General Decision Number: OH080029 03/06/2009 OH29 Superseded General Decision Number: OH20070029 State: Ohio Construction Type: Building Counties: Adams, Allen, Ashland, Auglaize, Belmont, Brown, Butler, Clermont, Clinton, Coshocton, Crawford, Delaware, Erie, Fairfield, Fayette, Franklin, Greene, Guernsey, Hancock, Harrison, Highland, Hocking, Holmes, Huron, Jackson, Jefferson, Knox, Licking, Madison, Miami, Monroe, Montgomery, Morgan, Morrow, Muskingum, Noble, Ottawa, Perry, Pickaway, Pike, Preble, Richland, Ross, Sandusky, Scioto, Seneca, Tuscarawas, Vinton, Warren, Washington, Wayne, Wood and Wyandot Counties in Ohio. BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including four (4) stories) Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/07/2008 3 04/04/2008 4 05/02/2008 5 06/06/2008 6 07/04/2008 7 07/25/2008 8 08/01/2008 9 08/15/2008 10 09/05/2008 11 10/03/2008 12 11/07/2008 13 12/05/2008 14 01/02/2009 15 02/06/2009 16 03/06/2009 ASBE0003-001 07/28/2008 ERIE (to Sandusky city limits) & HURON Rates Fringes Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 33.63 13.60 ---------------------------------------------------------------- ASBE0008-001 11/01/2008 ADAMS, BROWN, BUTLER (Including Fairfield, Hanover, Liberty, Milford, Morgan, Oxford, Ripley, Ross, St. Clair, Union & Wayne Townships), CLERMONT, HIGHLAND & WARREN (Including Deerfield, Hamilton, Harlan, Salem, Union & Washington Townships) Rates Fringes Asbestos Workers/Insulator (ncludes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 25.98 11.39 ---------------------------------------------------------------- ASBE0041-003 07/06/2008 ALLEN Rates Fringes Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems).........................$ 27.94 11.06 ---------------------------------------------------------------- ASBE0045-001 07/01/2008 ERIE (City limits of Sandusky & Townships of Groton, Margaretta, Oxford & Perkins), HANCOCK, OTTAWA, SANDUSKY, SENECA, WOOD & WYANDOT Rates Fringes Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 29.37 18.38 ---------------------------------------------------------------- ASBE0050-001 07/01/2008 CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY, HOCKING, KNOX, LICKING, MADISON, MORGAN, MORROW, MUSKINGUM, NOBLE, PERRY, PICKAWAY, ROSS & VINTON Rates Fringes Asbestos Worker/Insulator (Includes application of all insulating materials, protective coverings, coatings & finisings to all types of mechanical systems).....$ 24.73 9.89 ---------------------------------------------------------------- ASBE0050-002 07/01/2008 AUGLAIZE, BUTLER (Lemon & Madison Townships), CLINTON, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (Clear Creek, Franklin, Massie, Turtle Creek & Wayne Townships) Rates Fringes Asbestos Worker/Insulator (Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 22.25 8.89 ---------------------------------------------------------------- ASBE0080-004 03/05/2008 JACKSON, PIKE, SCIOTO & WASHINGTON Rates Fringes Insulator/asbestos worker (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems) and Hazardous Material Handler.....................$ 28.83 15.51 ---------------------------------------------------------------- ASBE0084-001 07/01/2007 ASHLAND, COSHOCTON, HARRISON, HOLMES, RICHLAND, TUSCARAWAS & WAYNE Rates Fringes ASBESTOS WORKER/INSULATOR (Includes application of all insulating materials, protective coverings coatings & finishings to all types of mechanical systems)..............$ 25.70 12.30 ---------------------------------------------------------------- ASBE0207-004 06/01/2007 ALLEN Rates Fringes HAZARDOUS MATERIAL HANDLER (Includes preparation, wetting, stripping, removal, scraping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 18.75 9.70 ---------------------------------------------------------------- ASBE0207-006 08/01/2008 Rates Fringes HAZARDOUS MATERIAL HANDLER (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems) ADAMS, BROWN, BUTLER (Townships of Fairfield, Hanover, Liberty, Milford, Morgan, Oxford, Ripley, Ross, St. Clair, Union & Wayne), CLERMONT, HIGHLAND & WARREN (Townships of Deerfield, Hamilton, Harlan, Salem, Union & Washington) COUNTIES........$ 22.60 9.40 ASHLAND, COSHOCTON, ERIE (Post Offices & Townships of: Berlin, Berlin Heights, Birmingham, Florence, Huron, Milan, Shinrock & Vermilion), HARRISON & HURON COUNTIES...$ 22.60 9.40 AUGLAIZE, BUTLER (Townships of Lemon & Madison), CLINTON, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (Townships of Clear Creek, Franklin, Massie, Turtle Creek & Wayne) COUNTIES.............$ 22.60 9.40 CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY, HOCKING, KNOX, LICKING, MADISON, MORGAN, MORROW, MUSKINGUM, NOBLE, PERRY, PICKAWAY, ROSS & VINTON COUNTIES....................$ 22.60 9.40 ERIE (Portion covered by the city limits of Sandusky, Ohio & by the Townships of Groton, Margaretta, Oxford & Perkins), HANCOCK, OTTAWA, SANDUSKY, SENECA, WOOD & WYANDOT COUNTIES............$ 24.95 9.05 HOLMES, RICHLAND, TUSCARAWAS & WAYNE COUNTIES.$ 14.45 3.60 ---------------------------------------------------------------- BOIL0085-001 07/07/2008 ALLEN, ASHLAND, AUGLAIZE, CRAWFORD, DELAWARE, ERIE, HANCOCK, HURON, KNOX, MORROW, OTTAWA, RICHLAND, SANDUSKY, SENECA, WOOD & WYANDOT Rates Fringes BOILERMAKER......................$ 31.93 17.07 ---------------------------------------------------------------- BOIL0105-001 10/01/2008 ADAMS, BROWN, BUTLER, CLERMONT, CLINTON, FAIRFIELD, FAYETTE, FRANKLIN, GREENE, GUERNSEY, HIGHLAND, HOCKING, JACKSON, LICKING, MADISON, MIAMI, MONTGOMERY, MORGAN, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE, PREBLE, ROSS, SCIOTO, VINTON & WARREN Rates Fringes BOILERMAKER......................$ 33.09 16.32 ---------------------------------------------------------------- BOIL0154-005 06/01/2008 JEFFERSON Rates Fringes BOILERMAKER......................$ 33.90 19.82 ---------------------------------------------------------------- BOIL0667-002 10/01/2008 BELMONT, MONROE & WASHINGTON Rates Fringes BOILERMAKER......................$ 34.69 15.32 ---------------------------------------------------------------- BOIL0744-005 07/01/2008 COSHOCTON, HARRISON, HOLMES, TUSCARAWAS & WAYNE Rates Fringes BOILERMAKER......................$ 35.34 17.48 ---------------------------------------------------------------- BROH0003-001 07/01/2008 WOOD COUNTY (Townships of Perrysburg, Ross, Lake, Troy, Freedom, Montgomery, Webster, Center, Portage, Middleton, Plain, Liberty, Henry, Washington, Weston, Milton, Jackson & Grand Rapids) Rates Fringes Bricklayer, Stonemason...........$ 28.65 12.40 ---------------------------------------------------------------- BROH0003-004 07/01/2008 WOOD COUNTY (Townships of Perrysburg, Ross, Lake, Troy, Freedom, Montgomery, Webster, Center, Portage, Middleton, Plain, Liberty, Henry, Washington, Weston, Milton, Jackson & Grand Rapids) Rates Fringes FINISHER.........................$ 22.98 6.35 Marble Setter, Terrazzo Worker & Tile Setter.............$ 28.73 8.40 ---------------------------------------------------------------- BROH0005-005 10/01/2008 ASHLAND, ERIE, HURON & RICHLAND Rates Fringes Marble Setter Finisher/Tile Setter Finisher..................$ 25.30 9.55 Terrazzo Worker Finisher.........$ 24.88 10.05 ---------------------------------------------------------------- BROH0006-001 05/01/2008 TUSCARAWAS Rates Fringes Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 25.58 10.15 ---------------------------------------------------------------- BROH0006-002 05/01/2008 TUSCARAWAS Rates Fringes FINISHER.........................$ 20.57 8.10 Marble Setter, Terrazzo Worker, Terrazzo Grinder & Tile Setter......................$ 23.02 8.10 ---------------------------------------------------------------- BROH0006-004 05/01/2008 TUSCARAWAS Rates Fringes Cement Mason/Plasterer...........$ 25.58 10.15 ---------------------------------------------------------------- BROH0008-004 06/01/2008 Rates Fringes Marble Setter Finisher/Terrazzo Worker Finisher COSHOCTON, HARRISON, HOLMES, JEFFERSON & WAYNE (Excluding Milton & Chippewa Townships) COUNTIES....................$ 22.17 10.23 Tile setter finisher COSHOCTON, HOLMES, JEFFERSON (Townships of Mt. Pleasant, Warren, Salineville & the Village of Dillonvale), & WAYNE (Excluding Milton & Chippewa Townships) COUNTIES....................$ 22.17 10.23 ---------------------------------------------------------------- BROH0009-001 07/01/2008 BELMONT, JEFFERSON (Warren & Mt. Pleasant Townships & the Village of Dillonvale) & MONROE Rates Fringes Bricklayer, Stonemason...........$ 23.00 13.75 Marble Setter, Terrazzo Worker & Tile Setter.............$ 23.00 13.75 Refractory.......................$ 27.22 13.75 ---------------------------------------------------------------- BROH0010-001 07/01/2008 JEFFERSON COUNTY (Brush Creek & Saline Townships) Rates Fringes BRICKLAYER BRICKLAYERS; CAULKERS; CLEANERS; CEMENT BLOCKLAYERS; MARBLE SETTERS; POINTERS; STONEMASONS & TERRAZZO WORKERS.....................$ 24.20 12.11 TILE FINISHER....................$ 19.80 12.11 TILE SETTER......................$ 22.80 12.11 ---------------------------------------------------------------- BROH0014-001 07/01/2005 HARRISON & JEFFERSON (Except Mt. Pleasant, Warren, Brush Creek, Saline & Salineville Townships & the Village of Dillonvale) Rates Fringes Tile setter finisher.............$ 20.61 8.85 ---------------------------------------------------------------- BROH0018-001 06/01/2008 BROWN, BUTLER, CLERMONT, PREBLE Gasper, Dixon, Israel, Lanier, Somers & Gratis Townships) & WARREN Rates Fringes Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 26.11 9.49 Refractory.......................$ 26.61 9.49 ---------------------------------------------------------------- BROH0018-004 12/01/2008 BROWN, BUTLER, CLERMONT, PREBLE (Gasper, Dixon, Israel, Lanier, Somers & Gratis Townships) & WARREN Rates Fringes Marble Setter, Terrazzo Worker & Tile Setter.............$ 26.37 9.39 ---------------------------------------------------------------- BROH0018-006 12/01/2008 ADAMS, BROWN, BUTLER, CLERMONT, FAYETTE, JACKSON, PIKE, ROSS, SCIOTO, VINTON, WARREN & WASHINGTON Rates Fringes Marble, terrazzo and tile finisher Finishers...................$ 21.93 9.39 Marble Sanders, Polishers, Waxers, & Sawyers...........$ 22.00 9.39 Terrazzo Base Grinders (While operating base grinding machine)...........$ 22.35 9.39 ---------------------------------------------------------------- BROH0022-001 07/01/2007 CLINTON, GREENE, HIGHLAND, MIAMI, MONTGOMERY & PREBLE (Jackson, Monroe, Harrison, Twin, Jefferson & Washington Townships) Rates Fringes Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 25.20 9.24 ---------------------------------------------------------------- BROH0022-002 03/01/2008 CLINTON, GREENE, HIGHLAND, MIAMI, MONTGOMERY & PREBLE (Jackson, Monroe, Harrison, Twin, Jefferson & Washington Townships) Rates Fringes Marble Setter, Terrazzo Worker & Tile Setter.............$ 24.08 8.62 ---------------------------------------------------------------- BROH0022-003 03/01/2008 AUGLAIZE, CLINTON, GREENE, HIGHLAND, MIAMI, MONTGOMERY & PREBLE Rates Fringes Base Machine Men.................$ 23.33 3.75 FINISHER.........................$ 22.83 3.75 ---------------------------------------------------------------- BROH0035-001 07/01/2008 ALLEN & AUGLAIZE Rates Fringes Bricklayer, Caulkler, Cleaner, Pointer, Stonemason & Tile Setter....................$ 24.46 9.84 ---------------------------------------------------------------- BROH0039-001 06/01/2008 ADAMS & SCIOTO Rates Fringes BRICKLAYER BRICKLAYERS; CAULKERS; CLEANERS; MARBLE SETTERS; POINTERS; STONEMASONS; TERRAZZO WORKERS; & TILE SETTERS.....................$ 25.62 13.85 ---------------------------------------------------------------- BROH0040-001 06/01/2008 ASHLAND, CRAWFORD, HOLMES, MORROW, RICHLAND, WAYNE & WYANDOT (Except Crawford, Ridge, Richland & Tymochtee Townships) Rates Fringes BRICKLAYER BRICKLAYERS; BLOCKLAYERS; CAULKERS; CLEANERS; MARBLE SETTERS; POINTERS; STONEMASONS; TERRAZZO WORKERS & TILE SETTERS......$ 25.42 13.70 Layout Man and Sawman rate: $1.00 per hour above journeyman rate. Free standing stack work ground level to top of stack; Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate. "Hot" work: $2.50 above journeyman rate. ---------------------------------------------------------------- BROH0044-001 06/01/2008 Rates Fringes BRICKLAYER COSHOCTON, FAIRFIELD, GUERNSEY, HOCKING, KNOX, LICKING, MORGAN, MUSKINGUM, NOBLE (Beaver, Buffalo, Seneca & Wayne Townships) & PERRY COUNTIES BRICKLAYERS; CAULKERS; CLEANERS; POINTERS; & STONEMASONS................$ 24.70 9.65 Cement Mason/Plasterer COSHOCTON & GUERNSEY COUNTIES CEMENT MASONS & PLASTERERS.$ 24.70 9.65 ---------------------------------------------------------------- BROH0045-001 06/01/2008 FAYETTE, JACKSON, PIKE, ROSS & VINTON Rates Fringes Bricklayer, Caulker, Cement Mason, Cleaner, Pointer & Stonemason.......................$ 27.22 9.85 ---------------------------------------------------------------- BROH0046-001 06/01/2008 Rates Fringes BRICKLAYER ERIE, HANCOCK, HURON, OTTAWA, SANDUSKY, SENECA, WOOD (Perry & Bloom Townships) & WYANDOT (Tymochtee, Crawford, Ridge & Richland Townships) COUNTIES & the islands of Lake Erie north of Sandusky BRICKLAYERS; CAULKERS; CEMENT BLOCK LAYERS; CLEANERS; GUNNITE MASONS; MARBLE SETTERS; POINTERS; REFRACTORY MASONS; STONEMASONS; TERRAZZO WORKERS; & TILE SETTERS....$ 26.13 13.50 Cement Mason and plasterer ERIE, HURON, OTTAWA, SANDUSKY, SENECA, WOOD (Perry & Bloom Townships) & WYANDOT (Tymochtee, Crawford, Ridge & Richland Townships) COUNTIES & the islands of Lake Erie north of Sandusky................$ 26.13 13.50 Marble Setter Finisher, Terrazzo Worker Finisher, Tile Setter Finisher HANCOCK, OTTAWA, SANDUSKY, SENECA, WOOD (Perry & Bloom Townships) & WYANDOT (Tymochtee, Crawford, Ridge & Richland Townships) COUNTIES & the islands of Lake Erie north of Sandusky................$ 22.38 13.50 Colored or shake floors and epoxy floors: $.75 per hour above journeyman rate. Layout Man and Sawman; Premium topping materials (emery, iron, etc.): $1.00 per hour above journeyman rate. Free standing stack work ground level to top of stack; Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Vertical slip forms, jump forms or continuous forming of any kind up to 50 feet; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate. Vertical slip forms, jump forms or continuous forming of any kind above 50 feet: 1 1/2 times journeyman rate. "Hot" work: $2.50 above journeyman rate. ---------------------------------------------------------------- BROH0052-002 06/01/2008 NOBLE (Brookfield, Noble, Center, Sharon, Olive, Enoch, Stock, Jackson, Jefferson & Elk Townships) & WASHINGTON Rates Fringes Bricklayer, Blocklayer, Caulker, Cleaner, Marble Setter, Pointer, Stonemason, Te rrazo Worker & Tile Setter..$ 24.93 10.50 ---------------------------------------------------------------- BROH0055-001 06/01/2008 DELAWARE, FRANKLIN, MADISON & PICKAWAY Rates Fringes Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 26.30 10.90 ---------------------------------------------------------------- BROH0055-002 06/01/2008 COSHOCTON, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY, HOCKING, JACKSON, KNOX, LICKING, MADISON, MORGAN, MUSKINGUM, NOBLE (Beaver, Buffalo, Seneca & Wayne Townships), PERRY, PICKAWAY, PIKE, ROSS & VINTON Rates Fringes Marble & Tile Setter and Terrazzo Worker..................$ 24.62 9.12 ---------------------------------------------------------------- BROH0055-004 06/01/2008 BELMONT, DELAWARE, FAIRFIELD, FRANKLIN, GUERNSEY, HOCKING, KNOX, LICKING, MADISON, MONROE, MORGAN, MORROW, MUSKINGUM, NOBLE, PERRY & PICKAWAY Rates Fringes Marble, terrazzo and tile finisher.........................$ 25.34 1.85 ---------------------------------------------------------------- CARP0069-001 05/01/2008 TUSCARAWAS & WAYNE Rates Fringes Carpenter & Soft Floor Layer.....$ 23.78 10.53 ---------------------------------------------------------------- CARP0069-005 05/01/2008 COSHOCTON, HOLMES, KNOX & MORROW Rates Fringes Carpenter & Soft Floor Layer.....$ 22.44 9.91 ---------------------------------------------------------------- CARP0171-001 05/01/2008 BELMONT, HARRISON, JEFFERSON & MONROE Rates Fringes Carpenter & Soft Floor Layer.....$ 23.19 12.20 ---------------------------------------------------------------- * CARP0200-001 06/01/2008 DELAWARE, FAIRFIELD, FRANKLIN, GUERNSEY, LICKING, MADISON, MORGAN, MUSKINGUM, NOBLE, PERRY & PICKAWAY Rates Fringes Carpenter & Soft Floor Layer.....$ 23.96 9.73 PILEDRIVERMAN....................$ 24.64 9.73 ---------------------------------------------------------------- CARP0248-002 07/01/2008 HANCOCK & WOOD Rates Fringes FLOOR LAYER: CARPET (SOFT) FLOOR............................$ 26.35 14.78 ---------------------------------------------------------------- CARP0248-003 07/01/2008 HANCOCK Rates Fringes Carpenter/Lather.................$ 23.71 13.28 ---------------------------------------------------------------- CARP0356-001 06/01/2007 HOCKING, VINTON & WASHINGTON Rates Fringes CARPENTER........................$ 23.06 13.10 FLOOR LAYER: CARPET (SOFT) FLOOR............................$ 22.63 13.10 PILEDRIVERMAN....................$ 23.36 13.10 ---------------------------------------------------------------- CARP0372-001 07/01/2008 ALLEN & AUGLAIZE Rates Fringes Carpenter/Lather.................$ 23.18 13.28 ---------------------------------------------------------------- * CARP0437-001 06/01/2008 ADAMS, FAYETTE, HIGHLAND, JACKSON, PIKE, ROSS & SCIOTO Rates Fringes CARPENTER........................$ 25.28 14.13 ---------------------------------------------------------------- CARP0735-001 05/01/2008 ASHLAND, ERIE, HURON & RICHLAND Rates Fringes Carpenter & Soft Floor Layer.....$ 23.07 10.15 ---------------------------------------------------------------- CARP1066-001 09/01/1999 BROWN, BUTLER, CLERMONT, CLINTON & WARREN Rates Fringes MILLWRIGHT.......................$ 21.90 7.92 ---------------------------------------------------------------- CARP1066-002 09/01/1999 GREENE, MIAMI, MONTGOMERY & PREBLE Rates Fringes MILLWRIGHT.......................$ 21.90 9.02 ---------------------------------------------------------------- * CARP1241-001 06/01/2008 DELAWARE, FAIRFIELD, FRANKLIN, GUERNSEY, LICKING, MADISON, MORGAN, MUSKINGUM, NOBLE, PERRY & PICKAWAY Rates Fringes MILLWRIGHT.......................$ 27.30 13.77 ---------------------------------------------------------------- CARP1311-002 06/01/2008 BROWN, BUTLER, CLERMONT, CLINTON & WARREN Rates Fringes Carpenter & Piledrivermen (Does not include Walls & Ceiling Work)....................$ 23.85 9.67 ---------------------------------------------------------------- CARP1311-004 06/01/2008 GREENE, MIAMI, MONTGOMERY & PREBLE Rates Fringes Carpenter & Piledrivermen (Does not include Acoustic Ceiling Installers, Drywall Hangers or Metal Stud Framers)...$ 23.60 9.92 ---------------------------------------------------------------- CARP1311-007 06/01/2008 BROWN, BUTLER, CLERMONT, CLINTON & WARREN Rates Fringes Carpenter/Lather (Walls & Ceiling Work only)...............$ 23.85 9.67 ---------------------------------------------------------------- CARP1311-014 09/01/2006 GREENE, MIAMI, MONTGOMERY & PREBLE Rates Fringes FLOOR LAYER: CARPET (SOFT) FLOOR............................$ 21.79 8.83 ---------------------------------------------------------------- CARP1311-015 06/01/2008 GREENE, MIAMI, MONTGOMERY & PREBLE Rates Fringes Acoustic Ceiling Installer, Drywall Hanger, Lather & Metal Stud Framer................$ 23.60 9.92 ---------------------------------------------------------------- CARP1393-001 07/01/2008 CRAWFORD, HANCOCK, OTTAWA, SANDUSKY, SENECA & WOOD Rates Fringes Millwright/Piledriverman.........$ 27.30 16.05 ---------------------------------------------------------------- CARP1393-004 07/01/2008 ALLEN, AUGLAIZE & WYANDOT Rates Fringes Millwright/Piledriverman.........$ 25.15 15.92 ---------------------------------------------------------------- * CARP1519-002 06/01/2008 ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON, PIKE, ROSS, SCIOTO & VINTON Rates Fringes MILLWRIGHT.......................$ 29.07 13.78 ---------------------------------------------------------------- CARP1755-002 06/01/2001 WASHINGTON Rates Fringes MILLWRIGHT.......................$ 24.39 10.16 ---------------------------------------------------------------- CARP1871-001 05/01/2008 ASHLAND, ERIE, HURON & RICHLAND Rates Fringes MILLWRIGHT.......................$ 28.00 12.67 ---------------------------------------------------------------- CARP1871-002 05/01/2008 ASHLAND, ERIE, HURON & RICHLAND Rates Fringes PILEDRIVERMAN....................$ 28.00 12.67 ---------------------------------------------------------------- CARP1871-003 05/01/2008 BELMONT, HARRISON, & MONROE Rates Fringes PILEDRIVERMAN....................$ 28.05 11.95 ---------------------------------------------------------------- CARP1871-004 05/01/2008 COSHOCTON, HOLMES, KNOX & MORROW Rates Fringes PILEDRIVERMAN....................$ 22.35 10.69 ---------------------------------------------------------------- CARP1871-005 05/01/2008 BELMONT, HARRISON, JEFFERSON & MONROE Rates Fringes MILLWRIGHT.......................$ 26.05 11.95 ---------------------------------------------------------------- CARP1871-011 05/01/2008 COSHOCTON, HOLMES, KNOX & MORROW Rates Fringes MILLWRIGHT.......................$ 22.35 10.69 ---------------------------------------------------------------- CARP1871-012 05/01/2008 TUSCARAWAS & WAYNE Rates Fringes MILLWRIGHT.......................$ 23.25 11.54 ---------------------------------------------------------------- CARP1871-013 05/01/2008 TUSCARAWAS & WAYNE Rates Fringes PILEDRIVERMAN....................$ 23.25 11.54 ---------------------------------------------------------------- CARP2239-001 07/01/2008 CRAWFORD, OTTAWA, SANDUSKY, SENECA & WYANDOT Rates Fringes CARPENTER........................$ 23.71 13.28 ---------------------------------------------------------------- ELEC0008-001 05/26/2008 HANCOCK, OTTAWA, SANDUSKY, SENECA & WOOD Rates Fringes CABLE SPLICER....................$ 34.68 15.80 ELECTRICIAN......................$ 33.03 15.73 ---------------------------------------------------------------- ELEC0032-001 06/01/2008 ALLEN, AUGLAIZE & WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Ridgeland, Ridge & Salem Townships) Rates Fringes ELECTRICIAN......................$ 27.05 11.91 ---------------------------------------------------------------- ELEC0032-002 06/01/1998 ALLEN & WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Richland, Ridge & Salem Townships) Rates Fringes Line Construction Equipment Operator..........$ 20.27 4.12+a Groundman Truck Driver......$ 14.43 3.63+a Lineman.....................$ 22.52 4.31+a FOOTNOTE: a. Half a day's Paid Holiday: The last 4 hours of the workday prior to Christmas or New Year's Day ---------------------------------------------------------------- ELEC0071-002 05/29/2006 ASHLAND, COSHOCTON, CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY, HIGHLAND, HOCKING, JACKSON (Coal, Jackson, Liberty, Milton, Washington & Wellston Townships), KNOX, LICKING, MADISON, MONROE, MORGAN, MORROW, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, Peepee, Perry & Seal Townships), RICHLAND, ROSS, TUSCARAWAS (Auburn, Bucks, Clay, Jefferson, Oxford, Perry, Salem, Rush, Washington & York Townships), VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships) & WASHINGTON Rates Fringes Line Construction Linemen; Cable Splicers.....$ 28.30 10.34 ---------------------------------------------------------------- ELEC0071-003 05/29/2006 AUGLAIZE, CLINTON, GREENE, MIAMI, MONTGOMERY & PREBLE Rates Fringes Line Construction Equipment Operator..........$ 25.47 9.78 Groundman...................$ 18.40 8.38 Lineman.....................$ 28.30 10.34 ---------------------------------------------------------------- ELEC0071-011 05/29/2006 BELMONT, HARRISON, HOLMES, JEFFERSON & WAYNE Rates Fringes Line Construction Equipment Operator..........$ 25.47 9.78 Groundman...................$ 18.40 8.38 Lineman.....................$ 28.30 10.34 ---------------------------------------------------------------- ELEC0071-012 05/29/2006 BROWN, BUTLER, CLERMONT & WARREN Rates Fringes Line Construction Equipment Operator..........$ 25.47 9.78 Groundman...................$ 18.40 8.38 Lineman.....................$ 28.30 10.34 ---------------------------------------------------------------- * ELEC0082-001 06/02/2008 CLINTON, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (Wayne, Clear Creek & Franklin Townships) Rates Fringes ELECTRICIAN......................$ 28.45 11.94 ---------------------------------------------------------------- ELEC0082-005 05/24/2004 CLINTON, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (Wayne, Clear Creek & Franklin Townships) Rates Fringes Sound & Communication Technician Cable Puller................$ 9.14 4.91 Installer/Technician........$ 18.28 6.32 ---------------------------------------------------------------- ELEC0129-004 09/01/2001 ERIE & HURON (Lyme, Ridgefield, Norwalk, Townsend, Wakeman, Sherman, Peru, Bronson, Hartland, Clarksfield, Norwich, Greenfield, Fairfield, Fitchville & New London Townships) Rates Fringes ELECTRICIAN......................$ 27.25 6.85 ---------------------------------------------------------------- * ELEC0141-003 09/01/2008 BELMONT Rates Fringes CABLE SPLICER....................$ 26.51 18.60 ELECTRICIAN......................$ 26.26 18.60 ---------------------------------------------------------------- ELEC0212-001 06/02/2008 BROWN & CLERMONT Rates Fringes ELECTRICIAN......................$ 26.11 12.72 ---------------------------------------------------------------- ELEC0212-002 01/01/2006 BROWN & CLERMONT Rates Fringes Sound & Communication Technician.......................$ 20.45 6.95 ---------------------------------------------------------------- ELEC0245-001 09/01/2008 HANCOCK, OTTAWA, SANDUSKY, SENECA & WOOD Rates Fringes Line Construction Cable Splicer...............$ 38.12 21.25%+4.75 Groundman/Truck Driver......$ 19.82 21.25%+4.75 Heli-arc Welding............$ 33.45 21.25%+4.75 Lineman.....................$ 33.15 21.25%+4.75 Operator - Class 1..........$ 26.52 21.25%+4.75 Operator - Class 2..........$ 23.21 21.25%+4.75 Traffic Signal & Lighting Technician..................$ 29.84 21.25%+4.75 FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; & Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straight-time rates for the work performed on such holiday. ---------------------------------------------------------------- ELEC0246-001 10/29/2007 HARRISON & JEFFERSON Rates Fringes ELECTRICIAN......................$ 31.00 18.29+a FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday ---------------------------------------------------------------- ELEC0306-004 05/26/2008 WAYNE (Baughman, Canaan, Chester, Chippewa, Congress, Green, Milton & Wayne Townships) Rates Fringes CABLE SPLICER....................$ 33.52 5%+11.76 ELECTRICIAN......................$ 31.04 5%+11.76 ---------------------------------------------------------------- ELEC0317-007 06/01/1998 ADAMS, JACKSON (Bloomfield, Franklin, Hamilton, Lick, Jefferson, Scioto & Madison Townships), PIKE (Camp Creek, Marion, Newton, Scioto, Sunfish & Union Townships), SCIOTO & VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships) Rates Fringes Line Construction Cable Splicers..............$ 23.66 8.48 Equipment Operators.........$ 17.14 8.25 Groundmen...................$ 13.92 8.14 Linemen.....................$ 21.42 8.40 ---------------------------------------------------------------- ELEC0540-001 05/28/2007 HOLMES, TUSCARAWAS (North of Auburn Clay, Rush & York Townships), & WAYNE (South of Baughman, Chester, Green & Wayne Townships) Rates Fringes ELECTRICIAN......................$ 26.69 15.63 ---------------------------------------------------------------- ELEC0540-003 06/05/1997 TUSCARAWAS COUNTY (North of Auburn, Clay, Rush & York Townships) Rates Fringes Line Construction Groundman; & Truck Driver...$ 14.65 8.18 Line Equipment Operator.....$ 19.02 8.69 Lineman; & Cable Splicer....$ 21.86 9.01 ---------------------------------------------------------------- ELEC0575-001 12/01/2008 ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON (Bloomfield, Franklin, Hamilton, Jefferson, Lick, Madison, Scioto, Coal, Jackson, Liberty, Milton & Washington Townships), PICKAWAY (Deer Creek, Perry, Pickaway, Salt Creek & Wayne Townships), PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, PeePee, Perry, Seal, Camp Creek, Newton, Scioto, Sunfish, Union & Marion Townships), ROSS, SCIOTO & VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships) Rates Fringes ELECTRICIAN......................$ 29.84 11.81 ---------------------------------------------------------------- ELEC0575-003 05/28/2007 ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON, PICKAWAY (Deer Creek, Perry, Pickaway, Salt Creek & Wayne Townships), PIKE, ROSS, SCIOTO & VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships) Rates Fringes Sound & Communication Technician Cable Puller................$ 10.38 6.75 Installer...................$ 19.63 7.42 ---------------------------------------------------------------- ELEC0648-001 09/04/2006 BUTLER & WARREN (Deerfield, Hamilton, Harlan, Massie, Salem, Turtle Creek, Union & Washington Townships) Rates Fringes CABLE SPLICER....................$ 25.30 8.80 ELECTRICIAN......................$ 24.80 8.80 ---------------------------------------------------------------- ELEC0683-001 06/02/2008 DELAWARE, FAIRFIELD, FRANKLIN, MADISON & PICKAWAY (Circleville, Darby, Harrison, Jackson, Madison, Monroe, Muhlenberg, Scioto, Walnut & Washington Townships) Rates Fringes Electricians: Cable splicer...............$ 28.60 12.43 Electrician.................$ 28.00 12.41 ---------------------------------------------------------------- ELEC0683-006 05/28/2007 DELAWARE, FAIRFIELD, FRANKLIN, MADISON & PICKAWAY (Circleville, Darby, Harrison, Jackson, Madison, Monroe, Muhlenberg, Scioto, Walnut & Washington Townships) Rates Fringes Sound & Communication Technician Cable Puller................$ 11.75 4.20 Installer...................$ 22.11 4.95 ---------------------------------------------------------------- ELEC0688-001 12/03/2008 ASHLAND, CRAWFORD, HURON (Richmond, New Haven, Ripley & Greenwich Townships), KNOX (Liberty, Clinton, Union, Howard, Monroe, Middleberry, Morris, Wayne, Berlin, Pike, Brown & Jefferson Townships), MORROW, RICHLAND & WYANDOT (Sycamore, Crane, Eden, Pitt, Antrim & Tymochtee Townships) Rates Fringes ELECTRICIAN......................$ 25.66 13.71 ---------------------------------------------------------------- ELEC0688-004 05/28/2007 ASHLAND, CRAWFORD, HURON (Richmond, New Haven, Ripley & Greenwich Townships), KNOX (Liberty, Clinton, Union, Howard, Monroe, Middleberry, Morris, Wayne, Berlin, Pike, Brown & Jefferson Townships), MORROW, RICHLAND & WYANDOT (Sycamore, Crane, Eden, Pitt, Antrim & Tymochtee Townships) Rates Fringes Sound & Communication Technician Cable Puller................$ 11.16 5.22 Installer...................$ 21.04 5.93 ---------------------------------------------------------------- ELEC0867-001 06/01/1998 ERIE Rates Fringes Line Construction Lineman; Cable Splicer; & Equipment Operator..........$ 20.75 4.09 Truck Driver (Winch) Groundman; & Groundman......$ 13.49 3.87 ---------------------------------------------------------------- ELEC0972-001 06/01/2008 MONROE, MORGAN, NOBLE, VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships) & WASHINGTON Rates Fringes Electricians: Cable Splicer...............$ 28.48 18.27 Electrician.................$ 28.23 18.27 ---------------------------------------------------------------- ELEC1105-001 06/01/2008 COSHOCTON, GUERNSEY, KNOX (Jackson, Clay, Morgan, Miller, Milford, Hilliar, Butler, Harrison, Pleasant & College Townships), LICKING, MUSKINGUM, PERRY & TUSCARAWAS (Auburn, York, Clay, Jefferson, Rush, Oxford, Washington, Salem, Perry & Bucks Townships) Rates Fringes ELECTRICIAN......................$ 26.94 11.64 ---------------------------------------------------------------- ELEC1105-002 05/28/2007 COSHOCTON, GUERNSEY, KNOX (Jackson, Clay, Morgan, Miller, Milford, Hillard, Butler, Harrison, Pleasant & College Townships), LICKING, MUSKINGUM, PERRY & TUSCARAWAS (Auburn, York, Clay, Jefferson, Rush, Oxford, Washington, Salem, Perry & Bucks Townships) Rates Fringes Sound & Communication Technician Cable Puller................$ 10.09 7.27 Installer...................$ 19.10 7.93 ---------------------------------------------------------------- ELEV0006-003 01/01/2009 Rates Fringes ELEVATOR MECHANIC................$ 38.65 18.285+A&B FOOTNOTE: A. Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day; Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day. ---------------------------------------------------------------- ELEV0011-001 01/01/2009 ADAMS, BROWN, BUTLER, CLERMONT, CLINTON, GREENE, HIGHLAND, MIAMI, MONTGOMERY, PREBLE & WARREN Rates Fringes ELEVATOR MECHANIC................$ 36.24 18.285+a+b FOOTNOTES: a. 8 Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Day after Thanksgiving; & Christmas Day b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service. ---------------------------------------------------------------- ELEV0017-001 01/01/2009 ERIE & HURON Rates Fringes ELEVATOR MECHANIC................$ 40.41 18.285+a+b FOOTNOTES: a. 8 Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; Day After Thanksgiving; & Christmas Day b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years. ---------------------------------------------------------------- ELEV0037-001 01/01/2009 ASHLAND, COSHOCTON, CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HOCKING, HOLMES, KNOX, LICKING, MADISON, MORGAN, MORROW, MUSKINGUM, PERRY, PICKAWAY, RICHLAND, ROSS, TUSCARAWAS & VINTON Rates Fringes ELEVATOR MECHANIC................$ 36.20 18.285+a+b FOOTNOTES: a. 8 Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Day after Thanksgiving; & Christmas Day b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years. ---------------------------------------------------------------- ELEV0044-001 01/01/2009 ALLEN, AUGLAIZE, HANCOCK, OTTAWA, SANDUSKY, SENECA, WOOD & WYANDOT Rates Fringes ELEVATOR MECHANIC................$ 39.43 18.285+a+b FOOTNOTES: a. 8 Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans Day; Thanksgiving Day; The Day after Thanksgiving; & Christmas Day b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 yrs.; 6% for less than 5 yrs. ---------------------------------------------------------------- ELEV0045-001 01/01/2009 WAYNE Rates Fringes ELEVATOR MECHANIC................$ 38.29 18.285+a+b FOOTNOTES: a. 8 Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; Day after Thanksgiving; & Christmas Day b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years. ---------------------------------------------------------------- ELEV0048-002 01/01/2009 JACKSON, PIKE & SCIOTO Rates Fringes ELEVATOR MECHANIC................$ 37.30 18.285 FOOTNOTES: a. 8 Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Day after Thanksgiving Day; & Christmas Day b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service ---------------------------------------------------------------- ENGI0018-001 05/01/2008 ADAMS, ALLEN, ASHLAND, AUGLAIZE, BELMONT, BROWN, BUTLER, CLERMONT, CLINTON, COSHOCTON, CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GREENE, GUERNSEY, HANCOCK, HARRISON, HIGHLAND, HOCKING, HOLMES, JACKSON, JEFFERSON, KNOX, LICKING, MADISON, MIAMI, MONROE, MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PERRY, PICKAWAY, PIKE, PREBLE, RICHLAND, ROSS, SANDUSKY, SCIOTO, SENECA, TUSCARAWAS, VINTON, WARREN, WASHINGTON, WAYNE & WYANDOT Rates Fringes OPERATOR: Power Equipment GROUP 1.....................$ 29.79 10.81 GROUP 2.....................$ 29.54 10.81 GROUP 3.....................$ 29.04 10.81 GROUP 4.....................$ 28.79 10.81 GROUP 5.....................$ 28.54 10.81 GROUP 6.....................$ 28.42 10.81 GROUP 7.....................$ 27.38 10.81 GROUP 8.....................$ 26.20 10.81 GROUP 9.....................$ 20.74 10.81 OPERATING ENGINEER CLASSIFICATIONS GROUP 1 - Boom & Jib 250' & Over GROUP 2 - Boom & Jib Over 180' through 249' GROUP 3 - Boom & Jib 150' through 180' GROUP 4 - Master Mechanic GROUP 5 - Barrier Moving Machine; Boiler or Compressor Mounted on Crane (Piggy-Back Operation); Boom Truck (All Types); Cableway; Cherry Picker; Combination Concrete Mixer & Tower; All Concrete Pumps with Booms; Crane (All Types); Crane-Compact, Track or Rubber Over 4,000 lbs Capacity; Crane-Self Erecting, Stationary, Track or Truck (All Configurations); Derrick (All Types); Dragline; Dredge (Dipper, Clam or Suction) 3 Man Crew; Elevating Grader or Euclid Loader; Floating Equipment; Forklift(rough terrain with winch/hoist) Gradall; Helicopter Operator & Helicopter Winch Operator (Hoisting Builders Materials); Hoe (AllTypes); Hoist (Two or More Drums); Horizontal Directional Drill; Hydraulic Gantry (Lift System); Laser Finishing Machine; Laser Screed and Like Equipment; Lift Slab or Panel Jack; Locomotive (All Types); Maintenance Engineer (Mechanic and/or Welder); Mixer, Paving (Multiple Drum); Mobile Concrete Pump With Boom; Panelboard (All Types on Site); Pile Driver; Power Shovel; Prentice Loader; Rail Tamper (with Automatic Lifting & Aligning device); Rotary Drill (All) used on Caisson Work for Foundations & Substructure work; Side Boom; Slip Form Paver; Straddle Carrier (Building Construction on Site); Trench Machine (Over 24" Wide); & Tug Boat GROUP 6 - Asphalt Paver; Bobcat-type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Bulldozer; C.M.I. Type Equipment; Endloader; Hydro Milling Machine; Kolman Type Loader (Dirt Loading); Lead Greaseman; Mucking Machine; Pettibone-Rail Equipment; Power Grader; Power Scoop; Power Scraper; Push Cat; Rotomill (All), Grinders & Planers of All Types & Vermeer Type Concrete Saw GROUP 7 - A-Frame; Air Compressor Pressurizing Shafts or Tunnels; Asphalt Roller (All); Bobcat-type and/or Skid Steer Loader with or without Attachments; Boiler (15 lbs. pressure & over); All Concrete Pumps without Booms & with 5" System; Forklift (Except Masonry); Highway Drills-All Types (with Integral Power); Hoist (One Drum); House Elevator (except those automatic call button controlled); Man Lift; Material Hoist/Elevator; Mud Jack; Pressure Grouting; Pump (Installing or Operating Well Points or other Type of Dewatering Systems); Pump (4" and over Discharge); Railroad Tie Inserter/Remover; Rotovator (Lime soil Stabilizer); Submersible Pump (4" and over Discharge); Switch & Tie Tamper (w/o lifting & aligning device); Trench Machine (24" & under); & Utility GROUP 8 - Ballast Relocator; Backfiller & Tamper; Batch Plant; Bar & Joint Installing Machine; Bull Floats; Burlap & Curing Machines; Clefplanes; Compressor on Building Construction; Concrete Mixer, Capacity more than one bag; Concrete Mixer, one bag capacity (side loader); All Concrete Pumps without Booms with 4" or Smaller System; Concrete Spreading Machine; Conveyor, used for handling building materials; Crusher; Deckhand; Drum Fireman in Asphalt Plant; Farm Type Tractor, Pulling Attachments; Finishing Machines; Form Trencher; Generator; Gunite Machine; Hydro-Seeder; Pavement Breaker (Hydraulic or Cable); Post Driver; Post Hole Digger; Pressure Pump (over 1/2" discharge); Road Widening Trencher; Roller (except Asphalt); Self-propelled Power Spreader; Self-propelled Sub-Grader; Shotcrete Mahine; Tire Repairman; Tractor (Pulling Sheep Foot Roller or Grader); VAC/ALL; Vibratory Compactor (with Integral Power) & Welder GROUP 9 - Allen Screed Paver(concrete); Boiler (Less than 15 lbs. pressure); Crane-Compact, Track or Rubber under 4,000 lbs.; Directional Drill "Locator"; Inboard & Outboard Motor Boat Launch; Light Plant; Masonry Forklift; Oiler; Power Driven Heater (Oil Fired); Power Scrubber; Power Sweeper; Pump (Under 4" discharge); & Submersible Pump (Under 4" discharge) ---------------------------------------------------------------- ENGI0018-002 05/01/2008 ERIE & HURON Rates Fringes OPERATOR: Power Equipment Crane (Boom & Jib 200' & Over, Up to 299'); Master Mechanic....................$ 32.88 10.81 Crane (Boom & Jib 300' & Over).......................$ 33.13 10.81 GROUP 1.....................$ 32.13 10.81 GROUP 2.....................$ 31.98 10.81 GROUP 3.....................$ 30.53 10.81 GROUP 4.....................$ 29.75 10.81 GROUP 5.....................$ 29.43 10.81 GROUP 6.....................$ 22.35 10.81 OPERATING ENGINEER CLASSIFICATIONS GROUP 1 - A-Frame; Boiler or Compressor Operator, Hydraulic Pump & Power Pacs Mounted on Crane or Piggy-Back Operation; Boom Truck (All Types); Cableway; Cherry Picker; Combination Concrete Mixer & Tower; All Concrete Pumps; Crane (All Types); Derrick (All Types); Dragline; Dredge (Dipper, Clam or Suction); 3 Man Crew; Elevating Grader or Euclid Loader; Floating Equipment; Gradall; Helicopter Operator & Helicopter Winch Operator Hoisting Building Materials; Hoe (All Types); Hoist (Two or More Drums); Lift Slab or Panel Jack Operator; Locomotive (All Types); Maintenance Engineer (Mechanic); Mixer; Paving (Multiple Drum); Mobile Concrete Pump with Boom; Panelboard (All types on site); Pile Driver; Power Shovel; Robotic Equipment Operator/Mechanic; Rotary Drill (all), used on Caissons for Foundations & Sub-structure Work; Rough Terrain Forklift with Winch/Hoist; Side Boom; Slip Form Paver; Straddle Carrier; Trench Machine (Over 24" Wide); & Tug Boat GROUP 2 - Asphalt Paver; Bulldozer; CMI-Type Equipment; Endloader; Horizontal Directional Drill Locator and Operator; Kohlman Type Loader (Dirt Loading); Lead Greaseman; Mucking Machine; Power Grader; Power Scoop; Power Scraper; & Push Cat GROUP 3 - Air Compressor, Pressurizing Shafts or Tunnels; Asphalt Roller (all); Fork Lift; Hoist, One Drum; House Elevator (Except Automatic Call Button-controlled); Laser Screeds & Like Equipment; Man Lift; Mud Jack; Boiler (Over 15 lbs. Pressure); Pressure Grouting; Pump Operator ( Installing or operating Well Points or other type of Dewatering system); Trencher (24" & under); & Utility Operator GROUP 4 - Compressor on Building construction; Conveyor, building material; Generator; Gunite Machine; Concrete Mixer, Capacity more than one bag; Concrete Mixer, One Bag capacity (Side Loader); Pavement Breaker, Hydraulic or Cable; Post Driver; Post Hole Digger; Road Widening Trencher; Roller; & Welder Operator GROUP 5 - Backfiller & Tamper; Bar & Joint Installing Machine; Batch Plant; Bullfoat; Burlap and Curing Machine; Cleaning Machine (decontamination included); Clefplane; Concrete Spreading Machine; Crusher; Deckhand; Drum Fireman (Asphalt); Farm-type Tractor, Pulling attachments; Finishing Machine; Fork Lift (Masonry Work); Form Trencher; High Pressure Pump (Over 1/2" discharge); Hydro Seeder; Pump (4" and Over discharge); Submersible Pump (4" and Over discharge); Self-propelled Power Spreader; Self-propelled Sub-grader; Tire Repairman; Tractor, Pulling Sheeps Foot Roller or Grader; & Vibratory Compactor, With Integral Power GROUP 6 - Inboard & Outboard Motor Boat Launch; Light Plant Operator; Oiler; Signalman; Power Driven Heater (Oil Fired); Power Scrubber; Power Sweeper; Power Boiler (Less than 15 lbs. Pressure); Pump (Under 4" discharge); Submersible Pump (Under 4" discharge); Signalperson; Bob Cat-type and/or Skid Steer Loader; Grade Checker; VAC/ALL; Rod Man ---------------------------------------------------------------- ENGI0018-007 05/01/2008 WOOD Rates Fringes OPERATOR: Power Equipment GROUP 1.....................$ 30.54 10.81 GROUP 2.....................$ 30.29 10.81 GROUP 3.....................$ 29.79 10.81 GROUP 4.....................$ 29.54 10.81 GROUP 5.....................$ 29.29 10.81 GROUP 6.....................$ 29.17 10.81 GROUP 7.....................$ 28.13 10.81 GROUP 8.....................$ 26.95 10.81 GROUP 9.....................$ 21.49 10.81 OPERATING ENGINEER CLASSIFICATIONS GROUP 1 - Boom & Jib 250' & Over GROUP 2 - Boom & Jib Over 180' through 249' GROUP 3 - Boom & Jib 150' through 180' GROUP 4 - Master Mechanic GROUP 5 - Barrier Moving Machine; Boiler or Compressor Mounted on Crane (Piggy-Back Operation); Boom Truck (all types); Cableway; Cherry Picker; Combination Concrete Mixer & Tower; Concrete Pump with Booms; Crane (all types); Crane-Compact, Track or Rubber over 4,000 lbs. Capacity; Crane-Self Erecting, Stationary, Track or Truck (all configurations); Derrick (all types); Dragline; Dredge (Dipper, Clam or Suction) 3 Man Crew; Elevating Grader or Euclid Loader; Floating Equipment; Forklift (rough terrain with winch/hoist) Gradall; Helicopter Operator, Hoisting Building Materials; Hoes (all types); Hoists (with two or more drums in use); Horizontal Directional Drill; Hydraulic Gantry (lift system); Laser Finishing Machine; Laser Screed and Like Equipment; Lift Slab or Panel Jack; Locomotive (all types); Maintenance Engineer (Mechanic and/or welder); Mixer Paving (Multiple Drum); Mobile Concrete Pump (With Boom); Panelboard (all types on site); Pile Driver; Power Shovel; Prentice Loader; Rail Tamper (with automatic lifting & aligning device0; Rotary Drill (all) used on Caissons for Foundations & Substructure work; Side Boom; Slip Form Paver; Straddle Carrier (building construction on site); Trench Machine (Over 24" Wide); & Tug Boat GROUP 6 - Asphalt Paver; Bobcat-type and/or Skid Steer Loader with Hoe Attachment greater than 7,000 lbs.; Bulldozer; C.M.I. Type Equipment; Endloader; Hydro Milling Machine; Kolman Type Loader (Dirt Loading); Lead Greaseman; Mucking Machine; Pettibone-Rail Equipment; Power Grader; Power Scoop; Power Scraper; Push Cat; Rotomill (all), Grinders and Planers of All Types; & Vermeer Type Concrete Saw GROUP 7 - A-Frame; Air Compressor, Pressurizing Shafts or Tunnels; Asphalt Roller (all); Bobcat-type and/or Skid Steer Loader with or without Attachments; Boiler (15 lbs. pressure and over); All concrete Pumps (without booms with 5" system); Fork Lifts (except masonry); Highway Drills-all types (with Integral Power); Hoist (One Drum); House Elevator (except those automatic call button controlled); Man Lift; Material Hoist/Elevator; Mud Jack; Pressure Grouting; Pump (Installing or Operating Well Points or other Type of Dewatering Systems); Pump (4" and over Discharge); Railroad Tie Inserter/Remover; Rotovator (lime soil stabilizer); Submersible Pump (4" and over Discharge); Switch & Tie Tamper w/o lifting & aligning device; Trench Machine (24" & under); & Utility GROUP 8 - Ballast Relocator; Backfillers & Tampers; Batch Plant; Bar & Joint Installing Machines; Bull Floats; Burlap & Curing Machines; Clefplanes; Compressor on building construction; Concrete Mixer, Capacity more than one bag; Concrete Mixer, one bag capacity, (side loader); All Concrete Pumps without Booms and with 4" System or Smaller; Concrete Spreader; Conveyor, used for handling building material; Crusher; Deckhands; Drum firemen (in asphalt plants); Farm Type Tractor, pulling attachments; Finishing Machine; Form Trencher; Generator; Gunite Machine; Hydro-seeder; Pavement Breaker (Hydraulic or Cable); Post Driver; Post Hole Digger; Pressure Pump (over 1/2" discharge); Road Widening Trencher; Roller (except Asphalt); Self-propelled Power Spreader; Self-propelled Sub-Grader; Shotcrete Machine; Tire Repairman; Tractor, Pulling Sheep Foot Roller or Grader; VAC/ALL; & Vibratory Compactor, with Integral Power GROUP 9 - Allen Screed Paver(concrete); Boiler (Less than 15 lbs. pressure); Crane-Compact, Track or Rubber under 4,000 lbs. Cpacity; Directional Drill "Locator"; Inboard & Outboard Motor Boat Launch; Light Plant; Masonry Fork Lift; Oiler; Power Driven Heater (Oil Fired); Power Scrubber; Power Sweeper; Pump (Under 4" discharge); Signal Person; & Submersible Pump (Under 4" discharge) ---------------------------------------------------------------- IRON0017-001 08/01/2008 ERIE (Eastern 2/3) & HURON (East of a line drawn from the north border through Monroeville & Willard) Rates Fringes Ironworkers: Ornamental; Reinforcing & Structural..................$ 28.35 17.83 ---------------------------------------------------------------- IRON0044-001 06/01/2008 ADAMS (Western Part), BROWN, BUTLER (Southern Part), CLERMONT, CLINTON (South of a line drawn from Blanchester to Lynchburg), HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) & WARREN (South of a line drawn from Blanchester through Morrow to the west county line) Rates Fringes Ironworkers: Fence Erector...............$ 22.70 16.42 Ornamental; Structural......$ 25.22 16.42 ---------------------------------------------------------------- IRON0055-001 07/01/2008 CRAWFORD (Area between lines drawn from where Hwy #598 & #30 meet through North Liberty to the northern border & from said Hwy junction point due west to the border), ERIE (Western one-third), HANCOCK, HURON (West of a line drawn from the northern border through Monroeville & Willard), OTTAWA, SANDUSKY, SENECA, WOOD & WYANDOT (North of Rte. #30) Rates Fringes Ironworkers: Fence Erector...............$ 19.75 14.45 Furnaces & Kilns (Temperature units over 125 degrees Fahrenheit).....$ 29.00 14.45 Pre-Engineered Metal Building....................$ 23.28 14.45 All Other Work..............$ 28.00 14.45 ---------------------------------------------------------------- IRON0147-001 06/01/2008 ALLEN COUNTY (Northern half) Rates Fringes IRONWORKER.......................$ 23.32 16.52 ---------------------------------------------------------------- IRON0172-001 06/01/2008 COSHOCTON (West of a line beginning at the northwest county line going through Walhonding & Tunnel Hill to the southern county line), CRAWFORD (South of Rte. #30), DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HIGHLAND (Eastern one-fifth), HOCKING, JACKSON (Northern half), KNOX, LICKING, MADISON, MORROW, MUSKINGUM (West of a line starting at Adams Mill going to Adamsville & going from Adamsville through Blue Rock to the southern border), PERRY, PICKAWAY, PIKE, ROSS, VINTON & WYANDOT (South of Rte. #30) Rates Fringes IRONWORKER.......................$ 25.57 15.45 ---------------------------------------------------------------- IRON0290-001 06/01/2008 ALLEN (Southern half), AUGLAIZE, BUTLER (North of a line drawn from east to the west county line going through Oxford, Darrtown & Woodsdale), CLINTON (Excluding south of a line drawn from Blanchester to Lynchburg), GREENE, HIGHLAND (Inside lines drawn from Marshall to Lynchburg & from the northern county line through East Monroe to Marshall), MIAMI, MONTGOMERY, PREBLE & WARREN (Excluding south of a line drawn from Blanchester through Morrow to the west county line) Rates Fringes IRONWORKER Beyond 25 mile radius of L.U. #290 Office, Dayton....$ 24.68 16.85 Within 25 mile radius of L.U. #290 Office, Dayton....$ 24.53 16.85 ---------------------------------------------------------------- IRON0372-001 06/01/2008 ADAMS (Western Part), BROWN, BUTLER (Southern Part), CLERMONT, CLINTON (South of a line drawn from Blanchester to Lynchburg), HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) & WARREN (South of a line drawn from Blanchester through Morrow to the west county line) Rates Fringes IRONWORKER, REINFORCING Beyond 30-mile radius of Hamilton County Courthouse..$ 25.90 16.00 Up to & including 30-mile radius of Hamilton County Courthouse..................$ 25.65 16.00 ---------------------------------------------------------------- IRON0549-003 12/01/2008 BELMONT, GUERNSEY, HARRISON, JEFFERSON, MONROE & MUSKINGUM (Excluding portion west of a line starting at Adams Mill going to Adamsville and going from Adamsville through Blue Rock to the south border) Rates Fringes IRONWORKER.......................$ 28.75 15.69 ---------------------------------------------------------------- IRON0550-001 05/01/2008 ASHLAND, COSHOCTON (E. of a line beginning at NW Co. line going through Walhonding & Tunnel Hill to the South Co. line), HOLMES, HURON (S. of Old Route #224), RICHLAND, TUSCARAWAS & WAYNE Rates Fringes Ironworkers:Structural, Ornamental and Reinforcing.......$ 23.88 16.07 ---------------------------------------------------------------- IRON0769-003 12/01/2008 ADAMS (Eastern Half), JACKSON (Southern Half) & SCIOTO Rates Fringes Ironworkers: ZONE 1......................$ 32.30 17.07 ZONE 2......................$ 32.70 17.07 ZONE 3......................$ 34.30 17.07 ZONE 1 - Up to 10 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave. ZONE 2 - 10 to 50 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave. ZONE 3 - 50 mile radius & over of Union Hall, Ashland, Ky., 1643 Greenup Ave. ---------------------------------------------------------------- IRON0787-002 06/01/2008 MORGAN, NOBLE & WASHINGTON Rates Fringes Ironworker.......................$ 26.99 16.25 ---------------------------------------------------------------- LABO0083-001 06/01/2007 ADAMS, HIGHLAND, JACKSON, PIKE, ROSS, SCIOTO & VINTON Rates Fringes LABORER GROUP 1.....................$ 27.59 6.87 GROUP 2.....................$ 27.84 6.87 GROUP 3.....................$ 28.09 6.87 LABORER CLASSIFICATIONS GROUP 1 - Building & Construction; Carpenter Tender; Bottom Man; Mason Tender; Mortar Mixer; Pipe Layer; Plasterer Tender; Sheeting & Shoring Man; & Signalman GROUP 2 - Air & Machine Driver Tool Operator; Asphalt Raker & Smoother; Burning & Cutting Torch; Chain Saw; Form Setter (Street & Highway); Hand Spiker; & Powered Concrete Buggy GROUP 3 - Gunnite Machine Operator; Gunnite Nozzle Man; Miner (Tunnel & Caisson); Mucker (Tunnel & Caisson); & Powder Man & Blaster HAZARDOUS & HIGH WORK IN EXCESS OF 25 FEET ABOVE SOLID BASE - $.25 PREMIUM WORKERS HANDLING CREOSOTED OR INJURIOUS CHEMICALLY TREATED MATERIALS - $.25 PREMIUM THE ERECTION, ALTERATION, REPAIR OR DEMOLITION OF REINFORCED CONCRETE CHIMNEYS, MASONRY CHIMNEYS, SILOS, & FURNACES RECEIVE THE FOLLOWING RATES: 0 TO 25 FEET - BASE RATE 25 TO 100 FEET - $1.00 PREMIUM 100 TO 150 FEET - $1.25 PREMIUM 150 TO 200 FEET - $1.50 PREMIUM 200 TO 250 FEET - $1.75 PREMIUM OVER 250 FEET - $2.00 PREMIUM ---------------------------------------------------------------- LABO0134-001 05/01/2008 COSHOCTON, HOLMES & TUSCARAWAS Rates Fringes LABORER GROUP 1.....................$ 21.68 6.75 GROUP 2.....................$ 22.08 6.75 GROUP 3.....................$ 22.61 6.75 GROUP 4.....................$ 22.83 6.75 LABORER CLASSIFICATIONS GROUP 1 - Building & Construction; Signalman; Flagman; Carpenter Tender; Finisher Tender; Concrete Handler; Utility Construction; Guard Rail Erector; & Hazardous Waste Removal (Level D) Personal Protective Equipment (PPE) GROUP 2 - Bottom Man; Scaffold Builder; Tunnel; Pipe Layer; Air & Power Driven Tool; Burner on Demolition Work; Swinging Scaffold; Mucker; Caisson Worker; Cofferdam Worker; Powder Man & Dynamite Blaster; Creosote Worker; Form Setter; Plasterer Tender; Hod Carrier; All Confined Space Work; Furnaces; Pickel Tubs; Acid Pits & Hazardous Waste Removal (Level C) Personal Protective Equipment (PPE) GROUP 3 - Mason Tender; Mortar Mixer; Stonemason Tender; Skid Steer Loader; & Hazardous Waste Removal (Level B) Personal Protective Equipment (PPE) GROUP 4 - Gunnite Operator; & Hazardous Waste Removal (Level A) Personal Protective Equipment (PPE) ---------------------------------------------------------------- LABO0265-001 06/01/2008 BROWN, CLERMONT & CLINTON Rates Fringes LABORER GROUP 1.....................$ 23.05 6.70 GROUP 2.....................$ 23.15 6.70 GROUP 3.....................$ 23.20 6.70 GROUP 4.....................$ 23.25 6.70 GROUP 5.....................$ 23.55 6.70 GROUP 6.....................$ 23.80 6.70 LABORER CLASSIFICATIONS GROUP 1 - Building and Common Laborer; Asbestos Removal; Cement Mason Tender; Hand-Operated Mechanical Mule; Mechanical Mule; Mechanical Sweeper; Signaler; Flagger; Wrecking Laborer GROUP 2 - Bottom Man; Pipe Layer GROUP 3 - Skid Steer; Burning Torch Operator; Jack Hammer; Air Spade; Chipping Hammer; Mechanical and Air Tamper Operator; Mechanical Concrete Buggie; Power Operated Mechanical Mule; Concrete Pump Hose Man; Vibrator Man; CERCLA Trained Hazardous Material Removal-Levels A,B,C GROUP 4 - Bottom Jack Hammer Man GROUP 5 - Tunnel Laborer GROUP 6 - Gunnite Nozzle Operator ---------------------------------------------------------------- LABO0265-003 06/01/1997 BROWN, CLERMONT & CLINTON Rates Fringes Plasterer tender Mixer Pump Operator.........$ 18.45 3.90 Tender......................$ 18.30 3.90 ---------------------------------------------------------------- LABO0265-007 06/01/2007 BROWN, CLERMONT & CLINTON Rates Fringes Laborer: Mason Tender............$ 23.50 6.70 ---------------------------------------------------------------- LABO0329-001 05/01/2008 ALLEN & AUGLAIZE Rates Fringes LABORER GROUP 1.....................$ 22.66 6.55 GROUP 2.....................$ 22.81 6.55 GROUP 3.....................$ 22.96 6.55 GROUP 4.....................$ 23.16 6.55 LABORER CLASSIFICAITONS GROUP 1 - Building; Signal Person; Power Wheelbarrow or Power Buggy; Removal of Asbestos & Hazardous Waste (Levels C & D) GROUP 2 - Vibrator; Cement Finisher Tender; Cement Raker; Asphalt Raker; Tamper & Packer; Pump Man Under 4" Discharge; Caisson; Cofferdam; Tunnel; Spiker Railroad (By Hand); Pot Tender; Torch Man; Demolition; Machine Driven Tools (Gas, Electric, Air) GROUP 3 - Plaster Tender; Mortar Mixer; Cylinder, Shaft; Sewer, Water Conduit; Gas, Oil Pipeline, except Mainlines; Sewer Bottom Man; Sewer Pipe Layer; Manhole Builder; Blaster Tender; Wagon Drill Tender; Jack Hammer; Gunnite Operator; Mucker (Tunnel & Caisson) Free Air; Miner (Tunnel & Caisson) Free Air; Sand Blaster; Blaster-Powder Man; Wagon Drill/Operator; & Removal of Toxic & Hazardous Waste (Levels A & B) GROUP 4 - Mason Tender ---------------------------------------------------------------- LABO0423-001 06/01/2008 FAIRFIELD, FAYETTE, FRANKLIN, HOCKING, LICKING, MADISON & PICKAWAY Rates Fringes LABORER GROUP 1.....................$ 21.58 6.75 GROUP 2.....................$ 21.89 6.75 GROUP 3.....................$ 22.20 6.75 GROUP 4.....................$ 22.51 6.75 LABORER CLASSIFICATIONS GROUP 1 - General laborers; Carpenter tender; Cathodic protection; Cleaning debris; Cleaning of all material; General clean-up including vacuum cleaning, scraping and cleaning of walls and floors; Landscape; Installation and removal of fencing; Sod layers; All portable heaters; Flagman; Loading and unloading of all trucks; Handling and conveying all materials; Washing of all windows; Conveyer belt; Jurisdiction over the use of all water pumps up to and including 3 inch intake GROUP 2 - Skid steer specialist; Concrete specialist; Brick tender; Stone mason tender; Plaster tender; Mortar mixer and; operator; Cement mason tender; Construction specialist; All scaffold builders; Bush hammering; Jack hammer operator; Air or electrical pneumatic tool operator; Power driven tools; Power buggy operators; Pouring and placement of all concrete; Power wheelbarrow operator; Asphalt and blacktop rakers; Wall wrecker and bar man on demolition; Sand blasting and chipping; Welders on demolitions; Grade checkers; A person on a bucket pouring concrete; Gunite nozzle man; Wagon and churn drill operator; Concrete saw operator; Brush feeders on pulverizers; Pipe layers; Pavers set in sand; Bottom man; Laser gun; Burners; Sand blasting of concrete; Vibrator man; Steward; Signal man; Caisson; Caisson bottom man; Pile drivers; Asbestos and lead abatement laborers; Hazardous waste level B GROUP 3 - Hazardous waste level C GROUP 4 - Hazardous waste level D ---------------------------------------------------------------- LABO0480-001 06/01/2008 ERIE, HURON, OTTAWA & SANDUSKY Rates Fringes LABORER GROUP 1.....................$ 23.76 7.50 GROUP 2.....................$ 23.96 7.50 GROUP 3.....................$ 24.36 7.50 LABORER CLASSIFICATIONS GROUP 1 - Building & Construction Laborer; Signalman; Flagman; Carpenter Tender; Finisher Tender; Concrete Handler; Utility Construction Laborer; Guard Rail Erector; Railroad Spur Work & Hazardous Waste Worker Level D GROUP 2 - Bottom Man; Scaffold Builder; Tunnel Laborer; Pipe Layer; Air & Power Driven Tool; Burner on Demolition Work; Swinging Scaffold; Mucker; Caisson Worker; Cofferdam Worker; Powder Man & Dynamite Blaster; Creosote Worker; Mortar Mixer; Form Setter; Mason Tender; Plasterer Tender; Hod Carrier; Laser Beam set-up Man; Stonemason Tender; All Wet & Dry Vacuum Devices & Hazardous Waste Worker Level C GROUP 3 - Gunnite Operator; Dry Sandblast; Hazardous Waste Worker Level A & B; Caustic Lime Worker & Radioactive Atmosphere Worker (When special wearing apparel required) ---------------------------------------------------------------- LABO0500-001 07/01/2008 WOOD COUNTY Rates Fringes LABORER GROUP 1.....................$ 22.67 9.29 GROUP 2.....................$ 22.87 9.29 GROUP 3.....................$ 23.07 9.29 GROUP 4.....................$ 23.17 9.29 GROUP 5.....................$ 13.15 9.29 GROUP 6.....................$ 16.17 9.29 LABORER CLASSIFICATIONS GROUP 1 - Building & Construction; Signalperson; Flagperson; Carpenter Tender; Utility Construction; Guard Rail Erector; Deep Cleaning; & Hazardous Waste (Level A) GROUP 2 - Finisher Tender; Concrete Handler; Bottom Man; Scaffold Builder; Tunnel Laborer; Pipelayer; Air & Power Driven Tools; Burner on Demolition Work; Swinging Scaffold; Mucker; Caisson Worker; Cofferdam Worker; Powder Man & Dynamite Blaster; Creosote Worker; Mortar Mixer; Form Setter; Mason Tender; Plasterer Tender; Hod Carrier; Stonemason Tender & Hazardous Waste (Level B) GROUP 3 - Gunite Operator & Hazardous Waste (Level C) GROUP 4 - Hazardous Waste (Level D) GROUP 5 - Parking & Landscaping GROUP 6 - Installation of Fencing FIREBRICK WORK OVER 50 FEET, EXPEDITERS, HOT PAY, BOTTOM MAN & TOP MAN - $.75 PER HOUR OVER GROUP 1. ---------------------------------------------------------------- LABO0530-001 06/01/2006 GUERNSEY, MUSKINGUM, NOBLE & PERRY Rates Fringes LABORER GROUP 1.....................$ 20.12 5.80 GROUP 2.....................$ 20.37 5.80 GROUP 3.....................$ 20.62 5.80 GROUP 4.....................$ 22.57 5.80 LABORER CLASSIFICATIONS GROUP 1 - Building & Construction; Carpenter Tender; Tree Planter; Landscape Tree Trimmer; & Asbestos Removal, Hazardous Waste Removal GROUP 2 - Air & Machine Driven Tool Operator; Asphalt Plant Aggremeter Operator; Asphalt Plant Mixer Man; Car Pusher and Tunnel Laborer; Caulker; Cement Handler; Concrete Puddler (Behind Mixer); Curb Cutter & Setter; Cutting with Burning Torch; Dumpman; Hand Spiker (Railroad); Jackhammer Operator; Mucker (Tunnel & Caisson); Pipelayer; Proportioning Plant Operator; Pump Man; Road Form Setter; Sewer Bottom Man; Sheeting & Shoring Man; Vibrator Operator; & Yarner & Wrench Man GROUP 3 - Mason Tender; Mortar Mixer Man; Brick Slinger; Stone Mason Tender; Plaster Tender; Lock Tender; Brick Dropper GROUP 4 - Powder Man or Blaster; & Toxic/Hazardous Waste ---------------------------------------------------------------- LABO0534-001 06/01/2006 BUTLER & WARREN Rates Fringes LABORER GROUP 1.....................$ 22.14 5.80 GROUP 2.....................$ 22.24 5.80 GROUP 3.....................$ 22.34 5.80 GROUP 4.....................$ 22.47 5.80 GROUP 5.....................$ 22.72 5.80 GROUP 6.....................$ 22.49 5.80 LABORER CLASSIFICATIONS GROUP 1 - Building & Common Laborer; All General Laborers Including Landscaping; Rough Rider; All Pumps 4" or Smaller; Small Pump Portable Generators - Bobcat to Cleanup; Firewatch & Monitor (Safety Person) GROUP 2 - Asphalt Raker; Tamper; Smoother; Hand Air Pump; Hand Air Tamper Chisel; Power Tamper; Switch; Assemblies; Handling & Laying Precast Concrete Floor & Deck GROUP 3 - Concrete Specialist; Skid Steer (with attachments to perform laborers' duties); Jack Hammer and Concrete Busterman; Barco Tamper Man; Power Georgia Buggy Man; Power Sweeper Man; Vibrator; Concrete Saw Man; Rail Spikers; Acetylene Burner Pipe Layers; Bos'N or Cradleman; Bottom Man; Chipping Hammer; Grade Checker; Form Cleanout and Blowout Man; Red Concrete Coloring Man (Electrical Safety) GROUP 4 - Mason Tender; Mortar Mixer & Scaffold Builder GROUP 5 - Forklift for Mason; All Work involving Refractory Materials including Demolition; Asbestos Removal & Hazardous Waste Removal (Handling, control, removal, abatement, encapsulation or disposal of asbestos & hazardous waste) GROUP 6 - Gunnite Man; Sand Blaster; Concrete & Grout Pump & Hose Man; Blast Trac; Miner & Mucker, Free Air; Powderman or Blaster; Mortar or Gypsum Machineman; Scuba Diver ---------------------------------------------------------------- LABO0574-001 05/01/2008 Rates Fringes LABORER DELAWARE COUNTY GROUP 1....................$ 21.28 6.75 GROUP 2....................$ 21.59 6.75 GROUP 3....................$ 21.90 6.75 GROUP 4....................$ 22.21 6.75 HANCOCK, SENECA & WYANDOT COUNTIES GROUP 1....................$ 22.85 6.75 GROUP 2....................$ 23.15 6.75 GROUP 3....................$ 23.35 6.75 GROUP 4....................$ 23.55 6.75 LABORER CLASSIFICATIONS GROUP 1: Building & Construction; Signalman; Flagman; Carpenter Tender; Finisher Tender; Concrete Handler; Utility Construction; Guard Rail Erector; Fence Installer; Caulker; & Hazardous Waste (Level A) GROUP 2: Bottom Man; Scaffold; Mucker; Caisson Worker; Powder Man; Dynamite Blaster; Creosote Worker; Mortar Mixer; Form Setter; Plasterer Tender; Hod Carrier; Stonemason Tender & Hazardous Waste (Level B) GROUP 3: Mason Tender; Gunite Operator & Hazardous Waste (Level C) GROUP 4: Hazardous Waste (Level D) ---------------------------------------------------------------- LABO0639-001 06/01/2008 MONROE, MORGAN & WASHINGTON Rates Fringes LABORER GROUP 1.....................$ 25.77 6.75 GROUP 2.....................$ 26.12 6.75 LABORER CLASSIFICATIONS GROUP 1 - Asphalt Plant Agfremeter; Asphalt Plant Miner Man; Brick Slinger; Building & Construction; Car Pusher & Tunnel Laborer; Carpenter Tender; Cement Handler; Concrete Puddler Behind Mixer; Concrete Smoother; Drum Fireperson; Dump Man Batch Truck; Flagperson; Landscape Planter; Proportioning Plant Operator; Rammer Man; & Spreader Box Man GROUP 2 - Air, Gas or Machine Driven Tool; Asphalt Raker; Tamper, Forker, Shoveler or Smoother; Caulker, Yarner & Wrenchman; Cement Mason Tender; Curb Setter & Cutter; Form Setter; Grade Checker; Jackhammer Operator; Mason Tender; Mortar Mixer; Mucker (Tunnel & Caisson); Pipelayer; Pump Man (4" & Under); Sewer Bottom Man; Sheeting & Shoring Man; Stonemason Tender; Vibrator Operator; Plasterer Tender; Hand Spiker (Railroad); Concrete & Georgia Buggy Pusher; Deep Trench Work (Over 6'); Cutting & Burning Torch; Hydro-Water Jet Operator; Brick Dropper; Lock Tender; Miner (Tunnel & Caisson); Powderman or Blaster; & Signalperson ---------------------------------------------------------------- LABO0809-001 07/01/2008 HARRISON & JEFFERSON Rates Fringes LABORER..........................$ 22.12 7.50 Asbestos Work; Hazardous Waste Work; Instrument & Laser; and Lead Based Paint Removal - Additional $.50 per hour Hot Pay - Additional $1.00 per hour when working with other crafts receiving hot pay ---------------------------------------------------------------- LABO1015-001 05/01/2008 WAYNE Rates Fringes LABORER GROUP 1.....................$ 22.22 6.75 GROUP 2.....................$ 22.62 6.75 GROUP 3.....................$ 22.97 6.75 GROUP 4.....................$ 22.82 6.75 LABORER CLASSIFICATIONS GROUP 1 - Building & Construction; Signalman; Flagman; Carpenter Tender; Finisher Tender; Concrete Handler; Utility Construction; Guard Rail Erector; & Hazardous Waste Removal (Level D) Personal Protective Equipment (PPE) GROUP 2 - Bottom Man; Scaffold Builder; Tunnel; Pipe Layer; Air & Power Driven Tool; Burner on Demolition Work; Swinging Scaffold; Mucker; Caisson Worker; Cofferdam Worker; Powder Man & Dynamite Blaster; Creosote Worker; Form Setter; Plasterer Tender; Hod Carrier; All Confined Space Work; Furnaces; Pickel Tubs; Acid Pits & Hazardous Waste Removal (Level C) Personal Protective Equipment (PPE) GROUP 3 - Mason Tender; Mortar Mixer; Stonemason Tender; Skid, Steer Loader; & Hazardous Waste Removal (Level B) Personal Protective Equipment (PPE) GROUP 4 - Gunnite Operator; & Hazardous Waste Removal (Level A) Personal Protective Equipment (PPE) ---------------------------------------------------------------- LABO1149-002 12/01/2008 BELMONT Rates Fringes LABORER GROUP 1.....................$ 20.27 10.40 GROUP 2.....................$ 20.27 10.40 GROUP 3.....................$ 20.77 10.40 GROUP 4.....................$ 21.27 10.40 LABORER CLASSIFICATIONS GROUP 1 - Unskilled; Carpenter Tender; Flagman; Demolition Worker; Fire Watch; & Landscaper GROUP 2 - Powderman on Concrete Pump Hose; Semi-skilled Laborer; Scaffold Builder; Chainmen & Rodmen; Grade Checker; Signalman; Tenders of: Brickmasons, Plasterers, Cement Finishers, Stonemasons, Lathers & Tile Setters; Mortar Mixer; Operators of: Jackhammers, Forklifts, Bobcats, Vibrators, Tampers, Pavement Busters, Chipping & Peening Hammers, Air Siphon & Air Pumps, Concrete Saws, Power Saws, Chain Saws, Motorized Buggies, Post Hole Diggers, Lance and/or Water Blasters & Batch House Scales; Riprap Finisher; Concrete Specialist; Concrete Technician; Sheeter & Shorer; Asphalt Raker; Persons Working with: Mastic Asphalt, Acid Brick, Acid & Creosote; Nozzleman for Gunnite or Sandblasting; Demolition Worker; Ride or Walk Roller Tamper; Deep Ditch Vertical & Manholes 6 ft. or more; & Scaffolding Work over 50 ft. (inside or out) GROUP 3 - Blacksmith; Powderman; Air Track Operator; Pipe Layer; & Burner GROUP 4 - Asbestos Worker; Hazardous Waste Worker; & Lead Based Paint Removal Laborer ---------------------------------------------------------------- LABO1216-001 06/01/2008 ASHLAND, CRAWFORD, KNOX, MORROW & RICHLAND Rates Fringes LABORER GROUP 1.....................$ 24.17 6.50 GROUP 2.....................$ 24.37 6.50 GROUP 3.....................$ 24.67 6.50 LABORER CLASSIFICATIONS GROUP 1 - Building & Construction Laborer; Signalman; Flagman; Carpenter Tender; Finisher Tender; Concrete Handler; Utility Construction Laborer; Guard Rail Erector; Asbestos Handler; Hazardous Waste (Levels C & D) GROUP 2 - Bottom Man; Tunnel Laborer; Pipe Layer; Air & Power Driven Tool; Burner on Demolition Work; Swinging Scaffold; Mucker; Caisson Worker; Cofferdam Worker; Powder Man & Dynamite Blaster; Creosote Worker; Form Setter; Plasterer Tender; Hod Carrier; Laser Beam Set-up Man; Gunite Operator; Hazardous Waste (Levels A & B) GROUP 3 - Stonemason Tender; Scaffold Builder; Mason Tender; Mortar Mixer ---------------------------------------------------------------- LABO1410-001 06/01/2008 GREENE, MIAMI, MONTGOMERY & PREBLE Rates Fringes LABORER GROUP 1.....................$ 21.65 6.75 GROUP 2.....................$ 22.25 6.75 GROUP 3.....................$ 22.75 6.75 LABORER CLASSIFICATIONS GROUP 1 - Building & Construction Laborer; Railroad Laborers, Asbestos and Hazardous Waste (Levels A, B, C, & D); Concrete Crew, Form Setter, Pipelayer; Bottom Man; Burner (Cutting Torch); All Machine & Power Driven Tools; Sandblaster; Yardman - Landscaping; Sewer Jet; Waterperson; Unloading of Furniture & Fixtures; Final Clean-Up; Signal Men GROUP 2 - Mason Tender for Bricklayers; Flexicore; Firebrick Tender (Blast Furnaces, Soaking Pits, Stoves & Stacks); Plasterer Tenders GROUP 3 - Tender Operator ---------------------------------------------------------------- PAIN0006-013 07/01/2007 OTTAWA (Excluding Allen, Bay, Bono, Catawba Island, Clay Center, Curtice, Danbury, Eagle Beach, Elliston, Elmore, Erie, Fishback, Gem Beach & Genova) & WOOD Rates Fringes PAINTER (NEW COMMERCIAL BUILDING WORK) GROUP 1.....................$ 24.76 10.69 GROUP 2.....................$ 25.01 10.69 GROUP 3.....................$ 25.26 10.69 GROUP 4.....................$ 25.51 10.69 GROUP 5.....................$ 25.46 10.69 GROUP 6.....................$ 25.76 10.69 REPAINT IS 90% OF JR PAINTER CLASSIFICATIONS GROUP 1 - Brush; Paperhanger; Drywall Taper & Finisher; Spray & Sandblasting Pot Tender GROUP 2 - All Surfaces 30 ft. or over where material is applied to or labor performed on above ground level (exterior), floor level (interior) GROUP 3 - Swing Stage & Chair GROUP 4 - Solvent-Based Catalized Epoxy Materials of 2 or More Component Materials, to include Solvent-Based Conversion Varnish; Lead Paint Abatement GROUP 5 - All Methods of Spray, Paint or any Material Applied with a Pressure Device GROUP 6 - Solvent Based Material; Sand and Abrasive Blasting ---------------------------------------------------------------- PAIN0006-020 07/01/2007 ALLEN & AUGLAIZE Rates Fringes PAINTER Brush, Roller, & Spray (of waterbourne products).......$ 21.05 8.20 Drywall Finishing & Taping..$ 21.50 8.20 Lead Abatement..............$ 24.35 8.20 Sandblasting, Pressure Cleaning & Spray (of alkyd, epoxys and petroleum based products)...$ 21.80 8.20 Swing Stage, Chair, Spiders & Cherry Pickers....$ 21.30 8.20 Wallcoverings...............$ 21.30 8.20 All Surfaces 40 ft. or over where material is applied to or labor performed on, above ground level (exterior), floor level (interior) - $.50 premium Applying Coal Tar Products - $1.00 premium ---------------------------------------------------------------- PAIN0006-025 09/01/2004 ALLEN, AUGLAIZE, HANCOCK & WYANDOT (W. half) Rates Fringes GLAZIER..........................$ 17.11 4.55 ---------------------------------------------------------------- PAIN0012-007 06/14/2008 BUTLER Rates Fringes PAINTER GROUP 1.....................$ 23.10 6.83 GROUP 2.....................$ 23.60 6.83 GROUP 3.....................$ 23.85 6.83 GROUP 4.....................$ 24.10 6.83 PAINTERS CLASSIFICATIONS GROUP 1: Brush & Roller; Paperhanger; & Drywall Taping GROUP 2: Spray GROUP 3: Sandblasting; & Waterblasting GROUP 4: Lead Abatement ---------------------------------------------------------------- PAIN0012-009 06/14/2008 BROWN, CLERMONT, CLINTON & WARREN Rates Fringes PAINTER GROUP 1.....................$ 23.10 6.83 GROUP 2.....................$ 23.60 6.83 GROUP 3.....................$ 23.85 6.83 GROUP 4.....................$ 24.10 6.83 PAINTER CLASSIFICATIONS GROUP 1: Brush; Roller; Paperhanger & Drywall Taping GROUP 2: Spray GROUP 3: Sandblasting; Waterblasting GROUP 4: Lead Abatement ---------------------------------------------------------------- PAIN0012-013 11/01/2008 DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, MADISON, PICKAWAY & ROSS Rates Fringes PAINTER Brush; Paperhanger; Roller; & Wall Washing......$ 23.10 8.49 Drywall Sander..............$ 22.85 8.49 Drywall Taper & Finisher....$ 23.50 8.49 Sandblasting; Steamcleaning; Waterblasting (3500 PSI or Over)& Hazardous Work.......$ 23.80 8.49 Spray.......................$ 23.60 8.49 Structural Steel & Swing Stage.......................$ 23.40 8.49 ---------------------------------------------------------------- PAIN0053-002 12/01/2008 MONROE, NOBLE & WASHINGTON Rates Fringes GLAZIER..........................$ 25.99 7.30 ---------------------------------------------------------------- PAIN0091-008 12/01/2008 BELMONT, GUERNSEY, HARRISON, HOCKING, MORGAN & VINTON Rates Fringes GLAZIER..........................$ 25.10 9.60 ---------------------------------------------------------------- PAIN0091-009 12/01/2008 JEFFERSON Rates Fringes GLAZIER..........................$ 24.60 9.00 ---------------------------------------------------------------- PAIN0093-002 12/01/2008 GUERNSEY, HOCKING, MONROE, MORGAN, NOBLE & WASHINGTON Rates Fringes PAINTER (Painters; Drywall Finishers; Wall Covers & Dryvit and Stucco)...............$ 22.72 10.00 ---------------------------------------------------------------- PAIN0181-002 05/01/2007 ERIE (Excluding NW tip to Route #4), & HURON (NE part) Rates Fringes GLAZIER..........................$ 27.67 10.85 ---------------------------------------------------------------- PAIN0249-001 05/01/2008 GREENE, MIAMI, MONTGOMERY & PREBLE Rates Fringes PAINTER GROUP 1 - Brush; Roller.....$ 22.29 7.48 GROUP 2 - Spackling & Drywall Finishing; Vinyl - Paper Wallcovering..........$ 22.64 7.48 GROUP 3 - Swing & Scaffold; Structural Steel; High Tension Electrical Equipment; Hot Pipes.......................$ 22.70 7.48 GROUP 4 - Spray; Sandblasting; Steam Cleaning; & Lead Paint Abatement...................$ 23.04 7.48 GROUP 5 - Steeplejack Work - Church Steeples, Smoke Stacks & Hazardous Work.....$ 23.24 7.48 GROUP 6 - Coal Tar..........$ 23.79 7.48 ---------------------------------------------------------------- PAIN0356-001 07/01/2008 KNOX, LICKING, MUSKINGUM & PERRY Rates Fringes PAINTER Brush; Roller; Paperhanger; Wall Washer; Drywall Sander; Drywall Taper & Finisher............$ 20.43 6.95 Sandblasting; Steam Cleaning; Waterblasting & Hazardous Work..............$ 25.35 6.95 Spray.......................$ 20.93 6.95 Structural Steel & Swing Stage.......................$ 24.95 6.95 Tanks; Stacks & Towers......$ 28.16 6.95 ---------------------------------------------------------------- PAIN0372-001 11/01/2007 DELAWARE, FAIRFIELD, FAYETTE (West of State Rte. #41), FRANKLIN, JACKSON, LICKING, MADISON, MUSKINGUM, PERRY, PICKAWAY, PIKE, & ROSS Rates Fringes GLAZIER..........................$ 23.00 9.87+a FOOTNOTE: a. 1 Paid Holiday: Labor Day ---------------------------------------------------------------- PAIN0387-001 11/01/2008 ADAMS, BROWN, BUTLER, CLERMONT, CLINTON, FAYETTE (Eastern part), GREENE, HIGHLAND, MIAMI, MONTGOMERY, PREBLE & WARREN Rates Fringes GLAZIER..........................$ 23.70 10.35 ---------------------------------------------------------------- PAIN0406-003 06/01/2007 ASHLAND, CRAWFORD, HURON (S. half), KNOX, MORROW, RICHLAND, AND WYANDOT (E. half) Rates Fringes GLAZIER..........................$ 22.82 8.30 ---------------------------------------------------------------- PAIN0438-001 12/01/2008 BELMONT, HARRISON & JEFFERSON Rates Fringes PAINTER (Painter, Drywall Finisher, Wall Covers & Dryvit and Stucco)...............$ 22.55 10.00 ---------------------------------------------------------------- PAIN0555-001 06/01/2008 ADAMS, HIGHLAND, JACKSON, PIKE & SCIOTO Rates Fringes PAINTER GROUP 1.....................$ 21.22 11.47 GROUP 2.....................$ 22.34 11.47 PAINTER CLASSIFICATIONS GROUP 1 - Brush; Roller; Taping; & Wallcovering GROUP 2 - Floor Sanding; Power Tools; Sandblasting; Spray; Steam Cleaning; Pressure Washing; Lead Abatement; Hazardous Waste, Toxic Materials; Epoxy & Two Component Materials ---------------------------------------------------------------- PAIN0603-001 06/01/2008 COSHOCTON, HOLMES, TUSCARAWAS & WAYNE Rates Fringes PAINTER Brush & Roller..............$ 20.25 8.65 Drywall Taper With Machines.$ 21.00 8.65 Drywall Taper...............$ 20.65 8.65 Paperhanger.................$ 20.35 8.65 Spray.......................$ 20.75 8.65 Wipe Down Man & Taper, Swing Stage, Ladder Jack & Window Jack - Plus $.30 per hour Epoxy Application: Class 3 - Plus $.50 per hour; Class 4 - Plus $1.00 per hour Drywall Finisher - When using journeyman's own stilts or automatic tools: Plus $.80 per hour ---------------------------------------------------------------- PAIN0639-001 05/01/2003 Rates Fringes Sign Painter & Erector...........$ 17.57 4.55+a+b+c FOOTNOTES: a. 7 Paid Holidays: New Year's Day; Memorial Day; July 4th; Labor Day; Thanksgiving Day; Christmas Day & 1 Floating Day b. Vacation Pay: After 1 year's service - 5 days' paid vacation; After 2, but less than 10 years' service - 10 days' paid vacation; After 10, but less than 20 years' service - 15 days' paid vacation; After 20 years' service - 20 days' paid vacation c. Funeral leave up to 3 days maximum paid leave for death of mother, father, brother, sister, spouse, child, mother-in-law, father-in-law, grandparent and inlaw provided employee attends funeral ---------------------------------------------------------------- PAIN0788-001 06/01/2008 ASHLAND, CRAWFORD, ERIE, HANCOCK, HURON, MORROW, OTTAWA (Allen, Bay, Bono, Catawba Island, Clay Center, Curtice, Danbury, Eagle Beach, Elliston, Elmore, Erie, Fishback, Gem Beach & Genoa), RICHLAND, SANDUSKY, SENECA & WYANDOT Rates Fringes PAINTER Brush & Roller..............$ 21.80 8.71 Drywall.....................$ 22.80 8.71 Paperhanging................$ 22.20 8.71 Structural Steel............$ 23.40 8.71 WINTER REPAINT: Between December 1 to March 31 - 90% JR $.50 PER HOUR SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK: While working swingstage, boatswain chair, needle beam and horizontal cable. While operating sprayguns, sandblasting, cobblasting, high pressure waterblasting (4000 psi), and for automatic taping and finishing tools for drywall. $1.00 PER HOUR SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK: For the application of catalized epoxy, including latex epoxy that is deemed hazardous, lead abatement, or for work or material where special precautions beyond normal work duties must be taken. For working on stacks, tanks, and towers over 40 feet in height. ---------------------------------------------------------------- PAIN0948-001 07/01/2008 ERIE (NW tip of county to Route #4), OTTAWA, SANDUSKY, SENECA, & WOOD Rates Fringes GLAZIER..........................$ 27.73 9.76 ---------------------------------------------------------------- PAIN0970-006 12/01/2008 VINTON Rates Fringes PAINTER (Painter, Drywall Finisher, Wall Covers & Dryvit and Stucco)...............$ 22.68 10.00 ---------------------------------------------------------------- PAIN1162-001 05/01/2008 COSHOCTON, HOLMES, TUSCARAWAS & WAYNE Rates Fringes GLAZIER..........................$ 22.31 10.00 ---------------------------------------------------------------- PAIN1195-004 12/01/2008 SCIOTO Rates Fringes GLAZIER..........................$ 27.50 5.70 ---------------------------------------------------------------- PLAS0001-001 06/22/2004 BROWN, BUTLER, CLEMONT, HIGHLAND & WARREN COUNTIES: Rates Fringes PLASTERER........................$ 20.65 7.25 ---------------------------------------------------------------- PLAS0001-007 06/01/2002 ASHLAND, CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HOCKING, KNOX, LICKING, MADISON, MORGAN, MORROW, MUSKINGUM, PERRY, PICKAWAY, RICHLAND, ROSS & WYANDOT (Excluding Tymochtee, Crawford, Ridge & Richland Townships) Rates Fringes PLASTERER........................$ 21.31 6.80 ---------------------------------------------------------------- PLAS0001-008 06/01/2002 ASHLAND, CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HOCKING, KNOX, LICKING, MADISON, MORGAN, MORROW, MUSKINGUM, PERRY, PICKAWAY, RICHLAND, ROSS & WYANDOT (Excluding the townships of Tymochtee, Crawford, Ridge & Richland) Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 20.98 6.80 ---------------------------------------------------------------- PLAS0001-009 06/01/2004 MONROE, NOBLE & WASHINGTON Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 22.51 7.99 ---------------------------------------------------------------- PLAS0001-010 06/01/2003 MONROE, NOBLE & WASHINGTON Rates Fringes PLASTERER........................$ 22.21 7.22 ---------------------------------------------------------------- PLAS0039-001 07/01/2005 BELMONT, HARRISON & JEFFERSON Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 23.50 7.43 ---------------------------------------------------------------- PLAS0039-002 07/01/2005 BELMONT, HARRISON & JEFFERSON Rates Fringes PLASTERER........................$ 23.90 6.85 ---------------------------------------------------------------- PLAS0132-001 06/01/2004 CLINTON, GREENE, MIAMI, MONTGOMERY & PREBLE Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 20.18 9.35 ---------------------------------------------------------------- PLAS0132-003 05/01/2004 CLINTON, GREENE, MIAMI, MONTGOMERY & PREBLE Rates Fringes PLASTERER........................$ 22.00 7.95 ---------------------------------------------------------------- PLAS0132-005 06/01/2008 BROWN, BUTLER, CLERMONT, HIGHLAND & WARREN Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 22.10 8.95 ---------------------------------------------------------------- PLAS0132-009 06/01/2006 ADAMS, JACKSON, PIKE & SCIOTO Rates Fringes Cement Mason/Plasterer...........$ 26.63 10.95 ---------------------------------------------------------------- PLAS0886-001 07/01/2007 HANCOCK & WOOD Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 27.39 13.48 ---------------------------------------------------------------- PLAS0886-003 07/01/1999 ALLEN & AUGLAIZE Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 20.35 7.00 ---------------------------------------------------------------- PLAS0886-004 07/01/2007 ALLEN, AUGLAIZE, HANCOCK & WOOD (Excluding Perry & Bloom Townships) Rates Fringes Drywall..........................$ 26.01 11.78 PLASTERER........................$ 27.52 11.78 ---------------------------------------------------------------- PLUM0042-001 07/01/2008 ASHLAND, CRAWFORD, ERIE, HURON, KNOX, MORROW, RICHLAND & WYANDOT Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 27.50 14.95 ---------------------------------------------------------------- PLUM0050-001 09/29/2008 HANCOCK, OTTAWA, SANDUSKY, SENECA & WOOD Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 33.45 17.64 ---------------------------------------------------------------- PLUM0083-001 07/01/2007 BELMONT & MONROE (North of Rte. #78) Rates Fringes Plumber and Steamfitter..........$ 28.76 14.68 ---------------------------------------------------------------- PLUM0094-001 05/24/2008 WAYNE Rates Fringes PLUMBER/PIPEFITTER...............$ 27.60 14.17 ---------------------------------------------------------------- PLUM0162-001 06/01/2008 CLINTON, FAYETTE, GREENE, MIAMI, MONTGOMERY & PREBLE Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 27.50 16.07 ---------------------------------------------------------------- PLUM0168-001 06/01/2008 MONROE (South of Rte. #78), MORGAN (South of Rte. #78) & WASHINGTON Rates Fringes PLUMBER/PIPEFITTER...............$ 29.73 15.32 ---------------------------------------------------------------- PLUM0189-001 06/01/2008 DELAWARE, FAIRFIELD, FRANKLIN, HOCKING, LICKING, MADISON, PERRY, PICKAWAY & ROSS Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 30.01 15.48 ---------------------------------------------------------------- PLUM0392-001 06/01/2008 BROWN, BUTLER, CLERMONT & WARREN Rates Fringes PLUMBER/PIPEFITTER...............$ 28.39 14.30 ---------------------------------------------------------------- PLUM0495-001 06/01/2008 SHOCTON, GUERNSEY, HARRISON, HOLMES, JEFFERSON, MORGAN (South to State Rte. #78 & from McConnelsville west on State Rte. #37 to the Perry County Line), MUSKINGUM, NOBLE & TUSCARAWAS Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 29.23 14.38 ---------------------------------------------------------------- PLUM0577-001 06/01/2008 ADAMS, HIGHLAND, JACKSON, PIKE, SCIOTO & VINTON Rates Fringes Plumber, Pipefitter, Steamfitter Manufacturing Plants, Testing Facilities, Enrichment Plants, Compressor Stations, Power Generating Plants, Coke Plants, Co-Generation Plants, Chemical Plants, Incinerators & Steel Mills..$ 29.45 16.22 All Other Work..............$ 25.70 16.22 ---------------------------------------------------------------- PLUM0776-001 07/01/2008 ALLEN & AUGLAIZE Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 29.05 14.85 ---------------------------------------------------------------- ROOF0042-001 08/01/2007 BROWN, BUTLER, CLERMONT & WARREN Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs Pitch.......................$ 26.18 10.30 Roofer......................$ 25.18 10.30 ---------------------------------------------------------------- ROOF0044-001 05/01/2008 ERIE, OTTAWA & SANDUSKY Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 26.95 14.30 ---------------------------------------------------------------- ROOF0075-001 05/01/2006 CLINTON, GREENE, HIGHLAND, MIAMI, MONTGOMERY & PREBLE Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs Composition, Damp & Waterproof..................$ 20.85 9.32 Slate, Tile & Asbestos......$ 21.07 9.32 ---------------------------------------------------------------- ROOF0086-001 09/01/2005 AUGLAIZE, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HOCKING, KNOX, LICKING, MADISON, MORROW, PERRY, PICKAWAY, ROSS & WYANDOT Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 22.16 8.90 ---------------------------------------------------------------- ROOF0088-001 06/01/2008 ASHLAND, COSHOCTON, CRAWFORD, HOLMES, HURON, RICHLAND, SENECA, TUSCARAWAS & WAYNE Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 23.25 10.39 ---------------------------------------------------------------- ROOF0134-001 07/01/2007 ALLEN, HANCOCK & WOOD Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 23.85 14.945 ---------------------------------------------------------------- ROOF0185-001 06/01/2008 ADAMS, JACKSON, PIKE, SCIOTO & VINTON Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 26.00 9.76 ---------------------------------------------------------------- ROOF0188-001 07/01/2008 BELMONT, HARRISON, JEFFERSON & MONROE Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs Coal Tar Pitch & Waterproofing...............$ 24.82 9.85 Roofer......................$ 24.57 9.85 ---------------------------------------------------------------- ROOF0242-001 06/01/2007 GUERNSEY, MORGAN, MUSKINGUM, NOBLE & WASHINGTON Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 22.94 9.03 ---------------------------------------------------------------- SFOH0669-001 01/01/2009 ADAMS, ALLEN, ASHLAND, AUGLAIZE, BELMONT, BROWN, BUTLER, CLERMONT, CLINTON, COSHOCTON, CRAWFORD, DELAWARE, ERIE, FAIRFIELD, FAYETTE, FRANKLIN, GREENE, GUERNSEY, HANCOCK, HARRISON, HIGHLAND, HOCKING, HOLMES, HURON, JACKSON, JEFFERSON, KNOX, LICKING, MADISON, MIAMI, MONROE, MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PERRY, PICKAWAY, PIKE, PREBLE, RICHLAND, ROSS, SANDUSKY, SCIOTO, SENECA, TUSCARAWAS, VINTON, WARREN, WASHINGTON, WAYNE, WOOD & WYANDOT Rates Fringes SPRINKLER FITTER.................$ 31.85 15.80 ---------------------------------------------------------------- SHEE0024-001 06/01/2008 ALLEN, AUGLAIZE, BUTLER, CLINTON, GREENE, MIAMI, MONTGOMERY, PREBLE, WARREN & WYANDOT Rates Fringes Sheet metal worker...............$ 25.57 16.36 ---------------------------------------------------------------- SHEE0024-002 06/01/2008 BROWN, CLERMONT & HIGHLAND Rates Fringes Sheet metal worker...............$ 27.33 14.66 ---------------------------------------------------------------- SHEE0024-007 06/01/2008 ADAMS, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY, HOCKING, JACKSON, KNOX, LICKING, MADISON, MORGAN, MORROW, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE, ROSS, SCIOTO & VINTON Rates Fringes Sheet metal worker...............$ 25.05 17.57 ---------------------------------------------------------------- SHEE0033-004 06/01/2008 ASHLAND, COSHOCTON, CRAWFORD, HOLMES, RICHLAND, TUSCARAWAS & WAYNE Rates Fringes Sheet metal worker...............$ 27.14 15.48 ---------------------------------------------------------------- SHEE0033-006 06/01/2008 ERIE, HURON & SANDUSKY Rates Fringes Sheet metal worker...............$ 25.48 14.84 ---------------------------------------------------------------- SHEE0033-009 06/01/2008 WASHINGTON Rates Fringes Sheet metal worker...............$ 26.26 16.50 ---------------------------------------------------------------- SHEE0033-011 07/01/2008 BELMONT, HARRISON, JEFFERSON & MONROE Rates Fringes Sheet metal worker...............$ 25.85 15.13 ---------------------------------------------------------------- TEAM0020-001 05/01/2008 ERIE, HANCOCK (From the southern boundary of the city of Findlay to the northern boundary of Hancock County), HURON, OTTAWA, SANDUSKY, SENECA & WOOD COUNTIES Rates Fringes TRUCK DRIVER GROUP 1.....................$ 24.69 10.01 GROUP 2.....................$ 26.33 10.01 GROUP 1 - Pickup; Straight; Single Axle; Tandem Axle GROUP 2 - Heavy Duty; Five Axle or Over; Winch; Carry-Alls; Low Boy; Articulating Dump ---------------------------------------------------------------- TEAM0092-003 07/01/2008 COSHOCTON, FAIRFIELD, GUERNSEY, HARRISON, HOCKING, JEFFERSON (South to Short Creek), LICKING, MORGAN, MUSKINGUM, NOBLE & PERRY COUNTIES Rates Fringes Truck drivers: GROUP 1.....................$ 21.39 9.87 GROUP 2.....................$ 21.43 9.87 GROUP 3.....................$ 21.47 9.87 GROUP 4.....................$ 22.17 9.87 GROUP 5.....................$ 22.29 9.87 CLASSIFICATIONS GROUP 1 - End Dump; Dumpster; Turnarocker; Ross Carrier; Athry Wagon; Greaser; Tiremen; Articulated Dump GROUP 2 - Flatboy Material Tuck, Dump & and Semi-Dump Truck; Semi Trailer & Tractor Trailer GROUP 3 - Tank Trucks (straight & semi) GROUP 4 - Mechanic GROUP 5 - Lowboy Trailer; Winch Truck; A-Frame; Forktruck; Distributor Truck (front & back end) & Truck Crane ---------------------------------------------------------------- TEAM0175-001 06/01/2008 WASHINGTON Rates Fringes TRUCK DRIVER GROUP 1.....................$ 22.07 a GROUP 2.....................$ 22.17 a GROUP 3.....................$ 22.32 a GROUP 4.....................$ 22.47 a GROUP 5.....................$ 22.72 a GROUP 6.....................$ 22.82 a GROUP 7.....................$ 22.97 a FOOTNOTE: a. $1,924.31 per month TRUCK DRIVER CLASSIFICATIONS GROUP 1 - Pick-Up; Panel; John Deere Gators or Similar Equipment GROUP 2 - Flat Body Material (Straight Jobs); Dump (Up to 5 cu. yds.); Greaser; Tank (Straight) GROUP 3 - Dump (5 cu. yds. & over); Semi-Dump; Semi-Trailer (whether Flat, Rack or Pole and hauled or pushed by truck or tractor); Agitator or Mixed (Up to 5 cu. yds.); Tank (Semi); & Monorail GROUP 4 - Low Boy Trailer; Winch; Fork; Distributor (Front & Back End); Truck Crane; Agitator or Mixer (5 cu. yds. & over); Hydraulic Tail Gate; & Farm Type Tractor GROUP 5 - Euclid; Dumpster; Turnarocker; Ross Carrier; Athey Wagon or Similar Equipment; A-Frame; Hydrolift; & Dual Purpose GROUP 6 - Mechanic GROUP 7 - Master Mechanic (3 or more mechanics employed) ---------------------------------------------------------------- TEAM0697-001 07/01/2008 BELMONT, JEFFERSON (North to Short Creek) & MONROE Rates Fringes TRUCK DRIVER GROUP 1 - Pickup...........$ 21.84 11.87 GROUP 2 - Greaser..........$ 21.85 11.87 GROUP 3 - Flatbed Material; Dump & Semi-Dump..$ 21.89 11.87 GROUP 4 - Tank (straight & semi).....................$ 21.92 11.87 GROUP 5 - Semi-Tractor Trailer.....................$ 21.94 11.87 GROUP 6 - Pole-Trailer.....$ 22.04 11.87 GROUP 7 - Agitator & Mixer (Up to 5 cu. yds.)....$ 22.12 11.87 GROUP 8 - Euclid; Dumpster; Turnarocker; Ross Carrier; & Athey Wagon.$ 22.17 11.87 GROUP 9 - Agitator & Mixer (Over 5 cu. yds.).....$ 22.20 11.87 GROUP 10 - Lowboy Trailer; Winch; Fork & Distributor (Front & Back End); & Truck Crane.................$ 22.47 11.87 GROUP 11 - A-Frame..........$ 22.54 11.87 Group 12 - Mechanic.........$ 22.57 11.87 ---------------------------------------------------------------- TEAM0908-001 05/22/2008 ALLEN, AUGLAIZE & HANCOCK (From the southern boundary of the city of Findlay to the southern boundary of Hancock County) Rates Fringes TRUCK DRIVER Lowboy......................$ 21.66 5.51+a FOOTNOTE: a. $182.50 per week ---------------------------------------------------------------- TEAM9999-001 05/01/2005 ADAMS, ASHLAND, BROWN, BUTLER, CLERMONT, CLINTON, CRAWFORD, DELAWARE, FAYETTE, FRANKLIN, GREENE, HIGHLAND, HOLMES, JACKSON, KNOX, MADISON, MIAMI, MONTGOMERY, MORROW, PICKAWAY, PIKE, PREBLE, RICHLAND, ROSS, SCIOTO, TUSCARAWAS, VINTON, WARREN, WAYNE, & WYANDOT Rates Fringes TRUCK DRIVER GROUP 1.....................$ 20.59 8.57 GROUP 2.....................$ 21.01 8.57 TRUCK DRIVER CLASSIFICATIONS GROUP 1 - Asphalt Distributor; Batch; 4- Wheel Service; 4-Wheel Dump; Oil Distributor & Tandem GROUP 2 - Tractor-Trailer Combination; Fuel; Pole Trailer; Ready Mix; Semi-Tractor; & Asphalt Oil Spraybar Man When Operated From Cab; 5 Axles & Over; Belly Dump; End Dump; Articulated Dump; Heavy Duty Equipment; Low Boy; & Truck Mechanic ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION