags, bag dimensions and total filter surface area will be specified by the applicant when determined.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This baghouse shall operate concurrently with the equipment described as the Finish Mill KM1 (B005192).

2. The owner/operator (o/o) shall conduct a minimum program of inspection and maintenance (frequencies may be changed upon successful demonstration to the District that less frequent monitoring is equally effective). The o/o shall maintain current and on-site for five (5) years a log of this information which shall be provided to District personnel upon request:
a. Pressure differential across the bags (weekly);
b. Baghouse stack visible emissions determination (monthly);
c. Bags and bag suspension system inspection (quarterly); and
d. Bag replacements and repairs.

3. The o/o shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles which produce minimum emissions of air contaminants.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall discharge no more than 2.95 lb/hour of particulate at a maximum concentration of 0.010 grain/dscf at the operating conditions given in the above description.

7. Within 180 days from the initial start-up of this unit, the o/o shall conduct emissions testing in strict accord with all procedures described in the District's Compliance Test Procedural Manual. This testing is necessary to demonstrate compliance with permit conditions in 6 above and District Rules 404 and 405. The District shall be notified no less than 10 working days prior to the test and receive the final test report of emissions no later than 45 days subsequent to the final day of on-site sampling and measurement.



GROUP #3B – FINISH MILLS (#7, #8, #9, #10) & CEMENT STORAGE

46. FINISH MILL (KFM7)- MDAQMD PERMIT # B000045; consisting of:
Control: C000046 (KBH7) 155 hp.
Belt Feeders, 2 (KWF7C and KWF7GS)
Finish Mill - KFM7
Elevator - KE7
Air Separator - KAS7

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permit C000046.


47. AIR POLLUTION CONTROL EQUIPMENT (KBH 7) – MDAQMD PERMIT # C000046; consisting of:
Serving Finish Mill No. 7 (B000045).
Baghouse, SWPM MkIII, 9 Compartments, 648 bags - 6" dia x 118" 1. 9,504 ft2 cloth, 25,000 cfm, 155 hp - KBH7

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


48. FINISH MILL (KFM8) – MDAQMD PERMIT # B000047; consisting of:
Control: C000048 (KBH8) 60 hp
Belt Feeders, 2 - KWF8C & KWF8GS
Finish Mill - KFM8
Elevator - KE8
Air Separator - KAS8

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permit C000048.


49. AIR POLLUTION CONTROL EQUIPMENT (KBH 8) – MDAQMD PERMIT # C000048; consisting of:
Serving Finish Mill No. 8 (B000047).
Baghouse, SWPC Mk V, 4 Compartments, 288 bags, 6" dia x 156" 1, 5,656 ft2 cloth, 16,000 cfm, 60 hp - KBH8

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


50. FINISH MILL (KE 9) – MDAQMD PERMIT # B000049; consisting of:
Control: C000050 (KBH9) 65 hp
Belt Feeders, 2 - KWF9C & KWF9GS
Finish Mill - KFM9
Elevator - KE9
Air Separator - KAS9

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permit C000050.


51. AIR POLLUTION CONTROL EQUIPMENT (KBH 9) – MDAQMD PERMIT # C000050; consisting of:
Serving Finish Mill No. 9 (B000049).
Baghouse, SWPC Mk V, 4 Compartments, 288 bags, 6" dia x 156" 1, 5,656 ft2 cloth, 16,000 cfm, 65 hp - KBH9

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


52. FINISH MILL (KFM10) – MDAQMD PERMIT # B000051; consisting of:
Control: C000052 (KBH10) 100 hp
Belt Feeders, 2 - KWF10C & KWF10G
Finish Mill - KFM10
Elevator - KE10
Air Separator - KAS10

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permit C000052.


53. AIR POLLUTION CONTROL EQUIPMENT (KBH 10) – MDAQMD PERMIT # C000052; consisting of:
Serving Finish Mill No. 10 (B000051).
Baghouse, SWPC Mk V, 4 Compartments, 288 bags, 6" dia x 156" 1, 5,650 ft2 cloth, 18,000 cfm, 100 hp - KBH10

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


54. CEMENT TRANSFER TO STORAGE (DEPT. 60) – MDAQMD PERMIT # B000059; consisting of:
Controls: C000060 (LBH1) 25 hp; C000061 (LBH2) 25 hp; C000062 (LBH3) 25 hp; C000063 (LBH4) 50 hp; C000064 (LBH5) 3 hp; C000065 (LBH6) 40 hp; C008247 (LBH8) 15 hp; C001569 (LBH9) 7.5 hp; C008246 (LBH10) 15 hp; C008565 (LBH11) 7.5 hp; and C008566 (LBH12) 50 hp:
Air Slide System
Cement Pump System (from Finish Mills 7, 8, 9, 10) 4 @ 200, 3 @ 75, 1 @ 60 hp
Feed System Group 1 Silos: MSC12 Screw Conveyor
Transfer System from Silo 3: 4B Screw Conveyors LSC11 & LSC12 @ 5 hp ea.
Feed System Group 2 Silos: LRS1 Rot Screen
Silo Fill Screw Conveyor
Feed System Group 3 Silos: LRS2 Rot Screen
LSC5 Screw Conveyor
Feed System Group 4 Silos: LRS3 Rot Screen
LSC4 Rot Screen
Silo Fill System

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permits: C000060, C000061, C000062, C000063, C000064, C000065, C001569, C008246, C008247, C008565 and C008566.


55. AIR POLLUTION CONTROL EQUIPMENT (LBH 1) – MDAQMD PERMIT # C000060; consisting of:
Serving Cement to Group 2 Silos System (B000059).
Baghouse, SWPC Dwg. D99-M101, 2 Compartments, 144 bags, 6" dia x 166" 1, 3,016 ft2 cloth area, 6,000 cfm, 25 hp - LBH1

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


56. AIR POLLUTION CONTROL EQUIPMENT (LBH 2) – MDAQMD PERMIT # C000061; consisting of:
Serving Cement to Group 4 Silos System (B000059).
Mikro-Pul Pulse Jet, 2,500 ft2, 10,000 acfm @ 140 degrees F, model 210-S-10 TR, 1.53' dia x 122' high. Fan: American Blower type E, size 450, 25 hp - LBH2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The baghouse shall be fitted with an airlock on each material discharge port.

4. Baghouse (and each module thereof) shall be provided with magnehelic gauges (or equivalent differential pressure measuring devices). The nominal operation differential pressure is 2 to 6 inches water gauge.

5. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


57. AIR POLLUTION CONTROL EQUIPMENT (LBH 3) – MDAQMD PERMIT # C000062; consisting of:
Serving Cement to Group 4 Silos System (B000059).
Mikro-Pul Pulse Jet, 2,500 ft2, 10,000 acfm @ 140 degrees F, model 210-S-10 TR, 1.53' dia x 122' high. Fan: American Blower type E, size 450, 25 hp - LBH3

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The baghouse shall be fitted with an airlock on each material discharge port.

4. Baghouse (and each module thereof) shall be provided with magnehelic gauges (or equivalent differential pressure measuring devices). The nominal operation differential pressure is 2 to 6 inches water gauge.

5. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


58. BAGHOUSE (LBH 4) – MDAQMD PERMIT # C000063; consisting of:
A Norblo reverse air baghouse equipped with 220 96" L x 6.25" diameter 16 oz. singed duo-density polyester felt bags of 2880 square feet total area and a 50 hp fan generating 13,200 ACFM (air-to-cloth ratio of 4.6:1). This unit exhausts at greater than ambient temperature (140 deg F). Located on top of Silo 13, serving Cement to Group III Silos System (B000059).

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. This equipment shall be operated concurrently with the Group III cement silos (B000059).

3. The o/o shall conduct a minimum program of inspection and maintenance (frequencies may be changed upon successful demonstration to the District that less frequent monitoring is equally effective). The o/o shall maintain current and on-site for five (5) years a log of the following information, which shall be provided to District personnel upon request:
a. Pressure differential across the bags (monthly);
b. Baghouse stack visible emissions determination using Method 22 (monthly);
c. Bags and bag suspension system inspection (quarterly); and,
d. Bag replacements and repairs.

4. Within sixty days of initial start-up, the o/o shall conduct a compliance test in accordance with the District Compliance Test Procedural Manual. This test is required to show compliance with permit conditions. The District shall be notified at least 10 working days prior to the test date. The test report shall be submitted to the District within 45 days following the tests.

5. This baghouse shall discharge no more than 0.98 pounds per hour of PM10 at a maximum concentration of 0.01 gr/dSCF at the operating conditions given in the above description.

6. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable rules of District Regulation IV.


59. AIR POLLUTION CONTROL EQUIPMENT (LBH 6) – MDAQMD PERMIT # C000065; consisting of:
Serving Group 2 Cement Silos (B000059).
Baghouse, SWPC Dwg. D99-M101, 3 Compartments, 216 Bags, 6" dia x 166" 1, 4,524 ft2 cloth area, 12,000 cfm, 40 hp - LBH6

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


60. BAGHOUSE (LBH 9) – MDAQMD PERMIT # C001569; consisting of:
Serves Pneumatic Cement Conveyor (B000059).
Dust Collector, Series 20 General Industrial, Gross cloth area: 542 ft2, 2450 ACFM at above ambient (140 deg F). A/C ratio: 4.5:1, 7.5 hp induced draft fan. Cement Silo No. 25 - LBH9

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.

4. The o/o shall conduct a minimum program of inspection and maintenance (frequencies may be changed upon successful demonstration to the District that less frequent monitoring is equally effective). The o/o shall maintain current and on-site for five (5) years a log of the following information, which shall be provided to District personnel upon request:
a. Pressure differential across the bags (monthly);
b. Baghouse stack visible emissions determination using Method 22 (monthly);
c. Bags and bag suspension system inspection (quarterly); and
d. Bag replacements and repairs.

5. This baghouse shall discharge no more than 0.18 pounds per hour of PM10 at a maximum concentration of 0.01 gr/dSCF at the operating conditions given in the above description. This equipment does not require a regularly scheduled emission compliance test. However, emission compliance testing may be required at the discretion of the District.

6. This equipment shall be operated concurrently with cement silo 25 covered in District permit B000059.


61. SILO - GROUP I LIME AND CEMENT STORAGE – MDAQMD PERMIT # T002049; consisting of:
Control: C008246 (LBH10), and C008247 (LBH8), under B000059
Silo: 1 Lime - 34,064 CF
Silo: 2 Lime - 34,064 CF
Silo: 3 Cement - 34,064 CF
Silo: 4 Cement - 34,064 CF
Silo: 5 Cement - 37,800
Silo: 6 Cement - 37,800

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. These silos shall not be filled unless they are vented to the functioning air pollution control equipment covered by valid District permits C008246 (Silos 5 and 6), and C008247 (Silos 3 and 4).


62. BAGHOUSE (LBH 10) – MDAQMD PERMIT # C008246; consisting of:
Mikro Pulseaire 81S-10-20 B, Pulse-Jet, airflow of 4710 acfm at ambient temperature, 15 bhp motor, 81 Polyester Bags, 954 ft2 of cloth area and Air-to-Cloth ratio of 4.9:1, maximum emission rate of 0.01 grains PM-10/dscf

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall be used to control emissions from Group 1 Cement Silos (Silos 5 and 6).

7. This baghouse shall discharge no more than 0.40 lb/hour at a maximum concentration of 0.01 grains/dscf of PM10 at the operating conditions described above.

8. Opacity measurements shall not exceed 10% aggregated for 3 minutes in any 1-hour period.

9. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required, however, an initial source test is required as noted below. The District may require additional emissions testing at its discretion.

10. Within Sixty days of initial start-up, the o/o shall conduct a compliance test in accordance with the District Compliance Test Procedural Manual to verify the PM-10 emission factor of 0.01 grains/DSCF, as submitted with the application. This test is required to show compliance with Permit conditions and Rules 404 and 405. The District shall be notified at least 10 working days prior to the test date. The test report shall be submitted to the District within 45 days following the tests.


63. BAGHOUSE (LBH8) – MDAQMD PERMIT # C008247; consisting of:
FlexKleen 120WSTS-49arr111, Pulse-Jet, stack height of 42 ft, diameter of 2.3 ft, airflow of 4000 acfm, velocity of 16.0 ft/second at ambient temperature, 15 bhp motor, Polyester Bags, 750 ft2 of cloth area and Air-to-Cloth ratio of 5.3:1, maximum emission rate of 0.01 grains PM-10/dscf

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall be used to control emissions from Group 1 Cement Silos (Silos 3 and 4).

7. This baghouse shall discharge no more than 0.34 lb/hour at a maximum concentration of 0.01 grains/dscf of PM10 at the operating conditions described above.

8. Opacity measurements shall not exceed 10% aggregated for 3 minutes in any 1-hour period.

9. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required, however, an initial source test is required as noted below. The District may require additional emissions testing at its discretion.

10. Within Sixty days of initial start-up, the o/o shall conduct a compliance test in accordance with the District Compliance Test Procedural Manual to verify the PM-10 emission factor of 0.01 grains/DSCF, as submitted with the application. This test is required to show compliance with Permit conditions and Rules 404 and 405. The District shall be notified at least 10 working days prior to the test date. The test report shall be submitted to the District within 45 days following the tests.


64. SILO - GROUP II CEMENT STORAGE – MDAQMD PERMIT # T002050; consisting of:
Supplied by Finish Mills. Control: C000064 (LBH5) under B000059; C000065 (LBH6) under B000059:
Silo 7: 35,976 CF
Silo 8: 35,976 CF
Silo 9: 87,318 CF
Silo 10: 87,318 CF
Silo 11: 87,318 CF
Silo 12: 87,318 CF
Silo A: 9,400 CF
Silo B: 9,400 CF
Silo E: 9,400 CF
Silo F: 9,400 CF

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. All 10 silos are served by two dust collectors. Therefore, these silos shall not be filled unless vented to that functional air pollution control equipment covered by valid District permits C000064 and C000065.


65. SILO - GROUP III CEMENT STORAGE – MDAQMD PERMIT # T002051; consisting of:
Supplied by Finish Mills. Control: C000063 (LBH4) under B000059.
Silo 13: 74,304 CF
Silo 14: 77,914 CF
Silo 15: 81516 CF
Silo 16: 81528 CF
Silo 17: 77,914 CF
Silo 18: 74,297 CF

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. All six silos are served by one dust collector. Therefore, these silos shall not be filled unless vented to that functional air pollution control equipment covered by valid District permits C000063.


66. SILO - GROUP IV CEMENT STORAGE – MDAQMD PERMIT # T002052; consisting of:
Supplied by Finish Mills. Control: All under B000059; C000061 (LBH2) serves all silos; C000062 (LBH3) serves all silos; C001569 (LBH9) serves silo 25, C008565 (LBH11) & C008566 (LBH12) serves Group IV Silos.
*NOTE: If fill line 60-RS-1 is used, Control C000061 shall be operating. If fill line 60-RS-2 is used, Control C000062 shall be operating.
Silo 19; 59,095 CF
Silo 20; 59,095 CF
Silo 21; 62,574 CF
Silo 22; 62,565 CF
Silo 23; 63,404 CF
Silo 24; 62,484 CF
Silo 25 (Lime); 62,476 CF
Silo 26; 63,404 CF
Silo 27; 62,574 CF
Silo 28; 62,574 CF
Silo 29; 59,957 CF
Silo 30; 59,106 CF

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Silo 25 shall not be filled unless vented to that functional air pollution control equipment covered by valid District permit C001569. The other silos shall be vented to the controls listed above under *NOTE.


67. BAGHOUSE (LBH 11) – MDAQMD PERMIT # C008565; consisting of:
A General Industrial Series 20 baghouse, equipped with 542 square feet of bags and a 7.5 induced draft fan generating 2450 ACFM (air-to-cloth ratio of 4.5:1). This unit exhausts at greater than ambient (140 deg F). This unit is located on top of silo 23 and controls the Group IV silos (B000059).

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.

4. The o/o shall conduct a minimum program of inspection and maintenance (frequencies may be changed upon successful demonstration to the District that less frequent monitoring is equally effective). The o/o shall maintain current and on-site for five (5) years a log of the following information, which shall be provided to District personnel upon request:
a. Pressure differential across the bags (monthly);
b. Baghouse stack visible emissions determination using Method 22 (monthly);
c. Bags and bag suspension system inspection (quarterly); and
d. Bag replacements and repairs.

5. This baghouse shall discharge no more than 0.18 pounds per hour of PM10 at a maximum concentration of 0.01 gr/dSCF at the operating conditions given in the above description. This equipment does not require a regularly scheduled emission compliance test. However, emission compliance testing may be required at the discretion of the District.

6. This equipment shall be operated concurrently with the Group IV cement silos covered in District permit T002052.


68. BAGHOUSE (LBH 12) – MDAQMD PERMIT # C008566; consisting of:
A BHA pulse jet baghouse, equipped with 272 120.5" L x 5.75" diameter 16 oz singed duo-density polyester felt bags (4112 total square feet) and a 50 hp belt drive fan generating 20,000 ACFM (for an air-to-cloth ratio of 4.86:1). This unit exhausts at greater than ambient (140 deg F). This unit is lcoated on top of silo 20 and controls the Group IV cement silos (B000059).

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.

4. The o/o shall conduct a minimum program of inspection and maintenance (frequencies may be changed upon successful demonstration to the District that less frequent monitoring is equally effective). The o/o shall maintain current and on-site for five (5) years a log of the following information, which shall be provided to District personnel upon request:
a. Pressure differential across the bags (monthly);
b. Baghouse stack visible emissions determination using Method 22 (monthly);
c. Bags and bag suspension system inspection (quarterly); and
d. Bag replacements and repairs.

5. This baghouse shall discharge no more than 0.18 pounds per hour of PM10 at a maximum concentration of 0.01 gr/dSCF at the operating conditions given in the above description. This equipment does not require a regularly scheduled emission compliance test. However, emission compliance testing may be required at the discretion of the District.

6. This equipment shall be operated concurrently with the Group IV cement silos covered in District permit T002052.


GROUP # 3C – FINISH GRINDING (FM) #11

69. FINISH MILL (KFM11) – MDAQMD PERMIT # B000053; consisting of:
Controls: C000054 (KBH13) 125 hp; C000055 (KBH15) 40 hp; C000056 (KBH11) 25 hp; C000057 (JBH14) 7.5 hp; C000058 (JBH15) 3 hp; C002011 (KBH14 -product collector); C002012 (KBH12) 75 hp.
The fee base is determined by the basic equipment horsepower which includes the 700 hp associated with the pollution control equipment, KBH14 - KBH14F (C002011) which is deemed an element of the product recovery system.
Clinker Bin - JGH11 (119,680 gallons)
Gypsum Bin - JGH11 (19,942 gallons)
Fringe Bin - JFH11 (19,942 gallons)
Vibrating bin bottom (vibra screw) - Gypsum bin - JGH11VBJ
Vibratory feeder (Eriez) - Gypsum – ABDN
Vibratory feeder (Eriez) - Clinker bin – ABDN
Vibratory feeder (Eriez) - Fringe bin - KWF11VF
Weightbelt feeder (Autoweigh) - Gypsum - KWF11G
Scavenger screw conveyor (under 36BF-17) - KWF11GDC
Weightbelt feeder (Autoweigh) - Clinker - KWF11C
Scavenger screw conveyor (under 36BF-18) - KWF11CDC
Weightbelt feeder (Autoweigh) - Fringe - KWF11F
Scavenger screw conveyor (under 36BF-19) - KWF11FSC
Bucket elevator - Alternate mill feed - KE13
Water spray pump (mill cooling water) - JP8
Ball mill No. 11, 13' x 45' A/C COMPEB - KFM11
Trunnion lube pump - 3 hp - run one at a time - KFM11LP2
Trunnion lube pump - 3 hp - KFM11P1
Trunnion lube pump - 3 hp - rune one at a time - KFM11P4
Trunnion lube pump - 3 hp - KFM11P3
Pinion and gear lube pump - KFM11P5
Air Compressor - For Airflex mill clutch - KFM11DC
Airslide blower - For KAC8 - KB10
Airslide blower - For KAC6/7 and KAC14/17 - KB11
Bucket elevator - Mill discharge - KE14
Cement pump F-K 200MM - LP9
Rotary compressor Fuller No. 350 - LC9
Rotary compressor Fuller No. 350 - LC10
Drag Conveyor - KDC1
Drag Conveyor - KDC2
Bucket Elevator - KE11
Bucket Elevator - KE12
Tramp iron separator (Eriez) - KRP11MS
Roller press - Koppern - KRP11
Feeder for roll press
Hydraulic system for roll press, 2 @ 1.5 hp
Cooling system rolls & bearings - Roll press
Bearing lube pump
Coupling lube pump
Belt conveyor - KBC1
Belt conveyor - KBC2
Air separator FLS Sepax model - KAS11
Oil cooler for Sepax
Blower - Airslide fluidizing - for KAC10-11-12 - KB13
Blower - Airslide fluidizing - For KAC13 - KB14
Dust collector - No. 11 finish mill product - KBH14
Fan - Exhauster 11.F.M. product collector - KBH14F
Feeder - Sepax rejects recycle to roll press
Airlock - Rotary Sepax dropouts - KAS11
Screw CNV (KE12 to KRP11) - KRP11SC
Sampler - Gustafson Model D - KFM11SC


PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. All of the controls listed above shall be maintained in operable condition and operating as per the schedule below:
Finish Mill Operations - Permit Numbers, which must be operating
Mill Running - C000054; C000055; C000056; C002011; C002012
Mill & Roll Press Running - C000054; C000055; C002011; C002012
Filling Clinker Bin - C000057
Filling Gypsum Bin - C000058
Filling Fringe Bin and/or the Altenate Bin Fill System via Elevator - C000056


70. AIR POLLUTION CONTROL EQUIPMENT (KBH 13) – MDAQMD PERMIT # C000054; consisting of:
Serving Finish Mill No. 11 (B000053)
Baghouse, ICA Pulse Clean model 625-7, 280 Filter Tubes, 125 hp Rees Fan, 4,375 ft2, 25,000 cfm - KBH 13

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


71. AIR POLLUTION CONTROL EQUIPMENT (KBH 15) – MDAQMD PERMIT # C000055; consisting of:
Serving Finish Mill No. 11 (B000053).
Baghouse, ICA Pulse Clean model 625-2, 80 Filter Tubes, 40 hp Rees Fan, 1,250 ft2, 7,000 cfm - KBH15

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


72. AIR POLLUTION CONTROL EQUIPMENT (KBH 11) – MDAQMD PERMIT # C000056; consisting of:
Serving Clinker Feed System, Elevators (B000053).
Baghouse, ICA Pulse Clean model 625-2 (III), 80 Filter Tubes, 25 hp Exhaust Fan, 1,250 ft2, 6,600 cfm - KBH11

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


73. AIR POLLUTION CONTROL EQUIPMENT (JBH 14) – MDAQMD PERMIT # C000057; consisting of:
Serving Clinker Feed System Bins (B000053).
Baghouse, Mikropul Pulse Jet dust collector, 424 ft2, 1,500 acfm, 7.5 hp - JBH14

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


74. AIR POLLUTION CONTROL EQUIPMENT (JBH 15) – MDAQMD PERMIT # C000058; consisting of:
Serving Gypsum Feed System Bins (B000053).
Baghouse, ICA Pulse Clean model 5-9, nine Filter Tubes, 65 ft2 cloth area, 400 cfm, 3 hp - JBH15

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


75. AIR POLLUTION CONTROL EQUIPMENT (KBH 14) – MDAQMD PERMIT # C002011; consisting of:
Serving Finish Mill (KFM-11) (B000053).
Baghouse: KBH14 Sepax classifier product recovery, Mikropul pulse jet model 680K-12-30TR 28. Cloth area: 28,824 ft2. A/C ratio: 3.98 @ 190 degrees F. Air Flow Rate: 115,000 cfm.
Fan: Buffalo Forge model 1460-L-25 ID, @ 700 hp

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control/process stream equipment in strict accord with the manufacturer's specifications and/or sound engineering principles. The operating instructions shall be immediately available for use by the operator and made available to the District upon request.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District upon request. The log shall be kept for a minimum period of five years.

3. The baghouse shall be fitted with an airlock on each material discharge port.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


76. AIR POLLUTION CONTROL EQUIPMENT (KBH 12) – MDAQMD PERMIT # C002012; consisting of:
Serving Finish Mill (KFM 11) (B000053).
Baghouse, Mikropul Pulse Jet model 2385-12-20TR. Cloth area: 3,364 ft2. A/C Ratio: 5.9 @ 20 degrees F. Air flow rate: 20,000 cfm - KBH12
Buffalo Forge model 600 BL @ 75 hp

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control/process stream equipment in strict accord with the manufacturer's specifications and/or sound engineering principles. The operating instructions shall be immediately available for use by the operator and made available to the District upon request.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District upon request. The log shall be kept for a minimum period of five years.

3. The baghouse shall be fitted with an airlock on each material discharge port.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.



GROUP # 3D – FINISH GRINDING (FM #12)

77. FINISH MILL – (KFM –12) – MDAQMD PERMIT # B001093; consisting of:
Control: C001285 (KBH17); C001286 (KBH18); C001279 (KBH16); C008660 (KBH 19)
Bin Vibrator - JTS2VB1
Weigh Belt Feeders (2 @ 4 hp ea.) - KWF12C & G
Belt Conveyor (15 & 10 hp) - KBC3 & 4
Screw Conveyor, Dust Return System - KBH1BSC
Bucket Elevator to Finish Mill - KE15
Bucket Elevator from Finish Mill - KE16
Finish Mill No. 12 Ball -- KFM12
Airslide blower - KAC18
Air Separator - KAS12:
Drive
Fan
Lubricator
Cement Cooler - 42-CCC-2
Pneumatic Conveyor - 42P11
Roll Press
Cement Pump LP11
Fan-exhaust KBH 19
FM 12 Product Collector

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Operation of this equipment shall be conducted in compliance with data and specifications submitted with the application under which this permit is issued unless otherwise noted below.

2. This equipment shall not be operated unless it is vented to functioning air pollution control equipment (C001285, C001286, and C001279) and C008660.


78. BAGHOUSE (KBH 16) – MDAQMD PERMIT # C001279; consisting of:
Serves (KfM - 12) (B001093).
Baghouse, FM-12, Flex Kleen model 120 WRTC-48 (III), 734 ft2 cloth area, 3,500 cfm, 25 hp - KBH 16

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


79. BAGHOUSE (KBH 17) – MDAQMD PERMIT # C001285; consisting of:
Serves (KFM - 12) (B001093).
Baghouse, FM-12, Flex Kleen model 120 WRTC-48 (III), 734 ft2 cloth area, 3,500 cfm, 25 hp - KBH17

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


80. BAGHOUSE (KBH 18) – MDAQMD PERMIT # C001286; consisting of:
Serves (KFM - 12) (B001093).
Dust Collector, MikroPul pulse jet type with (480) 4.5" dia x 10' felted polyester bags, 5,654 sq cloth area, 37,400 cfm solyvent-ventec GP165 S1A exhauster 42F34, 201, 200 hp - KBH18

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


81. BAGHOUSE- KBH19, WHICH SERVES FINISH MILL #12 SKS AIR SEPARATOR PROCESS UNDER DISTRICT PERMIT B001093, - MDAQMD PERMIT # C008660; consisting of:
Amerex 5408, pulse type, model (2) RP-12-817D6 (19X43), 129,470 acfm, 700hp Robinson 5399 fan, with 1634- 16 oz Polyester Bags operating at 162 degrees F, and with an Air-to-Cloth Ratio of 4.2:1.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Operation of this baghouse shall meet all applicable sections of the Federal Portland Cement Manufacturing Industry MACT standard, 40 CFR 63 Subpart LLL, including but not necessarily limited to those sections referenced herein. In those instances where the conditions below conflict with the MACT standard, the MACT standard shall govern.

2. The owner/operator shall monitor opacity by conducting daily visual emissions observations in accordance with the procedures of Method 22 of 40 CFR 60 appendix A.
The duration of the Method 22 test shall be six minutes. If visible emissions are observed, the owner/operator must:
a) Initiate, within one-hour, the corrective actions specified in the site specific operating and maintenance plan developed in accordance with 40 CFR 63.1350(a)(1) and (a)(2); and
b) Within 24 hours of the end of the Method 22 test in which visible emissions were observed conduct a follow-up Method 22 test. If visible emissions are observed again, conduct a visual opacity test in accordance with Method 9 of 40 CFR 60 appendix A. When required, the duration of the Method 9 test shall be thirty minutes.

4. Performance testing referenced in condition 3 shall be conducted in accordance with EPA Method 5 to verify the PM-10 emission factor of 0.01 grains/DSCF as submitted with the application. The District shall be notified at least 10 working days prior to the test date.

5. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

6. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

7. The o/o shall log all applicable items referenced in condition 6, and all daily visible emissions observations, and any Method 9 tests conducted. The log shall also include bag replacements, repairs and non-scheduled maintenance information. The log shall be kept current for 5 years, and on-site for a minimum of 2 years and provided to District personnel on request.

8. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

9. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

10. This baghouse shall operate concurrently with the Finish Mill #12 SKS Air Separator Process under district permit B001093.

11. This baghouse shall discharge no more than 9.42 lb/hour of PM-10 at a maximum concentration of 0.01 grain/dscf PM-10 operating at the conditions described above.

12. The o/o shall comply with District Rule 430, Breakdown Provisions, with regard to equipment malfunctions, which result in excess emissions.


GROUP #4 – SHIPPING

82. CEMENT, BULK LOADOUT – MDAQMD PERMIT # B001683; consisting of:
Group 1 Silos. Control: C000068 (MBH2) 10 hp
Screw Conveyors @ 20 hp ea (MSC1, 2)
Elevator (ME1)

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permit C000068.


83. AIR POLLUTION CONTROL EQUIPMENT (MBH 2) – MDAQMD PERMIT # C000068; consisting of:
Serving Cement Shipping (B001683).Baghouse, Norblo No. 112-AS, 1,325 ft2 cloth area, 2,300 cfm, 10 hp - MBH2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


84. TRANSFER EQUIPMENT – MDAQMD PERMIT # B001784; consisting of:
From Cement Storage to Truck Loading. Control: C000075 (MBH6) 20 hp.
Screw Conveyor - MSC2
Elevator – ME2
Rotary Screen – MRS1

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permit C000075.


85. AIR POLLUTION CONTROL EQUIPMENT (MBH 6) – MDAQMD PERMIT # C000075; consisting of:
Serving Bulk Truck Cement Shipping (B001784).
Baghouse, Norblo, 2,944 ft2 cloth area, 6,000 cfm, 20 hp - MBH6

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


86. SHIPPING – BULK CEMENT – MDAQMD PERMIT # B001640; consisting of:
Groups I and II Silos. Control: C001684 (MBH1) 15 hp.
Screw Conveyors - MSCS4, 5, 10
Air Slide – MG2AC1

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permit C001684.


87. BAGHOUSE (MBH 1) – MDAQMD PERMIT # C001684; consisting of:
Serves Bulk Loadout System (B001640).
Baghouse, Mikropul model 81S-8TR, 763 ft2, 470 cfm, 15 hp - MBH1

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


88. CEMENT WITHDRAWAL SYSTEM – NORTH PACKOUT – MDAQMD PERMIT # B001480; consisting of:
Control: C001481 (NBH1) 15 hp.
Silo Withdrawal Pneumatic Gravity Conveyors (Airslides), operated one at a time. Capacity: 75-ton/hr ea. - NAC1, 2, 3, 4
Aeration Blower (Aerzen), 432 cfm (Free Air), @ 4.3 psig - NSA2B1
Aeration Blowers (Aerzen), @ 20 hp ea, 280 cfm (Free Air) @ 8.7 psig - NSA2B2, B5
Pneumatic Conveying System for Cement Transport (Fuller-Kinyon), 100 hp "M" type pump. Oil-free air cooled compressor (IBAU) with 100 hp drive and 0.75 Cooling Fan - NP1
Alleviator Cyclone - NA8
Screen, Vibratory (Haver-Niagara), 1,000 x 2,000 mm Pack Bin (East), 750 ft3 - NPM2VS

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permit C001481.


89. BAGHOUSE ( NBH 1)-MDAQMD PERMIT # C001481; consisting of:
Serves Cement Withdrawal System (North) (B001480).
Baghouse, Flex Kleen model 120 BUTC-16 (III) 245 ft2, 1,000 cfm, 15.75 hp - NBH1

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


90. PACKAGING SYSTEM – MDAQMD PERMIT # B001484; consisting of:
Line "A" (West). Control: C001485 (NBH3) 60.75 hp
Rotary Air Locks, Packer - NPM1RF1
Feed, Haver units in parallel @ 1.5 hp ea - NPM1RF2
Feed, Haver units in parallel @ 1.5 hp ea - NPM1RF2
Bag Packing Machine, inline, 4 spout, Haver & Boecker type 5054-4BB, 30 hp - NPM1
Packer Takeaway Conveyor, flat wire mesh type, 2 hp - NPM1BC1
Belt Conveyor, flat, 1.5 hp - NPM1BC2
Bag Cleaning Conveyor Station, Beumer "Torture Chamber" type, @ 3 hp, 1,000 cfm (Free Air) 19.5" W.G. Blower - NPM1CS
Live Roller Conveyor - NPM1RC1
Check Weight Scale Belt, Bockels - NPM1WB
Live Roller Conveyor - NPM1RC2
Rejector Belt Conveyor - NPM1BC3
Bag Flattener - NPM1LBF & NPM1BVF
Packing Conveyor - NBP1PSC
Palletizer, Moellers model PLS-1 - NBP1
Recycle Screw Conveyor - NPM1SC
Recycle Pneumatic Conveying System, 30 hp, 365 cfm - NPM1RP
(Free Air) Blower, 10.1 psig - NPM1RPB

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permit C001485.


91. BAGHOUSE (NBH 3) – MDAQMD PERMIT # C001485; consisting of:
Serves Package System "A" (B001484).
Baghouse, Flex Kleen model 120 WRTC-132 (III), 2,020 ft2, 12,000 cfm, 60 hp, 0.75hp Rotary Airlock - NBH3

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.
4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


92. CEMENT WITHDRAWAL SYSTEM – MDAQMD PERMIT # B001482; consisting of:
South Packout. Control: C001483 (NBH2) 15.75 hp
Silo Withdrawal Pneumatic Gravity Conveyors (Airslides), operated one at a time. Capacity: 75 ton/hr ea - NAC 5, 6, 7, 8
Aeration Blower (Aerzen), 432 cfm (Free Air), @ 4.3 psig - NSA2B3
Aeration Blowers (Aerzen), @ 20 hp ea, 280 cfm (Free Air) @ 8.7 psig - NSA2B4, B6
Aeration Blowers (IBAU), @ 3 hp ea, 210 cfm (Free Air) @ 0.9 psig - NB9, 10
Pneumatic Conveying System for Cement Transport (Fuller-Kinyon), 100 hp "M" type pump. Oil-free air cooled compressor (IBAU) with 100 hp drive and 0.75 Cooling Fan - NP2
Alleviator Cyclone - NA7
Screen, Vibratory (Haver-Niagara), 1,000 x 2,000 mm Pack Bin (East), 750 ft3 - PM1VS

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:


93. BAGHOUSE (NBH 2) – MDAQMD PERMIT # C001483; consisting of:
Serves Cement Withdrawal System(South) (B001482).
Baghouse, Flex Kleen model 120 BUTC-16 (III) 245 ft2, 1,000 cfm, 15.75 hp - NBH2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


94. PACKAGING SYSTEM – MDAQMD PERMIT # B001486; consisting of:
Line "B" (East). Control: C001487 (NBH4) 60.75 hp.
Rotary Air Locks, Packer - NPM2RF1
Feed, Haver units in parallel @ 1.5 hp ea - NPM2RF2
Bag Packing Machine, inline, 4 spout, Haver & Boecker type 5054-4BB, 30 hp - NPM2
Packer Takeaway Conveyor, flat wire mesh type, 2 hp - NPM2BC1
Belt Conveyor, flat, 1.5 hp - NPM2BC2
Bag Cleaning Conveyor Station, Beumer "Torture Chamber" type, @ 3 hp, 1,000 cfm (Free Air) 19.5" W.G. Blower - NPM2CS
Live Roller Conveyor - NPM2RC1
Check Weight Scale Belt, Bockels - NPM2WB
Live Roller Conveyor - NPM2RC2
Rejector Belt Conveyor - NPM2BC3
Bag Flattener - NPM2LBF & NPM2VBF
Packing Conveyor - NPM2PSC
Palletizer, Moellers model PLS-1 - NBP2
Recycle Screw Conveyor - NPM2SC
Recycle Pneumatic Conveying System, 30 hp, 365 cfm (Free Air) 10.1 psig Blower - NPM2RP

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permit C001487.


95. BAGHOUSE (NBH 4) – MDAQMD PERMIT # C001487; consisting of:
Serves Package System "B" (East) (B001486).
Baghouse, Flex Kleen model 120 WRTC-132 (III), 2,020 ft2, 12,000 cfm, 60 hp, 0.75 hp Rotary Airlock - NBH4

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of 0.02 gr/ACF.

2. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

3. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


96. SHIPPING, BULK CEMENT – MDAQMD PERMIT # B001954; consisting of:
Group 3 Silos. Control: C004865 (MBH3) 40 hp.
Air Slide System
Bucket Elevator – ME6
Rotary Screen – MRS3
Air Slide System

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permit C004865.


97. BAGHOUSE (MBH3) – MDAQMD PERMIT # C004865; consisting of:
Serving the Group 3 silos bulkloading station (B001954) with the following specifications:
Mfg. by Flex-Kleen
Model No.: 120-WRTC-195 Arr III
Exhaust Fan: 40 hp & 15,000 cfm
A/C: 5.0:1 & 2,982 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with Group 3 silos bulkhoading station covered in District permit B001954.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


98. SHIPPING – BULK, CEMENT – MDAQMD PERMIT # B000066; consisting of:
Group 4 Silos. Control: C004864 (MBH4) 30 hp; C000071 (MBH5) 30 hp; C008438 (MBH5B) 15 hp.
Air Slide Systems
Elevators, 2 @ 60 hp ea. – ME4, 5
Rotary Screens, 2 @ 15 hp ea – MRS4, 5
Air Slides, 2 @ 10 hp ea, 1 @ 15 hp

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permits C004864, C000071, and C008438.


99. AIR POLLUTION CONTROL EQUIPMENT (MBH 5) – MDAQMD PERMIT # C000071; consisting of:
Serving Cement Shipping (B000066). Baghouse, Pulse Jet type, 360 bags @ 5.8" dia x 8' L, 4,370 ft2, 2.29 A/C ratio, 30 hp - MBH5

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this control equipment in strict accord with the manufacturer's specification and/or sound engineering principles.

2. The o/o shall maintain a record of repairs and maintenance on this equipment and submit it to the District on request. The record shall be retained for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


100. BAGHOUSE (MBH 4) – MDAQMD PERMIT # C004864; consisting of:
Serving the Group 4 silos bulkloading station (B000066) with the following specifications:
Mfg. by Flex-Kleen
Model No.: 120-WRTC-252 Arr III
Exhaust Fan: 30 hp & 20,000 cfm
A/C: 5.2:1 & 3,856 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Group 4 silos bulkloading station covered in District permit B000009.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


101. BAGHOUSE (MBH5B) – MDAQMD PERMIT # C008438; consisting of:
Airtrol Model 132BSWS120, Pulse-Jet, stack height of 125 ft, diameter of 2.0 ft, airflow of 11500 acfm, velocity of 61 ft/second at 120 degrees F, 15 bhp motor, 132 Polyester bags, 2073 ft2 of cloth area and Air-to-Cloth ratio of 5.5:1, maximum emission rate of 0.01 grains PM-10/dscf serving cement shipping Permit (B000066).

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall be used to control emissions from Cement Railcar Shipping Upgrade.

7. This baghouse shall discharge no more than 0.90 lb/hour at a maximum concentration of 0.01 grains/dscf of PM10 at the operating conditions described above.

8. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required, however, an initial source test is required as noted below. The District may require additional emissions testing at its discretion.

9. Within Sixty days of initial start-up, the o/o shall conduct a compliance test in accordance with the District Compliance Test Procedural Manual to verify the PM-10 emission factor of 0.01 grains/DSCF, as submitted with the application. This test is required to show compliance with Permit conditions and Rules 404 and 405. The District shall be notified at least 10 working days prior to the test date. The test report shall be submitted to the District within 45 days following the tests.


102. CEMENT STORAGE BIN, SCALES & LOADOUT – MDAQMD PERMIT # T007369; consisting of:
A cement storage bin of approximately 200,000 cubic ft, motors, plant air, scales and loadout bin. This equipment is vented to controls: C008185 (MG3BH10), C007370 (MG3SB1BH1), C007371 (MG3LS11BH1), C007372 (MG3LS12BH1), C008190 (MG3LS13BH1), C008191 (MG3LS14BH1), C008192 (MG3LS15BH1), C008193 (MG3LS16BHI)

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator, o/o, shall install, operate and maintain the equipment described on this permit in compliance with all data and specifications submitted with the application under which this permit is issued unless specifically exempted below.

2. This equipment shall not be operated unless it is vented to the properly functioning baghouses C008185 (MG3BH10), C007370 (MG3SB1BH1), C007371 (MG3LS11BH1), C007372 (MG3LS12BH1), C008190 (MG3LS13BH1), C008191 (MG3LS14BH1), C008192 (MG3LS15BH1), C008193 (MG3LS16BHI).


103. BAGHOUSE – MG3SB1BH1 – MDAQMD PERMIT # C007370; consisting of:
Model DCL BV-49, Pulse-Jet, airflow of 2800 acfm at 110 degrees F, 10 hp motor, 37 Polyester Bags, 490 ft2 of cloth area and Air-to-Cloth ratio of 5.7:1

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This baghouse shall operate as part of the process known as the Bulk Unloading System to control emissions from one of 6 loading spouts.

2. The o/o shall maintain, on-site, an inventory of replacement bags sufficient to ensure compliance with applicable rules of District Regulation IV.

3. Regular emissions testing for demonstration of compliance with District rules 404 and 405 is not required after the initial source test already performed. The District may require additional emissions testing at its discretion.

4. The o/o shall operate and maintain this baghouse in strict accord with the recommendations of the manufacturer/supplier.


104. BAGHOUSE (MG3LS11BH1) – MDAQMD PERMIT # C007371; consisting of:
Model DCL FS-467; Pulse-Jet, airflow of 2000 acfm at 110 degrees F, 7.5 hp motor, 32 Polyester Bags, 467 ft2 of cloth area and Air-to-Cloth ratio of 4.3:1

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This baghouse shall operate as part of the process known as the Bulk Unloading System to control emissions from one of 6 loading spouts.

2. The o/o shall maintain, on-site, an inventory of replacement bags sufficient to ensure compliance with applicable rules of District Regulation IV.

3. Regular emissions testing for demonstration of compliance with District rules 404 and 405 is not required after the initial source test already performed. The District may require additional emissions testing at its discretion.

4. The o/o shall operate and maintain this baghouse in strict accord with the recommendations of the manufacturer/supplier.


105. BAGHOUSE- MG3LS12BH1 – MDAQMD PERMIT # C007372; consisting of:
Model DCL DCL FS-467, Pulse-Jet, airflow of 2000 acfm at 110 degrees F, 7.5 hp motor, 32 Polyester Bags, 467 ft2 of cloth area and Air-to-Cloth ratio of 4.3:1.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This baghouse controls emissions from one of 6 loading spouts.

2. The o/o shall maintain, on-site, an inventory of replacement bags sufficient to ensure compliance with applicable rules of District Regulation IV.

3. Regular emissions testing for demonstration of compliance with District rules 404 and 405 is not required after the initial source test already performed. The District may require additional emissions testing at its discretion.

4. The o/o shall operate and maintain this baghouse in strict accord with the recommendations of the manufacturer/supplier.


106. BAGHOUSE (MG3BH10) – MDAQMD PERMIT # C008185; consisting of:
Model DCL DC64-100, Pulse-Jet, airflow of 4000 acfm at 110 degrees F, 15 hp motor, 59 Polyester Bags, 768 ft2 of cloth area and Air-to-Cloth ratio of 5.2:1

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This baghouse shall operate as part of the process known as the Bulk Unloading System to control emissions from Air Slide MG3AC20, and Bucket Elevator MG3BE 10.

2. The o/o shall maintain, on-site, an inventory of replacement bags sufficient to ensure compliance with applicable rules of District Regulation IV.

3. Regular emissions testing for demonstration of compliance with District rules 404 and 405 is not required after the initial source test already performed. The District may require additional emissions testing at its discretion.

4. The o/o shall operate and maintain this baghouse in strict accord with the recommendations of the manufacturer/supplier.


107. BAGHOUSE (MG3LS13BH1) – MDAQMD PERMIT # C008190; consisting of:
Model DCL FS-467; Pulse-Jet, airflow of 2000 acfm at 110 degrees F, 7.5 hp motor, 32 Plyester Bags, 467 ft2 of cloth area and Air-to-Cloth ratio of 4.3:1

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This baghouse shall operate as part of the process known as the Bulk Unloading System to control emissions from Loading Spout MG3LS13.

2. The o/o shall maintain, on-site, an inventory of replacement bags sufficient to ensure compliance with applicable rules of District Regulation IV.

3. Regular emissions testing for demonstration of compliance with District rules 404 and 405 is not required after the initial source test already performed. The District may require additional emissions testing at its discretion.

4. The o/o shall operate and maintain this baghouse in strict accord with the recommendations of the manufacturer/supplier.


108. BAGHOUSE (MG3LS14BH1) – MDAQMD PERMIT # C008191; consisting of;
Model DCL FS-467; Pulse-Jet, airflow of 2000 acfm at 110 degrees F, 7.5 hp motor, 32 Polyester Bags, 467 ft2 of cloth area and Air-to-Cloth ratio of 4.3:1

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This baghouse shall operate as part of the process known as the Bulk Unloading System to control emissions from Loading Spout MG3LS14.

2. The o/o shall maintain, on-site, an inventory of replacement bags sufficient to ensure compliance with applicable rules of District Regulation IV.

3. Regular emissions testing for demonstration of compliance with District rules 404 and 405 is not required after the initial source test already performed. The District may require additional emissions testing at its discretion.

4. The o/o shall operate and maintain this baghouse in strict accord with the recommendations of the manufacturer/supplier.


109. BAGHOUSE (MG3LS15BH1) – MDAQMD PERMIT # C008192; consisting of:
Model DCL FS-467; Pulse-Jet, airflow of 2000 acfm at 110 degrees F, 7.5 hp motor, 32 Polyester Bags, 467 ft2 of cloth area and Air-to-Cloth ratio of 4.3:1

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This baghouse shall operate as part of the process known as the Bulk Unloading System to control emissions from Loading Spout MG3LS15.

2. The o/o shall maintain, on-site, an inventory of replacement bags sufficient to ensure compliance with applicable rules of District Regulation IV.

3. Regular emissions testing for demonstration of compliance with District rules 404 and 405 is not required after the initial source test already performed. The District may require additional emissions testing at its discretion.

4. The o/o shall operate and maintain this baghouse in strict accord with the recommendations of the manufacturer/supplier.


110. BAGHOUSE (MG3LS16BH1)- MDAQMD PERMIT # C008193; consisting of:
Model DCL FS-467; Pulse-Jet, airflow of 2000 acfm at 110 degrees F, 7.5 hp motor, 32 Polyester Bags, 467 ft2 of cloth area and Air-to-Cloth ratio of 4.3:1

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This baghouse shall operate as part of the process known as the Bulk Unloading System to control emissions from Loading Spout MG3LS16.

2. The o/o shall maintain, on-site, an inventory of replacement bags sufficient to ensure compliance with applicable rules of District Regulation IV.

3. Regular emissions testing for demonstration of compliance with District rules 404 and 405 is not required after the initial source test already performed. The District may require additional emissions testing at its discretion.

4. The o/o shall operate and maintain this baghouse in strict accord with the recommendations of the manufacturer/supplier.


GROUP # 5 – MISCELLANEOUS EQUIPMENT

111. GASOLINE DISPENSING FACILITY (NON-RETAIL) – MDAQMD PERMIT # N001452; consisting of:
Capacity Fuel Type Underground
10000 87U YES
15000 Diesel YES

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The toll-free telephone number that must be posted is 1-800-635-4617.

2. The owner/operator (o/o) shall maintain a log of all inspections, repairs, and maintenance on equipment subject to Rule 461. Such logs or records shall be maintained at the facility for at least five (5)) years and shall be available to the District upon request.

3. Any modifications or changes to the piping or control fittings of the vapor recovery system requires prior approval from the District.


112. EMERGENCY ELECTRICAL GENERATOR – MDAQMD PERMIT # E004746; consisting of:
One Caterpillar, Diesel fired internal combustion engine, Model No. 3508DITA and Serial No. 12F00507, After Cooled, Turbo Charged, producing 1337 bhp with 8 cylinders at ____ rpm while consuming a maximum of ____. This equipment powers a ____.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall log all starting and stopping times of the test periods of this generator, to the nearest minute, and the date. The log shall be maintained current, on-site, for a minimum of five years and presented to District personnel on request.

2. The o/o shall comply with all applicable rules and regulations of the District.

3. The o/o shall use only diesel fuel whose sulfur concentration is less than or equal to 5% on a weight per weight basis.

4. This unit shall be limited to use for emergency power when commercially available power has been interrupted. The unit may be operated weekly as part of a testing program which does not exceed 60 minutes per week.

5. This unit shall not be operated more than 1,000 hours yearly without prior written approval of the District APCO.


113. IC ENGINE, DIESEL EMERGENCY COMPRESSOR – MDAQMD PERMIT # E004731; consisting of:
Detroit ICE, rated at 320 bhp. The Detroit, model No. 70 83 7000, serial No. 8VA25408, 8-cylinder engine, is used to power an Air Compressor, named Joy. These units do not operate simultaneously except during brief periods when one is changed over while another one is being repaired and/or maintained.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall log all starting and stopping times of the test periods of this compressor, to the nearest minute; the date; and the delivery of fuel.

2. The o/o shall comply with all applicable rules and regulations of the District.

3. The o/o shall not use diesel fuel whose sulfur concentration is 0.05% on w/w basis.

4. The o/o shall not use any fuel in this compressor other than diesel without the written prior approval of the District. The o/o may use the supplier's sulfur analytical data, but at the discretion of the District, shall take a sample of the fuel and submit it for analysis by an independent laboratory. The results of said analyses, by ASTM method D 2622-82, shall be logged.

5. The o/o shall maintain the logs current, on-site for a minimum of five years and provide them to District personnel on request.

6. This unit shall only be used in time of emergency, defined as when commercially available power has been interrupted, and as part of a testing program which does not exceed 60 minutes per week.




CEMEX - Black Mountain Quarry Plant

A. EQUIPMENT DESCRIPTION

GROUP # 1 – CRUSHING SYSTEM

1. CRUSHER - PRIMARY LIMESTONE – MDAQMD PERMIT # B000080; consisting of:
Allis Mineral Systems, Superior model 4265 gyratory crusher which is rated at a maximum of 1200 t/h for the current open side setting and eccentric throw.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Materials processed by equipment in this permit shall contain sufficient natural and/or added moisture to ensure compliance with District Rules 401 and 403. Sufficient water and equipment in operable condition shall be maintained on-site and used as necessary to ensure compliance with the above-mentioned rules.

2. The owner/operator (o/o) shall operate all equipment described in this permit in strict accord with the recommendations of the manufacturer/supplier and/or sound engineering principles which produce the minimum emission of air contaminants.

3. This equipment is limited to processing 21,600 tons of material in any day from midnight to midnight.

4. The o/o shall log the mass of all materials processed on a daily basis. Also logged shall be all inspections, repairs and maintenance. This log shall be maintained current, on-site and provided to District personnel on request.


2. CRUSHER - SECONDARY LIMESTONE – MDAQMD PERMIT # B000081; consisting of:
900 tons per hour. Controls: C002081 (BIC1DS) @ .5 hp; C002082 (BIC2DS) @ .5 hp.
Scavenger Drag Conveyor - BAFC1DC
Scavenger Drag Conveyor - BAFC2DC
Apron Feed Conveyor - BAFC1
Apron Feed Conveyor - BAFC2
Belt Conveyor - BBC2
Belt Conveyor - BBC5
Vibrating Screen - BVS1
Vibrating Screen - BVS2
Impactor, Pennsylvania - BIC1
Impactor, Pennsylvania - BIC2
Belt Conveyor - BBC3
Belt Conveyor - BBC6
Belt Conveyor - BBC4
Belt Conveyor - BBC7
Vibrating Screen - BVS3
Vibrating Screen - BVS4
Vibrating Screen - BVS5
Vibrating Screen - BVS6
Belt Conveyor - CBC1
Belt Conveyor - CBC2
Belt Conveyor - CBC3
Belt Conveyor - CBC4
Sample System
Belt Conveyor - CBC5
Belt Conveyor - CBC6
Belt Conveyor - CBC8
Air Compressors - 1 @ 50 hp and 1 @ 3 hp

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless material processed is treated by dust suppression foam applied to each line at the vibrating feeders and impactors. Dust Suppression Systems operating under District valid permit Nos. C002081 and C002082 shall supply foam. If only one processing line is in operation, only the appropriate control for that line is required to be in operation.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain a Daily Log of hourly limestone feed rates to this crusher, feed rates shall not exceed 900 tph. The log shall be kept on-site for a minimum of two years and submitted to the District on request.


3. AIR POLLUTION CONTROL EQUIPMENT- MDAQMD PERMIT # C002081; consisting of:
Serving Secondary Limestone Crusher, West Line (B000081).
BIC1DS – Superkon Dust Suppression System:
1 Superkon chemical additive container and 1 Pump System
16 HP Motor - Type Grundsos:

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.


4. AIR POLLUTION CONTROL EQUIPMENT- MDAQMD PERMIT # C002082; consisting of:
Serving Secondary Limestone Crusher, East line (B000081).
BIC2DS – Superkon Dust Suppression System:
1 Superkon chemical additive container and 1 Pump System
16 HP Motor - Type Grundsos:

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.


5 LIMESTONE SHIPPING – MDAQMD PERMIT # B000082; consisting of:
Bulk by Rail.
Vibrating Feeders – CVF! & CVF2
Belt Conveyor – CBC7

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Materials processed shall contain sufficient natural, or added, moisture to ensure compliance with Rule 401, 402 and 403. Sufficient water and equipment to properly wet the material being processed shall be maintained in operable condition on the site and used as necessary to assure compliance.

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.


6. LIMESTONE STACKING SYSTEM – STORAGE – MDAQMD PERMIT # B001666; consisting of:
Controls: C002081 (BIC1DS), C002082 (BIC2DS), and C007337 (CBH3), all under B000081.
Drop Tube from CBD8
Belt Conveyor – CBC9
Belt Conveyor – CBC10
Belt Conveyor – CBC11

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Materials processed shall contain sufficient natural, or added, moisture to ensure compliance with Rule 401, 402, and 403. Sufficient water and equipment to properly wet the material being processed shall be maintained in operable condition on the site and used as necessary to assure compliance.

2. This equipment shall not be operated unless it is receiving limestone treated by foam system operating under District valid permit Nos. C002081, C002082, and (Baghouse CBH3) C007337.


GROUP # 2 – RAW GRINDING: RAW MILLS 1 & 2
LIMESTONE RECLAIM & STORAGE

7. RAW MATERIAL SYSTEM – NO. 1 – MDAQMD PERMIT # B000083; consisting of:
Controls: C000087 (DBH3) 15 hp; C000095 (EBH1) 75 hp; C0001667 (DBH1) 75 hp; C001668 (EBH2) 25 hp; C001294 (EBH3); C001295 (EBH4) under B001084; C008244 (DBH6) 20 hp

Belt Conveyor – DBC4
Belt Conveyor – DBC5,6 (25 + 3 hp)
Raw Mill No. 1 – DRM1 (2 x 1,250 hp)
Belt Feeder – DWF5 (3 + 1 hp)
Bucket Elevator – DE1
Dust Return System
Air Separators - DAS1,2 (2 x 125 + 30 hp)
Fuller Kinyon Pump - DP1 (400 + 250)
3 Rotary Locks @ 1.5 hp ea.
1 Rotary Lock

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to the functioning air pollution control equipment covered by all the appropriate District valid permit Nos. C000087, C000095, C001294, C001295, C001667, C001668, and C008244 as determined by three possible routings from 3-way valves 27-TWV-3 and 27-TWV-4.

2. The owner/operator (o/o) shall operate this equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.


8. AIR POLLUTION CONTROL EQUIPMENT (DBH3) – MDAQMD PERMIT # C000087; consisting of:
Serving Raw Mill System 27RM1 (B000083).
DBH3 - Baghouse, Fabric Filters Corp., model 120-WRTC-80III on line, from DBC-4 to DBC-5, 120 16-oz polyester felt bags 5.8" dia x 10' L, 2,252 sq.ft., 0.9 A/C ratio.
19F2 - 2,500 ACFM fan, American Standard, size 15, type E, model 15-249, with 15 hp motor.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


9. AIR POLLUTION CONTROL EQUIPMENT (EBH1) – MDAQMD PERMIT # C000095 consisting of:
Serving Kiln 1Q feed silo (B000083).
EBH1 - Baghouse, Mikro Pul 3 compartment, 2,862 sq.ft. cloth area, 14,000 CFM, 75 hp fan.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


10. AIR POLLUTION CONTROL EQUIPMENT (EBH3) – MDAQMD PERMIT # C001294 consisting of:
Serving No. 1 raw mill system DRM12 (B00083).
EBH3 - Dust Collector System, Kiln No. 1 homogenizing silo No. 2 vent, Pulse jet type with 10' polyester felt bags, 15,000 CFM (max intermittent), 2,525 sq.ft. cloth area, A/C ratio 5.9:1, 60 hp, 1,332 RPM Buffalo 60 MW fan. 60 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


11. AIR POLLUTION CONTROL EQUIPMENT (DBH1) – MDAQMD PERMIT # C001667; consisting of:
Serving No. 1 Raw Mill (B000083).
DBH1 - Baghouse, Southwest PC Mark VII, 7 compartments, 525 - 6"x166" fabric bags, 11,393 SF, 26,000 CFM, 75 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


12. AIR POLLUTION CONTROL EQUIPMENT (EBH2) – MDAQMD PERMIT # C001668; consisting of:
Serving No. 1 Raw Mill, East Homo Silo (B000083).
EBH2 - Baghouse, FlexKleen Pulse-Jet 754 SF, 4,000 CFM. 25 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


13. BAGHOUSE (DBH6) – MDAQMD PERMIT # C008244; consisting of:
Flex-Kleen 12U-BVT-25 (III), Pulse-Jet, airflow of 2000 acfm at ambient temperature, 20 bhp motor, 25 Polyester Bags, 383 ft2 of cloth area and Air-to-Cloth ratio of 5.2:1, maximum emission rate of 0.01 grains PM-10/dscf

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with the Raw Material Grinding System, under valid District permit number B000083 at transfer point DB5/DB6.

7. This baghouse shall discharge no more than 0.17 lb/hour, at a maximum concentration of 0.01 grains/dscf of PM10, at the operating conditions described above.

8. Opacity measurements shall not exceed 10% aggregated for 3 minutes in any 1-hour period.

9. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required after the initial source test that has previously been accomplished. The District may require additional emissions testing at its discretion.


14. RAW MILL NO. 2 SYSTEM – MDAQMD PERMIT # B001084; consisting of:
Controls: C001292 (DBH5) 20 hp; C001293 (DBH2) 1000 hp; C001295 (EBH4) 100 hp; C001296 (DBH4) 5 hp; and C003249 (QBH1) 3 hp.
Vibrating Feeder (2 x 2 hp) – DVF4,5,6
Weight Feeders (4 x 2 hp) – DWF6-9, 12
Weight Feeder (3 + 1) DWF10
Conveyor Belt, Tunnel
Conveyor Belt, Covered
Conveyor Belt, Covered
Conveyor Belt, Covered
Conveyor Belt, Covered
No. 2 Raw Mill, Ball (inching Drive @ 125 hp)
Conveyor, Pneu (4, 7.5, 7.5 hp)
Conveyor, Pneu
Bucket Elevator
Air Separator
Cyclone
Conveyor, Screw
Conveyor, Pneu (4@250, 1 stand-by)
Aux. Heater (50+30+3)
3 Rotary Air Locks @ 1.5 hp
Conveyor, Screw
Additive Feed Bin
Aeration Blower
Rotary Feeder

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to the functioning air pollution control equipment covered by the appropriate District valid permit Nos. C001292, C001293, C001295, C001296 and C003249, as determined by three possible routings from 2-way valves DP2TWV1 and DP2TWV2.

2. The owner/operator (o/o) shall operate this equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.


15. AIR POLLUTION CONTROL EQUIPMENT (DBH5) - MDAQMD PERMIT # C001292; consisting of:
Serving raw mill system DRM2 (B001084).
DBH5 - Dust Collector System, DBC-8 to DBC-9 transfer, Flex Kleen 12U-BVT-25 (III), serial No. 40-53-20716, Pulse Jet type with polyester felt media, 2,000 CFM, 383 sq.ft. A/C ratio 5.22:1 with 25 5.84"x10' bags. 20 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


16. AIR POLLUTION CONTROL EQUIPMENT (DBH2) - MDAQMD PERMIT # C001293; consisting of:
Serving raw mill system DRM2 (B001084).
DBH2 - Dust Collector System, No. 2 Raw Mill vent plus RM nuisance dust control, Pulse jet type with 12' polyester felt bags, 95,000 CFM, 16,961 sq.ft., A/C ratio 5.60:1 includes 700 hp, 1,180 RPM Solvent-Ventec fan. 1,000 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


17. AIR POLLUTION CONTROL EQUIPMENT (EBH4) - MDAQMD PERMIT # C001295; consisting of:
Serving No. 2 Raw Mill System 27RM2 (B001084).
EBH4 - Dust Collector System, Kiln No. 2 homogenizing silo vent, pulse jet type with 10' polyester felt bags, 20,000 CFM (max intermittent), 3.443 sq.ft. cloth area, A/C ratio 5.8:1 100 hp, 1,113 RPM Buffalo 70 MW fan. 100 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


18. AIR POLLUTION CONTROL EQUIPMENT (DBH4) - MDAQMD PERMIT # C001296; consisting of:
Serving Raw Mill System DRM2 (B001084).
DBH4 - Dust Collector System, DBC-7 to DBC-8 Transfer, DCE Vokes envelope filter model DCM-V20/10, 2,000 CFM, 323 sq.ft., A/C ratio 6.19:1. 5 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


19. BAGHOUSE (QBH1) - MDAQMD PERMIT # C003249; consisting of:
Serving No. 2 Raw Mill Additive System (B001084) - Fuller type 3FM Unifilter Dust Collector - 16 envelope type bags 4'8" x 3'6" with 400 ft2 cloth area - exhauster is 3 hp, 1600 ACFM, 47.4 fps and 110 degrees F with a stack 56' height and 10.2" dia. - Bag cleaning by mechanical shaker.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall have a maintenance plan for this baghouse, which will include at a minimum, a log that will include visual emission readings on a regular basis, recording of differential pressures across the baghouse and inspection/repairs frequency.

2. The maintenance log for this baghouse shall be maintained on-site for five years and be made available to the District upon request.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.

4. This baghouse shall only be operated and maintained in strict accord with manufacturer's and/or supplier's recommendations and/or sound engineering principles.


20. LIMESTONE RECLAIM SYSTEM - MDAQMD PERMIT # B001289; consisting of:
For storage. Controls: C001290 (CBH1) 25 hp; C001291 (CBH2) 40 hp.
Bridge-type Reclaimer - CBR
Conveyor Belt - CBC12
Conveyor Belt CBC 13
Surge Bin

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to the functioning air pollution control equipment covered by both District valid permit Nos. C001290 and C001291.

2. Materials processed shall contain sufficient natural, or added, moisture to ensure compliance with Rule 401, 402, and 403. Sufficient water and equipment to properly wet the material being processed shall be maintained in operable condition on the site and used as necessary to assure compliance.

3. The owner/operator (o/o) shall operate this equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

4. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.


21. AIR POLLUTION CONTROL EQUIPMENT (CBH1) - MDAQMD PERMIT # C001290; consisting of:
Serving raw material reclaim conveyor to elevator conveyor (B001289).
CBH1 - Dust Collector, Flex-Kleen model 120 WRTC 48III, 734 sq.ft. cloth area, 4,000 CFM. A/C ratio 5.45. 25 hp Buffalo Forge exhaust fan, size 45. 25 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


22. AIR POLLUTION CONTROL EQUIPMENT (CBH2) - MDAQMD PERMIT # C001291; consisting of:
Serving raw material conveyor DBC 13 to raw mill RM feeder bin (B001289).
CBH2 - Dust Collector, Flex-Kleen model 120 WATC 96III, 1,458 sq.ft. cloth area, 84,000 CFM. A/C ratio 5.45. 40 hp Buffalo Forge exhaust fan, size 45. 40 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


23. SILO - STORAGE - MDAQMD PERMIT # T001998; consisting of:
Blending and Homogenizing for Raw Mills.
Controls: C001294 (EBH3 - B000083); C000095 (EBH1 - B000083); C001295 (EBH4 - B001084); C001668 (EBH2 - B000083).
2 Silos, Homogenizing, 100 MCF
1 Silo, Blending Kiln, 195 MCF

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. These silos shall not be operated unless they are vented to the functioning air pollution control equipment covered by the appropriate valid District permit Nos. C001294, C001295, C000095 and C001668.


GROUP # 3A - CLINKER BURNING & COOLING

24. KILN (Q2) AND CLINKER COOLER SYSTEM - MDAQMD PERMIT # B001083; consisting of:
Coal milling, a pre-heater pre-Calciner short cement kiln (operating with oxygen enrichment), and a clinker cooler assembly. Note that horsepower ratings have been converted to heat input assuming 2550 Btu per horsepower.
Blending System (67 hp)
Elevator (40 hp) - EF1
Calibration System (15 hp) - EFB
Dust Return System (140 hp)
Air Lift (400 hp) - EALF
Preheater-Precalciner - GPH2 (240 MMBTU/HR)
Preheater 7A (3500 hp) -GDF2
Kiln Q2 (600 hp) - GK2 (and 220 MMBTU/hr)
Clinker Cooler (1560 hp) - GCC2
Belt Conveyor (15 hp) - FBC3
Fifteen 5 hp Screw Conveyors - GGF2SC
Two 3 hp Feeders - FCM1, 2WF
Two 300 hp Coal Mills - FCM 2 & 3
Coal Mill 1 (for 1Q and 2Q, 500 hp) - 33-CMI
Primary Air Fan (110 hp) - GK2BOF
Drag Conveyor (30 hp) - GCC2DC1
Drag Conveyor (10 hp) - GCC2DC2
Roller Crusher (four 17.7 hp)
Bucket Conveyor (25 hp) - GPC1
Distribution Drag Conveyor (30 hp) - GGCDC
Seven 75 hp Cooling Fans - GGCF1 through GGCF7
Discharge Gate Drive (10 hp) - GGCDG1B
Pan Conveyor (15 hp) - HPC1


PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Operation of this equipment shall be conducted in compliance with data and specifications submitted with the application under which this permit is issued unless otherwise noted below.

2. This equipment shall not be operated unless it is vented to the functioning air pollution control equipment covered by all six valid District permits (C001090 (GBH2), C001091 (GBF2), C001299 (EBH5), and C005190).

3. The sulfur content requirements of Rule 431 shall be complied with through the SOx emissions limits presented below, in accordance with Rule 431(g).

4. No fuel oil may be stored on-site unless it has a 0.9042 specific gravity or higher (25 degrees API or lower), in accordance with Rule 219(n)(3)(b), or is stored in containers with a valid operating permit.

5. The combined emissions from Kilns Q2 and Q3, on any fuel or mix of fuels, shall not exceed the following daily (midnight to midnight) limits, calculated on a rolling thirty (30) day arithmetic average basis:
a. NOx - 42,207 lbs (verified by CEMS and CERMS)
b. SOx - 4,220 lbs (verified by CEMS and CERMS)
c. CO - 27,522 lbs (verified by CEMS and CERMS)
d. VOC - 2,139 lbs (verified by annual source test and CERMS)
e. Main Stack TSP - 1,435 lbs (verified by annual source test and CERMS)
f. Clinker Cooler Stack TSP (Q2 clinker cooler only) - 699 lbs (verified by annual source test and clinker production)

6. The following are the acceptability testing requirements for the CEMS and COMS:
a. For COMS (Opacity) - Performance Specification 1 of 40 CFR 60 Appendix B.
b. For SO2 and NOx CEMS - Performance Specification 2 of 40 CFR 60 Appendix B.
c. For O2 CEMS - Performance Specification 3 of 40 CFR 60 Appendix B.
d. For VOC CEMS - Performance Specification 4 of 40 CFR 60 Appendix B.
e. For main stack TSP (stack gas flow rate) - Performance Specification 6 of 40 CFR 60 Appendix B.

7. The emissions of CO, NOx, SOx and O2 for kiln Q2 shall be monitored using a Continuous Emissions Monitoring System (CEMS). The Q2 stack gas flow rate shall be monitored using a continuous Emission Rate Monitoring System (CERMS). The Q2 stack gas opacity shall be monitored using a Continuous Opacity Monitoring System (COMS). This equipment shall be operated in compliance with a District-approved CEMS protocol.

8. The o/o shall submit a written report of excess emissions to the District Compliance Supervisor for every semi-annual reporting period. All semi-annual reports shall be postmarked by the 30th day following the end of each semi-annual reporting period.

9. Kiln Q2 may use internally generated spent UNOCAL Gearite as a supplemental fuel. This material shall maintain its status as non-hazardous by the Department of Health Services of the State of California. This material replaces a portion of primary fuel to the precalciner/kiln and is limited to a maximum rate of 2.5 gallons per minute. A log shall be maintained which includes the amount, date, rate, and cumulative total of gallons burned. (Ref. Letter from SWPC dated 10/29/90 with test results.)

10. Kiln Q2 may use Tire Derived Fuel (TDF) as a supplemental fuel. The TDF may be either whole or chipped tires or a combination of both. The feed rate of TDF being utilized shall not exceed 29% of the total Btu content being fed into the kiln for any single hourly average or 26% on any 24-hour average basis.

11. Southdown Victorville Cement Plant (o/o) may utilize TDF only if all other applicable regulatory permits associated with storage and handling of TDF are obtained.

12. Daily logs shall be maintained for the operation of Q2, which include but is not limited to the following:
A. Hours of operation/day.
B. Dates of routine maintenance.
C. Dates of major repairs and/or replacements.
D. Type of fuel being used and the Btu/hr of each.
E. Mass of tires burned.
F. Mass of filters charged.
G. Mass of each of the following:
1. Used bags from dust collectors.
2. Containers which contain the oil/grease contaminated rags/adsorbents.
H. Daily emissions of Kiln Q2 (this data shall be submitted to the District within 30 days of the end of each semi-annual reporting period).

13. Kiln Q2 may use low level hydrocarbon contaminated soil (sand) from LUST remediation on the o/o's other facilities, i.e. Victorville and Apple Valley, as an alternate source of silica in the kiln feed. Excavation, loading and handling of this material will be monitored by the Lahontan Regional Water Quality Board, and are subject to their rules.

14. Kiln Q2 may use furnace ash generated from incineration of sewage and spent abrasive blasting material as alternate sources of silica, iron or alumina. Authority for this condition is subject to the conditions included in California Department of Toxic Substances Control Variance, serial number V-091-2 ATD/ATU and is valid only when the variance is in effect. A protocol for the air emissions testing at the conclusion of the demonstration period shall be approved by the District and the District shall be notified 10 days prior to the actual start of the testing.

15. Kiln Q2 may have drained oil filters added into the system via the precalciner tower airlock. These filters may only originate from Southdown, Inc. generated in California from their equipment and used as an alternate source of iron for the clinkering process. Filters shall not be added at a rate in excess of 5.5 lb/ton of kiln feed. Filters shall not be charged into the system unless all CEMS and COMS are on line and functioning according to the specifications recommended by the manufacturer/supplier.

16. The o/o shall be limited to using only the following materials which are generated by Southdown, Inc. in California, as substitutes for raw materials in this Q2 system: Ultrasorb 248, Tribol's Molub-Alloy, used bags from dust collectors, shop rags any or all of which may have variable quantities of Unocal products such as but not limited to Drillube 320, Turbine Oils (100 and 450), Unax AW (46 and 68), HiTemp EP Grease 2, Multiplex EP2, Unoba Grease (2 and 0), MP Gear Lube LS 85W-140, Extra Duty NL Gear Lube (2EP, 4EP, 5EP, 6EP, and 7 EP).

17. The o/o is limited to using 400 pounds/day of those materials listed in Condition 16 above including those containers which the o/o places them into for use.

18. The o/o shall use the TDF chute for the addition of those materials and containers described in Conditions 15 and 16 above, under the same utilization limit as TDF.

19. This kiln Q2 may be fueled or fired with coal, natural gas, fuel oil, petroleum coke, TDF, Gearite and other materials as specified in the conditions above, and shall comply with all emission limits in these conditions irrespective of the fuel or fuel mixture.

20. The o/o shall perform the following annual compliance tests in accordance with a District-approved test plan and the MDAQMD Compliance Test Procedural Manual. A written report with the results of the test shall be submitted within forty-five (45) days after testing. The following compliance tests are required each year:
a. VOC (Q2 main kiln stack) as CH4 in ppmvd, lbs/hr and lbs/ton of clinker (measured per USEPA reference Methods 25A and 18 or the equivalent);
b. TSP (Q2 main kiln stack) in mg/m3, lbs/hr and lbs/ton of clinker (measured per USEPA Reference Methods 5 and 201A/202, or CARB Method 5); and,
c. TSP (Q2 clinker cooler) in lbs/hr and lbs/ton of clinker (measured per USEPA Reference Methods 5 and 201A/202, or CARB Method 5).


25. AIR POLLUTION CONTROL EQUIPMENT (GBH2) - MDAQMD PERMIT # C001090; consisting of:
Serving Kiln 2Q (B001083).
GBH2 - Dust Collector - Reverse air Mikro Pul with 2,592 glass bags 11-1/2" dia x 31.5"L. Gross cloth area 247,020 sq.ft., 400,000 ACFM @ 400 degrees F, 1.32:1 A/C ratio with four 30 hp heat exchanger fans, one 125 hp 30,878 ACFM collapse blower and one Solvent-Ventec type DX239 3TD8A, 1,475 hp exhaust fan 34F1 discharging to atmosphere via stack. 1,720 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


26. AIR POLLUTION CONTROL EQUIPMENT (GGF2) - MDAQMD PERMIT # C001091; consisting of:
Serving Kiln 2Q (B001083).
GGF2 - Gravel bed filter - Lurgi DS type model 2x4/4 DDS 28/N 28 16 mondules 9.19' dia with two beds per module. Total bed area 1,963 sq.ft. Filter medial quartz +0.1-0.2" with 28 hydraulically atuated air locks, four 40 hp 9,420 CFM scavenging fans, sixteen 5 hp rake drives, one 4 hp hydraulic pump drive, and one Solyvent - Ventec FP 254-3TD8A 1,475 hp exhaust fan with stack for 150,000 ACFM @ 280 degrees F (exit conditions). Also included via 1990 up-grade is one Fuller custom designed 49,626 sq.ft. air to air heat exchanger with stilling chamber, drop out box, six 30 hp cooling fans and two 10 hp screw conveyors added to the incoming hot air duct system. 1,919 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


27. AIR POLLUTION CONTROL EQUIPMENT (EBH5) - MDAQMD PERMIT # C001299; consisting of:
Serving Kiln 2Q raw material feed (B001083).

EBH5 - Dust Collector, pulse jet type Flexkleen with 64 5.84: dia x 10' felted polyester bags (979 sq.ft.), 5,500 ACFM, 30 hp exhauster (A/C ratio 5:6) and 3/4 hp rotary air lock.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


28. K2 G-COOLER DUST COLLECTOR (GGC BH) - MDAQMD PERMIT # C005190; consisting of:
3100 sq ft of Nomex bags with an exhaust of 18,600 acfm at 350 deg Fahrenheit
Dust Collector Fan GGCC1
Tipping Valves GGCBHTU1 - A and -B
Screw Conveyor GGSC1
Screw Conveyor GGSC2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with Kiln No. 2 G-Cooler under valid District permit number B001083.


29. COAL/COKE TRANSFER EQUIPMENT - MDAQMD PERMIT # B001085; consisting of:
Bins 1 and 2
Belt Conveyor (FBC2)

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Materials processed shall contain sufficient natural moisture to ensure compliance with Rule 401, 402, and 403. Water equipment to properly wet dried out material being processed shall be maintained in operable condition on the site and used as necessary to assure compliance.


30. COAL UNLOADING SYSTEM - MDAQMD PERMIT # B001264; consisting of:
Railroad car.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Materials processed shall contain sufficient natural moisture to ensure compliance with Rule 401, 402, and 403. Water equipment to properly wet dried out material being processed shall be maintained in operable condition on the site and used as necessary to assure compliance.


31. CLINKER TRANSFER SYSTEM TO OUTSIDE STORAGE - MDAQMD PERMIT # B001672; consisting of:
Control: C004870 (HBH24)
Conveyor - HBC1
Stacker - HBC2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permit C004871.


32. BAGHOUSE (HBH24) - MDAQMD PERMIT # C004870; consisting of:
Serving a transfer point between conveyors HBC1 and HBC2 which transfer clinker to outside storage (B001672) with the following specifications:
Mfg. By Flex-Kleen
Model No. 120-WSTS-49 Arr. III
Exhaust Fan: 15 hp and 4,000 cfm
Air to Cloth: 5.3:1 and 750 ft2

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Conveyors HBC1 and HBC2 which transfer clinker to outside storage covered in District permit B001672.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.


33. CLINKER OUTSIDE STORAGE RECLAIM SYSTEM - MDAQMD PERMIT # B007709; consisting of:
Outside "fringe" clinker storage pile belt conveyor and related equipment, feeding the clinker rock ladder.
Weigh Feeder HWF-1
Weigh Feeder HWF-2
Vibratory Feeder VF-5
Vibratory Feeder VF-6
Vibratory Feeder VF-8
Vibratory Feeder VF-10
Vibratory Feeder VF-11
Vibratory Feeder VF-12
Belt Conveyor HBC -12

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate and maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. This equipment shall not be operated unless the baghouse covered by District Permit C004871 under permit B000085 Group #4 is in operation.


34. BAGHOUSE (HBH23) - MDAQMD PERMIT # C004871; consisting of:
A baghouse at an elevator which serves the clinker railcar loading area (B000085) and the clinker outside storage reclaim system (B007709), manufactured by Flex-Kleen, Model No. 120-WSTS-49 Arr. III, with a 15 hp exhaust fan generating 4000 cfm through 750 sqft of bags (air to cloth of 5.3:1).

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Elevator which serves the clinker railcar loading area covered in District permit B000085 and the belt conveyor which serves the outside clinker storage pile reclaim system covered in District Permit B007709.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.

5. Within sixty days of initial start-up, the o/o shall conduct a compliance test in accordance with the District Compliance Test Procedural Manual. This test is required to show compliance with permit conditions and Rules 404 and 405. The District shall be notified at least 10 working days prior to the test date. The test report shall be submitted to the District within 45 days following the tests.


35. CLINKER TRANSFER SYSTEM - STORAGE SILO NO. 1 - MDAQMD PERMIT # B001673; consisting of:
Control: C001301 HBH3) 20 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to the functioning air pollution control equipment covered by District valid permit No. C001301.


36. AIR POLLUTION CONTROL EQUIPMENT (HBH 3) - MDAQMD PERMIT # C001301; consisting of:
Serving 6,000 ton North Silo No. 1 (B001673).
HBH3 - Dust Collector, pulse jet type Flexkleen 120-BVTC-36 (III) with 36 5.84" dia x 10' 16 oz. felted polyester bags and 2,600 CFM 20 hp Buffalo 45 PW fan. (A/C ratio 4.7:1). Returns dust to silo on which unit is mounted. 20 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


37. CLINKER TRANSFER SYSTEM - STORAGE SILO NO. 2 - MDAQMD PERMIT # B001674; consisting of:
Control: C001302 (HBH4) 25 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to the functioning air pollution control equipment covered by District valid permit No. C001302.


38. AIR POLLUTION CONTROL EQUIPMENT (HBH 4) - MDAQMD PERMIT # C001302; consisting of:
Serving South Clinker Storage Silo (B001674).
HBH4 - Dust Collector, pulse jet type Flexkleen 120-WRTC-64 (III) with 64 5.84" dia x 10' 16 oz. felted polyester bags and 4,600 CFM, 25 hp Buffalo 45 PW fan. A/C ratio 4.7:1. Returns dust to silo on which unit is mounted.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


39. CLINKER TRANSFER SYSTEM - STORAGE DOME - MDAQMD PERMIT # B001675; consisting of:
Controls: C001297 (HBH1); C001298 (HBH2); C001303 (HBH5)

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to the functioning air pollution control equipment covered by District valid permit Nos. C001297, C001298 and C001303.


40. AIR POLLUTION CONTROL EQUIPMENT (HBH 1) - MDAQMD PERMIT # C001297; consisting of:
Serving South Clinker Conveyor HBC5 (B001675).
HBH1 - Dust Collector, pulse jet Flexkleen 120-BVTC-36 (III) with 36 5.84" dia x 10' 16 oz. felted polyester bags and 3,000 CFM, 20 hp Buffalo 45 PW fan. A/C ratio 5.4:1 and returns dust to conveyor HBC7. 20 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


41. AIR POLLUTION CONTROL EQUIPMENT (HBH 2) - MDAQMD PERMIT # C001298; consisting of:
Serving 20,000-ton Clinker Storage Vessel (B001675).
HBH2 - Dust Collector, pulse jet type Flexkleen 120-WATC-96 (III) with 96 5.84" dia x 10' 16 oz. felted polyester bags (1,469 sq.ft.) and 8,000 CFM, Buffalo 45 MW fan. A/C ratio 5.4:1 returns dust to 20,000-ton clinker vessel. 40 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


42. AIR POLLUTION CONTROL EQUIPMENT - MDAQMD PERMIT # C001303; consisting of:
Serving Clinker Transfer System to Storage Dome (B001675).
HBH5 - Dust Collector - pulse jet type - Flexkleen 120-WRTC-80 (III) with 8-0 5.84" dia x 10' 16 oz. polyester felt bags with 6,500 CFM Buffalo 45 MW fan. A/C ratio 5.3:1. Discharging to Belt HC1. 30 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


43. SILO - CLINKER STORAGE (1104) - MDAQMD PERMIT # T001997; consisting of:
Clinker Silo, North - 141 MCF
Clinker Silo, South - 141 MCF
Clinker Dome (pile)

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The Clinker Silos shall not be filled unless they are vented to the appropriate functioning air pollution control equipment covered by valid District permit Nos. C001301 and C001302, each of which are included under B001673 and B001674, respectively.


44. BULK TRUCK & SUPER SACK LOADOUT FACILITY - MDAQMD PERMIT # B002709; consisting of:
For dust from Kiln 1Q. Control: C002710 (GWDBH)
Airslide, 16" x 18'
Blower IAP, model 11-15, 460 CFM - GWDACB
Telescoping Loading Spout, 12" ID, 3'10" retracted length with 9' travel. Two Budget Cat G356-1R 500 lb capacity, 1/2 hp Hoists.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to the functioning air pollution control equipment covered by District valid permit No. C002710.


45. AIR POLLUTION CONTROL EQUIPMENT (GWDBH) - MDAQMD PERMIT # C002710; consisting of:
Serving 1Q Bulk Kiln Dust Loadout System (B002709).
GWDBH - Dust Collector, Fabric, WW SLY Model PS-5, 440 ft2 with Shaker, Flow Rate: 1,460 CFM @ 110 degrees F; 0.33 hp.
GWDBHF - Fan, integral with GWDBH; 5 hp.
Total hp = 5.33

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.



GROUP # 3B - CLINKER BURNING & COOLING

46. KILN (Q3) AND CLINKER COOLER SYSTEM - MDAQMD PERMIT # B005362; consisting of:
Coal milling, a pre-heater/pre-Calciner kiln, and a clinker cooler assembly. Note that horsepower ratings have been converted to heat input assuming 2550 Btu per horsepower.
Kiln Feed System
Belt Conveyors
Elevator
Calibration System
Dust Return System
Pre-Calciner
Pre-Heater
Kiln (Q3), which is rated at 625 millions Btu/h input
Induced Draft Fan
Clinker Cooler Cyclone Separator
Clinker Cooler Heat Exchanger
Pan Conveyor
Screw Conveyors
Feeders
Coal Mill (Raymond Mill FCM4 Bin)
Primary Air Fan
Drag Conveyors
Clinker Breakers
Clinker Cooler Fans
Discharge Gate Drives

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator, o/o, shall install, operate and maintain the equipment described on this permit in compliance with all data and specifications submitted with the application under which this permit is issued unless specifically exempted in other conditions hereon.

2. This equipment shall not be operated unless it is vented to the properly functioning baghouses GBH 3, HBH 25, FBH4P1 under valid District permit numbers C007368, C007347, C007359.

3. The sulfur content requirements of Rule 431 shall be complied with through the SOx emissions limits presented below, in accordance with Rule 431(g).

4. The emissions from Q3 shall not exceed the following, in lb/ton clinker, calculated on a 30-day rolling average basis:
NOx 2.8
SOx 0.35
VOC 0.12
TSP-Kiln Stack 0.14
Opacity: 20%

5. The requirements for oxides of nitrogen above shall not apply during start-up and during the first 36 hours of operation following start-up nor during the 36 hours immediately preceding shut-down During those calendar days, from midnight to midnight, when these start-ups and shut-downs occur, the total oxides of nitrogen from Q2 and Q3 shall not exceed those described below.

6. The emissions from Q3 and Q2, in lb/day on a 30-day rolling average basis shall not exceed the following:
NOx 42,207
SOx 4,220
CO 27,522
VOC 2,139
PM 1,435 (This is from the main stacks of both kilns)
PM 699 (This from Q2 main clinker cooler stack only, in that Q3 has no vent.
For the testing requirements, please see the baghouse NBH 9 serving kiln Q3.

7. Compliance with the emissions limits described above shall be determined by using CEMS data and calculating an arithmetic average of the previous 30 days (day is defined as any 24-hour period beginning at midnight).

8. The daily emissions for each operating day for kiln Q3 shall be recorded and/or calculated in a manner approved by the District. The data shall be submitted to the District within 30 days of the end of each semi-annual reporting period.

9. The daily emissions of the following contaminants shall be monitored using a Continuous Emissions System (CEMS): NOx, SOx, and CO. The stack gas volumetric flow rate shall be monitored using a Continuous Emission Rate Monitoring System (CERMS). The stack gas opacity shall be monitored using a Continuous Opacity Monitoring System (COMS).
VOC can be reasonably expected to be much lower than that proposed and for this reason, testing will be required on an annual basis in accordance to USEPA method 25A, or equivalent method, after the initial compliance testing.

10. The following are the acceptability testing requirements for the CEMS, CERMS and COMS:
A. For COMS - Performance Specification 1 of 40 CFR 60, appendix B;
B. For SO2 and NOx CEMS - Performance Specification 2 of 40 CFR 60, appendix B;
C. For O2 CEMS - Performance Specification 3 of 40 CFR 60, appendix B;
D. For CO CEMS - Performance Specification 4 of 40 CFR 60, appendix B; and
E. For CERMS - Performance Specification 6 of 40 CFR 60, appendix B.
COMS, CEMS and CERMS have the same meaning as in condition 4 above.

11. The District requires an approved quality assurance program for CEMS. The program shall be in strict accord with 40 CFR 60, appendix F and shall include sulfur dioxide, nitrogen oxides, oxygen and carbon monoxide for CEMS as well as for COMS and CERMS.

12. The o/o shall submit a written report of excess emissions to the District Compliance Supervisor for every semi-annual reporting period. All semi-annual reports shall be postmarked by the 30th day following the end of each semi-annual reporting period.

13. All logs required under this permit shall be maintained current, on-site for a minimum of 5 years and provided to District personnel on request.

14. Daily logs shall be kept for the operation of kiln Q3. These logs shall include, but not necessarily be limited to the following:
A. Hours of operation per day, h/d;
B. Dates of routine maintenance;
C. Dates of major repairs and scheduled shut-downs;
D. Type and Btu/h of fuel(s) being used;
E. Tons of raw material, excluding coal charged to the kiln; and
F. Tons of clinker produced (this datum shall be calculated by an equation similar to the following, which is used for kiln Q2:
Clinker, T/H = kiln feed scale reading X 1/1.575 X F. F is the correction factor for the actual weight of clinker and 1/1.575 is the conversion factor from ton of feed to ton of clinker all of which will be incorporated into the software for the emissions measurement instrumentation.

15. This unit may be fueled or fired with coal, natural gas, fuel oil, petroleum coke, and fuel supplements (as specifically allowed in these conditions). All emission limitations specified in these conditions apply irrespective of fuel or fuel mixture.

16. This equipment may be fired with supplemental fuels. Any use of supplemental fuels shall be reflected on the daily log on an individual category basis, including date of use, amount used, rate of use, and cumulative annual use to date. The following materials and rates are allowed:
a. UNOCAL Gearite (internally generated), up to 2.5 gallons per minute;
b. Tire Derived Fuel (TDF) as whole or chipped tires or a combination thereof, via a TDF chute, as up to 29% of the total BTU kiln feed rate for any hour or 26% on a 24 hour average basis;
c. LUST remediation sand from CEMEX Victorville and Apple Valley facilities, as kiln feed;
d. Used Oil Filters from CEMEX California operations via a TDF chute, up to 5.5 lb/ton of kiln feed; and
e. Materials from CEMEX California operations via a TDF chute, specifically Ultrasorb 248, Tirbol Molub-Alloy, used dust collector bags, and used shop rags, up to 400 lbs/day including containers.


47. MAIN BAGHOUSE (GBH 3) WHICH SERVES KILN (Q3) AND CLINKER COOLER SYSTEM 3Q - MDAQMD PERMIT # C007368; consisting of:
A baghouse to withstand 485 degrees F and handle a flow rate of 520,000 ACFM. When final contracts have been let, more specific details may be added, but the final installation used will define the final permit.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install, operate and maintain a continuous emissions measurements and monitoring system as described in the Kiln Q-3 permit under valid District permit B005362. This device shall measure and record those parameters in the units described in that permit.

6. This baghouse shall operate concurrently with the Kiln Q-3 and its associated Clinker Cooler; under valid District permit number B005362.

7. This baghouse shall discharge no more than 727 lb/day on a 30-day rolling average basis, pursuant to the operating conditions described above.

8. Opacity measurements shall not exceed 20% aggregated for more than 30 minutes in any 1-hour period, consistent with District Rule 401.


48. BAGHOUSE - HBH25, WHICH SERVES THE KILN Q-3 CLINKER PAN CONVEYOR - MDAQMD PERMIT # C007347; consisting of:
Baghouse with Nomex bags operating at 250 degrees F and 7500 ACFM

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.


2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with Clinker Pan Conveyor of the Kiln (Q-3)/Clinker Cooler under valid District permit number B005362.

7. This baghouse shall discharge no more than 0.48 lb/hour of PM-10 at a maximum concentration of 0.01 grain/dscf PM-10 at the operating conditions described in the above description.

8. Opacity measurements shall not exceed 10% aggregated for 3 minutes in any 1-hour period.

9. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required, however, an initial source test is required as noted below. The District may require additional emissions testing at its discretion.


49. BAGHOUSE - FBH4P1 - MDAQMD PERMIT # C007359; consisting of:
Bags to collect particulates from existing Raymond Mill, FCM 4. Bags will withstand 125 degrees F at a flow rate 15,000 ACFM. Southdown will provide additional information as contracts are let, but further revisions may be necessary.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with Raymond Mill FCM4 Bin; under valid District permit number B005362.

7. This baghouse shall discharge no more than 0.5 lb/hour at a maximum concentration of 0.02 gr/dSCF at the operating conditions described in the above description.


50. KILN Q3 PRE-HEATER FEED SYSTEM - MDAQMD PERMIT # B007340; consisting of:
This system is vented to 3 baghouses. Cemex refers to the baghouses as EBH6 (C007348), EBH7 (C007350), EBH8 (C007351) and EBH9 (C008253). Baghouse motors for this system will be provided as contracts are let, and subject to revision.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator, o/o, shall install, operate and maintain the equipment described on this permit in compliance with all data and specifications submitted with the application under which this permit is issued unless specifically exempted below.

2. This equipment shall not be operated unless it is vented to the properly functioning baghouses EBH6, EBH7, EBH8 and EBH9; under valid District permits C007348, C007350, C007351, and C008253 respectively.


51 BAGHOUSE - EBH6, WHICH SERVES THE KILN Q-3 PRE-HEATER SYSTEM - MDAQMD PERMIT # C007348; consisting of:
Bags to collect particulates from pre-heater kiln feed of Q-3. Baghouse operates at 150 degrees F at a flow rate 4500 ACFM. Cemex will provide additional information as contracts are let; revisions may be necessary.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with kiln Q-3 pre-heater feed system; under valid District permit number B007340.

7. This baghouse shall discharge no more than 0.29 lb/hour of PM-10 at a maximum concentration of 0.01 gr/dSCF of PM-10 at the operating conditions described in the above description.

8. Opacity measurements shall not exceed 10% aggregated for 3 minutes in any 1-hour period.

9. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required, however, an initial source test is required as noted below. The District may require additional emissions testing at its discretion.


52 BAGHOUSE- EBH7, CONTROL DEVICE FOR KILN Q-3 PRE-HEATER FEED SYSTEM - MDAQMD PERMIT # C007350; consisting of:
Bags to collect particulates from pre-heater kiln feed of Q-3. Baghouse operates at 150 degrees F, and flow rate of 4400 ACFM. Cemex will provide additional information as contracts are let; further revisions may be necessary.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with kiln Q-3 pre-heater feed system; under valid District permit number B007340.

7. This baghouse shall discharge no more than 0.33 lb/hour of PM-10 at a maximum concentration of 0.01 gr/dSCF of PM-10 at the operating conditions described in the above description.

8. Opacity measurements shall not exceed 10% aggregated for 3 minutes in any 1-hour period.

9. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required, however, an initial source test is required as noted below. The District may require additional emissions testing at its discretion.


53 BAGHOUSE- EBH8, WHICH SERVES KILN Q-3 PRE-HEATER FEED SYSTEM - MDAQMD PERMIT # C007351; consisting of:
Bags to collect particulates from pre-heater kiln feed of Q-3. Baghouse operates at 150 degrees F and flow rate of 2100 ACFM. Cemex will provide additional information as contracts are let; further revisions may be necessary.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with kiln Q-3 pre-heater feed system; under valid District permit number B007340.

7. This baghouse shall discharge no more than 0.16 lb/hour of PM-10 at a maximum concentration of 0.01 gr/dSCF of PM-10 at the operating conditions described in the above description.

8. Opacity measurements shall not exceed 10% aggregated for 3 minutes in any 1-hour period.

9. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required, however, an initial source test is required as noted below. The District may require additional emissions testing at its discretion.


54 BAGHOUSE (EBH9) - MDAQMD PERMIT # C008253; consisting of:
Fuller 120TA10, Pulse-Jet, stack height of 339 ft, diameter of 1.5 ft, airflow of 8100 acfm, velocity of 76.4 ft/second at 150 degrees F, 40 bhp motor, 120 Polyester Bags, 1560 ft2 of cloth area and Air-to-Cloth ratio of 5.2:1, maximum emission rate of 0.01 grains PM-10/dscf

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with kiln Q-3 pre-heater feed system; under valid District permit number B007340.

7. This baghouse shall discharge no more than 0.60 lb/hour of PM-10 at a maximum concentration of 0.01 gr/dSCF of PM-10 at the operating conditions described in the above description.

8. Opacity measurements shall not exceed 10% aggregated for 3 minutes in any 1-hour period.

9. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required, however, an initial source test is required as noted below. The District may require additional emissions testing at its discretion.


55 COAL STACKER & RECLAIM SYSTEM - MDAQMD PERMIT # B005344; consisting of:
The outside coal will be stacked in a pile that is approximately 430 ft long and 125 ft wide and about 55 ft high. This pile is not enclosed.
Receiving Hoppers, 2; below Railcar Dump, each rated at 300 ton/h
Railcar Shaker
Belt Feeders, each at 15 hp
C-2A Conveyor
C-3A Conveyor
Traveling Stacker/Reclaimer, rated at 600 ton/h
C-4 Conveyor
Emergency Reclaim Hopper

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator, o/o, shall install, operate and maintain this equipment in strict accord with the recommendations of the manufacturer/supplier.

2. All outside conveyors, excluding the stacker/reclaimer yard conveyor shall be covered.

3. Water sprays shall be installed, operated and maintained on the receiving hopper under the railcar dump. These sprays shall be used as necessary to prevent violations of District rules 401, 402, and 403.

4. A log of operations shall be kept by the o/o for this equipment. The log shall record at least the following:
a. Date of coal train delivery
b. Number of cars delivered
c. Number of tons of coal per car

5. With prior written approval, or if there is a breakdown, consistent with District rule 430, of the stacker/reclaimer yard equipment, other means, which include but is not limited to the use of front-end loaders, may be used to transport coal to the Emergency Reclaim Hopper, prior to its entrance into the kiln.

6. The Emergency Reclaim Hopper may be used to deliver petroleum coke (with a moisture content of at least eight (8) percent) to the conveyor.

7. The o/o will ensure that the petroleum coke storage pile (or delivered petroleum coke) contains sufficient moisture through the use of water sprays or other means. Moisture content shall be verified through moisture content tests; a petroleum coke moisture content test shall be performed during each week petroleum coke is used as fuel (and the date and results of each test shall be maintained on-site for five (5) years).


56 NEW PULVERIZED COAL BIN (FPFB 4) - MDAQMD PERMIT # T007357; consisting of:
8800 cubic ft bin served by Baghouse-K3CDCF1. Ancillary equipment includes explosion vent, plant air, agitator, new pfister feeder, high-pressure CO2 system and those necessary electrical motors, controls and instrumentation to operate.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator, o/o, shall install, operate and maintain the equipment described on this permit in compliance with all data and specifications submitted with the application under which this permit is issued unless specifically exempted below.

2. This equipment shall not be operated unless it is vented to the properly functioning baghouse FPFB4DC under valid District permit C007358.


57 BAGHOUSE - (FPFB4DC), WHICH SERVES THE NEW PULVERIZED COAL BIN- MDAQMD PERMIT # C007358; consisting of:
Bags to collect particulates from the New Pulverized Coal Bin. Bags will withstand 150 degrees F at a flow rate 3500 ACFM. Southdown will provide additional information as contracts are let, but further revisions may be necessary.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with New Pulverized Coal Bin; under valid District permit number T007357.

7. This baghouse shall discharge no more than 0.5 lb/hour of PM-10 at a maximum concentration of 0.02 gr/dSCF of PM-10 at the operating conditions described in the above description.


58 ROLL PRESS NO. 1, RAW MATERIAL GRINDING - MDAQMD PERMIT # B007336; consisting of:
Roll Press Grinder, approximately 3000 bhp. This process vents to 4 baghouses. Southdown refers to these baghouses as DBH07, DBH08 and DBH09.
Conveyors
Bucket Elevators
Ducting to Baghouse NBH2
Note: total hp of motors to drive this system as well as the complete description of selected equipment will be provided as contracts are let.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator, o/o, shall install, operate and maintain the equipment described on this permit in compliance with all data and specifications submitted with the application under which this permit is issued unless specifically exempted below.

2. This equipment shall not be operated unless it is vented to the properly functioning baghouses DBH09, DBH07 and DBH08 under valid District permits C007360, C007361 and C007362 respectively.


59 BAGHOUSE, CBH3, AT DROP TUBE FROM CBC8 (B001666), RAW MATERIAL TRANSPORT SYSTEM - MDAQMD PERMIT # C007337; consisting of:
Flex-Kleen, Pulse Jet Type, Air: Cloth ratio of 5.6:1, operating at ambient temperature, 40 bhp motor, 64 Polyester bags, cloth area 979 ft2, stack height 6 ft, diameter 1.6 ft, flow rate 5500 acfm, exhaust velocity of 45.6 ft/sec, maximum emission rate of 0.01 grains PM-10/dscf

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with the Raw Material Grinding system; under valid District permit number B001666.

7. This baghouse shall discharge no more than 0.47lb/hour of PM-10 at a maximum concentration of 0.01 gr/dSCF of PM-10 at the operating conditions described in the above description.

8. Opacity measurements shall not exceed 10% aggregated for 3 minutes in any 1-hour period.

9. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required, however, an initial source test is required as noted below. The District may require additional emissions testing at its discretion.


60. BAGHOUSE- DBH 9, WHICH SERVES ROLL PRESS 1(MATERIAL GRINDING) - MDAQMD PERMIT # C007360; consisting of:
Bags to collect particulates from Roll Press No. 1 system. Bags will withstand 125 degrees F at a flow rate 96,000 ACFM. Southdown will provide additional information as contracts are let, but further revisions may be necessary.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with the Roll Press No.1 System; under valid District permit number B007336.

7. This baghouse shall discharge no more than 13.5 lb/hour of PM-10 at a maximum concentration of 0.02 gr/dSCF of PM-10 at the operating conditions described in the above description.


61. BAGHOUSE DBH 7, WHICH SERVES ROLL PRESS No. 1 - MDAQMD PERMIT # C007361; consisting of:
Bags to collect particulates from Roll Press No. 1 system. Bags will withstand 150 degrees F at a flow rate 9,400 ACFM. Southdown will provide additional information as contracts are let, but further revisions may be necessary.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with the Roll Press No.1 System; under valid District permit number B007336.

7. This baghouse shall discharge no more than 1.25 lb/hour of PM-10 at a maximum concentration of 0.02 gr/dSCF of PM-10 at the operating conditions described in the above description.


62. BAGHOUSE-DBH 8, WHICH SERVES ROLL PRESS No.1 - MDAQMD PERMIT # C007362; consisting of:
Bags to collect particulates from Roll Press No. 1 system. Bags will withstand 125 degrees F at a flow rate 9,400 ACFM. Southdown will provide additional information as contracts are let, but further revisions may be necessary.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with the Roll Press No.1 System; under valid District permit number B007336.

7. This baghouse shall discharge no more than 1.25 lb/hour of PM-10 at a maximum concentration of 0.02 gr/dSCF of PM-10 at the operating conditions described in the above description.


63. BAGHOUSE- DBH 13, WHICH SERVES ROLL PRESS No.1 - MDAQMD PERMIT # C007363; consisting of:
Bags to collect particulates from Roll Press No. 1 system. Bags will withstand 150 degrees F at a flow rate 4800 ACFM. Southdown will provide additional information as contracts are let, but further revisions may be necessary.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall discharge no more than 0.65 lb/hour of PM-10 at a maximum concentration of 0.02 gr/dSCF of PM-10 at the operating conditions described in the above description.


64. ROLL PRESS No. 2, RAW MATERIAL GRINDING - MDAQMD PERMIT # B007364; consisting of:
Roll Press Grinder, approximately 3000 bhp. This process vents to 4 baghouses. Southdown refers to these baghouses as DBH13, DBH12, DBH10 and DBH11.
Conveyors
Bucket Elevators
Ducting to Baghouse NBH2
Note: total hp of motors to drive this system as well as the complete description of selected equipment will be provided as contracts are let.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator, o/o, shall install, operate and maintain the equipment described on this permit in compliance with all data and specifications submitted with the application under which this permit is issued unless specifically exempted below.

2. This equipment shall not be operated unless it is vented to the properly functioning baghouses DBH13, DBH12, DBH10 and DBH11 under valid District permits C007365, C007366, C007367 and C007363 respectively.


65. BAGHOUSE-DBH 12, WHICH SERVES ROLL PRESS No. 2 - MDAQMD PERMIT # C007365; consisting of:
A baghouse to withstand 150 degrees F and handle a flow rate of 114,000 ACFM. When final contracts have been let, more specific details may be added, but the final installation used will define the final permit.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with the Roll Press No.2 System; under valid District permit number B007364.

7. This baghouse shall discharge no more than 16.5 lb/hour of PM-10 at a maximum concentration of 0.02 gr/dSCF of PM-10 at the operating conditions described in the above description.


66. BAGHOUSE-DBH 10, WHICH SERVES ROLL PRESS No.2 - MDAQMD PERMIT # C007366; consisting of:
A baghouse to withstand 150 degrees F and handle a flow rate of 9,400 ACFM. When final contracts have been let, more specific details may be added, but the final installation used will define the final permit.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with the Roll Press No.2 System; under valid District permit number B007364.

7. This baghouse shall discharge no more than 1.35 lb/hour of PM-10 at a maximum concentration of 0.02 gr/dSCF of PM-10 at the operating conditions described in the above description.


67 BAGHOUSE-DBH 11, WHICH SERVES ROLL PRESS No. 2 - MDAQMD PERMIT # C007367; consisting of:
A baghouse to withstand 150 degrees F and handle a flow rate of 9400 ACFM. When final contracts have been let, more specific details may be added, but the final installation used will define the final permit.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with the Roll Press No.2 System; under valid District permit number B007364.

7. This baghouse shall discharge no more than 1.35 lb/hour of PM-10 at a maximum concentration of 0.02 gr/dSCF of PM-10 at the operating conditions described in the above description.


68. AW MEAL TRANSPORT SYSTEM - MDAQMD PERMIT # T007339; consisting of:
A silo of approximately 250,000 gallons and conveyors. System vents to 3 baghouses, DBH6, DBH14, and DBH15.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator, o/o, shall install, operate and maintain the equipment described on this permit in compliance with all data and specifications submitted with the application under which this permit is issued unless specifically exempted below.

2. This equipment shall not be operated unless it is vented to properly functioning baghouses; DBH6, DBH14, and DBH15, per valid District permits C007353, C007355 and C007356, respectively.


69. BAGHOUSE- DBH13, WHICH SERVES RAW MATERIAL TRANSPORT SYSTEM - MDAQMD PERMIT # C007353; consisting of:
Bags to collect particulates from Raw Material Transport system. Baghouse operates at 150 degrees F and flow rate of 4600 ACFM. Cemex will provide additional information as contracts are let further revisions may be necessary.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with the Raw Material Grinding system; under valid District permit number T007339.

7. This baghouse shall discharge no more than 0.34lb/hour of PM-10 at a maximum concentration of 0.01 gr/dSCF of PM-10 at the operating conditions described in the above description.

8. Opacity measurements shall not exceed 10% aggregated for 3 minutes in any 1-hour period.

9. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required, however, an initial source test is required as noted below. The District may require additional emissions testing at its discretion.


70. BAGHOUSE-DBH14, CONTROLLING EMISSIONS FROM THE RAW MATERIAL TRANSPORT SYSTEM - MDAQMD PERMIT # C007355; consisting of:
Bags to collect particulates from Ray Material Transport system. Baghouse operates at 150 degrees F and 8,650 ACFM flow rate. Cemex will provide additional information as contracts are let; revisions may be necessary.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with the Raw Meal Transport system; under valid District permit number T007339.

7. This baghouse shall discharge no more than 0.64lb/hour of PM-10 at a maximum concentration of 0.01 gr/dSCF of PM-10 at the operating conditions described in the above description.

8. Opacity measurements shall not exceed 10% aggregated for 3 minutes in any 1-hour period.

9. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required, however, an initial source test is required as noted below. The District may require additional emissions testing at its discretion.


71. BAGHOUSE - DBH 15 - MDAQMD PERMIT C007356; consisting of:
Bags to collect particulates from Raw Material Transport system. Baghouse operates at 150 degrees F at a flow rate of 5300 ACFM. Cemex will provide additional information as contracts are let; further revisions may be necessary.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall install, operate and maintain this dust collector in strict accord with those recommendations of the manufacturer/supplier, and sound engineering principles, which produce minimum emissions of air contaminants.

2. The o/o shall institute a program of maintenance which embraces; visible emission determinations performed according to the frequency outlined in the attached summary Table entitled “MACT Standard -- Portland Cement Manufacturing Industry”, monthly visual inspections of all associated equipment (inclusive of the bags and their suspensions system) in accordance with 40CFR Part 63.1350, and regular (to be determined with experience with this unit) measurements of the pressure differential across the bags.

3. The o/o shall log all the items in 2 above in addition to the bag replacements, repairs and non-scheduled maintenance. The log shall be kept current, on-site for a minimum of 5 years and provided to District personnel on request.

4. The o/o shall maintain an inventory of replacement bags on-site at all times which will ensure compliance with applicable Rules of District Regulation IV.

5. The o/o shall install and maintain a device which measures the pressure differential across the bags if one has not been provided with this unit.

6. This baghouse shall operate concurrently with the Raw Material Transport system; under valid District permit number T007339.

7. This baghouse shall discharge no more than 0.39lb/hour of PM-10 at a maximum concentration of 0.01 gr/dSCF of PM-10 at the operating conditions described in the above description.

8. Opacity measurements shall not exceed 10% aggregated for 3 minutes in any 1-hour period.

9. Regular emissions testing for demonstration of compliance with District rules 404 and 405 are not required, however, an initial source test is required as noted below. The District may require additional emissions testing at its discretion.


72. SILO-RAW MEAL ES4 - MDAQMD PERMIT # T008472; consisting of:
A new K3 blending silo, which contains approximately 12,000 ton of raw meal at 70 lb/cubic ft (total rating 2.56 million gallons). This silo to be designated ES4 will sit approximately 115 feet on centers from silo ES3. This new silo will be equipped with two new baghouses to collect PM-10. Included in this silo will be the necessary rotary control valve motors (electric and air operated); hand operated cut-off gate; Airslides and the necessary equipment to tie into K2 Blending Silo, ES3. Additionally this new silo will vent to existing baghouse EBH6, which also serves the Q3 kiln preheater, District permit number C007348.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The equipment described above, and those additions to it as may be necessary upon actual construction, shall be vented to the two new baghouses C008473 (EBH10) and C008474 (EBH11) as well as the existing baghouse C007348.

2. This unit shall not be operated if any of the above baghouses are not operated for any reason, unless prior written approval is given by the APCO.

3. The owner/operator, o/o, shall give the District written notice of the following dates:
a. Commencement of construction, defined as ground breaking for pad placement;
b. Completion of construction;
c. Start-up for shakedown purposes; and
d. Commencement of commercial use.

4. Within 180 days of commercial startup, as determined in condition 3d, the o/o shall conduct emissions testing for PM and PM-10 on the outlets of the baghouse described in District permits C008473 and C0084f74. The testing shall follow the District's Compliance Test Procedural Manual without exception relative to Pre-Test Protocol Meeting, Pre-Test Protocol submittal(s) and acceptance, Testing, Analyses and Final Report preparation and submittal.


73. BAGHOUSE - EBH 10 - MDAQMD PERMIT # C008473; consisting of:
A FBH 81TA 10-6, pulse type. This unit is powered by a 20 hp electric motor driven fan that produces a flow of approximately 5300 ACFM. There are 80 bags of 16 ounce/square yard of polyester felt and they have a total filter area of 1,256 square feet and an A:C of 4.22::1.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator, (o/o), shall install, operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This baghouse shall operate concurrently with the Blending Silo under valid District permit T008472.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications, which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of data shall be required with the log kept on site for a minimum of five (5) years. This log shall be provided to District personnel on request.

5. This baghouse does not require regular emissions testing beyond that described in the ATC T008472, but the District may require testing at its discretion.


74. BAGHOUSE - EBH11 - MDAQMD PERMIT # C008474; consisting of:
A FBH 64C 10-L6, pulse type. This unit is powered by a 20 hp electric motor driven fan that produces a flow of approximately 5300 ACFM. There are 64 bags of 16 ounce/square yard of polyester felt and they have a total filter area of 1,005 square feet and an A:C of 5.27::1.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator, (o/o), shall install, operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This baghouse shall operate concurrently with the Blending Silo under valid District permit T008472.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications, which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of data shall be required with the log kept on site for a minimum of 5 years. This log shall be provided to District personnel on request.

5. This baghouse does not require regular emissions testing beyond that described in the ATC T008472, but the District may require testing at its discretion.



GROUP # 4 - CLINKER STORAGE & HANDLING (QUARRY)

75. CLINKER RECLAIM SYSTEM - OUTSIDE STORAGE - MDAQMD PERMIT # B001676; consisting of:
Control: C001669 (HBH22) 20 hp.
Vibrating Feeders (7 @ 2.5 hp ea.) (only 4 run at a time)
Conveyor - HBC 12
Vibrating Feeders (6 @ 5hp ea.) (2 set of 3 @ 15 hp ea.)

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to the functioning air pollution control equipment covered by District valid permit No. C001669.


76. AIR POLLUTION CONTROL EQUIPMENT (HBH 22) - MDAQMD PERMIT # C001669; consisting of:
Serving Clinker Dome Clinker Reclaim System (B001676).
HBH22 - Baghouse, SWPC MK V, reverse pressurization, 150 6" x 166" bags. 3,255 sq.ft., 6,000 CFM. 20 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


77. CLINKER RECLAIM SYSTEM - STORAGE DOME - MDAQMD PERMIT # B001677; consisting of:
Controls: C000092 (HBH6) 18 hp; C000093 (HBH17) 18 hp; C001660 (HBH20) 30 hp.
Vibrating Feeders - 6 (2 sets @ 9.9 hp ea.)
Conveyor - HBC8
Conveyor - HBC9
1 1/3 hp Rotary Locks

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to the functioning air pollution control equipment covered by District valid permit Nos. C000092, C000093 and C001660.


78. AIR POLLUTION CONTROL EQUIPMENT (HBH 6) - MDAQMD PERMIT # C000092; consisting of:
Serving Clinker Loadout Conveyor (HBC8, under permit B001677).
HBH6 - Dust Collector System, Pulse jet envelope filter type DCE-Vokes 2 DCM-V 20/10 with twenty 19 oz. polyester felt (terylene) bags 1 meter long. 215 sq.ft. filtering area with 3 hp 1,000 CFM fan. A/C ratio 4.65:1 total of six identical units controlling transfer points from vibratory feeders 65-VF-31/33 to Belt 65-BC-1 and discharging to 65-BC-1. 18 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


79. AIR POLLUTION CONTROL EQUIPMENT (HBH 17) - MDAQMD PERMIT # C000093; consisting of:
Serving Clinker Loadout Conveyor (HBC9, under permit B001677).
HBH17 - Dust Collector Ssystem, Pulse jet envelope filter type DCE-Vokes 2 DCM-V 20/10 with twenty 19 oz. polyester felt (terylene) bags 1 meter long. 215 sq.ft. filtering area with hp 1,000 CFM fan. A/C ratio 4.65:1 total of six identical units controlling transfer points from vibratory feeders 65-VF-34/36 to Belt 65-BC-2 and discharging to 65-BC-2. 18 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

3. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


80. AIR POLLUTION CONTROL EQUIPMENT (HBH 20) - MDAQMD PERMIT # C001660; consisting of:
Serving Clinker Loadout Conveyor 65-BC-1 and 65-BC-2 (B001677).
HBH20 - Dust Collector System Pulse jet type - Flexkleen 100 WRTC=96 (III) with 96 5.84" dia. x 100" 16 oz. felted polyester bags. 1,219 sq.ft. with 30 hp Buffalo 45 MW 7,000 CFM fan. A/C ratio 5.7:1.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


81. CLINKER RECLAIM SYSTEM - STORAGE SILO NO. 1 - MDAQMD PERMIT # B001678; consisting of:
Control: C001308 (HBH18) 30 hp.
Vibratory Feeders (4)
Air Locks - 2 @ 3/4 hp ea.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to the functioning air pollution control equipment covered by District valid permit No. C001308.


82. AIR POLLUTION CONTROL EQUIPMENT (HBH 18) - MDAQMD PERMIT # C001308; consisting of:
Serving Clinker Loadout Conveyor 65-BC-1 (B001678).
HBH18 - Dust Collector System, Pulse jet type - Flexkleen 100 WRTC-96 (III) with 96 5.84" dia x 100" 16 oz. felted polyester bags. 1,219 sq.ft. with 30 hp Buffalo 45 MW 7,000 CFM fan. A/C ratio 5.7:1.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


83. CLINKER RECLAIM SYSTEM - STORAGE SILO NO. 2 - MDAQMD PERMIT # B001679; consisting of:
Control: C001300 (HBH19)
Vibratory Feeders - 4
Rotary Locks - 2 @ 3/4 hp ea.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to the functioning air pollution control equipment covered by District valid permit No. C001300.


84. AIR POLLUTION CONTROL EQUIPMENT (HBH 19) - MDAQMD PERMIT # C001300; consisting of:
Serving clinker loadout conveyor 65-BC-2 (B001679).
HBH19 - Dust Collector System, Pulse jet type - Flexkleen 100 WRTC-96 (III) with 96 5.894" x 100" 16 oz. felted polyester bags. 1,219 sq. ft. with 30 hp Buffalo 45 MW 7,000 CFM fan. A/C ratio 5.7:1. 30 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Particulate emissions shall not exceed a discharge grain loading of .02 grains per actual cubic foot.

2. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

3. The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

4. The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


85. CLINKER LOADOUT SYSTEM - RAIL - MDAQMD PERMIT # B000085; consisting of:
Control: C001670 (HBH21), C004871 (HBH12DC).
Conveyor (HBC 10)
Conveyor (HBC 11)

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. This equipment shall not be operated unless it is vented to functioning air pollution control equipment covered by valid District permits C001670, C004871 and C008567.


86. AIR POLLUTION CONTROL EQUIPMENT (HBH 21) - MDAQMD PERMIT # C001670; consisting of:
Serving Clinker Rail Loadout System (B000085).
HBH21 - Baghouse, SWPC MK V, reverse pressurization, 300 6" x 166" bags. 6,565 sq.ft. 11,500 CFM. 30 hp.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate this particulate control equipment in strict accordance with the manufacturer's specifications and/or sound engineering principles.

2 The o/o shall maintain a log of all inspections, repairs, and maintenance on this equipment and submit it to the District on request. The log shall be kept for a minimum period of five years.

3 The o/o shall maintain on-site, as a minimum, an inventory of replacement bags that assures compliance with applicable Rules of District Regulation IV.


87. BAGHOUSE (HBH23) - MDAQMD PERMIT # C004871; consisting of:
A baghouse at an elevator which serves the clinker railcar loading area (B000085) and the clinker outside storage reclaim system (B007709), manufactured by Flex-Kleen, Model No. 120-WSTS-49 Arr. III, with a 15 hp exhaust fan generating 4000 cfm through 750 sq. ft. of bags (air to cloth of 5.3:1).

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The owner/operator (o/o) shall operate/maintain this equipment in strict accord with recommendations of the manufacturer and/or sound engineering practices.

2. The operating instructions shall be immediately available for use by the operator and provided to District personnel upon request.

3. This equipment shall be operated concurrently with the Elevator which serves the clinker railcar loading area covered in District permit B000085 and the belt conveyor which serves the outside clinker storage pile reclaim system covered in District Permit B007709.

4. The o/o shall have a continuing program of maintenance/inspections in accord with manufacturer's recommendations and specifications, which ensures compliance with District Rules. This program shall include, but not be limited to, regular opacity readings, pressure differential measurements, and maintenance inspections. Logging of these data shall be required with the log kept on-site for a minimum of five years. This log shall be provided to District personnel on request.

5. Within sixty days of initial start-up, the o/o shall conduct a compliance test in accordance with the District Compliance Test Procedural Manual. This test is required to show compliance with permit conditions and Rules 404 and 405. The District shall be notified at least 10 working days prior to the test date. The test report shall be submitted to the District within 45 days following the tests.


88. N002209; GASOLINE DISPENSING FACILITY (NON RETAIL); Consisting of:

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. The toll-free telephone number that must be posted is 1-800-635-4617.

2. The owner/operator (o/o) shall maintain a log of all inspections, repairs, and maintenance on equipment subject to Rule 461. Such logs or records shall be maintained at the facility for at least two (2) years and shall be available to the District upon request.

3. Any modifications or changes to the piping or control fittings of the vapor recovery system requires prior approval from the District.


89. IC ENGINE, EMERGENCY DIESEL GENERATOR; District Permit Number E001910; Consisting of:
One 1,000 kW standby generator, skid mounted, weather enclosed, Steward & Stevenson Services with GM Electromotice Diesel Engine, work order No. 65487; manufactured 2/10/72. Equivalent hp - 1,341.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below.

2. This equipment shall be installed, operated and maintained in strict accord with those recommendations of the manufacturer/supplier and/or sound engineering principles, which produce the minimum emissions of contaminants.

3. This unit shall be limited to use for emergency power, defined as when commercially available power has been interrupted, and as part of a testing program, which does not exceed 60 minutes of operation per week.

4. The owner/operator (o/o) shall use only diesel fuel whose sulfur concentration is less than or equal to 0.05% on a weight per weight basis in this unit.

5. The o/o shall maintain a log for this unit, which, at a minimum, contains the information specified below. This log shall be maintained current and on-site for a minimum of five (5) years and shall be provided to District personnel on request:
a. Date of each use;
b. Duration of each use, in minutes;
c. Fuel consumed during each calendar year, in gallons;
d. Fuel sulfur concentration (the o/o may use the supplier's certification of
sulfur content if it is maintained as part of this log).


90. IC ENGINE AIR COMPRESSOR, EMERGENCY; District Permit Number E004732; Consisting of:
One Caterpillar, Diesel fired internal combustion engine, Model No. 3208T and Serial No. 03 Z07007, Turbo Charged, producing 200 bhp with 8 cylinders at 1800 rpm while consuming a maximum of. This equipment powers a Compressor.

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Operation of this equipment shall be conducted in accordance with all data and specifications submitted with the application under which this permit is issued unless otherwise noted below.

2. This equipment shall be installed, operated and maintained in strict accord with those recommendations of the manufacturer/supplier and/or sound engineering principles, which produce the minimum emissions of contaminants.

3. This unit shall be limited to use for emergency power, defined as when commercially available power has been interrupted, and as part of a testing program which does not exceed 60 minutes of operation per week (up to two hours once per year for annual testing and up to four hours once every three years for triennial testing).

4. The owner/operator (o/o) shall use only diesel fuel whose sulfur concentration is less than or equal to 0.05% on a weight per weight basis in this unit.

5. A timer shall be installed and maintained on this unit to indicate elapsed engine operating time.

6. The o/o shall maintain a log for this unit, which, at a minimum, contains the information specified below. This log shall be maintained current and on-site for a minimum of five (5) years and shall be provided to District personnel on request:
a. Date of each use;
b. Duration of each use, in minutes;
c. Annual operation in terms of total calendar year fuel use (in gallons) or hours;
d. Fuel sulfur concentration (the o/o may use the supplier's certification of
sulfur content if it is maintained as part of this log).


91. TANK – WASTE OIL; District Permit Number T004582; Consisting of;
Aboveground, 1,000 gallon steel tank that is 64" diameter and 72" long:

PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

1. Operation of this equipment shall be conducted in compliance with data and specifications submitted with the application under which this permit is issued unless otherwise noted below.

2. Materials that may be stored in this tank are limited to internally generated waste oils.


MACT STANDARD -- PORTLAND CEMENT MANUFACTURING INDUSTRY

















          40 CFR 63 Subpart LLL



















                        Effective Date:
                        June 14, 1999


















                          Affected Sources
                          Pollutant
                          Emission limit by Source Type


                          Monitoring and Compliance






                            40 CFR 63.1340(b)



                              Performance Testing




                              Monitoring Requirements 2 & 3

                              Area
                              Major
                              Code
                              Method
                              Code
                              Initial Compliance Date

                              Frequency
                              Method
                              Code
                              Frequency


                              40 CFR
                              40 CFR
                              Existing
                              New

                              40 CFR
                                Applicability
                                HCl
                                Less than 10 tpy
                                10 or more tpy
                                CAA 112(a)(1) & (2)
                                Methods 320 or 321
                                63.1352(a)







                                CAA 112(a)(1) & (2)
                                Methods 26 or 26A
                                63.1352(b)





                                HAPs
                                Less than 10/25 tpy
                                10/25 or more tpy
                                CAA 112(a)(1) & (2)
                                Method 18 or 320
                                63.1352(c)












                                  All kiln and in-line kiln/raw mill
                                  PM
                                  0.30 lb per ton of feed (dry basis) 10
                                  63.1343(b)(1)
                                  Method 5
                                  63.1349(b)(1)
                                  June 14, 2002
                                  on Start up
                                  5 years
                                  PM CEMS 7
                                  63.1350(k)
                                  Continuous
                                    Opacity

                                    20%
                                    63.1343(b)(2)
                                    COM
                                    63.1349(b)(1)(v)
                                    June 14, 2002
                                    on Start up
                                    Continuous
                                    COM
                                    63.1350(c)(1)
                                    Continuous



                                        Method 9
                                        63.1349(b)(1)(vi)
                                        June 14, 2002
                                        on Start up
                                        Daily
                                        Method 9
                                        63.1350(c)(2)
                                        Daily
                                                PMCD inlet greater than 400o F
                                          Dioxins/furans
                                          8.7x10-11 gr per dscf @ 7% O2
                                          8.7x10-11 gr per dscf @ 7% O2
                                          63.1343(b)(3)
                                          Method 23
                                          63.1349(b)(3)
                                          June 14, 2002
                                          on Start up
                                          30 months
                                          Temperature
                                          63.1350(f)
                                          Continuous





                                              Inspection 4
                                              63.1350(I)
                                              Annual
                                                PMCD inlet equal to or less than 400o F
                                                Dioxins/furans
                                                1.7x10-10 gr per dscf @ 7% O2
                                                1.7x10-10 gr per dscf @ 7% O2
                                                63.1343(b)(3)
                                                Method 23
                                                63.1349(b)(3)
                                                June 14, 2002
                                                on Start up
                                                30 months
                                                Temperature
                                                63.1350(f)
                                                Continuous





                                                    Inspection 4
                                                    63.1350(I)
                                                    Annual
                                                      Kiln and in-line kiln/raw mill, new Greenfield
                                                      THC
                                                      50 ppmvd as propane @ 7% O2
                                                      50 ppmvd as propane @ 7% O2
                                                      63.1343(c)(4)
                                                      SP-8A
                                                      63.1349(b)(4)
                                                      June 14, 2002
                                                      on Start up
                                                      5 years
                                                      SP-8A
                                                      63.1350(h)
                                                      Continuous
                                                        Clinker cooler
                                                        PM
                                                        0.10 lbs per ton of feed (dry basis)
                                                        63.1345(a)(1)
                                                        Method 5
                                                        63.1349(b)(1)
                                                        June 14, 2002
                                                        on Start up
                                                        5 years


                                                          Opacity

                                                          10%
                                                          63.1345(a)(2)
                                                          COM
                                                          63.1349(b)(1)(v)
                                                          June 14, 2002
                                                          on Start up
                                                          Continuous
                                                          COM
                                                          63.1350(d)(1)
                                                          Continuous



                                                              Method 9
                                                              63.1349(b)(1)(vi)
                                                              June 14, 2002
                                                              on Start up
                                                              Daily
                                                              Method 9
                                                              63.1350(d(2)
                                                              Daily
                                                                Raw mill
                                                                Opacity

                                                                10%
                                                                63.1347
                                                                Method 9
                                                                63.1349(b)(2)
                                                                June 14, 2002
                                                                on Start up
                                                                5 years
                                                                Method 22 - 6m 8
                                                                63.1350(e)
                                                                Daily 9
                                                                  Finish mill
                                                                  Opacity

                                                                  10%
                                                                  63.1347
                                                                  Method 9
                                                                  63.1349(b)(2)
                                                                  June 14, 2002
                                                                  on Start up
                                                                  5 years
                                                                  Method 22 - 6m 8
                                                                  63.1350(e)
                                                                  Daily 9
                                                                    Raw material dryer, new Brownfield
                                                                    Opacity

                                                                    10%
                                                                    63.1346(a)
                                                                    Method 9
                                                                    63.1349(b)(2)
                                                                    June 14, 2002
                                                                    on Start up
                                                                    5 years
                                                                    Method 22 - 1m 8
                                                                    63.1350(a)(4) & (j)
                                                                    M/SA/A 5
                                                                      Raw material dryer, new Greenfield
                                                                      THC
                                                                      50 ppmvd as propane @ 7% O2
                                                                      50 ppmvd as propane @ 7% O2
                                                                      63.1346(b) & (c)(1)
                                                                      SP-8A
                                                                      63.1349(b)(4)
                                                                      June 14, 2002
                                                                      on Start up
                                                                      5 years
                                                                      SP-8A
                                                                      63.1350(h)
                                                                      Continuous
                                                                        Opacity

                                                                        10%
                                                                        63.1346(c)(2)
                                                                        Method 9
                                                                        63.1349(b)(2)
                                                                        June 14, 2002
                                                                        on Start up
                                                                        5 years
                                                                        Method 22 - 1m 8
                                                                        63.1350(a)(4) & (j)
                                                                        M/SA/A 5
                                                                          Raw material, clinker, or finished product storage bin
                                                                          Opacity

                                                                          10%
                                                                          63.1348
                                                                          Method 9
                                                                          63.1349(b)(2)
                                                                          June 14, 2002
                                                                          on Start up
                                                                          5 years
                                                                          Method 22 - 1m 8
                                                                          63.1350(a)(4) & (j)
                                                                          M/SA/A 5
                                                                            Conveying system transfer point 1
                                                                            Opacity

                                                                            10%
                                                                            63.1348
                                                                            Method 9
                                                                            63.1349(b)(2)
                                                                            June 14, 2002
                                                                            on Start up
                                                                            5 years
                                                                            Method 22 - 1m 8
                                                                            63.1350(a)(4) & (j)
                                                                            M/SA/A 5
                                                                              Bagging system


                                                                              10%
                                                                              63.1348
                                                                              Method 9
                                                                              63.1349(b)(2)
                                                                              June 14, 2002
                                                                              on Start up
                                                                              5 years
                                                                              Method 22 - 1m 8
                                                                              63.1350(a)(4) & (j)
                                                                              M/SA/A 5
                                                                                Bulk loading or unloading system


                                                                                10%
                                                                                63.1348
                                                                                Method 9
                                                                                63.1349(b)(2)
                                                                                June 14, 2002
                                                                                on Start up
                                                                                5 years
                                                                                Method 22 - 1m 8
                                                                                63.1350(a)(4) & (j)
                                                                                M/SA/A 5
                                                                                  Alkali Bypass


                                                                                  63.1344(a)(3) & (b)







                                                                                    Carbon Injection


                                                                                    63.1344(c)




                                                                                    Injection Rate
                                                                                    63.1350(g)
                                                                                    Continuous










                                                                                          FOOTNOTES






                                                                                          NOTIFICATION - 40 CFR 63.1353


                                                                                            1. Starting at raw material storage prior to raw mill






                                                                                            Initial
                                                                                            Oct. 12, 1999
                                                                                            63.9(b)(2)
                                                                                              2. Operation and Maintenance (O&M) Plan 40 CFR 63.1350(a)






                                                                                              Performance Test
                                                                                              60 days prior
                                                                                              63.9(e)
                                                                                                3. Startup, Shutdown or Malfunction (SSM) Plan 40 CFR 63.6(e)(3)






                                                                                                Opacity Test
                                                                                                30 days prior
                                                                                                63.9(f)
                                                                                                  4. Inspection of combustion system







                                                                                                  CMS
                                                                                                  60 days prior
                                                                                                  63.9(g)
                                                                                                    5. Monthly for 6 months, if no visible emissions for 6 months then semi-annual & then annual; if visible emissions back to monthly Method 22




                                                                                                    Compliance Status
                                                                                                    60 days after test
                                                                                                    63.9(h)
                                                                                                      6. Within 2 working days by phone, FAX, email. When written report.










                                                                                                        7. Deferred






                                                                                                        Reporting - 40 CFR 63.1354


                                                                                                          8. 'Method 22 - 6m' is a 6-minute Method 22 & 'Method 22 - 1m' is a 1-minute Method 22





                                                                                                          Test results
                                                                                                          within 60 days
                                                                                                          63.10(d)(2)
                                                                                                            9. If visible emissions then take corrective action within 1-hour per O&M Plan, follow-up Method 22 within 24-hours & if visible emissions conduct a 30-minute Method 9 within 1-hour.



                                                                                                            Opacity Results
                                                                                                            within 30 days
                                                                                                            63.10(d)(3)
                                                                                                              10. Metric units for emission limits:







                                                                                                              Extended Compliance
                                                                                                              within 30 days
                                                                                                              63.10(d)(4)
                                                                                                                All kiln and in-line kiln/raw mill





                                                                                                                  Consistent with SSM
                                                                                                                  every 6 months
                                                                                                                  63.10(d)(5)(i)
                                                                                                                          PM

                                                                                                                    0.15 kg per Mg



                                                                                                                    Not consistent with SSM
                                                                                                                    2 working days 6
                                                                                                                    63.10(d)(5)(ii)
                                                                                                                            Dioxins/furans





                                                                                                                        CMS & COMS Evaluations
                                                                                                                        within 60 days
                                                                                                                        63.8(e)(5)

                                                                                                                                PMCD inlet greater than 400o F
                                                                                                                          0.20 ng per dscm @ 7% O2



                                                                                                                            Summary Report
                                                                                                                            Semiannually
                                                                                                                            63.10(e)(3)(vi)

                                                                                                                                    PMCD inlet equal to or less than 400o F
                                                                                                                              0.40 ng per dscm @ 7% O2







                                                                                                                                  Clinker Cooler




                                                                                                                                    Record keeping - 40 CFR 63.1355


                                                                                                                                          PM

                                                                                                                                    0.05 kg per Mg



                                                                                                                                    Record Retention
                                                                                                                                    5 years
                                                                                                                                    63.10(b)(1)






                                                                                                                                        Retention on-site
                                                                                                                                        2 years
                                                                                                                                        63.10(b)(1)

                                                                                                                                        90. Subpart LLL--National Emission Standards For Hazardous Air
                                                                                                                                        Pollutants From The Portland Cement Manufacturing Industry

                                                                                                                                        General
                                                                                                                                        63.1340
                                                                                                                                        Applicability And Designation Of Affected Sources.
                                                                                                                                        63.1341
                                                                                                                                        Definitions.
                                                                                                                                        Emission Standards And Operating Limits
                                                                                                                                        63.1342
                                                                                                                                        Standards: General.
                                                                                                                                        63.1343
                                                                                                                                        Standards For Kilns And In-Line Kiln/Raw Mills.
                                                                                                                                        63.1344
                                                                                                                                        Operating Limits For Kilns And In-Line Kiln/Raw Mills.
                                                                                                                                        63.1345
                                                                                                                                        Standards For Clinker Coolers.
                                                                                                                                        63.1346
                                                                                                                                        Standards For New And Reconstructed Raw Material Dryers.
                                                                                                                                        63.1347
                                                                                                                                        Standards For Raw And Finish Mills.
                                                                                                                                        63.1348
                                                                                                                                        Standards For Affected Sources Other Than Kilns; In-Line Kiln
                                                                                                                                        Raw Mills; Clinker Coolers; New And Reconstructed Raw
                                                                                                                                        Material Dryers; And Raw And Finish Mills.
                                                                                                                                        Monitoring And Compliance Provisions
                                                                                                                                        63.1349
                                                                                                                                        Performance Testing Requirements.
                                                                                                                                        63.1350
                                                                                                                                        Monitoring Requirements.
                                                                                                                                        63.1351
                                                                                                                                        Compliance Dates.
                                                                                                                                        63.1352
                                                                                                                                        Additional Test Methods.
                                                                                                                                        Notification, Reporting And Recordkeeping
                                                                                                                                        63.1353
                                                                                                                                        Notification Requirements.
                                                                                                                                        63.1354
                                                                                                                                        Reporting Requirements.
                                                                                                                                        63.1355
                                                                                                                                        Recordkeeping Requirements.
                                                                                                                                        Other
                                                                                                                                        63.1356
                                                                                                                                        Exemption From New Source Performance Standards.
                                                                                                                                        63.1357
                                                                                                                                        Temporary, Conditioned Exemption From Particulate And
                                                                                                                                        Opacity Standards.
                                                                                                                                        63.1358
                                                                                                                                        Delegation Of Authority.
                                                                                                                                        63.1359
                                                                                                                                        [Reserved]
                                                                                                                                        Table 1
                                                                                                                                        To
                                                                                                                                        Subpart
                                                                                                                                        LLL


                                                                                                                                        40 CFR 63.1340 Applicability And Designation Of Affected
                                                                                                                                        Sources.
                                                                                                                                        (a) Except as specified in paragraphs (b) and (c) of this section, the provisions
                                                                                                                                        of this subpart apply to each new and existing portland cement plant which is a
                                                                                                                                        major source or an area source as defined in §63.2.
                                                                                                                                        (b) The affected sources subject to this subpart are:
                                                                                                                                        (b)(1) Each kiln and each in-line kiln/raw mill at any major or area source,
                                                                                                                                        including alkali bypasses, except for kilns and in-line kiln/raw mills that burn
                                                                                                                                        hazardous waste and are subject to and regulated under subpart EEE of this
                                                                                                                                        part;
                                                                                                                                        (b)(2) Each clinker cooler at any portland cement plant which is a major
                                                                                                                                        source;
                                                                                                                                        (b)(3) Each raw mill at any portland cement plant which is a major source;
                                                                                                                                        (b)(4) Each finish mill at any portland cement plant which is a major source;
                                                                                                                                        (b)(5) Each raw material dryer at any portland cement plant which is a major
                                                                                                                                        source and each greenfield raw material dryer at any portland cement plant
                                                                                                                                        which is a major or area source;
                                                                                                                                        (b)(6) Each raw material, clinker, or finished product storage bin at any
                                                                                                                                        portland cement plant which is a major source;
                                                                                                                                        (b)(7) Each conveying system transfer point at any portland cement plant which
                                                                                                                                        is a major source;
                                                                                                                                        (b)(8) Each bagging system at any portland cement plant which is a major
                                                                                                                                        source; and
                                                                                                                                        (b)(9) Each bulk loading or unloading system at any portland cement plant
                                                                                                                                        which is a major source.
                                                                                                                                        (c) For portland cement plants with on-site nonmetallic mineral processing
                                                                                                                                        facilities, the first affected source in the sequence of materials handling
                                                                                                                                        operations subject to this subpart is the raw material storage, which is just
                                                                                                                                        prior to the raw mill. The primary and secondary crushers and any other
                                                                                                                                        equipment of the on-site nonmetallic mineral processing plant which precedes
                                                                                                                                        the raw material storage are not subject to this subpart. Furthermore, the first
                                                                                                                                        conveyor transfer point subject to this subpart is the transfer point associated
                                                                                                                                        with the conveyor transferring material from the raw material storage to the raw
                                                                                                                                        mill.
                                                                                                                                        (d) The owner or operator of any affected source subject to the provisions of
                                                                                                                                        this subpart is subject to title V permitting requirements.

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1341 Definitions.
                                                                                                                                        All terms used in this subpart that are not defined in this section have the
                                                                                                                                        meaning given to them in the CAA and in subpart A of this part.
                                                                                                                                        Alkali bypass means a duct between the feed end of the kiln and the preheater
                                                                                                                                        tower through which a portion of the kiln exit gas stream is withdrawn and
                                                                                                                                        quickly cooled by air or water to avoid excessive buildup of alkali, chloride
                                                                                                                                        and/or sulfur on the raw feed. This may also be referred to as the "kiln exhaust
                                                                                                                                        gas bypass".
                                                                                                                                        Bagging system means the equipment which fills bags with portland cement.
                                                                                                                                        Clinker cooler means equipment into which clinker product leaving the kiln is
                                                                                                                                        placed to be cooled by air supplied by a forced draft or natural draft supply
                                                                                                                                        system.
                                                                                                                                        Continuous monitor means a device which continuously samples the
                                                                                                                                        regulated parameter specified in §63.1350 of this subpart without interruption,
                                                                                                                                        evaluates the detector response at least once every 15 seconds, and
                                                                                                                                        computes and records the average value at least every 60 seconds, except
                                                                                                                                        during allowable periods of calibration and except as defined otherwise by the
                                                                                                                                        continuous emission monitoring system performance specifications in
                                                                                                                                        appendix B to part 60 of this chapter.
                                                                                                                                        Conveying system means a device for transporting materials from one piece
                                                                                                                                        of equipment or location to another location within a facility. Conveying
                                                                                                                                        systems include but are not limited to the following: feeders, belt conveyors,
                                                                                                                                        bucket elevators and pneumatic systems.
                                                                                                                                        Conveying system transfer point means a point where any material including
                                                                                                                                        but not limited to feed material, fuel, clinker or product, is transferred to or from
                                                                                                                                        a conveying system, or between separate parts of a conveying system.
                                                                                                                                        Dioxins and furans (D/F) means tetra-, penta-, hexa-, hepta-, and octa-
                                                                                                                                        chlorinated dibenzo dioxins and furans.
                                                                                                                                        Facility means all contiguous or adjoining property that is under common
                                                                                                                                        ownership or control, including properties that are separated only by a road or
                                                                                                                                        other public right-of-way.
                                                                                                                                        Feed means the prepared and mixed materials, which include but are not
                                                                                                                                        limited to materials such as limestone, clay, shale, sand, iron ore, mill scale,
                                                                                                                                        cement kiln dust and flyash, that are fed to the kiln. Feed does not include the
                                                                                                                                        fuels used in the kiln to produce heat to form the clinker product.
                                                                                                                                        Finish mill means a roll crusher, ball and tube mill or other size reduction
                                                                                                                                        equipment used to grind clinker to a fine powder. Gypsum and other materials
                                                                                                                                        may be added to and blended with clinker in a finish mill. The finish mill also
                                                                                                                                        includes the air separator associated with the finish mill.
                                                                                                                                        Greenfield kiln, in-line kiln/raw mill, or raw material dryer means a kiln, in-line
                                                                                                                                        kiln/raw mill, or raw material dryer for which construction is commenced at a
                                                                                                                                        plant site (where no kilns and no in-line kiln/raw mills were in operation at any
                                                                                                                                        time prior to March 24, 1998) after March 24, 1998.
                                                                                                                                        Hazardous waste is defined in §261.3 of this chapter.
                                                                                                                                        In-line kiln/raw mill means a system in a portland cement production process
                                                                                                                                        where a dry kiln system is integrated with the raw mill so that all or a portion of
                                                                                                                                        the kiln exhaust gases are used to perform the drying operation of the raw mill,
                                                                                                                                        with no auxiliary heat source used. In this system the kiln is capable of
                                                                                                                                        operating without the raw mill operating, but the raw mill cannot operate without
                                                                                                                                        the kiln gases, and consequently, the raw mill does not generate a separate
                                                                                                                                        exhaust gas stream.
                                                                                                                                        Kiln means a device, including any associated preheater or precalciner
                                                                                                                                        devices, that produces clinker by heating limestone and other materials for
                                                                                                                                        subsequent production of portland cement.
                                                                                                                                        Kiln exhaust gas bypass means alkali bypass.
                                                                                                                                        Monovent means an exhaust configuration of a building or emission control
                                                                                                                                        device (e. g. positive pressure fabric filter) that extends the length of the
                                                                                                                                        structure and has a width very small in relation to its length (i. e., length to width
                                                                                                                                        ratio is typically greater than 5:1). The exhaust may be an open vent with or
                                                                                                                                        without a roof, louvered vents, or a combination of such features.
                                                                                                                                        New brownfield kiln, in-line kiln raw mill, or raw material dryer means a kiln, in-
                                                                                                                                        line kiln/raw mill or raw material dryer for which construction is commenced at
                                                                                                                                        a plant site (where kilns and/or in-line kiln/raw mills were in operation prior to
                                                                                                                                        March 24, 1998) after March 24, 1998.
                                                                                                                                        One-minute average means the average of thermocouple or other sensor
                                                                                                                                        responses calculated at least every 60 seconds from responses obtained at
                                                                                                                                        least once during each consecutive 15 second period.
                                                                                                                                        Portland cement plant means any facility manufacturing portland cement.
                                                                                                                                        Raw material dryer means an impact dryer, drum dryer, paddle-equipped
                                                                                                                                        rapid dryer, air separator, or other equipment used to reduce the moisture
                                                                                                                                        content of feed materials.
                                                                                                                                        Raw mill means a ball and tube mill, vertical roller mill or other size reduction
                                                                                                                                        equipment, that is not part of an in-line kiln/raw mill, used to grind feed to the
                                                                                                                                        appropriate size. Moisture may be added or removed from the feed during the
                                                                                                                                        grinding operation. If the raw mill is used to remove moisture from feed
                                                                                                                                        materials, it is also, by definition, a raw material dryer. The raw mill also
                                                                                                                                        includes the air separator associated with the raw mill.
                                                                                                                                        Rolling average means the average of all one-minute averages over the
                                                                                                                                        averaging period.
                                                                                                                                        Run average means the average of the one-minute parameter values for a run.
                                                                                                                                        TEQ means the international method of expressing toxicity equivalents for
                                                                                                                                        dioxins and furans as defined in U.S. EPA, Interim Procedures for Estimating
                                                                                                                                        Risks Associated with Exposures to Mixtures of Chlorinated Dibenzo-p-
                                                                                                                                        dioxins and -dibenzofurans (CDDs and CDFs) and 1989 Update, March 1989.

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1342 Standards: General.
                                                                                                                                        (a) Table 1 to this subpart provides cross references to the 40 CFR part 63,
                                                                                                                                        subpart A, general provisions, indicating the applicability of the general
                                                                                                                                        provisions requirements to subpart LLL.
                                                                                                                                        (b) Table 1 of this section provides a summary of emission limits and
                                                                                                                                        operating limits of this subpart.
                                                                                                                                        TABLE 1 TO §63.1342.--EMISSION LIMITS AND OPERATING LIMITS
                                                                                                                                        -----------------------------------------+----------------------+---------------------------------------
                                                                                                                                        Affected source | Pollutant or opacity | Emission and operating limit
                                                                                                                                        -----------------------------------------+----------------------+---------------------------------------
                                                                                                                                        All kilns and in-line kiln/raw mills at | PM...................| 0.15 kg/Mg of feed (dry basis).
                                                                                                                                        major sources (including alkali | Opacity..............| 20 percent.
                                                                                                                                        bypass). | |
                                                                                                                                        All kilns and in-line kiln/raw mills at | D/F..................| 0.20 ng TEQ/dscm
                                                                                                                                        major and area sources (including | | or
                                                                                                                                        alkali bypass). | | 0.40 ng TEQ/dscm when the
                                                                                                                                        | | average of the performance
                                                                                                                                        | | test run average particulate
                                                                                                                                        | | matter control device (PMCD)
                                                                                                                                        | | inlet temperatures is 204°C
                                                                                                                                        | | or less. [Corrected to
                                                                                                                                        | | 7 percent oxygen]
                                                                                                                                        | | Operate such that the three-
                                                                                                                                        | | hour rolling average PMCD
                                                                                                                                        | | inlet temperature is no
                                                                                                                                        | | greater than the temperature
                                                                                                                                        | | established at performance
                                                                                                                                        | | test.
                                                                                                                                        | | If activated carbon injection
                                                                                                                                        | | is used: Operate such that
                                                                                                                                        | | the three-hour rolling
                                                                                                                                        | | average activated carbon
                                                                                                                                        | | injection rate is no less
                                                                                                                                        | | than rate established at
                                                                                                                                        | | performance test. Operate
                                                                                                                                        | | such that either the carrier
                                                                                                                                        | | gas flow rate or carrier gas
                                                                                                                                        | | pressure drop exceeds the
                                                                                                                                        | | value established at
                                                                                                                                        | | performance test. Inject
                                                                                                                                        | | carbon of equivalent
                                                                                                                                        | | specifications to that used
                                                                                                                                        | | at performance test.
                                                                                                                                        New greenfield kilns and in-line kiln/ | THC..................| 50 ppmvd, as propane,
                                                                                                                                        raw mills at major and area sources. | | corrected to 7 percent oxygen.
                                                                                                                                        All clinker coolers at major sources. | PM...................| 0.050 kg/Mg of feed (dry basis)
                                                                                                                                        | Opacity..............| 10 percent.
                                                                                                                                        All raw mills and finish mills at major | Opacity..............| 10 percent.
                                                                                                                                        sources. | |
                                                                                                                                        New greenfield raw material dryers at | THC..................| 50 ppmvd, as propane,
                                                                                                                                        major and area sources. | | corrected to 7 percent oxygen.
                                                                                                                                        All raw material dryers and material | Opacity..............| 10 percent.
                                                                                                                                        handling points at major sources. | |
                                                                                                                                        -----------------------------------------+----------------------+---------------------------------------

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1343 Standards For Kilns And In-Line Kiln/Raw
                                                                                                                                        Mills.
                                                                                                                                        (a) General. The provisions in this section apply to each kiln, each in-line
                                                                                                                                        kiln/raw mill, and any alkali bypass associated with that kiln or in-line kiln/raw
                                                                                                                                        mill.
                                                                                                                                        (b) Existing, reconstructed, or new brownfield/major sources. No owner or
                                                                                                                                        operator of an existing, reconstructed or new brownfield kiln or an existing,
                                                                                                                                        reconstructed or new brownfield in-line kiln/raw mill at a facility that is a major
                                                                                                                                        source subject to the provisions of this subpart shall cause to be discharged
                                                                                                                                        into the atmosphere from these affected sources, any gases which:
                                                                                                                                        (b)(1) Contain particulate matter (PM) in excess of 0.15 kg per Mg (0.30 lb per
                                                                                                                                        ton) of feed (dry basis) to the kiln. When there is an alkali bypass associated
                                                                                                                                        with a kiln or in-line kiln/raw mill, the combined particulate matter emissions
                                                                                                                                        from the kiln or in-line kiln/raw mill and the alkali bypass are subject to this
                                                                                                                                        emission limit.
                                                                                                                                        (b)(2) Exhibit opacity greater than 20 percent.
                                                                                                                                        (b)(3) Contain D/F in excess of:
                                                                                                                                        (b)(3)(i) 0.20 ng per dscm (8.7 x 10-11 gr per dscf) (TEQ) corrected to seven
                                                                                                                                        percent oxygen; or
                                                                                                                                        (b)(3)(ii) 0.40 ng per dscm (1.7 x 10-10 gr per dscf) (TEQ) corrected to seven
                                                                                                                                        percent oxygen, when the average of the performance test run average
                                                                                                                                        temperatures at the inlet to the particulate matter control device is 204°C
                                                                                                                                        (400°F) or less.
                                                                                                                                        (c) Greenfield/major sources. No owner or operator that commences
                                                                                                                                        construction of a greenfield kiln or greenfield inline kiln/raw mill at a facility
                                                                                                                                        which is a major source subject to the provisions of this subpart shall cause to
                                                                                                                                        be discharged into the atmosphere from these affected sources any gases
                                                                                                                                        which:
                                                                                                                                        (c)(1) Contain particulate matter in excess of 0.15 kg per Mg (0.30 lb per ton)
                                                                                                                                        of feed (dry basis) to the kiln. When there is an alkali bypass associated with a
                                                                                                                                        kiln or in-line kiln/raw mill, the combined particulate matter emissions from the
                                                                                                                                        kiln or in-line kiln/raw mill and the bypass stack are subject to this emission
                                                                                                                                        limit.
                                                                                                                                        (c)(2) Exhibit opacity greater than 20 percent.
                                                                                                                                        (c)(3) Contain D/F in excess of:
                                                                                                                                        (c)(3)(i) 0.20 ng per dscm (8.7 x 10-11 gr per dscf) (TEQ) corrected to seven
                                                                                                                                        percent oxygen; or
                                                                                                                                        (c)(3)(ii) 0.40 ng per dscm (1.7 x 10-10 gr per dscf) (TEQ) corrected to seven
                                                                                                                                        percent oxygen, when the average of the performance test run average
                                                                                                                                        temperatures at the inlet to the particulate matter control device is 204°C
                                                                                                                                        (400°F) or less.
                                                                                                                                        (c)(4) Contain total hydrocarbon (THC), from the main exhaust of the kiln or in-
                                                                                                                                        line kiln/raw mill, in excess of 50 ppmvd as propane, corrected to seven
                                                                                                                                        percent oxygen.
                                                                                                                                        (d) Existing, reconstructed, or new brownfield/area sources. No owner or
                                                                                                                                        operator of an existing, reconstructed, or new brownfield kiln or an existing,
                                                                                                                                        reconstructed or new brownfield in-line kiln/raw mill at a facility that is an area
                                                                                                                                        source subject to the provisions of this subpart shall cause to be discharged
                                                                                                                                        into the atmosphere from these affected sources any gases which contain D/F
                                                                                                                                        in excess of:
                                                                                                                                        (d)(1) 0.20 ng per dscm (8.7 x 10-11 gr per dscf) (TEQ) corrected to seven
                                                                                                                                        percent oxygen; or
                                                                                                                                        (d)(2) 0.40 ng per dscm (1.7 x 10-10 gr per dscf) (TEQ) corrected to seven
                                                                                                                                        percent oxygen, when the average of the performance test run average
                                                                                                                                        temperatures at the inlet to the particulate matter control device is 204°C
                                                                                                                                        (400°F) or less.
                                                                                                                                        (e) Greenfield/area sources. No owner or operator of a greenfield kiln or a
                                                                                                                                        greenfield in-line kiln/raw mill at a facility that is an area source subject to the
                                                                                                                                        provisions of this subpart shall cause to be discharged into the atmosphere
                                                                                                                                        from these affected sources any gases which:
                                                                                                                                        (e)(1) Contain D/F in excess of:
                                                                                                                                        (e)(1)(i) 0.20 ng per dscm (8.7 x 10-11 gr per dscf) (TEQ) corrected to seven
                                                                                                                                        percent oxygen; or
                                                                                                                                        (e)(1)(ii) 0.40 ng per dscm (1.7 x 10-11 gr per dscf) (TEQ) corrected to seven
                                                                                                                                        percent oxygen, when the average of the performance test run average
                                                                                                                                        temperatures at the inlet to the particulate matter control device is 204°C
                                                                                                                                        (400°F) or less.
                                                                                                                                        (e)(2) Contain THC, from the main exhaust of the kiln or in-line kiln/ raw mill, in
                                                                                                                                        excess of 50 ppmvd as propane, corrected to seven percent oxygen.

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1344 Operating Limits For Kilns And In-Line
                                                                                                                                        Kiln/Raw Mills.
                                                                                                                                        (a) The owner or operator of a kiln subject to a D/F emission limitation under
                                                                                                                                        §63.1343 must operate the kiln such that the temperature of the gas at the inlet
                                                                                                                                        to the kiln particulate matter control device (PMCD) and alkali bypass PMCD,
                                                                                                                                        if applicable, does not exceed the applicable temperature limit specified in
                                                                                                                                        paragraph (b) of this section. The owner or operator of an in-line kiln/raw mill
                                                                                                                                        subject to a D/F emission limitation under §63.1343 must operate the in-line
                                                                                                                                        kiln/raw mill, such that:
                                                                                                                                        (a)(1) When the raw mill of the in-line kiln/raw mill is operating, the applicable
                                                                                                                                        temperature limit for the main in-line kiln/raw mill exhaust, specified in
                                                                                                                                        paragraph (b) of this section and established during the performance test
                                                                                                                                        when the raw mill was operating is not exceeded.
                                                                                                                                        (a)(2) When the raw mill of the in-line kiln/raw mill is not operating, the
                                                                                                                                        applicable temperature limit for the main in-line kiln/raw mill exhaust, specified
                                                                                                                                        in paragraph (b) of this section and established during the performance test
                                                                                                                                        when the raw mill was not operating, is not exceeded.
                                                                                                                                        (a)(3) If the in-line kiln/raw mill is equipped with an alkali bypass, the applicable
                                                                                                                                        temperature limit for the alkali bypass, specified in paragraph (b) of this
                                                                                                                                        section and established during the performance test when the raw mill was
                                                                                                                                        operating, is not exceeded.
                                                                                                                                        (b) The temperature limit for affected sources meeting the limits of paragraph
                                                                                                                                        (a) of this section or paragraphs (a)(1) through (a)(3) of this section is
                                                                                                                                        determined in accordance with §63.1349(b)(3)(iv).
                                                                                                                                        (c) The owner or operator of an affected source subject to a D/F emission
                                                                                                                                        limitation under §63.1343 that employs carbon injection as an emission control
                                                                                                                                        technique must operate the carbon injection system in accordance with
                                                                                                                                        paragraphs (c)(1) and (c)(2) of this section.
                                                                                                                                        (c)(1) The three-hour rolling average activated carbon injection rate shall be
                                                                                                                                        equal to or greater than the activated carbon injection rate determined in
                                                                                                                                        accordance with §63.1349(b)(3)(vi).
                                                                                                                                        (c)(2) The owner or operator shall either:
                                                                                                                                        (c)(2)(i) Maintain the minimum activated carbon injection carrier gas flow rate,
                                                                                                                                        as a three-hour rolling average, based on the manufacturer's specifications.
                                                                                                                                        These specifications must be documented in the test plan developed in
                                                                                                                                        accordance with §63.7(c), or
                                                                                                                                        (c)(2)(ii) Maintain the minimum activated carbon injection carrier gas pressure
                                                                                                                                        drop, as a three-hour rolling average, based on the manufacturer's
                                                                                                                                        specifications. These specifications must be documented in the test plan
                                                                                                                                        developed in accordance with §63.7(c).
                                                                                                                                        (d) Except as provided in paragraph (e) of this section, the owner or operator
                                                                                                                                        of an affected source subject to a D/F emission limitation under §63.1343 that
                                                                                                                                        employs carbon injection as an emission control technique must specify and
                                                                                                                                        use the brand and type of activated carbon used during the performance test
                                                                                                                                        until a subsequent performance test is conducted, unless the site-specific
                                                                                                                                        performance test plan contains documentation of key parameters that affect
                                                                                                                                        adsorption and the owner or operator establishes limits based on those
                                                                                                                                        parameters, and the limits on these parameters are maintained.
                                                                                                                                        (e) The owner or operator of an affected source subject to a D/F emission
                                                                                                                                        limitation under §63.1343 that employs carbon injection as an emission control
                                                                                                                                        technique may substitute, at any time, a different brand or type of activated
                                                                                                                                        carbon provided that the replacement has equivalent or improved properties
                                                                                                                                        compared to the activated carbon specified in the site-specific performance
                                                                                                                                        test plan and used in the performance test. The owner or operator must
                                                                                                                                        maintain documentation that the substitute activated carbon will provide the
                                                                                                                                        same or better level of control as the original activated carbon.

                                                                                                                                        [64 FR 31898, June 14, 1999]



                                                                                                                                        40 CFR 63.1345 Standards For Clinker Coolers.
                                                                                                                                        (a) No owner or operator of a new or existing clinker cooler at a facility which is
                                                                                                                                        a major source subject to the provisions of this subpart shall cause to be
                                                                                                                                        discharged into the atmosphere from the clinker cooler any gases which:
                                                                                                                                        (a)(1) Contain particulate matter in excess of 0.050 kg per Mg (0.10 lb per ton)
                                                                                                                                        of feed (dry basis) to the kiln.
                                                                                                                                        (a)(2) Exhibit opacity greater than ten percent.
                                                                                                                                        (b) [Reserved].

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1346 Standards For New And Reconstructed
                                                                                                                                        Raw Material Dryers.
                                                                                                                                        (a) Brownfield/major sources. No owner or operator of a new or reconstructed
                                                                                                                                        brownfield raw material dryer at a facility which is a major source subject to this
                                                                                                                                        subpart shall cause to be discharged into the atmosphere from the new or
                                                                                                                                        reconstructed raw material dryer any gases which exhibit opacity greater than
                                                                                                                                        ten percent.
                                                                                                                                        (b) Greenfield/area sources. No owner or operator of a greenfield raw material
                                                                                                                                        dryer at a facility which is an area source subject to this subpart shall cause to
                                                                                                                                        be discharged into the atmosphere from the greenfield raw material dryer any
                                                                                                                                        gases which contain THC in excess of 50 ppmvd, reported as propane,
                                                                                                                                        corrected to seven percent oxygen.
                                                                                                                                        (c) Greenfield/major sources. No owner or operator of a greenfield raw
                                                                                                                                        material dryer at a facility which is a major source subject to this subpart shall
                                                                                                                                        cause to be discharged into the atmosphere from the greenfield raw material
                                                                                                                                        dryer any gases which:
                                                                                                                                        (c)(1) Contain THC in excess of 50 ppmvd, reported as propane, corrected to
                                                                                                                                        seven percent oxygen.
                                                                                                                                        (c)(2) Exhibit opacity greater than ten percent.

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1347 Standards For Raw And Finish Mills.
                                                                                                                                        The owner or operator of each new or existing raw mill or finish mill at a facility
                                                                                                                                        which is a major source subject to the provisions of this subpart shall not cause
                                                                                                                                        to be discharged from the mill sweep or air separator air pollution control
                                                                                                                                        devices of these affected sources any gases which exhibit opacity in excess of
                                                                                                                                        ten percent.

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1348 Standards For Affected Sources Other
                                                                                                                                        Than Kilns; In-Line Kiln/Raw Mills; Clinker Coolers; New
                                                                                                                                        And Reconstructed Raw Material Dryers; And Raw And
                                                                                                                                        Finish Mills.
                                                                                                                                        The owner or operator of each new or existing raw material, clinker, or finished
                                                                                                                                        product storage bin; conveying system transfer point; bagging system; and
                                                                                                                                        bulk loading or unloading system; and each existing raw material dryer, at a
                                                                                                                                        facility which is a major source subject to the provisions of this subpart shall not
                                                                                                                                        cause to be discharged any gases from these affected sources which exhibit
                                                                                                                                        opacity in excess of ten percent.

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1349 Performance Testing Requirements.
                                                                                                                                        (a) The owner or operator of an affected source subject to this subpart shall
                                                                                                                                        demonstrate initial compliance with the emission limits of §63.1343 and
                                                                                                                                        §§63.1345 through 63.1348 using the test methods and procedures in
                                                                                                                                        paragraph (b) of this section and §63.7. Performance test results shall be
                                                                                                                                        documented in complete test reports that contain the information required by
                                                                                                                                        paragraphs (a)(1) through (a)(10) of this section, as well as all other relevant
                                                                                                                                        information. The plan to be followed during testing shall be made available to
                                                                                                                                        the Administrator prior to testing, if requested.
                                                                                                                                        (a)(1) A brief description of the process and the air pollution control system;
                                                                                                                                        (a)(2) Sampling location description(s);
                                                                                                                                        (a)(3) A description of sampling and analytical procedures and any
                                                                                                                                        modifications to standard procedures;
                                                                                                                                        (a)(4) Test results;
                                                                                                                                        (a)(5) Quality assurance procedures and results;
                                                                                                                                        (a)(6) Records of operating conditions during the test, preparation of
                                                                                                                                        standards, and calibration procedures;
                                                                                                                                        (a)(7) Raw data sheets for field sampling and field and laboratory analyses;
                                                                                                                                        (a)(8) Documentation of calculations;
                                                                                                                                        (a)(9) All data recorded and used to establish parameters for compliance
                                                                                                                                        monitoring; and
                                                                                                                                        (a)(10) Any other information required by the test method.
                                                                                                                                        (b) Performance tests to demonstrate initial compliance with this subpart shall
                                                                                                                                        be conducted as specified in paragraphs (b)(1) through (b)(4) of this section.
                                                                                                                                        (b)(1) The owner or operator of a kiln subject to limitations on particulate
                                                                                                                                        matter emissions shall demonstrate initial compliance by conducting a
                                                                                                                                        performance test as specified in paragraphs (b)(1)(i) through (b)(1)(iv) of this
                                                                                                                                        section. The owner or operator of an in-line kiln/raw mill subject to limitations
                                                                                                                                        on particulate matter emissions shall demonstrate initial compliance by
                                                                                                                                        conducting separate performance tests as specified in paragraphs (b)(1)(i)
                                                                                                                                        through (b)(1)(iv) of this section while the raw mill of the in-line kiln/raw mill is
                                                                                                                                        under normal operating conditions and while the raw mill of the in-line kiln/raw
                                                                                                                                        mill is not operating. The owner or operator of a clinker cooler subject to
                                                                                                                                        limitations on particulate matter emissions shall demonstrate initial compliance
                                                                                                                                        by conducting a performance test as specified in paragraphs (b)(1)(i) through
                                                                                                                                        (b)(1)(iii) of this section. The opacity exhibited during the period of the Method
                                                                                                                                        5 of Appendix A to part 60 of this chapter performance tests required by
                                                                                                                                        paragraph (b)(1)(i) of this section shall be determined as required in
                                                                                                                                        paragraphs (b)(1)(v) through (vi) of this section.
                                                                                                                                        (b)(1)(i) EPA Method 5 of appendix A to part 60 of this chapter shall be used
                                                                                                                                        to determine PM emissions. Each performance test shall consist of three
                                                                                                                                        separate runs under the conditions that exist when the affected source is
                                                                                                                                        operating at the highest load or capacity level reasonably expected to occur.
                                                                                                                                        Each run shall be conducted for at least one hour, and the minimum sample
                                                                                                                                        volume shall be 0.85 dscm (30 dscf). The average of the three runs shall be
                                                                                                                                        used to determine compliance. A determination of the particulate matter
                                                                                                                                        collected in the impingers ("back half") of the Method 5 particulate sampling
                                                                                                                                        train is not required to demonstrate initial compliance with the PM standards of
                                                                                                                                        this subpart. However this shall not preclude the permitting authority from
                                                                                                                                        requiring a determination of the "back half" for other purposes.
                                                                                                                                        (b)(1)(ii) Suitable methods shall be used to determine the kiln or inline kiln/raw
                                                                                                                                        mill feed rate, except for fuels, for each run.
                                                                                                                                        (b)(1)(iii) The emission rate, E, of PM shall be computed for each run using
                                                                                                                                        equation 1:

                                                                                                                                        Where:
                                                                                                                                        E = emission rate of particulate matter, kg/Mg of kiln feed.
                                                                                                                                        cs = concentration of PM, kg/dscm.
                                                                                                                                        Qsd = volumetric flow rate of effluent gas, dscm/hr.
                                                                                                                                        P = total kiln feed (dry basis), Mg/hr.
                                                                                                                                        (b)(1)(iv) When there is an alkali bypass associated with a kiln or in-line
                                                                                                                                        kiln/raw mill, the main exhaust and alkali bypass of the kiln or in-line kiln/raw
                                                                                                                                        mill shall be tested simultaneously and the combined emission rate of
                                                                                                                                        particulate matter from the kiln or in-line kiln/raw mill and alkali bypass shall be
                                                                                                                                        computed for each run using equation 2,

                                                                                                                                        Where:
                                                                                                                                        Ec = the combined emission rate of particulate matter from the kiln or in-line
                                                                                                                                        kiln/raw mill and bypass stack, kg/Mg of kiln feed.
                                                                                                                                        csk = concentration of particulate matter in the kiln or in-line kiln/raw mill
                                                                                                                                        effluent, kg/dscm.
                                                                                                                                        Qsdk = volumetric flow rate of kiln or in-line kiln/raw mill effluent, dscm/hr.
                                                                                                                                        csb = concentration of particulate matter in the alkali bypass gas, kg/dscm.
                                                                                                                                        Qsdb = volumetric flow rate of alkali bypass gas, dscm/hr.
                                                                                                                                        P = total kiln feed (dry basis), Mg/hr.
                                                                                                                                        (b)(1)(v) Except as provided in paragraph (b)(1)(vi) of this section the opacity
                                                                                                                                        exhibited during the period of the Method 5 performance tests required by
                                                                                                                                        paragraph (b)(1)(i) of this section shall be determined through the use of a
                                                                                                                                        continuous opacity monitor (COM). The maximum six-minute average opacity
                                                                                                                                        during the three Method 5 test runs shall be determined during each Method 5
                                                                                                                                        test run, and used to demonstrate initial compliance with the applicable opacity
                                                                                                                                        limits of §63.1343(b)(2), §63.1343(c)(2), or §63.1345(a)(2).
                                                                                                                                        (b)(1)(vi) Each owner or operator of a kiln, in-line kiln/raw mill, or clinker cooler
                                                                                                                                        subject to the provisions of this subpart using a fabric filter with multiple stacks
                                                                                                                                        or an electrostatic precipitator with multiple stacks may, in lieu of installing the
                                                                                                                                        continuous opacity monitoring system required by paragraph (b)(1)(v) of this
                                                                                                                                        section, conduct an opacity test in accordance with Method 9 of appendix A to
                                                                                                                                        part 60 of this chapter during each Method 5 performance test required by
                                                                                                                                        paragraph (b)(1)(i) of this section. If the control device exhausts through a
                                                                                                                                        monovent, or if the use of a COM in accordance with the installation
                                                                                                                                        specifications of Performance Specification 1 (PS-1) of appendix B to part 60
                                                                                                                                        of this chapter is not feasible, a test shall be conducted in accordance with
                                                                                                                                        Method 9 of appendix A to part 60 of this chapter during each Method 5
                                                                                                                                        performance test required by paragraph (b)(1)(i) of this section. The maximum
                                                                                                                                        six-minute average opacity shall be determined during the three Method 5 test
                                                                                                                                        runs, and used to demonstrate initial compliance with the applicable opacity
                                                                                                                                        limits of §63.1343(b)(2), §63.1343(c)(2), or §63.1345(a)(2).
                                                                                                                                        (b)(2) The owner or operator of any affected source subject to limitations on
                                                                                                                                        opacity under this subpart that is not subject to paragraph (b)(1) of this section
                                                                                                                                        shall demonstrate initial compliance with the affected source opacity limit by
                                                                                                                                        conducting a test in accordance with Method 9 of appendix A to part 60 of this
                                                                                                                                        chapter. The performance test shall be conducted under the conditions that
                                                                                                                                        exist when the affected source is operating at the highest load or capacity level
                                                                                                                                        reasonably expected to occur. The maximum six-minute average opacity
                                                                                                                                        exhibited during the test period shall be used to determine whether the
                                                                                                                                        affected source is in initial compliance with the standard. The duration of the
                                                                                                                                        Method 9 performance test shall be 3-hours (30 6-minute averages), except
                                                                                                                                        that the duration of the Method 9 performance test may be reduced to 1-hour if
                                                                                                                                        the conditions of paragraphs (b)(2)(i) through (ii) of the section apply:
                                                                                                                                        (b)(2)(i) There are no individual readings greater than 10 percent opacity;
                                                                                                                                        (b)(2)(ii) There are no more than three readings of 10 percent for the first 1-
                                                                                                                                        hour period.
                                                                                                                                        (b)(3) The owner or operator of an affected source subject to limitations on D/F
                                                                                                                                        emissions shall demonstrate initial compliance with the D/F emission limit by
                                                                                                                                        conducting a performance test using Method 23 of appendix A to part 60 of
                                                                                                                                        this chapter. The owner or operator of an in-line kiln/raw mill shall demonstrate
                                                                                                                                        initial compliance by conducting separate performance tests while the raw mill
                                                                                                                                        of the in-line kiln/raw mill is under normal operating conditions and while the
                                                                                                                                        raw mill of the in-line kiln/raw mill is not operating. The owner or operator of a
                                                                                                                                        kiln or in-line kiln/raw mill equipped with an alkali bypass shall conduct
                                                                                                                                        simultaneous performance tests of the kiln or in-line kiln/raw mill exhaust and
                                                                                                                                        the alkali bypass, however the owner or operator of an in-line kiln/raw mill is not
                                                                                                                                        required to conduct a performance test of the alkali bypass exhaust when the
                                                                                                                                        raw mill of the in-line kiln/raw mill is not operating.
                                                                                                                                        (b)(3)(i) Each performance test shall consist of three separate runs; each run
                                                                                                                                        shall be conducted under the conditions that exist when the affected source is
                                                                                                                                        operating at the highest load or capacity level reasonably expected to occur.
                                                                                                                                        The duration of each run shall be at least three hours and the sample volume
                                                                                                                                        for each run shall be at least 2.5 dscm (90 dscf). The concentration shall be
                                                                                                                                        determined for each run and the arithmetic average of the concentrations
                                                                                                                                        measured for the three runs shall be calculated and used to determine
                                                                                                                                        compliance.
                                                                                                                                        (b)(3)(ii) The temperature at the inlet to the kiln or in-line kiln/raw mill PMCD,
                                                                                                                                        and where applicable, the temperature at the inlet to the alkali bypass PMCD,
                                                                                                                                        must be continuously recorded during the period of the Method 23 test, and the
                                                                                                                                        continuous temperature record(s) must be included in the performance test
                                                                                                                                        report.
                                                                                                                                        (b)(3)(iii) One-minute average temperatures must be calculated for each
                                                                                                                                        minute of each run of the test.
                                                                                                                                        (b)(3)(iv) The run average temperature must be calculated for each run, and
                                                                                                                                        the average of the run average temperatures must be determined and included
                                                                                                                                        in the performance test report and will determine the applicable temperature
                                                                                                                                        limit in accordance with §63.1344(b).
                                                                                                                                        (b)(3)(v) If activated carbon injection is used for D/F control, the rate of
                                                                                                                                        activated carbon injection to the kiln or in-line kiln/raw mill exhaust, and where
                                                                                                                                        applicable, the rate of activated carbon injection to the alkali bypass exhaust,
                                                                                                                                        must be continuously recorded during the period of the Method 23 test, and the
                                                                                                                                        continuous injection rate record(s) must be included in the performance test
                                                                                                                                        report. In addition, the performance test report must include the brand and type
                                                                                                                                        of activated carbon used during the performance test and a continuous record
                                                                                                                                        of either the carrier gas flow rate or the carrier gas pressure drop for the
                                                                                                                                        duration of the test. Activated carbon injection rate parameters must be
                                                                                                                                        determined in accordance with paragraphs (b)(3)(vi) of this section.
                                                                                                                                        (b)(3)(vi) The run average injection rate must be calculated for each run, and
                                                                                                                                        the average of the run average injection rates must be determined and
                                                                                                                                        included in the performance test report and will determine the applicable
                                                                                                                                        injection rate limit in accordance with §63.1344(c)(1).
                                                                                                                                        (b)(4) The owner or operator of an affected source subject to limitations on
                                                                                                                                        emissions of THC shall demonstrate initial compliance with the THC limit by
                                                                                                                                        operating a continuous emission monitor in accordance with Performance
                                                                                                                                        Specification 8A of appendix B to part 60 of this chapter. The duration of the
                                                                                                                                        performance test shall be three hours, and the average THC concentration (as
                                                                                                                                        calculated from the one-minute averages) during the three hour performance
                                                                                                                                        test shall be calculated. The owner or operator of an in-line kiln/raw mill shall
                                                                                                                                        demonstrate initial compliance by conducting separate performance tests
                                                                                                                                        while the raw mill of the in-line kiln/raw mill is under normal operating
                                                                                                                                        conditions and while the raw mill of the in-line kiln/raw mill is not operating.
                                                                                                                                        (c) Except as provided in paragraph (e) of this section, performance tests
                                                                                                                                        required under paragraphs (b)(1) and (b)(2) of this section shall be repeated
                                                                                                                                        every five years, except that the owner or operator of a kiln, in-line kiln/raw mill
                                                                                                                                        or clinker cooler is not required to repeat the initial performance test of opacity
                                                                                                                                        for the kiln, in-line kiln/raw mill or clinker cooler.
                                                                                                                                        (d) Performance tests required under paragraph (b)(3) of this section shall be
                                                                                                                                        repeated every 30 months.
                                                                                                                                        (e) The owner or operator is required to repeat the performance tests for kilns
                                                                                                                                        or in-line kiln/raw mills as specified in paragraphs (b)(1) and (b)(3) of this
                                                                                                                                        section within 90 days of initiating any significant change in the feed or fuel
                                                                                                                                        from that used in the previous performance test.
                                                                                                                                        (f) Table 1 of this section provides a summary of the performance test
                                                                                                                                        requirements of this subpart.
                                                                                                                                        TABLE 1 TO §63.1349--SUMMARY OF PERFORMANCE TEST
                                                                                                                                        REQUIREMENTS
                                                                                                                                        ----------------------------------------------+--------------------------
                                                                                                                                        Affected source and pollutant | Performance test
                                                                                                                                        ----------------------------------------------+--------------------------
                                                                                                                                        New and existing kiln and in-line |
                                                                                                                                        kiln/raw mill b c PM.........................| EPA Method 5.a
                                                                                                                                        New and existing kiln and in-line |
                                                                                                                                        kiln/raw mill b c Opacity....................| COM if feasible d e or
                                                                                                                                        | EPA Method 9 visual
                                                                                                                                        | opacity readings.
                                                                                                                                        New and existing kiln and in-line |
                                                                                                                                        kiln/raw mill b c f g D/F....................| EPA Method 23h.
                                                                                                                                        New greenfield kiln and in-line |
                                                                                                                                        kiln/raw mill c THC..........................| THC CEM (EPA PS-8A)i.
                                                                                                                                        New and existing clinker cooler PM............| EPA Method 5a.
                                                                                                                                        New and existing clinker cooler |
                                                                                                                                        opacity......................................| COM d,j or EPA Method 9
                                                                                                                                        | visual opacity readings.
                                                                                                                                        New and existing raw and finish |
                                                                                                                                        mill opacity.................................| EPA Method 9.a j
                                                                                                                                        New and existing raw material |
                                                                                                                                        dryer and materials handling |
                                                                                                                                        processes (raw material storage, |
                                                                                                                                        clinker storage, finished |
                                                                                                                                        product storage, conveyor |
                                                                                                                                        transfer points, bagging, and |
                                                                                                                                        bulk loading and unloading |
                                                                                                                                        systems) opacity.............................| EPA Method 9.a j
                                                                                                                                        New greenfield raw material dryer THC.........| THC CEM (EPA PS-8A).i
                                                                                                                                        ----------------------------------------------+-------------------------
                                                                                                                                        a Required initially and every 5 years thereafter.
                                                                                                                                        b Includes main exhaust and alkali bypass.
                                                                                                                                        c In-line kiln/raw mill to be tested with and without raw mill in operation.
                                                                                                                                        d Must meet COM performance specification criteria. If the fabric filter or
                                                                                                                                        electrostatic precipitator has multiple stacks, daily EPA Method 9 visual
                                                                                                                                        opacity readings may be taken instead of using a COM.
                                                                                                                                        e Opacity limit is 20 percent.
                                                                                                                                        f Alkali bypass is tested with the raw mill on.
                                                                                                                                        g Temperature and (if applicable) activated carbon injection parameters
                                                                                                                                        determined separately with and without the raw mill operating.
                                                                                                                                        h Required initially and every 30 months thereafter.
                                                                                                                                        i EPA Performance Specification (PS)-8A of appendix B to 40 CFR part 60.
                                                                                                                                        j Opacity limit is 10 percent.

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1350 Monitoring Requirements.
                                                                                                                                        (a) The owner or operator of each portland cement plant shall prepare for each
                                                                                                                                        affected source subject to the provisions of this subpart, a written operations
                                                                                                                                        and maintenance plan. The plan shall be submitted to the Administrator for
                                                                                                                                        review and approval as part of the application for a part 70 permit and shall
                                                                                                                                        include the following information:
                                                                                                                                        (a)(1) Procedures for proper operation and maintenance of the affected
                                                                                                                                        source and air pollution control devices in order to meet the emission limits
                                                                                                                                        and operating limits of §§63.1343 through 63.1348;
                                                                                                                                        (a)(2) Corrective actions to be taken when required by paragraph (e) of this
                                                                                                                                        section;
                                                                                                                                        (a)(3) Procedures to be used during an inspection of the components of the
                                                                                                                                        combustion system of each kiln and each in-line kiln raw mill located at the
                                                                                                                                        facility at least once per year; and
                                                                                                                                        (a)(4) Procedures to be used to periodically monitor affected sources subject
                                                                                                                                        to opacity standards under §§63.1346 and 63.1348. Such procedures must
                                                                                                                                        include the provisions of paragraphs (a)(4)(i) through (a)(4)(iv) of this section.
                                                                                                                                        (a)(4)(i) The owner or operator must conduct a monthly 1-minute visible
                                                                                                                                        emissions test of each affected source in accordance with Method 22 of
                                                                                                                                        Appendix A to part 60 of this chapter. The test must be conducted while the
                                                                                                                                        affected source is in operation.
                                                                                                                                        (a)(4)(ii) If no visible emissions are observed in six consecutive monthly tests
                                                                                                                                        for any affected source, the owner or operator may decrease the frequency of
                                                                                                                                        testing from monthly to semi-annually for that affected source. If visible
                                                                                                                                        emissions are observed during any semi-annual test, the owner or operator
                                                                                                                                        must resume testing of that affected source on a monthly basis and maintain
                                                                                                                                        that schedule until no visible emissions are observed in six consecutive
                                                                                                                                        monthly tests.
                                                                                                                                        (a)(4)(iii) If no visible emissions are observed during the semi-annual test for
                                                                                                                                        any affected source, the owner or operator may decrease the frequency of
                                                                                                                                        testing from semi-annually to annually for that affected source. If visible
                                                                                                                                        emissions are observed during any annual test, the owner or operator must
                                                                                                                                        resume testing of that affected source on a monthly basis and maintain that
                                                                                                                                        schedule until no visible emissions are observed in six consecutive monthly
                                                                                                                                        tests.
                                                                                                                                        (a)(4)(iv) If visible emissions are observed during any Method 22 test, the
                                                                                                                                        owner or operator must conduct a 6-minute test of opacity in accordance with
                                                                                                                                        Method 9 of appendix A to part 60 of this chapter. The Method 9 test must
                                                                                                                                        begin within one hour of any observation of visible emissions.
                                                                                                                                        (b) Failure to comply with any provision of the operations and maintenance
                                                                                                                                        plan developed in accordance with paragraph (a) of this section shall be a
                                                                                                                                        violation of the standard.
                                                                                                                                        (c) The owner or operator of a kiln or in-line kiln/raw mill shall monitor opacity at
                                                                                                                                        each point where emissions are vented from these affected sources including
                                                                                                                                        alkali bypasses in accordance with paragraphs (c)(1) through (c)(3) of this
                                                                                                                                        section.
                                                                                                                                        (c)(1) Except as provided in paragraph (c)(2) of this section, the owner or
                                                                                                                                        operator shall install, calibrate, maintain, and continuously operate a
                                                                                                                                        continuous opacity monitor (COM) located at the outlet of the PM control
                                                                                                                                        device to continuously monitor the opacity. The COM shall be installed,
                                                                                                                                        maintained, calibrated, and operated as required by subpart A, general
                                                                                                                                        provisions of this part, and according to PS-1 of appendix B to part 60 of this
                                                                                                                                        chapter.
                                                                                                                                        (c)(2) The owner or operator of a kiln or in-line kiln/raw mill subject to the
                                                                                                                                        provisions of this subpart using a fabric filter with multiple stacks or an
                                                                                                                                        electrostatic precipitator with multiple stacks may, in lieu of installing the
                                                                                                                                        continuous opacity monitoring system required by paragraph (c)(1) of this
                                                                                                                                        section, monitor opacity in accordance with paragraphs (c)(2)(i) through (ii) of
                                                                                                                                        this section. If the control device exhausts through a monovent, or if the use of a
                                                                                                                                        COM in accordance with the installation specifications of PS-1 of appendix B
                                                                                                                                        to part 60 of this chapter is not feasible, the owner or operator must monitor
                                                                                                                                        opacity in accordance with paragraphs (c)(2)(i) through (ii) of this section.
                                                                                                                                        (c)(2)(i) Perform daily visual opacity observations of each stack in accordance
                                                                                                                                        with the procedures of Method 9 of appendix A of part 60 of this chapter. The
                                                                                                                                        Method 9 test shall be conducted while the affected source is operating at the
                                                                                                                                        highest load or capacity level reasonably expected to occur within the day. The
                                                                                                                                        duration of the Method 9 test shall be at least 30 minutes each day.
                                                                                                                                        (c)(2)(ii) Use the Method 9 procedures to monitor and record the average
                                                                                                                                        opacity for each six-minute period during the test.
                                                                                                                                        (c)(3) To remain in compliance, the opacity must be maintained such that the
                                                                                                                                        6-minute average opacity for any 6-minute block period does not exceed 20
                                                                                                                                        percent. If the average opacity for any 6-minute block period exceeds 20
                                                                                                                                        percent, this shall constitute a violation of the standard.
                                                                                                                                        (d) The owner or operator of a clinker cooler shall monitor opacity at each point
                                                                                                                                        where emissions are vented from the clinker cooler in accordance with
                                                                                                                                        paragraphs (d)(1) through (d)(3) of this section.
                                                                                                                                        (d)(1) Except as provided in paragraph (d)(2) of this section, the owner or
                                                                                                                                        operator shall install, calibrate, maintain, and continuously operate a COM
                                                                                                                                        located at the outlet of the clinker cooler PM control device to continuously
                                                                                                                                        monitor the opacity. The COM shall be installed, maintained, calibrated, and
                                                                                                                                        operated as required by subpart A, general provisions of this part, and
                                                                                                                                        according to PS-1 of appendix B to part 60 of this chapter.
                                                                                                                                        (d)(2) The owner or operator of a clinker cooler subject to the provisions of this
                                                                                                                                        subpart using a fabric filter with multiple stacks or an electrostatic precipitator
                                                                                                                                        with multiple stacks may, in lieu of installing the continuous opacity monitoring
                                                                                                                                        system required by paragraph (d)(1) of this section, monitor opacity in
                                                                                                                                        accordance with paragraphs (d)(2)(i) through (ii) of this section. If the control
                                                                                                                                        device exhausts through a monovent, or if the use of a COM in accordance
                                                                                                                                        with the installation specifications of PS-1 of appendix B to part 60 of this
                                                                                                                                        chapter is not feasible, the owner or operator must monitor opacity in
                                                                                                                                        accordance with paragraphs (d)(2)(i) through (ii) of this section.
                                                                                                                                        (d)(2)(i) Perform daily visual opacity observations of each stack in accordance
                                                                                                                                        with the procedures of Method 9 of appendix A of part 60 of this chapter. The
                                                                                                                                        Method 9 test shall be conducted while the affected source is operating at the
                                                                                                                                        highest load or capacity level reasonably expected to occur within the day. The
                                                                                                                                        duration of the Method 9 test shall be at least 30 minutes each day.
                                                                                                                                        (d)(2)(ii) Use the Method 9 procedures to monitor and record the average
                                                                                                                                        opacity for each six-minute period during the test.
                                                                                                                                        (d)(3) To remain in compliance, the opacity must be maintained such that the
                                                                                                                                        6-minute average opacity for any 6-minute block period does not exceed 10
                                                                                                                                        percent. If the average opacity for any 6-minute block period exceeds 10
                                                                                                                                        percent, this shall constitute a violation of the standard.
                                                                                                                                        (e) The owner or operator of a raw mill or finish mill shall monitor opacity by
                                                                                                                                        conducting daily visual emissions observations of the mill sweep and air
                                                                                                                                        separator PMCDs of these affected sources, in accordance with the
                                                                                                                                        procedures of Method 22 of appendix A of part 60 of this chapter. The Method
                                                                                                                                        22 test shall be conducted while the affected source is operating at the highest
                                                                                                                                        load or capacity level reasonably expected to occur within the day. The
                                                                                                                                        duration of the Method 22 test shall be six minutes. If visible emissions are
                                                                                                                                        observed during any Method 22 visible emissions test, the owner or operator
                                                                                                                                        must:
                                                                                                                                        (e)(1) Initiate, within one-hour, the corrective actions specified in the site
                                                                                                                                        specific operating and maintenance plan developed in accordance with
                                                                                                                                        paragraphs (a)(1) and (a)(2) of this section; and
                                                                                                                                        (e)(2) Within 24 hours of the end of the Method 22 test in which visible
                                                                                                                                        emissions were observed, conduct a visual opacity test of each stack from
                                                                                                                                        which visible emissions were observed in accordance with Method 9 of
                                                                                                                                        appendix A of part 60 of this chapter. The duration of the Method 9 test shall
                                                                                                                                        be thirty minutes.
                                                                                                                                        (f) The owner or operator of an affected source subject to a limitation on D/F
                                                                                                                                        emissions shall monitor D/F emissions in accordance with paragraphs (f)(1)
                                                                                                                                        through (f)(6) of this section.
                                                                                                                                        (f)(1) The owner or operator shall install, calibrate, maintain, and continuously
                                                                                                                                        operate a continuous monitor to record the temperature of the exhaust gases
                                                                                                                                        from the kiln, in-line kiln/raw mill and alkali bypass, if applicable, at the inlet to,
                                                                                                                                        or upstream of, the kiln, in-line kiln/raw mill and/or alkali bypass PM control
                                                                                                                                        devices.
                                                                                                                                        (f)(1)(i) The recorder response range must include zero and 1.5 times either of
                                                                                                                                        the average temperatures established according to the requirements in
                                                                                                                                        §63.1349(b)(3)(iv).
                                                                                                                                        (f)(1)(ii) The reference method must be a National Institute of Standards and
                                                                                                                                        Technology calibrated reference thermocouple-potentiometer system or
                                                                                                                                        alternate reference, subject to approval by the Administrator.
                                                                                                                                        (f)(2) The owner or operator shall monitor and continuously record the
                                                                                                                                        temperature of the exhaust gases from the kiln, in-line kiln/raw mill and alkali
                                                                                                                                        bypass, if applicable, at the inlet to the kiln, in-line kiln/raw mill and/or alkali
                                                                                                                                        bypass PMCD.
                                                                                                                                        (f)(3) The three-hour rolling average temperature shall be calculated as the
                                                                                                                                        average of 180 successive one-minute average temperatures.
                                                                                                                                        (f)(4) Periods of time when one-minute averages are not available shall be
                                                                                                                                        ignored when calculating three-hour rolling averages. When one-minute
                                                                                                                                        averages become available, the first one-minute average is added to the
                                                                                                                                        previous 179 values to calculate the three-hour rolling average.
                                                                                                                                        (f)(5) When the operating status of the raw mill of the in-line kiln/ raw mill is
                                                                                                                                        changed from off to on, or from on to off the calculation of the three-hour rolling
                                                                                                                                        average temperature must begin anew, without considering previous
                                                                                                                                        recordings.
                                                                                                                                        (f)(6) The calibration of all thermocouples and other temperature sensors shall
                                                                                                                                        be verified at least once every three months.
                                                                                                                                        (g) The owner or operator of an affected source subject to a limitation on D/F
                                                                                                                                        emissions that employs carbon injection as an emission control technique shall
                                                                                                                                        comply with the monitoring requirements of paragraphs (f)(1) through (f)(6) and
                                                                                                                                        (g)(1) through (g)(6) of this section to demonstrate continuous compliance with
                                                                                                                                        the D/F emission standard.
                                                                                                                                        (g)(1) Install, operate, calibrate and maintain a continuous monitor to record
                                                                                                                                        the rate of activated carbon injection. The accuracy of the rate measurement
                                                                                                                                        device must be ±1 percent of the rate being measured.
                                                                                                                                        (g)(2) Verify the calibration of the device at least once every three months.
                                                                                                                                        (g)(3) The three-hour rolling average activated carbon injection rate shall be
                                                                                                                                        calculated as the average of 180 successive one-minute average activated
                                                                                                                                        carbon injection rates.
                                                                                                                                        (g)(4) Periods of time when one-minute averages are not available shall be
                                                                                                                                        ignored when calculating three-hour rolling averages. When one-minute
                                                                                                                                        averages become available, the first one-minute average is added to the
                                                                                                                                        previous 179 values to calculate the three-hour rolling average.
                                                                                                                                        (g)(5) When the operating status of the raw mill of the in-line kiln/ raw mill is
                                                                                                                                        changed from off to on, or from on to off the calculation of the three-hour rolling
                                                                                                                                        average activated carbon injection rate must begin anew, without considering
                                                                                                                                        previous recordings.
                                                                                                                                        (g)(6) The owner or operator must install, operate, calibrate and maintain a
                                                                                                                                        continuous monitor to record the activated carbon injection system carrier gas
                                                                                                                                        parameter (either the carrier gas flow rate or the carrier gas pressure drop)
                                                                                                                                        established during the D/F performance test in accordance with paragraphs
                                                                                                                                        (g)(6)(i) through (g)(6)(iii) of this section.
                                                                                                                                        (g)(6)(i) The owner or operator shall install, calibrate, operate and maintain a
                                                                                                                                        device to continuously monitor and record the parameter value.
                                                                                                                                        (g)(6)(ii) The owner or operator must calculate and record three-hour rolling
                                                                                                                                        averages of the parameter value.
                                                                                                                                        (g)(6)(iii) Periods of time when one-minute averages are not available shall be
                                                                                                                                        ignored when calculating three-hour rolling averages. When one-minute
                                                                                                                                        averages become available, the first one-minute average shall be added to the
                                                                                                                                        previous 179 values to calculate the three-hour rolling average.
                                                                                                                                        (h) The owner or operator of an affected source subject to a limitation on THC
                                                                                                                                        emissions under this subpart shall comply with the monitoring requirements of
                                                                                                                                        paragraphs (h)(1) through (h)(3) of this section to demonstrate continuous
                                                                                                                                        compliance with the THC emission standard:
                                                                                                                                        (h)(1) The owner or operator shall install, operate and maintain a THC
                                                                                                                                        continuous emission monitoring system in accordance with Performance
                                                                                                                                        Specification 8A, of appendix B to part 60 of this chapter and comply with all of
                                                                                                                                        the requirements for continuous monitoring systems found in the general
                                                                                                                                        provisions, subpart A of this part.
                                                                                                                                        (h)(2) The owner or operator is not required to calculate hourly rolling averages
                                                                                                                                        in accordance with section 4.9 of Performance Specification 8A.
                                                                                                                                        (h)(3) Any thirty-day block average THC concentration in any gas discharged
                                                                                                                                        from a greenfield raw material dryer, the main exhaust of a greenfield kiln, or
                                                                                                                                        the main exhaust of a greenfield in-line kiln/raw mill, exceeding 50 ppmvd,
                                                                                                                                        reported as propane, corrected to seven percent oxygen, is a violation of the
                                                                                                                                        standard.
                                                                                                                                        (i) The owner or operator of any kiln or in-line kiln/raw mill subject to a D/F
                                                                                                                                        emission limit under this subpart shall conduct an inspection of the
                                                                                                                                        components of the combustion system of each kiln or in-line kiln raw mill at
                                                                                                                                        least once per year.
                                                                                                                                        (j) The owner or operator of an affected source subject to a limitation on
                                                                                                                                        opacity under §63.1346 or §63.1348 shall monitor opacity in accordance with
                                                                                                                                        the operation and maintenance plan developed in accordance with paragraph
                                                                                                                                        (a) of this section.
                                                                                                                                        (k) The owner or operator of an affected source subject to a particulate matter
                                                                                                                                        standard under §63.1343 shall install, calibrate, maintain and operate a
                                                                                                                                        particulate matter continuous emission monitoring system (PM CEMS) to
                                                                                                                                        measure the particulate matter discharged to the atmosphere. The compliance
                                                                                                                                        deadline for installing the PM CEMS and all requirements relating to
                                                                                                                                        performance of the PM CEMS and implementation of the PM CEMS
                                                                                                                                        requirement is deferred pending further rulemaking.
                                                                                                                                        (l) An owner or operator may submit an application to the Administrator for
                                                                                                                                        approval of alternate monitoring requirements to demonstrate compliance with
                                                                                                                                        the emission standards of this subpart, except for emission standards for THC,
                                                                                                                                        subject to the provisions of paragraphs (l)(1) through (l)(6) of this section.
                                                                                                                                        (l)(1) The Administrator will not approve averaging periods other than those
                                                                                                                                        specified in this section, unless the owner or operator documents, using data
                                                                                                                                        or information, that the longer averaging period will ensure that emissions do
                                                                                                                                        not exceed levels achieved during the performance test over any increment of
                                                                                                                                        time equivalent to the time required to conduct three runs of the performance
                                                                                                                                        test.
                                                                                                                                        (l)(2) If the application to use an alternate monitoring requirement is approved,
                                                                                                                                        the owner or operator must continue to use the original monitoring requirement
                                                                                                                                        until approval is received to use another monitoring requirement.
                                                                                                                                        (l)(3) The owner or operator shall submit the application for approval of
                                                                                                                                        alternate monitoring requirements no later than the notification of performance
                                                                                                                                        test. The application must contain the information specified in paragraphs
                                                                                                                                        (l)(3)(i) through (l)(3)(iii) of this section:
                                                                                                                                        (l)(3)(i) Data or information justifying the request, such as the technical or
                                                                                                                                        economic infeasibility, or the impracticality of using the required approach;
                                                                                                                                        (l)(3)(ii) A description of the proposed alternative monitoring requirement,
                                                                                                                                        including the operating parameter to be monitored, the monitoring approach
                                                                                                                                        and technique, the averaging period for the limit, and how the limit is to be
                                                                                                                                        calculated; and
                                                                                                                                        (l)(3)(iii) Data or information documenting that the alternative monitoring
                                                                                                                                        requirement would provide equivalent or better assurance of compliance with
                                                                                                                                        the relevant emission standard.
                                                                                                                                        (l)(4) The Administrator will notify the owner or operator of the approval or
                                                                                                                                        denial of the application within 90 calendar days after receipt of the original
                                                                                                                                        request, or within 60 calendar days of the receipt of any supplementary
                                                                                                                                        information, whichever is later. The Administrator will not approve an alternate
                                                                                                                                        monitoring application unless it would provide equivalent or better assurance
                                                                                                                                        of compliance with the relevant emission standard. Before disapproving any
                                                                                                                                        alternate monitoring application, the Administrator will provide:
                                                                                                                                        (l)(4)(i) Notice of the information and findings upon which the intended
                                                                                                                                        disapproval is based; and
                                                                                                                                        (l)(4)(ii) Notice of opportunity for the owner or operator to present additional
                                                                                                                                        supporting information before final action is taken on the application. This
                                                                                                                                        notice will specify how much additional time is allowed for the owner or
                                                                                                                                        operator to provide additional supporting information.
                                                                                                                                        (l)(5) The owner or operator is responsible for submitting any supporting
                                                                                                                                        information in a timely manner to enable the Administrator to consider the
                                                                                                                                        application prior to the performance test. Neither submittal of an application,
                                                                                                                                        nor the Administrator's failure to approve or disapprove the application
                                                                                                                                        relieves the owner or operator of the responsibility to comply with any provision
                                                                                                                                        of this subpart.
                                                                                                                                        (l)(6) The Administrator may decide at any time, on a case-by-case basis that
                                                                                                                                        additional or alternative operating limits, or alternative approaches to
                                                                                                                                        establishing operating limits, are necessary to demonstrate compliance with
                                                                                                                                        the emission standards of this subpart.
                                                                                                                                        (m) A summary of the monitoring requirements of this subpart is given in Table
                                                                                                                                        1 to this section.
                                                                                                                                        TABLE 1 TO §63.1350--MONITORING REQUIREMENTS
                                                                                                                                        ----------------------------+---------------------+---------------------
                                                                                                                                        Affected source/pollutant | Monitor type/ | Monitoring
                                                                                                                                        or opacity | operation/process | requirements
                                                                                                                                        ----------------------------+---------------------+---------------------
                                                                                                                                        All affected sources........| Operations and | Prepare written plan
                                                                                                                                        | maintenance plan. | for all affected
                                                                                                                                        | | sources and control
                                                                                                                                        | | devices.
                                                                                                                                        All kilns and in-line kiln | Continuous opacity | Install, calibrate,
                                                                                                                                        raw mills at major sources | monitor, if | maintain and
                                                                                                                                        (including alkali bypass)/ | applicable. | operate in
                                                                                                                                        opacity. | | accordance with
                                                                                                                                        | | general provisions
                                                                                                                                        | | and with PS-1.
                                                                                                                                        | Method 9 opacity | Daily test of at
                                                                                                                                        | test, if applicable| least 30-minutes,
                                                                                                                                        | | while kiln is at
                                                                                                                                        | | highest load or
                                                                                                                                        | | capacity level.
                                                                                                                                        Kilns and in-line kiln raw | Particulate matter | Deferred.
                                                                                                                                        mills at major sources | continuous emission|
                                                                                                                                        (including alkali bypass)/ | monitoring system. |
                                                                                                                                        particulate matter. | |
                                                                                                                                        Kilns and in-line kiln raw | Combustion system | Conduct annual
                                                                                                                                        mills at major and area | inspection. | inspection of
                                                                                                                                        sources (including alkali | | components of
                                                                                                                                        bypass)/ D/F. | | combustion system.
                                                                                                                                        | Continuous | Install, operate,
                                                                                                                                        | temperature | calibrate and
                                                                                                                                        | monitoring at PMCD | maintain continuous
                                                                                                                                        | inlet. | temperature
                                                                                                                                        | | monitoring and
                                                                                                                                        | | recording system;
                                                                                                                                        | | calculate three-
                                                                                                                                        | | hour rolling
                                                                                                                                        | | averages; verify
                                                                                                                                        | | temperature sensor
                                                                                                                                        | | calibration at
                                                                                                                                        | | least quarterly.
                                                                                                                                        Kilns and in-line kiln raw | Activated carbon | Install, operate,
                                                                                                                                        mills at major and area | injection rate | calibrate and
                                                                                                                                        sources (including alkali | monitor, if | maintain continuous
                                                                                                                                        bypass)/ D/F (continued). | applicable. | activated carbon
                                                                                                                                        | | injection rate
                                                                                                                                        | | monitor; calculate
                                                                                                                                        | | three-hour rolling
                                                                                                                                        | | averages; verify
                                                                                                                                        | | calibration at
                                                                                                                                        | | least quarterly;
                                                                                                                                        | | install, operate,
                                                                                                                                        | | calibrate and
                                                                                                                                        | | maintain carrier
                                                                                                                                        | | gas flow rate
                                                                                                                                        | | monitor or carrier
                                                                                                                                        | | gas pressure drop
                                                                                                                                        | | monitor; calculate
                                                                                                                                        | | three-hour rolling
                                                                                                                                        | | averages; document
                                                                                                                                        | | carbon
                                                                                                                                        | | specifications.
                                                                                                                                        New greenfield kilns and in-| Total hydrocarbon | Install, operate,
                                                                                                                                        line kiln raw mills at | continuous emission| and maintain THC
                                                                                                                                        major and area sources/THC.| monitor. | CEM in accordance
                                                                                                                                        | | with PS-8A;
                                                                                                                                        | | calculate 30-day
                                                                                                                                        | | block average THC
                                                                                                                                        | | concentration.
                                                                                                                                        Clinker coolers at major | Continuous opacity | Install, calibrate,
                                                                                                                                        sources/opacity. | monitor, if | maintain and
                                                                                                                                        | applicable. | operate in
                                                                                                                                        | | accordance with
                                                                                                                                        | | general provisions
                                                                                                                                        | | and with PS-1.
                                                                                                                                        | Method 9 opacity | Daily test of at
                                                                                                                                        | test, if applicable| least 30-minutes,
                                                                                                                                        | | while kiln is at
                                                                                                                                        | | highest load or
                                                                                                                                        | | capacity level.
                                                                                                                                        Raw mills and finish mills | Method 22 visible | Conduct daily 6-
                                                                                                                                        at major sources/opacity. | emissions test. | minute Method 22
                                                                                                                                        | | visible emissions
                                                                                                                                        | | test while mill is
                                                                                                                                        | | operating at
                                                                                                                                        | | highest load or
                                                                                                                                        | | capacity level; if
                                                                                                                                        | | visible emissions
                                                                                                                                        | | are observed,
                                                                                                                                        | | initiate corrective
                                                                                                                                        | | action within one
                                                                                                                                        | | hour and conduct 30-
                                                                                                                                        | | minute Method 9
                                                                                                                                        | | test within 24
                                                                                                                                        | | hours.
                                                                                                                                        New greenfield raw material | Total hydrocarbon | Install, operate,
                                                                                                                                        dryers at major and area | continuous emission| and maintain THC
                                                                                                                                        sources/THC. | monitor. | CEM in accordance
                                                                                                                                        | | with PS-8A;
                                                                                                                                        | | calculate 30-day
                                                                                                                                        | | block average THC
                                                                                                                                        | | concentration.
                                                                                                                                        Raw material dryers; raw | Method 22 visible | As specified in
                                                                                                                                        material, clinker, finished| emissions test. | operation and
                                                                                                                                        product storage bins; | | maintenance plan.
                                                                                                                                        conveying system transfer | |
                                                                                                                                        points; bagging systems; | |
                                                                                                                                        and bulk loading and | |
                                                                                                                                        unloading systems at major | |
                                                                                                                                        sources/opacity. | |


                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1351 Compliance Dates.
                                                                                                                                        (a) The compliance date for an owner or operator of an existing affected
                                                                                                                                        source subject to the provisions of this subpart is June 10, 2002.
                                                                                                                                        (b) The compliance date for an owner or operator of an affected source subject
                                                                                                                                        to the provisions of this subpart that commences new construction or
                                                                                                                                        reconstruction after March 24, 1998 is June 9, 1999 or immediately upon
                                                                                                                                        startup of operations, whichever is later.

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1352 Additional Test Methods.
                                                                                                                                        (a) Owners or operators conducting tests to determine the rates of emission of
                                                                                                                                        hydrogen chloride (HCl) from kilns, in-line kiln/raw mills and associated bypass
                                                                                                                                        stacks at portland cement manufacturing facilities, for use in applicability
                                                                                                                                        determinations under §63.1340 are permitted to use Method 320 or Method
                                                                                                                                        321 of appendix A of this part.
                                                                                                                                        (b) Owners or operators conducting tests to determine the rates of emission of
                                                                                                                                        hydrogen chloride (HCl) from kilns, in-line kiln/raw mills and associated bypass
                                                                                                                                        stacks at portland cement manufacturing facilities, for use in applicability
                                                                                                                                        determinations under §63.1340 are permitted to use Methods 26 or 26A of
                                                                                                                                        appendix A to part 60 of this chapter, except that the results of these tests shall
                                                                                                                                        not be used to establish status as an area source.
                                                                                                                                        (c) Owners or operators conducting tests to determine the rates of emission of
                                                                                                                                        specific organic HAP from raw material dryers, kilns and in-line kiln/raw mills at
                                                                                                                                        portland cement manufacturing facilities, for use in applicability determinations
                                                                                                                                        under §63.1340 of this subpart are permitted to use Method 320 of appendix
                                                                                                                                        A to this part, or Method 18 of appendix A to part 60 of this chapter.

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1353 Notification Requirements.
                                                                                                                                        (a) The notification provisions of 40 CFR part 63, subpart A that apply and
                                                                                                                                        those that do not apply to owners and operators of affected sources subject to
                                                                                                                                        this subpart are listed in Table 1 of this subpart. If any State requires a notice
                                                                                                                                        that contains all of the information required in a notification listed in this
                                                                                                                                        section, the owner or operator may send the Administrator a copy of the notice
                                                                                                                                        sent to the State to satisfy the requirements of this section for that notification.
                                                                                                                                        (b) Each owner or operator subject to the requirements of this subpart shall
                                                                                                                                        comply with the notification requirements in §63.9 as follows:
                                                                                                                                        (b)(1) Initial notifications as required by §63.9(b) through (d). For the purposes
                                                                                                                                        of this subpart, a Title V or 40 CFR part 70 permit application may be used in
                                                                                                                                        lieu of the initial notification required under §63.9(b), provided the same
                                                                                                                                        information is contained in the permit application as required by §63.9(b), and
                                                                                                                                        the State to which the permit application has been submitted has an approved
                                                                                                                                        operating permit program under part 70 of this chapter and has received
                                                                                                                                        delegation of authority from the EPA. Permit applications shall be submitted by
                                                                                                                                        the same due dates as those specified for the initial notification.
                                                                                                                                        (b)(2) Notification of performance tests, as required by §§63.7 and 63.9(e).
                                                                                                                                        (b)(3) Notification of opacity and visible emission observations required by
                                                                                                                                        §63.1349 in accordance with §§63.6(h)(5) and 63.9(f).
                                                                                                                                        (b)(4) Notification, as required by §63.9(g), of the date that the continuous
                                                                                                                                        emission monitor performance evaluation required by §63.8(e) is scheduled to
                                                                                                                                        begin.
                                                                                                                                        (b)(5) Notification of compliance status, as required by §63.9(h).

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1354 Reporting Requirements.
                                                                                                                                        (a) The reporting provisions of subpart A of this part that apply and those that
                                                                                                                                        do not apply to owners or operators of affected sources subject to this subpart
                                                                                                                                        are listed in Table 1 of this subpart. If any State requires a report that contains
                                                                                                                                        all of the information required in a report listed in this section, the owner or
                                                                                                                                        operator may send the Administrator a copy of the report sent to the State to
                                                                                                                                        satisfy the requirements of this section for that report.
                                                                                                                                        (b) The owner or operator of an affected source shall comply with the reporting
                                                                                                                                        requirements specified in §63.10 of the general provisions of this part 63,
                                                                                                                                        subpart A as follows:
                                                                                                                                        (b)(1) As required by §63.10(d)(2), the owner or operator shall report the
                                                                                                                                        results of performance tests as part of the notification of compliance status.
                                                                                                                                        (b)(2) As required by §63.10(d)(3), the owner or operator of an affected source
                                                                                                                                        shall report the opacity results from tests required by §63.1349.
                                                                                                                                        (b)(3) As required by §63.10(d)(4), the owner or operator of an affected source
                                                                                                                                        who is required to submit progress reports as a condition of receiving an
                                                                                                                                        extension of compliance under §63.6(i) shall submit such reports by the dates
                                                                                                                                        specified in the written extension of compliance.
                                                                                                                                        (b)(4) As required by §63.10(d)(5), if actions taken by an owner or operator
                                                                                                                                        during a startup, shutdown, or malfunction of an affected source (including
                                                                                                                                        actions taken to correct a malfunction) are consistent with the procedures
                                                                                                                                        specified in the source's startup, shutdown, and malfunction plan specified in
                                                                                                                                        §63.6(e)(3), the owner or operator shall state such information in a semiannual
                                                                                                                                        report. Reports shall only be required if a startup, shutdown, or malfunction
                                                                                                                                        occurred during the reporting period. The startup, shutdown, and malfunction
                                                                                                                                        report may be submitted simultaneously with the excess emissions and
                                                                                                                                        continuous monitoring system performance reports; and
                                                                                                                                        (b)(5) Any time an action taken by an owner or operator during a startup,
                                                                                                                                        shutdown, or malfunction (including actions taken to correct a malfunction) is
                                                                                                                                        not consistent with the procedures in the startup, shutdown, and malfunction
                                                                                                                                        plan, the owner or operator shall make an immediate report of the actions
                                                                                                                                        taken for that event within 2 working days, by telephone call or facsimile (FAX)
                                                                                                                                        transmission. The immediate report shall be followed by a letter, certified by
                                                                                                                                        the owner or operator or other responsible official, explaining the
                                                                                                                                        circumstances of the event, the reasons for not following the startup, shutdown,
                                                                                                                                        and malfunction plan, and whether any excess emissions and/or parameter
                                                                                                                                        monitoring exceedances are believed to have occurred.
                                                                                                                                        (b)(6) As required by §63.10(e)(2), the owner or operator shall submit a written
                                                                                                                                        report of the results of the performance evaluation for the continuous
                                                                                                                                        monitoring system required by §63.8(e). The owner or operator shall submit
                                                                                                                                        the report simultaneously with the results of the performance test.
                                                                                                                                        (b)(7) As required by §63.10(e)(2), the owner or operator of an affected source
                                                                                                                                        using a continuous opacity monitoring system to determine opacity
                                                                                                                                        compliance during any performance test required under §63.7 and described
                                                                                                                                        in §63.6(d)(6) shall report the results of the continuous opacity monitoring
                                                                                                                                        system performance evaluation conducted under §63.8(e).
                                                                                                                                        (b)(8) As required by §63.10(e)(3), the owner or operator of an affected source
                                                                                                                                        equipped with a continuous emission monitor shall submit an excess
                                                                                                                                        emissions and continuous monitoring system performance report for any event
                                                                                                                                        when the continuous monitoring system data indicate the source is not in
                                                                                                                                        compliance with the applicable emission limitation or operating parameter
                                                                                                                                        limit.
                                                                                                                                        (b)(9) The owner or operator shall submit a summary report semiannually
                                                                                                                                        which contains the information specified in §63.10(e)(3)(vi). In addition, the
                                                                                                                                        summary report shall include:
                                                                                                                                        (b)(9)(i) All exceedences of maximum control device inlet gas temperature
                                                                                                                                        limits specified in §63.1344(a) and (b);
                                                                                                                                        (b)(9)(ii) All failures to calibrate thermocouples and other temperature sensors
                                                                                                                                        as required under §63.1350(f)(7) of this subpart; and
                                                                                                                                        (b)(9)(iii) All failures to maintain the activated carbon injection rate, and the
                                                                                                                                        activated carbon injection carrier gas flow rate or pressure drop, as
                                                                                                                                        applicable, as required under §63.1344(c).
                                                                                                                                        (b)(9)(iv) The results of any combustion system component inspections
                                                                                                                                        conducted within the reporting period as required under §63.1350(i).
                                                                                                                                        (b)(9)(v) All failures to comply with any provision of the operation and
                                                                                                                                        maintenance plan developed in accordance with §63.1350(a).
                                                                                                                                        (b)(10) If the total continuous monitoring system downtime for any CEM or any
                                                                                                                                        continuous monitoring system (CMS) for the reporting period is ten percent or
                                                                                                                                        greater of the total operating time for the reporting period, the owner or
                                                                                                                                        operator shall submit an excess emissions and continuous monitoring system
                                                                                                                                        performance report along with the summary report.

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1355 Recordkeeping Requirements.
                                                                                                                                        (a) The owner or operator shall maintain files of all information (including all
                                                                                                                                        reports and notifications) required by this section recorded in a form suitable
                                                                                                                                        and readily available for inspection and review as required by §63.10(b)(1).
                                                                                                                                        The files shall be retained for at least five years following the date of each
                                                                                                                                        occurrence, measurement, maintenance, corrective action, report, or record.
                                                                                                                                        At a minimum, the most recent two years of data shall be retained on site. The
                                                                                                                                        remaining three years of data may be retained off site. The files may be
                                                                                                                                        maintained on microfilm, on a computer, on floppy disks, on magnetic tape, or
                                                                                                                                        on microfiche.
                                                                                                                                        (b) The owner or operator shall maintain records for each affected source as
                                                                                                                                        required by §63.10(b)(2) and (b)(3) of this part; and
                                                                                                                                        (b)(1) All documentation supporting initial notifications and notifications of
                                                                                                                                        compliance status under §63.9;
                                                                                                                                        (b)(2) All records of applicability determination, including supporting analyses;
                                                                                                                                        and
                                                                                                                                        (b)(3) If the owner or operator has been granted a waiver under §63.8(f)(6),
                                                                                                                                        any information demonstrating whether a source is meeting the requirements
                                                                                                                                        for a waiver of recordkeeping or reporting requirements.
                                                                                                                                        (c) In addition to the recordkeeping requirements in paragraph (b) of this
                                                                                                                                        section, the owner or operator of an affected source equipped with a
                                                                                                                                        continuous monitoring system shall maintain all records required by §63.10(c).

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1356 Exemption From New Source
                                                                                                                                        Performance Standards.
                                                                                                                                        (a) Except as provided in paragraphs (a)(1) and (a)(2) of this section, any
                                                                                                                                        affected source subject to the provisions of this subpart is exempted from any
                                                                                                                                        otherwise applicable new source performance standard contained in 40 CFR
                                                                                                                                        part 60, subpart F.
                                                                                                                                        (a)(1) Kilns and in-line kiln/raw mills, as applicable under 40 CFR 60.60(b),
                                                                                                                                        located at area sources are subject to PM and opacity limits and associated
                                                                                                                                        reporting and recordkeeping, under 40 CFR part 60, subpart F.
                                                                                                                                        (a)(2) Greenfield raw material dryers, as applicable under 40 CFR 60.60(b),
                                                                                                                                        located at area sources are subject to opacity limits and associated reporting
                                                                                                                                        and recordkeeping under 40 CFR part 60, subpart F.

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1357 Temporary, Conditioned Exemption From
                                                                                                                                        Particulate Matter And Opacity Standards.
                                                                                                                                        (a) Subject to the limitations of paragraphs (b) through (f) of this section, an
                                                                                                                                        owner or operator conducting PM CEMS correlation tests (that is, correlation
                                                                                                                                        with manual stack methods) is exempt from:
                                                                                                                                        (a)(1) Any particulate matter and opacity standards of part 60 or part 63 of this
                                                                                                                                        chapter that are applicable to cement kilns and in-line kiln/raw mills.
                                                                                                                                        (a)(2) Any permit or other emissions or operating parameter or other limitation
                                                                                                                                        on workplace practices that are applicable to cement kilns and in-line kiln raw
                                                                                                                                        mills to ensure compliance with any particulate matter and opacity standards of
                                                                                                                                        this part or part 60 of this chapter.
                                                                                                                                        (b) The owner or operator must develop a PM CEMS correlation test plan. The
                                                                                                                                        plan must be submitted to the Administrator for approval at least 90 days
                                                                                                                                        before the correlation test is scheduled to be conducted. The plan must
                                                                                                                                        include:
                                                                                                                                        (b)(1) The number of test conditions and the number of runs for each test
                                                                                                                                        condition;
                                                                                                                                        (b)(2) The target particulate matter emission level for each test condition;
                                                                                                                                        (b)(3) How the operation of the affected source will be modified to attain the
                                                                                                                                        desired particulate matter emission rate; and
                                                                                                                                        (b)(4) The anticipated normal particulate matter emission level.
                                                                                                                                        (c) The Administrator will review and approve or disapprove the correlation
                                                                                                                                        test plan in accordance with §63.7(c)(3)(i) and (iii). If the Administrator fails to
                                                                                                                                        approve or disapprove the correlation test plan within the time period specified
                                                                                                                                        in §63.7(c)(3)(iii), the plan shall be considered approved, unless the
                                                                                                                                        Administrator has requested additional information.
                                                                                                                                        (d) The stack sampling team must be on-site and prepared to perform
                                                                                                                                        correlation testing no later than 24 hours after operations are modified to attain
                                                                                                                                        the desired particulate matter emissions concentrations, unless the correlation
                                                                                                                                        test plan documents that a longer period is appropriate.
                                                                                                                                        (e) The particulate matter and opacity standards and associated operating
                                                                                                                                        limits and conditions will not be waived for more than 96 hours, in the
                                                                                                                                        aggregate, for a correlation test, including all runs and conditions.
                                                                                                                                        (f) The owner or operator must return the affected source to operating
                                                                                                                                        conditions indicative of compliance with the applicable particulate matter and
                                                                                                                                        opacity standards as soon as possible after correlation testing is completed.

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR 63.1358 Delegation Of Authority.
                                                                                                                                        (a) In delegating implementation and enforcement authority to a State under
                                                                                                                                        subpart E of this part, the authorities contained in paragraph (b) of this section
                                                                                                                                        shall be retained by the Administrator and not transferred to a State.
                                                                                                                                        (b) Authority which will not be delegated to States:
                                                                                                                                        (b)(1) Approval of alternative non-opacity emission standards under §63.6(g).
                                                                                                                                        (b)(2) Approval of alternative opacity standards under §63.6(h)(9).
                                                                                                                                        (b)(3) Approval of major changes to test methods under §§63.7(e)(2)(ii) and
                                                                                                                                        63.7(f). A major change to a test method is a modification to a federally
                                                                                                                                        enforceable test method that uses unproven technology or procedures or is an
                                                                                                                                        entirely new method (sometimes necessary when the required test method is
                                                                                                                                        unsuitable).
                                                                                                                                        (b)(4) Approval of major changes to monitoring under §63.8(f). A major change
                                                                                                                                        to monitoring is a modification to federally enforceable monitoring that uses
                                                                                                                                        unproven technology or procedures, is an entirely new method (sometimes
                                                                                                                                        necessary when the required monitoring is unsuitable), or is a change in the
                                                                                                                                        averaging period.
                                                                                                                                        (b)(5) Waiver of recordkeeping under §63.10(f).

                                                                                                                                        [64 FR 31898, June 14, 1999]


                                                                                                                                        40 CFR Table 1 To Subpart LLL Of Part 63--Applicability Of
                                                                                                                                        General Provisions
                                                                                                                                        TABLE 1 TO SUBPART LLL--APPLICABILITY OF GENERAL PROVISIONS
                                                                                                                                        ------------------------------------+------------------------+---------------+-------------------
                                                                                                                                        --------
                                                                                                                                        General Provisions 40 CFR Citation | Requirement | Applies to |
                                                                                                                                        | | Subpart LLL | Comment
                                                                                                                                        ------------------------------------+------------------------+---------------+-------------------
                                                                                                                                        --------
                                                                                                                                        63.1(a)(1) through (4)..............| Applicability..........| Yes. |
                                                                                                                                        63.1(a)(5)..........................| | No............| [Reserved].
                                                                                                                                        63.1(a)(6) through (a)(8)...........| Applicability..........| Yes. |
                                                                                                                                        63.1(a)(9)..........................| | No............| [Reserved].
                                                                                                                                        63.1(a)(10) through (14)............| Applicability..........| Yes. |
                                                                                                                                        63.1(b)(1)..........................| Initial Applicability | No............| §63.1340
                                                                                                                                        specifies
                                                                                                                                        | Determination. | | applicability.
                                                                                                                                        63.1(b)(2) and (3)..................| Initial Applicability | Yes. |
                                                                                                                                        | Determination. | |
                                                                                                                                        63.1(c)(1)..........................| Applicability After | Yes. |
                                                                                                                                        | Standard Established. | |
                                                                                                                                        63.1(c)(2)..........................| Permit Requirements....| Yes...........| Area sources must
                                                                                                                                        | | | obtain Title V
                                                                                                                                        permits.
                                                                                                                                        63.1(c)(3)..........................| | No............| [Reserved].
                                                                                                                                        63.1(c)(4) and (5)..................| Extensions, | Yes. |
                                                                                                                                        | Notifications. | |
                                                                                                                                        63.1(d).............................| | No............| [Reserved].
                                                                                                                                        63.1(e).............................| Applicability of Permit| Yes. |
                                                                                                                                        | Program. | |
                                                                                                                                        63.2................................| Definitions............| Yes. | Additional
                                                                                                                                        definitions
                                                                                                                                        | | | in §63.1341.
                                                                                                                                        63.3(a) through (c).................| Units and Abbreviations| Yes. |
                                                                                                                                        63.4(a)(1) through (a)(3)...........| Prohibited Activities..| Yes. |
                                                                                                                                        63.4(a)(4)..........................| | No............| [Reserved].
                                                                                                                                        63.4(a)(5)..........................| Compliance date........| Yes. |
                                                                                                                                        63.4(b) and (c).....................| Circumvention, | Yes. |
                                                                                                                                        | Severability. | |
                                                                                                                                        63.5(a)(1) and (2)..................| Construction/ | Yes. |
                                                                                                                                        | Reconstruction. | |
                                                                                                                                        63.5(b)(1)..........................| Compliance Dates.......| Yes. |
                                                                                                                                        63.5(b)(2)..........................| | No............| [Reserved].
                                                                                                                                        63.5(b)(3) through (6)..............| Construction Approval, | Yes. |
                                                                                                                                        | Applicability. | |
                                                                                                                                        63.5(c).............................| | No............| [Reserved].
                                                                                                                                        63.5(d)(1) through (4)..............| Approval of | Yes. |
                                                                                                                                        | Construction/ | |
                                                                                                                                        | Reconstruction. | |
                                                                                                                                        63.5(e).............................| Approval of | Yes. |
                                                                                                                                        | Construction/ | |
                                                                                                                                        | Reconstruction. | |
                                                                                                                                        63.5(f)(1) and (2)..................| Approval of | Yes. |
                                                                                                                                        | Construction/ | |
                                                                                                                                        | Reconstruction. | |
                                                                                                                                        63.6(a).............................| Compliance for | Yes. |
                                                                                                                                        | Standards and | |
                                                                                                                                        | Maintenance. | |
                                                                                                                                        63.6(b)(1) through (5)..............| Compliance Dates.......| Yes. |
                                                                                                                                        63.6(b)(6)..........................| | No............| [Reserved].
                                                                                                                                        63.6(b)(7)..........................| Compliance Dates.......| Yes. |
                                                                                                                                        63.6(c)(1) and (2)..................| Compliance Dates.......| Yes. |
                                                                                                                                        63.6(c)(3) and (c)(4)...............| .......................| No............| [Reserved].
                                                                                                                                        63.6(c)(5)..........................| Compliance Dates.......| Yes. |
                                                                                                                                        63.6(d).............................| | No............| [Reserved].
                                                                                                                                        63.6(e)(1) and (e)(2)...............| Operation & Maintenance| Yes. |
                                                                                                                                        63.6(e)(3)..........................| Startup, Shutdown | Yes. |
                                                                                                                                        | Malfunction Plan. | |
                                                                                                                                        63.6(f)(1) through (3)..............| Compliance with | Yes. |
                                                                                                                                        | Emission Standards. | |
                                                                                                                                        63.6(g)(1) through (g)(3)...........| Alternative Standard...| Yes. |
                                                                                                                                        63.6(h)(1) and (2)..................| Opacity/VE Standards...| Yes. |
                                                                                                                                        63.6(h)(3)..........................| | No............| Reserved
                                                                                                                                        63.6(h)(4) and (h)(5)(i)............| Opacity/VE Standards...| Yes. |
                                                                                                                                        63.6(h)(5)(ii) through (iv).........| Opacity/VE Standards...| No............| Test duration
                                                                                                                                        specified
                                                                                                                                        | | | in Subpart LLL.
                                                                                                                                        63.6(h)(6)..........................| Opacity/VE Standards...| Yes. |
                                                                                                                                        63.6(i)(1) through (i)(14)..........| Extension of Compliance| Yes. |
                                                                                                                                        63.6(i)(15).........................| | No............| [Reserved].
                                                                                                                                        63.6(i)(16).........................| Extension of Compliance| Yes. |
                                                                                                                                        63.6(j).............................| Exemption from | Yes. |
                                                                                                                                        | Compliance. | |
                                                                                                                                        63.7(a)(1) through (a)(3)...........| Performance Testing | Yes...........| §63.1349 has
                                                                                                                                        | Requirements. | | specific
                                                                                                                                        requirements.
                                                                                                                                        63.7(b).............................| Notification...........| Yes. |
                                                                                                                                        63.7(c).............................| Quality Assurance/Test | Yes. |
                                                                                                                                        | Plan. | |
                                                                                                                                        63.7(d).............................| Testing Facilities.....| Yes. |
                                                                                                                                        63.7(e)(1) through (4)..............| Conduct of Tests.......| Yes. |
                                                                                                                                        63.7(f).............................| Alternative Test Method| Yes. |
                                                                                                                                        63.7(g).............................| Data Analysis..........| Yes. |
                                                                                                                                        63.7(h).............................| Waiver of Tests........| Yes. |
                                                                                                                                        63.8(a)(1)..........................| Monitoring Requirements| Yes. |
                                                                                                                                        63.8(a)(2)..........................| Monitoring.............| No............| §63.1350 includes
                                                                                                                                        | | | CEM
                                                                                                                                        requirements.
                                                                                                                                        63.8(a)(3)..........................| | No............| [Reserved].
                                                                                                                                        63.8(a)(4)..........................| Monitoring.............| No............| Flares not
                                                                                                                                        applicable.
                                                                                                                                        63.8(b)(1) through (3)..............| Conduct of Monitoring..| Yes. |
                                                                                                                                        63.8(c)(1) through (8)..............| CMS Operation/ | Yes. | Performance
                                                                                                                                        | Maintenance. | | specification
                                                                                                                                        | | | supersedes
                                                                                                                                        | | | requirements for
                                                                                                                                        THC
                                                                                                                                        | | | CEM. Temperature
                                                                                                                                        and
                                                                                                                                        | | | activated carbon
                                                                                                                                        | | | injection
                                                                                                                                        monitoring
                                                                                                                                        | | | data reduction
                                                                                                                                        | | | requirements
                                                                                                                                        given in
                                                                                                                                        | | | subpart LLL.
                                                                                                                                        63.8(d).............................| Quality Control........| Yes. |
                                                                                                                                        63.8(e).............................| Performance Evaluation | Yes...........| Performance
                                                                                                                                        | for CMS. | | specification
                                                                                                                                        | | | supersedes
                                                                                                                                        | | | requirements for
                                                                                                                                        THC
                                                                                                                                        | | | CEM.
                                                                                                                                        63.8(f)(1) through (f)(5)...........| Alternative Monitoring | Yes...........| Additional
                                                                                                                                        requirements
                                                                                                                                        | Method. | | in §1350(l).
                                                                                                                                        63.8(f)(6)..........................| Alternative to RATA | Yes. |
                                                                                                                                        | Test. | |
                                                                                                                                        63.8(g).............................| Data Reduction.........| Yes. |
                                                                                                                                        63.9(a).............................| Notification | Yes. |
                                                                                                                                        | Requirements. | |
                                                                                                                                        63.9(b)(1) through (5)..............| Initial Notifications..| Yes. |
                                                                                                                                        63.9(c).............................| Request for Compliance | Yes. |
                                                                                                                                        | Extension. | |
                                                                                                                                        63.9(d).............................| New Source Notification| Yes. |
                                                                                                                                        | for Special Compliance| |
                                                                                                                                        | Requirements. | |
                                                                                                                                        63.9(e).............................| Notification of | Yes. |
                                                                                                                                        | Performance Test. | |
                                                                                                                                        63.9(f).............................| Notification of VE/ | Yes | Notification not
                                                                                                                                        | Opacity Test. | | required for VE/
                                                                                                                                        | | | opacity test
                                                                                                                                        under
                                                                                                                                        | | | §63.1350(e) and
                                                                                                                                        | | | (j).
                                                                                                                                        63.9(g).............................| Additional CMS | Yes. |
                                                                                                                                        | Notifications. | |
                                                                                                                                        63.9(h)(1) through (h)(3)...........| Notification of | Yes. |
                                                                                                                                        | Compliance Status. | |
                                                                                                                                        63.9(h)(4)..........................| | No............| [Reserved].
                                                                                                                                        63.9(h)(5) and (h)(6)...............| Notification of | Yes. |
                                                                                                                                        | Compliance Status. | |
                                                                                                                                        63.9(i).............................| Adjustment of Deadlines| Yes. |
                                                                                                                                        63.9(j).............................| Change in Previous | Yes. |
                                                                                                                                        | Information. | |
                                                                                                                                        63.10(a)............................| Recordkeeping/Reporting| Yes | Yes.
                                                                                                                                        63.10(b)............................| General Requirements...| Yes. |
                                                                                                                                        63.10(c)(1).........................| Additional CMS | Yes...........| PS-8A applies.
                                                                                                                                        | Recordkeeping. | |
                                                                                                                                        63.10(c)(2) through (c)(4)..........| | No............| Reserved]
                                                                                                                                        63.10(c)(5) through (c)(8)..........| Additional CMS | Yes...........| PS-8A applies
                                                                                                                                        instead
                                                                                                                                        | Recordkeeping. | | of requirements
                                                                                                                                        for
                                                                                                                                        | | | THC CEM.
                                                                                                                                        63.10(c)(9).........................| | No............| [Reserved]
                                                                                                                                        63.10(c)(10) through (15)...........| Additional CMS | Yes...........| PS-8A applies
                                                                                                                                        instead
                                                                                                                                        | Recordkeeping. | | of requirements
                                                                                                                                        for
                                                                                                                                        | | | THC CEM.
                                                                                                                                        63.10(d)(1).........................| General Reporting | Yes. |
                                                                                                                                        | Requirements. | |
                                                                                                                                        63.10(d)(2).........................| Performance Test | Yes. |
                                                                                                                                        | Results. | |
                                                                                                                                        63.10(d)(3).........................| Opacity or VE | Yes. |
                                                                                                                                        | Observations. | |
                                                                                                                                        63.10(d)(4).........................| Progress Reports.......| Yes. |
                                                                                                                                        63.10(d)(5).........................| Startup, Shutdown, | Yes. |
                                                                                                                                        | Malfunction Reports. | |
                                                                                                                                        63.10(e)(1) and (e)(2)..............| Additional CMS Reports.| Yes. |
                                                                                                                                        63.10(e)(3).........................| Excess Emissions and | Yes...........| Exceedences are
                                                                                                                                        defined
                                                                                                                                        | CMS Performance | | in subpart LLL.
                                                                                                                                        | Reports. | |
                                                                                                                                        63.10(f)............................| Waiver for | Yes. |
                                                                                                                                        | Recordkeeping/ | |
                                                                                                                                        | Reporting. | |
                                                                                                                                        63.11(a) and (b)....................| Control Device | No............| Flares not
                                                                                                                                        applicable.
                                                                                                                                        | Requirements. | |
                                                                                                                                        63.12(a)-(c)........................| State Authority and | Yes. |
                                                                                                                                        | Delegations. | |
                                                                                                                                        63.13(a)-(c)........................| State/Regional | Yes. |
                                                                                                                                        | Addresses. | |
                                                                                                                                        63.14(a) and (b)....................| Incorporation by | Yes. |
                                                                                                                                        | Reference. | |
                                                                                                                                        63.15(a) and (b)....................| Availability of | Yes. |
                                                                                                                                        | Information. | |
                                                                                                                                        ------------------------------------+------------------------+---------------+---------------------------
                                                                                                                                        [64 FR 31898, June 14, 1999]

                                                                                                                                        XXX. GASOLINE DISPENSING FACILITIES:

                                                                                                                                        C-1. CONDITIONS APPLICABLE TO GASOLINE DISPENSING FACILITY (non-retail); MDAQMD PERMIT NUMBER N001452 & N002209; consisting of:

                                                                                                                                        N001452PTOGasoline Service Station - Non-RetailGASOLINE DISPENSING FACILITY (NON RETAIL)
                                                                                                                                        N002209PTOGasoline Service Station - Non-RetailGASOLINE DISPENSING FACILITY (NON RETAIL)


                                                                                                                                        a. Tanks - Number of Tanks: 3

                                                                                                                                        Tank Number: 1a 1b 2
                                                                                                                                        1. Material Stored: (87)Unleaded MO Diesel
                                                                                                                                        2. Volume Gallons: 6,000 6,000 20,000
                                                                                                                                        3. Aboveground(A): U U U

                                                                                                                                        1. Gasoline Dispensing Nozzles (Number): 1
                                                                                                                                        2. Diesel Dispensing Nozzles (Number): 2
                                                                                                                                        3. Phase II Vapor Recovery System (Type): Balance [gasoline only]

                                                                                                                                        PERMIT CONDITIONS; (UNLESS OTHERWISE STATED ALL CONDITIONS RESULT FROM RULE 204 - PERMIT CONDITIONS; VERSION IN SIP = CARB EX. ORDER G-73, 40 CFR 52.220(C)(39)(II)(B) - 11/09/78 43 FR 52237; CURRENT RULE VERSION = 07/25/77:

                                                                                                                                        1. The toll-free telephone number that must be posted is 1-800-635-4617.

                                                                                                                                        2. The owner/operator shall maintain a log of all inspections, repairs, and maintenance on equipment subject to Rule 461. Such logs or records shall be maintained at the facility for at least five (5) years and shall be available to the District upon request.

                                                                                                                                        3. Any modifications or changes to the piping or control fittings of the vapor recovery system requires prior approval from the District.


                                                                                                                                        C-2. CONDITIONS APPLICABLE TO ALL GASOLINE DISPENSING FACILITIES:

                                                                                                                                        1. Owner/Operator shall not sale or supply for use within the District as a fuel for motor vehicles as defined by the Vehicle Code of the State of California, gasoline having a degree of unsaturation greater than that indicated by a Bromine Number of 30 as determined by ASTM Method D1159-66.
                                                                                                                                        [Rule 432 - Gasoline Specifications; Version in SIP = Current, 40 CFR 52.220(c)(39)(ii)(B) - 09/08/78 - 43 FR 40011]

                                                                                                                                        2. Owner/Operator shall not transfer, permit the transfer or provide equipment for the transfer of gasoline into or from any tank truck, trailer, or railroad tank car into the gasoline storage tank unless the transfer is made to tank equipped as required in Rule 463 or unless all of the following conditions are met: [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]

                                                                                                                                        3. Owner/Operator shall not transfer, or permit the transfer, or provide equipment for the transfer of gasoline from the gasoline storage tank into any motor vehicle tank of greater than 19 liters (5 gallons) capacity unless: (ii) Torn or cut face seals or face cones;
                                                                                                                                        (iii) Loose or broken retractors; (v) Leaking nozzles; (vii) Defective shutoff mechanisms; [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]

                                                                                                                                        4. Vapor processing or vapor recovery system used by Owner/Operator shall comply with all safety, fire, weights and measures, and other applicable codes and/or regulations.
                                                                                                                                        [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]

                                                                                                                                        5. Owner/Operator shall not install any new or rebuilt vapor recovery equipment unless the components and parts clearly identify by markings the certified manufacturing company and/or certified rebuilding company.
                                                                                                                                        [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]

                                                                                                                                        6. Vapor recovery system shall be at all times maintained in accordance with the manufacturer's specifications and the State's certification.
                                                                                                                                        [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]

                                                                                                                                        7. When problems or defects are detected and are associated with any vapor recovery, storage, delivery vessel or dispensing equipment, other than a breakdown of the central vapor incineration or processing unit, the Owner/Operator shall at the end of the cycle, as defined in Rule 461, remove the equipment from service and not use the equipment until it has been repaired, replaced or adjusted as necessary to remove the problem or defect.
                                                                                                                                        [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]

                                                                                                                                        8. Owner/Operator shall not perform or permit the "pump-out" (bulk transfer) of gasoline from the gasoline storage tank unless such bulk transfer is performed using a vapor recovery system capable of returning the displaced vapors from the delivery vessel or other container being filled back to the gasoline storage tank. This vapor recovery is not required where the container is to be removed or filled with water for testing. For visual inspections, the requirements of Part II, Section B, condition B.3.d. are applicable.
                                                                                                                                        [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]

                                                                                                                                        9. Owner/Operator shall not store, or allow the storage of, gasoline in the gasoline storage tank unless the tank is equipped with a permanent submerged fill pipe and a certified vapor recovery system.
                                                                                                                                        [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]

                                                                                                                                        10. Owner/Operator shall maintain a log of all inspections, repairs, and maintenance on equipment subject to Rule 461 as listed in Part II, Section B conditions. In addition, Owner/Operator shall maintain a leak inspection log containing, at a minimum, the following: inspector’s name, location and description of component type where any leak is found; date of leak detection, emission level (ppm) if applicable, and date leak is repaired. Such logs or records shall be maintained at the facility for a minimum of 5 years from the date the records were created and shall be made available to District, state or federal personnel upon request.
                                                                                                                                        [40 CFR 70.6(a)(3)(ii)(B); Rule 1203(D)(1)(d)(ii)].
                                                                                                                                        [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]
                                                                                                                                        [40 CFR 70.6(a)(3)(ii)(B); Rule 1203(D)(1)(d)(ii)]
                                                                                                                                        [40 CFR 70.6 (a)(3)(i)(B) - Periodic Monitoring Requirements]

                                                                                                                                        11. Any violation determined by any one of the following listed Reference Method Tests shall constitute a violation of applicable Part II and Part III conditions: [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]
                                                                                                                                        [40 CFR 70.6 (a)(3)(i)(B) - Periodic Monitoring Requirements]
                                                                                                                                        [Rule 204 - Permit Conditions; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 11/09/78 43 FR 52237; Current Rule Version = 07/25/77]

                                                                                                                                        12. Compliance with the requirement of the Phase II system to be 95 % effective for the recovery of displaced vapors is considered to be demonstrated by maintaining equipment as specified in the applicable ARB Executive Order certifying the system.
                                                                                                                                        [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]
                                                                                                                                        [40 CFR 70.6 (a)(3)(i)(B) - Periodic Monitoring Requirements]
                                                                                                                                        [Rule 204 - Permit Conditions; Version in SIP = CARB Ex. Order G-73, 40 CFR 52.220(c)(39)(ii)(B) - 11/09/78 43 FR 52237; Current Rule Version = 07/25/77]

                                                                                                                                        13. Owner/Operator shall maintain a daily log of product throughput for gasoline dispensing facility.
                                                                                                                                        [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]
                                                                                                                                        [40 CFR 70.6 (a)(3)(i)(B) - Periodic Monitoring Requirements]

                                                                                                                                        14. Owner/Operator shall conspicuously post in the gasoline dispensing area the operating instructions, the District's toll-free telephone number for complaints and a District specified warning sign. Post the following toll-free telephone number: 1-800-635-4617.
                                                                                                                                        [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]
                                                                                                                                        [40 CFR 70.6 (a)(3)(i)(B) - Periodic Monitoring Requirements]

                                                                                                                                        15. Any modifications or changes to the piping or control fittings of the vapor recovery system requires prior approval from the MDAQMD.
                                                                                                                                        [Rule 461 - Gasoline Transfer and Dispensing; Version in SIP = Current, 40 CFR 52.220(c)(198)(i)(E)(1) - 05/03/95 - 60 FR 21702]
                                                                                                                                        [40 CFR 70.6 (a)(3)(i)(B) - Periodic Monitoring Requirements]






                                                                                                                                        PART IV
                                                                                                                                        STANDARD FEDERAL OPERATING PERMIT CONDITIONS

                                                                                                                                        A. Standard Conditions:

                                                                                                                                        1. If any portion of this Federal Operating Permit is found to be invalid by the final decision of a court of competent jurisdiction the remaining portion(s) of this Federal Operating Permit shall not be affected thereby.
                                                                                                                                        [40 CFR 70.6(a)(5); Rule 1203(D)(1)(f)(i)]

                                                                                                                                        2. Owner/Operator shall comply with all condition(s) contained herein. Noncompliance with any condition(s) contained herein constitutes a violation of the Federal Clean Air Act and of MDAQMD Regulation XII and is grounds for enforcement action; termination, revocation and re-issuance, or modification of this Federal Operating Permit; and/or grounds for denial of a renewal of this Federal Operating Permit.
                                                                                                                                        [40 CFR 70.6(a)(6)(i); Rule 1203(D)(1)(f)(ii)] 3. It shall not be a defense in an enforcement action brought for violation(s) of condition(s) contained in this Federal Operating Permit that it would have been necessary to halt or reduce activity to maintain compliance with those condition(s).
                                                                                                                                        [40 CFR 70.6(a)(6)(ii); Rule 1203(D)(1)(f)(iii)]

                                                                                                                                        4. This Federal Operating Permit may be modified, revoked, reopened or terminated for cause.
                                                                                                                                        [40 CFR 70.6(a)(6)(iii); Rule 1203(D)(1)(f)(iv)] 5. The filing of an application for modification; a request for revocation and re-issuance; a request for termination; notifications of planned changes; or anticipated noncompliance with condition(s) does not stay the operation of any condition contained in this Federal Operating Permit.
                                                                                                                                        [40 CFR 70.6(a)(6)(iii); Rule 1203(D)(1)(f)(v)] 6. The issuance of this Federal Operating Permit does not convey any property rights of any sort nor does it convey any exclusive privilege.
                                                                                                                                        [40 CFR 70.6(a)(6)(iv); Rule 1203(D)(1)(f)(vi)] 7. Owner/Operator shall furnish to the MDAQMD, within a reasonable time as specified by the MDAQMD, any information that the MDAQMD may request in writing.
                                                                                                                                        [40 CFR 70.6(a)(6)(v); Rule 1203(D)(1)(f)(vii)]

                                                                                                                                        8. Owner/Operator shall furnish to District, state or federal personnel, upon request, copies of any records required to be kept pursuant to condition(s) of this Federal Operating Permit.
                                                                                                                                        [40 CFR 70.6(a)(6)(v); Rule 1203(D)(1)(f)(viii)]

                                                                                                                                        9. Any records required to be generated and/or kept by any portion of this Federal Operating Permit shall be retained by the facility Owner/Operator for at least five (5) years from the date the records were created.
                                                                                                                                        [40 CFR 70.6(a)(3)(ii)(B); Rule 1203(D)(1)(d)(ii)] 10. Owner/Operator shall pay all applicable fees as specified in MDAQMD Regulation III, including those fees related to permits as set forth in Rules 301 and 312.
                                                                                                                                        [40 CFR 70.6(a)(7); Rule 1203(D)(1)(f)(ix)] 11. Owner/Operator shall not be required to revise this permit for approved economic incentives, marketable permits, emissions trading or other similar programs provided for in this permit.
                                                                                                                                        [40 CFR 70.6(a)(8); Rule 1203(D)(1)(f)(x)] 12. Compliance with condition(s) contained in this Federal Operating Permit shall be deemed compliance with the Applicable Requirement underlying such condition(s). The District clarifies that “only” Applicable Requirements listed & identified elsewhere in this Title V Permit are covered by this Permit Shield and does not extend to any unlisted/unidentified conditions pursuant to the requirements of 40 CFR 70.6(f)(1)(i).
                                                                                                                                        [40 CFR 70.6(f)(1)(i); Rule 1203(G)(1)] 13. The Permit Shield set forth above, in condition 12 of Part IV, shall not be construed to limit the emergency powers of USEPA as set forth in 42 U.S.C. §7603.
                                                                                                                                        [40 CFR 70.6(f)(3)(i); Rule 1203(G)(3)(a)] 14. The Permit Shield set forth above, in condition 12 of Part IV, shall not be construed to limit liability for violations which occurred prior to the issuance of this Federal Operating Permit.
                                                                                                                                        [40 CFR 70.6(f)(3)(ii); Rule 1203(G)(3)(b)]

                                                                                                                                        15. The Permit Shield set forth above, in condition 12 of Part IV, shall not be construed to alter any Applicable Requirement Contained in the Acid Rain Program.
                                                                                                                                        [40 CFR 70.6(f)(3)(iii); Rule 1203(G)(3)(c)]

                                                                                                                                        16. The Permit Shield set forth above, in condition 12 of Part IV, shall not be construed to limit the ability of USEPA or the MDAQMD to obtain information pursuant to other provisions of law including but not limited to 42 U.S.C. §7414. [40 CFR 70.6(f)(3)(iv); Rule 1203(G)(3)(d)]

                                                                                                                                        17. The Permit Shield set forth above, in condition 12 of Part IV, shall not be construed to apply to emissions trading pursuant to provisions contained in an applicable State Implementation Plan.
                                                                                                                                        [40 CFR 70.4(b)(12)(ii)(B); Rule 1203(G)(3)(e)] 18. The Permit Shield set forth above, in condition 12 of Part IV, shall not be construed to apply to changes made which are not expressly allowed by this Federal Operating Permit.
                                                                                                                                        [40 CFR 70.4(b)(14)(iii); Rule 1203(G)(3)(f)] 19. The Permit Shield set forth in Part IV, condition 12, shall not be construed to apply to changes made pursuant to the Significant Permit Modification provisions until such changes are included in this Federal Operating Permit.
                                                                                                                                        [40 CFR 70.5(a)(1)(ii), 70.7(e)(2)(vi); Rule 1203 (G)(3)(g)] 20. If Owner/Operator performs maintenance on, or services, repairs, or disposes of appliances, Owner/Operator shall comply with the standards for Recycling and Emissions Reduction pursuant to 40 CFR Part 82, Subpart F. These requirements are Federally Enforceable through this Title V Permit.
                                                                                                                                        [40 CFR Part 82, Subpart F]

                                                                                                                                        21. If Owner/Operator performs service on motor vehicles when this service involves the ozone-depleting refrigerant in the motor vehicle air conditioner (MVAC), Owner/Operator shall comply with the standards for Servicing of Motor Vehicle Air Conditioners pursuant to all the applicable requirements as specified in 40 CFR Part 82, Subpart B. These requirements are Federally Enforceable through this Title V Permit.
                                                                                                                                        [40 CFR Part 82, Subpart B]

                                                                                                                                        22. Notwithstanding the testing requirements contained elsewhere in this Title V Permit, any credible evidence may be used to establish violations, including but not limited to; reference test methods, engineering calculations, indirect estimates of emissions, CEMS data, and parametric monitoring data. Data need not be required to be collected in a Title V permit in order to be considered credible.
                                                                                                                                        [Section 113(a) of the Clean Air Act]




                                                                                                                                        PART V
                                                                                                                                        OPERATIONAL FLEXIBILITY

                                                                                                                                        A. Alternative Operating Scenario(s):

                                                                                                                                        No additional Operational Flexibility provisions allowed without appropriate permit modifications.




                                                                                                                                        PART VI
                                                                                                                                        CONVENTIONS, ABREVIATIONS, DEFINITIONS

                                                                                                                                        A. The following referencing conventions are used in this Federal Operating Permit:

                                                                                                                                        40CFR60, Standards of Performance for New Stationary Sources (NSPS)
                                                                                                                                        40CFR60, Appendix F, Quality Assurance Procedures
                                                                                                                                        40CFR61, National Emission Standards for Hazardous Air Pollutants (NESHAPS)
                                                                                                                                        40CFR61, Subpart M, National Emission Standards for Asbestos
                                                                                                                                        40CFR72, Permits Regulation (Acid Rain Program)
                                                                                                                                        40CFR73, Sulfur Dioxide Allowance System
                                                                                                                                        40CFR75, Continuous Emission Monitoring
                                                                                                                                        40CFR75, Subpart D, Missing Data Substitution Procedures
                                                                                                                                        40CFR75, Appendix B, Quality Assurance and Quality Control Procedures
                                                                                                                                        40CFR75, Appendix C, Missing Data Estimating Procedures
                                                                                                                                        40CFR75, Appendix D, Optional SO2 Emissions Data Protocol
                                                                                                                                        40CFR75, Appendix F, Conversion Procedures
                                                                                                                                        40CFR75, Appendix G, Determination of CO2 Emissions


                                                                                                                                        B. Other conventions:

                                                                                                                                        1. Unless otherwise noted, a “day” shall be considered a 24 hour period from midnight to midnight (i.e., calendar day).
                                                                                                                                        2. The process unit identifications represent the District permit number designations. These numbers are not sequential. The use of District permit numbers provides continuity between the District and Federal Operating Permit systems.


                                                                                                                                        C. Abbreviations used in this permit are as follows:

                                                                                                                                        CFR Code of Federal Regulations
                                                                                                                                        APCO Air Pollution Control Officer
                                                                                                                                        bhp brake horse power
                                                                                                                                        Btu British thermal units
                                                                                                                                        CCR California Code of Regulations
                                                                                                                                        CEMS continuous emissions monitoring system
                                                                                                                                        CO carbon monoxide
                                                                                                                                        CO2 carbon dioxide gpm gallons per minute
                                                                                                                                        gph gallons per hour H&SC California Health and Safety Code
                                                                                                                                        lb pounds
                                                                                                                                        lb / hr pounds per hour
                                                                                                                                        lb / MM Btu pounds per million British thermal units
                                                                                                                                        MM Btu million British thermal units
                                                                                                                                        MM Btu/hr million British thermal units per hour NMOC non-methane organic compounds
                                                                                                                                        NOx oxides of nitrogen
                                                                                                                                        NO2 nitrogen dioxide
                                                                                                                                        O2 oxygen
                                                                                                                                        pH pH (acidity measure of solution)
                                                                                                                                        PM10 particulate matter less than 10 microns aerodynamic diameter
                                                                                                                                        ppmv parts per million by volume
                                                                                                                                        psig pounds per square inch gauge pressure RVP Reid vapor pressure
                                                                                                                                        SCAQMD South Coast Air Quality Management District
                                                                                                                                        scfm standard cubic feet per minute SIP State of California Implementation Plan
                                                                                                                                        SOx oxides of sulfur
                                                                                                                                        SO2 sulfur dioxide
                                                                                                                                        tpy tons per year
                                                                                                                                        TVP true vapor pressure