General Decision Number: NY080031 03/13/2009 NY31 Superseded General Decision Number: NY20070031 State: New York Construction Types: Building, Heavy and Highway County: Genesee County in New York. BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 02/22/2008 3 02/29/2008 4 04/04/2008 5 05/23/2008 6 05/30/2008 7 06/27/2008 8 07/04/2008 9 07/18/2008 10 08/08/2008 11 09/19/2008 12 01/02/2009 13 03/06/2009 14 03/13/2009 ASBE0004-002 05/01/2008 TOWNSHIPS OF ALABAMA, ALEXANDER DARIEN, OAKFIELD AND PEMBROKE Rates Fringes HAZARDOUS MATERIAL HANDLER Duties limited to preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials whether they contain asbestos or not, from mechanical systems..........$ 18.72 9.95 Insulator/asbestos worker (Includes application of all insulating materials; protective covering and finishes to all types of mechanical systems. Also the application of firestooping material openings and penetrations in walls, floors ceilings, curtain walls and all lead abatement)..............$ 27.00 14.34 ---------------------------------------------------------------- ASBE0026-002 06/01/2008 TOWNSHIPS OF BATAVIA, BERGEN, BETHANY, BYRON, ELBA, LEROY, PAVILLION, AND STAFFORD including THE CITY OF BATAVIA Rates Fringes HAZARDOUS MATERIAL HANDLER Duties limited to preparation; wetting; stripping; removal; scrapping, vacuuming; bagging; and disposing of all insulation materials whether thety contain asbestos or not, from mechanical systems..........$ 18.72 9.95 Insulator/asbestos worker (Includes application of all insulating materials; protective covering and finishes to all types of mechanical systems. Also the application of firestooping material openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement)....$ 25.21 14.61 ---------------------------------------------------------------- BRNY0003-007 06/01/2008 ROCHESTER CHAPTER GENESEE COUNTY (Entire Township of BERGEN) Rates Fringes BRICKLAYER BUILDING CONSTRUCTION BRICKLAYERS, CEMENT MASON, STONE MASONS, PLASTERER, POINTER/CAULKER/CLEANER....$ 26.09 14.26 MARBLE, TILE & TERRAZZO FINISHERS..................$ 21.71 11.36 MARBLE, TILE & TERRAZZO WORKERS....................$ 27.09 14.37 CEMENT MASON/CONCRETE FINISHER HEAVY/HIGHWAY CONSTRUCTION CEMENT MASONS..............$ 26.29 14.59 ---------------------------------------------------------------- BRNY0045-005 06/01/2008 REMAINDER OF COUNTY Rates Fringes BRICKLAYER BRICKLAYERS, STONE MASON,...$ 28.65 15.80 CEMENT MASON, PLASTERER.....$ 26.09 14.26 MARBLE MASON................$ 28.40 15.55 POINTER, CAULKER, CLEANER...$ 28.65 15.80 TILE LAYER, TERRAZZO WORKER.$ 28.40 15.55 CEMENT MASON/CONCRETE FINISHER HEAVY/HIGHWAY CEMENT MASONS..............$ 26.29 14.59 ---------------------------------------------------------------- CARP0289-007 07/01/2008 Rates Fringes CARPENTER........................$ 27.52 20.55 MILLWRIGHT.......................$ 27.62 20.55 ---------------------------------------------------------------- ELEC0041-009 06/01/2008 ALABAMA, ALEXANDER, DARIEN, ELBA, OAKFIELD, PEMBROKE AND THAT PORTION OF BATAVIA AND ELBA WHICH ARE WEST OF LITTLE TONAWANDA CREEK, TONAWANDA CREEK, THE CITY OF BATAVIA (STATE AND HIGHWAY 98 NORTH OF THE CITY OF BATAVIA: Rates Fringes CABLE SPLICER....................$ 31.39 16.61 ELECTRICIAN......................$ 30.39 16.61 ---------------------------------------------------------------- ELEC0041-010 06/01/2005 TOWNSHIPS OF ALABAMA, ALEXANDER, DARIEN, ELBA, OAKFIELD, PEMBROKE and that protion of BATAVIA and ELBA which are west of LITTLE TONAWANDA CREEK, TONAWANDA CREEK, THE CITY OF BATAVIA (State and Highway 98 North of the City of BATAVIA) Rates Fringes Communications System CABLER......................$ 9.25 8.52+a INSTALLER...................$ 13.30 8.65+a MASTER TECHNICIAN...........$ 20.35 8.86+a SOUND WIREMAN...............$ 18.50 8.80+a Work covers low voltage construction, installation, maintenance, and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX fiber optic cable and equipment, railroad communications, micro waves, V-Sat, bypass, CATV, WAN (wide area networks); LAN (local area networks) and ISDN (integrated systems digital network). Also, installation of sound systems, nurses call systems, intercom systems, staff registry/locating/signaling systems, antenna systems and associated devices; installation of security systems and apparatus, and cabling from VDT's to computers. This work does not apply to new construction, or to the installation of raceway systems and boxes for the above work. FOOTNOTE: a. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the day after Thanksgiving Day, Christmas Day. ---------------------------------------------------------------- ELEC0086-005 05/26/2008 REMAINDER OF COUNTY Rates Fringes ELECTRICIAN......................$ 29.10 15.63 ---------------------------------------------------------------- ELEC1249-003 05/05/2008 Rates Fringes LINE CONSTRUCTION: Lineman (LIGHTING AND TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 21.83 12.00+6.5%+a Groundman Truck Driver (tractor trailer unit)......$ 30.92 12.00+6.5%+a Groundman Truck Driver......$ 29.10 12.00+6.5%+a Lineman & Technician........$ 36.38 12.00+6.5%+a Mechanic....................$ 29.10 12.00+6.5%+a FOOTNOTE: a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday. ---------------------------------------------------------------- ELEC1249-004 05/05/2008 Rates Fringes Line Construction: Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved): Cable Splicer..............$ 43.64 12.00+7%+a Flagman....................$ 23.80 12.00+7%+a Groundman digging machine operator...................$ 35.70 12.00+7%+a Groundman truck driver (tractor trailer unit).....$ 33.72 12.00+7%+a Groundman Truck driver.....$ 31.74 12.00+7%+a Lineman and Technician.....$ 39.67 12.00+7%+a Mechanic...................$ 31.74 12.00+7%+a Overhead transmission line work (where 40.09other trades are or have been involved): Cable Splicer..............$ 46.41 12.00+7%+a Overhead transmission line work (where other trades are or have been involved): Flagman....................$ 25.31 12.00+7%+a Groundman digging machine operator...................$ 37.97 12.00+7%+a Groundman truck driver (tractor trailer unit).....$ 35.86 12.00+7%+a Groundman truck driver.....$ 33.75 12.00+7%+a Lineman and Technician.....$ 42.19 12.00+7%+a Mechanic...................$ 33.75 12.00+7%+a Substation: Cable Splicer..............$ 43.64 12.00+7%+a Flagman....................$ 23.80 12.00+7%+a Ground man truck driver....$ 31.74 12.00+7%+a Groundman digging machine operator...................$ 35.70 12.00+7%+a Groundman truck driver (tractor trailer unit).....$ 33.72 12.00+7%+a Lineman & Technician.......$ 39.67 12.00+7%+a Mechanic...................$ 31.74 12.00+7%+a Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 45.08 12.00+7%+a Flagman....................$ 24.59 12.00+7%+a Groundman Digging Machine Operator...................$ 36.88 12.00+7%+a Groundman Truck Driver (tractor-trailer unit).....$ 34.83 12.00+7%+a Groundman Truck Driver.....$ 32.78 12.00+7%+a Lineman & Technician.......$ 38.87 11.75+7%+a Mechanic...................$ 32.78 12.00+7%+a TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT Cable splicer/Central Office Person..............$ 23.07 3.05+3% Groundman..................$ 11.61 3.05+3% Installer Repairman- Teledata Lineman/Tecnician- Equipment Operator.........$ 21.91 3.05+3% TREE TRIMMER................$ 18.92 4.05+3%+b FOOTNOTE: a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday. b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas Day. ---------------------------------------------------------------- ELEV0014-001 01/01/2009 Rates Fringes ELEVATOR MECHANIC................$ 39.50 18.285+a+b FOOTNOTE: a. 8 Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day. b. 6% Men under 5 years based on regular hourly rate for all hours worked 8% Men over 5 years based on regular houly rate for all hours worked ---------------------------------------------------------------- ENGI0017-005 07/01/2008 WESTERN PART OF GENESEE COUNTY Rates Fringes Power equipment operators: BUILDING, HEAVY AND HIGHWAY GROUP 1....................$ 30.26 20.71+a GROUP 2....................$ 25.76 20.71+a GROUP 3....................$ 31.01 20.71+a GROUP 4....................$ 31.26 20.71+a GROUP 5....................$ 31.76 20.71+a GROUP 6....................$ 31.33 20.71+a NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTE: a. PAID HOLIDAYS: A-New Year's Day; B-Memorial Day; C-Independence Day; D-Labor Day; Thanksgiving Day; F-Christmas Day, provided the employee has worked the day before and the day after the holiday. POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Air hoist, all boom type equipment (100 ft. or less), all pan and carry-alls, archer hoist, asphalt roller asphalt spreader or paver, automatic fine grade machine (CMI and similar type), archer hoist, backhoe and pull hoe (tractor mounted and rubber mounted), back filling machine, belt place (CMI and similar), bending machine (pipe), bituminous spreader and mixer, black top plant (automated), black top plant (non-automated), blast or rotary drill (truck or track mounted), blower for burning brush, boiler (when used for power), boom trucks, boring machine, bulldozer, cableway cage hoist, caisson auger, central mix plant (and all concrete batching plants), cherry picker (over 5 tons), cherry picker (under 5 tons), chipping machine and chip spreader, concrete curb and gutter machines, concrete curing machine, concrete mixer (over 1/2 cu. yd.) concrete pavement spreaders and finishers, concrete paver, concrete pump, concrete saw (self-propelled), conveyor, core drill, crane, crusher, derrick operator, dragline, dredge, drill rig (tractor mounted), dual drum paver, electric pump used in conjunction with well point systems, elevating grader self- propelled or towed), elevator excavator (all purpose, hydraulcally operated) farm tractor with accessories, fine grade machine, forklift, front end loader, generator (10 outlets or more), gradall, grader, grout or gunite machine, head tower, hoist-one drum, hoisting engine, hydraulic boom, hydraulic hammer, (self propelled), hydraulic pipe jack machine (or similar type machine), hydraulic system pumps, hydro crane, hydro hammer (or similar type), industrial tractor, jersey spreader, kolman plant loader (and similar type loaders), locomotive, lubrication truck, maintenance engineer, maintenance lubrication unit or truck, mine hoist, mixr for stabilized base (self-propelled), monorail, motorized hydraulic pin puller, motorized hydraulic seeder mucking machine, mulching machine, multiple drum hoist (more than 1 drum in use), overhead crane, peine crane (or similar type), pile driver, plant engineer, pneumatic mixer, post hole digger, power boom, pump crete, push or snatch cat, quarry master or equivalent road widener, rock bit sharpener (all types), roller (all), rolling machin (pipe), rotomill, scoopmobile, shovel, side boom, skimmer, slip form paver (CMI and similar type, first and second operator), snorkel, strato-tower, stump chipping machine, tire truck and repair, towed roller, tractor drawn belt type grader/loader, tractor shovel, tractor with towed accessories, tractors (when using winch power), tractors, trencher, truck crane, tunnel shovel, tube finisher (CMI and similar type), vibratory compactor, vibro tamp, well drilling machine, well point, winch, winch truck with "A" frame. GROUP 2: Aggregate bin, CMI and similar type concrete spreads, cement bin, chipping machine and chip spreader, compressors (4 or less), compressors: (any size, but subject to other provisions for compressors, dust collectors, generators, mechanical heaters, pumps, welding machines (four of any type or combination), concrete mixer (1/2 cu. yd. and under), fireman, form tamper, fuel truck, heating boiler (used for temporary heat), jeep trencher, power heaterman, power plant in excess of 10 K.W., pump (4" or over), revinius widener, stem cleaner, stump chipping machine, welding machine (1 machine over 300 amps or 2 or 3 machines regardless of amps). GROUP 3: Crane with boom over 100 feet GROUP 4: Crane with boom over 200 feet GROUP 5: Crane with boom over 300 feet GROUP 6: Master meachanic ---------------------------------------------------------------- ENGI0832-001 07/01/2008 Rates Fringes Power equipment operators: EXCAVATION AND PAVING: GROUP 1....................$ 24.44 16.95+a GROUP 2....................$ 24.01 16.95+a GROUP 3....................$ 20.31 16.95+a GROUP 4....................$ 19.21 16.95+a Master Mechanic............$ 25.04 16.95+a HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1....................$ 30.86 18.15+a GROUP 2....................$ 30.15 18.15+a GROUP 3....................$ 27.29 18.15+a GROUP 4....................$ 32.12 18.15+a GROUP 5....................$ 32.86 18.15+a TUNNEL and SHAFT: GROUP 1....................$ 33.23 18.25+b GROUP 2....................$ 32.01 18.25+b GROUP 3....................$ 29.22 18.25+a GROUP 4....................$ 26.21 18.15+b Master Mechanic & Chief Tunnel Engineer............$ 35.36 18.25+b For EXCAVATION AND PAVING: FOOTNOTE: a. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Christmas Day, regardless of the day of the week on which the holiday may fall, provided the employee works either on the work day immediately preceding the holiday or on the scheduled work day immediately following the holiday. EXCAVATION AND PAVING CLASSIFICATIONS GROUP 1: Asphalt paver; automatic fine grader; backhoe (except tractor mounted, rubber tired); blacktop plant (automated); cableway; caisson auger; central mix concrete plant (automated); cherry picker- over 5 ton capacity; crane; cranes and derricks (steel erection); dragline; dual drum paver; front end loader (4 cu. yd. and over); hoist,(Tow or 3 drum); pile driver; power grader with elevation loader attachment; quarry master (or equivalent); shovel; slip form paver; tractor drawn belt-type loader; truck crane tunnel shovel; excavator, all purpose hydraulically operated GROUP 2: Backhoe (tractor mounted, rubber tired); bituminous spreader and mixer; blacktop plant (non automated); boring machine; cage hoist; central mix plant (non automated) and all concrete batching plants; cherry picker, 5 tons and under; compressor (4 or less) exceeding 2000 CFM combined capacity; concrete paver over 16s; concrete pump; crusher; drill rigs (tractor mounted); front end loader (under 4 cu. yds); hi- pressure boiler (15 lbs and over); hoist (one drum); Kolman plant loader and similar type loaders; maintenance engineer; maintenance grease man; mechanical slurry machine; mixer for stabilized base self propelled; monorail machine; plant engineer; power broom; power grader; pump crete; ready mix concrete plant; road widener; roller (all above sub-grade); side boom; tractor scraper; tractor with dozer and or pusher; trencher; winch GROUP 3: Compressors (4 not to exceed 2000 CFM combined capacity; or 3 or less with more than 1200 CFM but not to exceed 2000 CFM); compressors (any size but subject to other provisions for compressors); dust collectors; generators; welding machines (4 of any type or combination); concrete pavement spreaders and finishers; conveyor; drill (core); drill (well); electric pump used in conjunction with well point systems; farm tractor with accessories; fine grade machine; fork lift; gunite machine; hammers-hydraulic-self propelled; locomotive; post hole digger and post driver; pumps (regardless of motive power, not more than 4 in number not to exceed 20" in total capacity); submersible electric pumps when used in lieu of well points, tractor with towed accessories; vibratory compactor; vibro tamp; well point GROUP 4: Compressor (any size, but subject to other provisions for compressors); dust collectors; generators; welding machines (3 or less of any type or combination); concrete mixer (16s and under), concrete saw-self propelled; fireman; form tamper; mulching machine; power heaterman; pumps regardless of motive power no more than 3 in number not to exceed 12" in total capacity; revinius widener; steam cleaner; tractor GROUP 5: Master Mechanic For HEAVY AND HIGHWAY CONSTRUCTION: FOOTNOTE: b. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day provided the employee works the working day before and the working day after the holiday POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Asphalt paver; automated concrete spreader (CMI type); automatic fine grader; backhoe (except tractor mounted, rubber tired); belt placer (CMI type); blacktop plant (automated); cableway; caisson auger; central mix concrete plant (automated), cherry picker (over 5 tons capacity); concrete curb machine (self-propelled-slipform); concrete pump (8" or over); crane; cranes and derricks (steel erection); dragline; dredge; dual drum paver; excavator (all purpose-hydraulically operated gradall or similar); fork lift (factory rated 15 ft and over); front end loader (4 cy and over); head tower (sauerman or equal); hoist (two or three drum); holland loader; hydro-blaster; maintenance engineer; mine hoist; mucking machine or mole; overhead crane (gentry or straddle type); pavement profiler (over 105 horsepower); pole driver; power grader; Quad 9; quarry master (or equivalent); scraper; shovel; side boom; slip form paver; tractor drawn belt-type loader; truck crane; truck or trailer mounted log chipper (self feeder); tug operator (manned rented equipment excluded); tunnel shovel GROUP 2: Backhoe (tractor mounted, rubber tired); bituminous spreader and mixer; blacktop plant (non automated); blast or rotary drill (truck or tractor mounted); boring machine; cage hoist; central mix plant (non automated and all concrete batching plants); cherry picker (5 tons capacity and under); compressors (4 or less) exceeding 2,000 CFM combined capacity; concrete paver (over 16s); concrete pump (under 8"); core drill; crusher; diesel power unit; drill rigs, tractor mounted; fork lift (factory rated under 15 ft); front end loader (under 4 cu yd); hi pressure boiler (15 lbs and over); hoist (one drum); hydro-axe; hydroblaster; kolman plant loader and similar type loaders; LCM work boat operator; locomotive; log skidder; lubrication engineer/greaseman; mixer (for stabilized base self-propelled); monorail machine; pavement breaker (self-propelled) wertgen; PB-4 and similar type; pavement profiler 105 horsepower and under; plant engineer; pump crete; ready mix concrete plant; refrigeration equipment (for soil stabilization); road widener; roller (all above sub-grade); sea mule; tractor with dozer and/or pusher; trencher; tugger hoist; vermeer type saw; welder; winch; winch cat GROUP 3: "A" frame truck; aggregate plant; ballast regulator (ride-on); boiler (used in conjunction with production); cement and bin operator; compressors (4 not to exceed 2,000 CFM combined capacity; or 3 or less with more than 1,200 CFM but not to exceed 2,000 cfm); compressors (any size but subject to other provisions for compressors); dust collectors; generators; pumps; welding machines; light plants (4 of any type or combination); concrete pavement spreader and finisher; concrete paver or mixer (16s and under); concrete saw (self-propelled); conveyor; electric pump used in conjunction with well-point system; farm tractor with accessories; fine grade machine; fireman; form tamper; grout pump; gunite machine; hammers (hydraulic self-propelled); hydra-spiker (ride on); hydraulic pump (jacking system); hydroblaster (low pressure cleaning); light plants; mulching machine; oiler; parapet concrete or pavement grinder; post hole digger and post driver; power broom (towed); power heaterman; power sweeper; revinius widener; roller (grade and fill); scarifier (ride on); shell winder; span-saw (ride on); steam cleaner; submersible electric pump (when used in lieu of well-point system); tamper (ride on); tie extractor (ride-on); tie handler (ride-on); tie inserter (ride-on); tie spacer (ride on); track liner (ride on); tractor (with or without towed accessories); vibratory compactor; vibrotamp; well drill; well point GROUP 4: Master mechanic GROUP 5: Crane, friction or lattice type with boom length 200 feet and over For TUNNEL AND SHAFT: FOOTNOTE: b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, regardless of the day of the week on which the Holiday may fall, provided the employee works the working day before and the working day after the holiday TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Automated concrete spreader (CMI or equivalent); automated fine grade machine (cmi); backhoe; belt placer (cmi or similar); blacktop spreader (automated); cableway; caisson auger; central mix plant (automated); cherry picker (5 tons); concrete curb machine (self-propelled slipform); concrete pump; crane; crane shaft; crane underground; cranes and derricks (steel erection); dragline; dredge; dual drum paver; excavator (all purpose-hydraulicly operated gradall or similar); fork lift (factory rated 15' and over); front end loader (4cu yd and over); head tower (sauerman or equal); hoist; shaft; hoist (two or three drum); holland loader; maintenance engineer (shaft and tunnel); mine hoist; mining machine (mole and similar types); mucking machine or mose; overhead crane (gantry or straddle type); pile driver; power grader; Quad 9, quarry master (or equivalent); scraper; shovel; side boom; slip form paver; tripper/maintenance engineer (shaft and tunnel); tractor drawn belt-type loader; truck crane; truck or trailer mounted log chipper (self feeder); tug operator (manned rented equipment excluded); tunnel shovel GROUP 2: Automated central mix concrete plant; backhoe (topside); backhoe (tractor mounted,rubber tired); bituminous spreader and mixer; blacktop plant (non automated); blast or rotary drill (truck or tractor mounted); boring machine; cage hoist; central mix plant (non automated) and all concrete batching plants; cherry picker (5 tons capacity and under); compressors (4 or less exceeding 2000 CFM combined capacity); concrete paver (over 16s); concrete pump; crane (topside); crusher; diesel power unit; drill rigs, tractor mounted; front end loader (under 4 cu. yds); grayco epoxy machine; hi-pressure boiler (15 lbs and over); hoist (one drum); hoist (two or three drum) (topside); kolman plant loader and similar type loaders; L.C.M. work boat operator; locomotive; maintenance engineer (topside); maintenance greaseman; mixer (for stabilized base self-propelled); monorial machine; plant engineer; personnel hoist; pump crete; ready mix concrete plant; refrigeration equipment (from soil stabilization); road widener; roller (all above sub-grade); sea mule; shotcrete machine; shovel (topside); tractor with dozer and/or pusher; trencher; tugger hoist; tunnel locomotive; welder; winch; winch cat GROUP 3: "A" frame truck; ballast regulator (ride on); compressors (4 not to exceed 2000 cfm combined capacity; or 3 or less with more than 1200 cfm but not to exceed 2000 cfm); compressors (any size but subject to other provisions for compressors; dust collectors; generators; pumps; welding machines; light plants (4 of any type or combination); concrete pavement spreaders and finishers; conveyor; drill (core); drill (well); electric pump used in conjunction with well point system; farm tractor with accessories; fine grade machine; fork lift (under 15 ft); ground pump over 5 cu. ft (manufacturers rating); gunite machine; hammers (hydraulic self propelled); hydra-spiker (ride on); hydra blaster (water); hydra blaster; motorized form carrier; post hole digger and post driver; power sweeper; roller (grade and fill); scarifer (ride on); span saw (ride on); submersible electric pump (when used in lieu of well points); tamper (ride on); tie extractor (ride on); tie handler (ride on); tie inserter (rider on); tie spacer (ride on); track liner (ride on); tractor with towed accessories; vibratory compactor; vibro tamp; well point aggregate plant; boiler (used in conjunction with production); cement and bin operator; compressors (3 or less not to exceed 1200 cfm combined capacity); compressors (any size; but subject to other provisions for compressors); dust collectors; generators; pumps; welding machines; light plants (3 or less of any type or combination); concrete paver or mixer (16s and under); concrete saw (self propelled); fireman; form tamper; greaseman; hydraulic pump (jacking system); junior engineer; light plants; mulching machine; oiler; parapet concrete or pavement grinder; power broom (towed); power heaterman (when used for production); revinius widener; shell winder; steam cleaner; tractor GROUP 4: Crane, friction or lattice type with boom length 200 feet and over ---------------------------------------------------------------- ENGI0832-002 07/01/2008 THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA Rates Fringes Power equipment operators: GROUP 1.....................$ 27.17 17.60+a GROUP 2.....................$ 26.45 17.60+a GROUP 3.....................$ 24.06 17.60+a GROUP 4.....................$ 28.41 17.60+a GROUP 5.....................$ 27.17 17.60+a a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the working day before and the working day after the holiday POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Asphalt paver, Automated concrete spreader (CMI type), Automatic fine grader, backhoe (except tractor mounted, rubber tired), belt placer (CMI type), blacktop plant (automated), cableway, caisson auger, central mix concrete plant (automated), cherry picker (over 5 tons capacity), concrete curb machine (self-propelled-slipform), concrete pump (8" or over) crane, cranes and derricks (steel erection), dragline, dredge, dual drum paver, excavator (all purpose-hydraulically operated gradall or similar, fork lift (factory rate 15 ft and over) front end loader (4 cy and over), head tower (sauerman or equal), hoist (two or three drum), holland loader, hydro-blaster, maintenance engineer mine hoist, mucking machine or mole, overhead crane (gentry or straddle type); pavement profiler (over 105 horsepower), pole driver, power grader, Quad 9, quarry master (or equivalent), scraper, shovel, side boom, slip from paver, tractor drawn belt-type loader; truck crane, truck or trailer mounted log chipper (self feeder), tug operator (manned rented equipment excluded); tunnel shovel GROUP 2: Backhoe (tractor mounted, rubber tired) bituminous spreader and mixer, blacktop plant (non automated), blast or rotary drill (truck or tractor mounted) boring machine, cage hoist, central mix plant (non automated and all concrete compressors (4 or less) exceeding 2,000 CFM combined capacity, concrete paver (over 16s), concrete pump (under 8"), core drill, crusher, disel power unity, drill rigs, tractor mounted, fork lift (factory rated under 15 ft), front end loader (under 4 cu yd), hi-pressure boiler (15 lbs and over), hoist (one drum), hydro-axe, hydroblaster, kolman plant loader and similar type loaders, LCM work boat operator, locomotive, log skidder, lubrication engineer/greaseman, mixer (for stablized base self-propelled) wertgen; PB-4 and similar type, pavement profiler 105 horsepower and under, plant engineer, pump crete, ready mix concrete plant, refrigeration equipment (for soil stablilization), road widener, roller (all above sub-grade), sea mule, tractor with dozer and /or pusher, trancher, tugger hoist, vermeer type saw, welder, winch, winch cat. GROUP 3: "A" frame truck, aggregate plant, ballast regulator (ride-on), boiler (used in conjunction with production), cement and bin operator, compressors (4 not to exceed 2,000 CFM combined capacity, or 3 or less with more than 1,200 CFM but not to exceed 2,000 CFM), compressors (any size but subjecto to other provisions for compressors), dust collectors, generators, pumps, welding machines, light plants (4 of any type or combination), concrete pavement spreader and finisher, concrete paver or mixer (16s and under), concrete saw (self-propelled), conveyor, electric pump used in conjunction with well-point system, farm tractor with accessories, fine grade machine, fireman, form tamper, grout pump, gunite machine, hammers (hydraulic self-propelled), hydra-spiker (ride on), hydraulic pump (jacking system), hydroblaster (low pressure cleaning), light plants, mulching machine, oiler, parapet concrete or pavement grinder, post hole digger and post driver, power broom (towed), powerheaterman, power sweeper, revinius widener, roller (grade and fill), scarifier (ride on), shell winder, span-saw (ride on), steam cleaner, submersible electric pump (when used in lieu of well-point system), tamper (ride on), tie extractor (ride-on), tie handler (ride-on), tie inserter (ride-on), tie spacer (ride-on), track liner (ride on), tractor (with or without towed accessories),vibratory compactor, vibrotamp well drill, well point. GROUP 4: Master mechanic GROUP 5: Crane, friction or lattice type with boom length 200 feet and over ---------------------------------------------------------------- IRON0006-005 05/01/2008 TOWNSHIPS OF ALABAMA, ALEXANDER, DARIEN, AND PEMBROKE Rates Fringes Ironworkers: (Structural, Oranmental, Reinforcing, Welders, Riggers and Rodmen).........$ 26.13 18.73 Fence Erector...............$ 24.73 17.23 Layout Man..................$ 26.63 18.73 Window Erector..............$ 23.76 18.73 ---------------------------------------------------------------- IRON0009-001 05/01/2008 REMAINDER OF COUNTY Rates Fringes Ironworkers: IRONWORKER..................$ 28.07 16.88 Sheeters SHEETER.....................$ 30.88 16.88 ---------------------------------------------------------------- IRON0033-004 05/01/2008 GENESSEE COUNTY (TWPS OF BATAVIA, BERGEN, BETHANY, BYRON, ELBA, LEROY, OAKFIELD, PAVILLION, AND STAFFORD) Rates Fringes Ironworkers: Ornamental, Reinforcing Stone Derrickman, Rigger, Rodman, Structural Machinery Movers Fence Erectors, Precast Concrete Erector.....................$ 24.55 16.54 Sheeter.....................$ 24.80 16.54 ---------------------------------------------------------------- * LABO0435-004 05/01/2008 Rates Fringes Laborers: BUILDING: Blaster....................$ 23.68 10.63 Chuck tender...............$ 22.55 10.03 Concrete vibrators.........$ 22.79 10.03 Drillers and asphalt raker.$ 22.75 10.03 Hazardous waste removal....$ 23.35 10.03 Jack hammer, mortar mixers.$ 22.65 10.03 Pipe layers, burners and cutters....................$ 22.65 10.03 Powder Monkey..............$ 23.22 10.03 Unskilled Laborer..........$ 22.35 10.03 Yardman, clean-up..........$ 19.50 10.03 HEAVY/HIGHWAY GROUP 1....................$ 24.37 12.00 GROUP 2....................$ 25.07 12.00 GROUP 3....................$ 25.07 12.00 GROUP 4....................$ 26.07 12.00 GROUP 5....................$ 26.57 12.00 HEAVY AND HIGHWAY LABORER CLASSIFICATIONS GROUP 1: Flaggers; GROUP 2: Laborers GROUP 3: Rakers, drillers, pipelayers, and torch operators GROUP 4: Blasters GROUP 5: Hazardous waste removal ---------------------------------------------------------------- PAIN0004-003 05/01/2007 Rates Fringes Painters: BRUSH & ROLLER..............$ 23.89 15.30 DRYWALL/TAPING..............$ 24.64 15.30 HEAVY & HIGHWAY CONSTRUCTION................$ 31.00 16.10 WALLCOVERING................$ 24.14 15.30 ---------------------------------------------------------------- PAIN0004-013 05/01/2008 Rates Fringes GLAZIER..........................$ 23.04 13.18 ---------------------------------------------------------------- PLUM0013-002 05/01/2008 BERGEN, BETHANY, BYRON, LEROY, PAVILLION AND STAFFORD TOWNSHIPS Rates Fringes Plumber and Steamfitter..........$ 30.34 15.65 ---------------------------------------------------------------- PLUM0022-002 05/01/2008 GENESEE-Townships of Alabama, Oakfield, Elba, Pembroke, Batavia, Darien, Alexander Rates Fringes Plumbers and Pipefitters (ZONE 1).........................$ 29.01 15.57 Steamfitter (ZONE 1).............$ 29.01 15.57 ---------------------------------------------------------------- ROOF0074-002 06/01/2006 Rates Fringes Roofers: Composition.................$ 24.00 11.91 Slate & Tile................$ 24.15 11.91 ---------------------------------------------------------------- SFNY0669-001 04/01/2008 Rates Fringes SPRINKLER FITTER.................$ 29.90 16.30 ---------------------------------------------------------------- SHEE0071-002 05/13/2007 Rates Fringes Sheet metal worker...............$ 29.25 13.50 ---------------------------------------------------------------- TEAM0398-001 07/01/1999 Rates Fringes Truck drivers: GROUP 1.....................$ 18.45 9.25+a GROUP 2.....................$ 18.50 9.25+a GROUP 3.....................$ 18.55 9.25+a GROUP 4.....................$ 18.70 9.25+a GROUP 5.....................$ 18.85 9.25+a Hazardous Waste Site Work Receives an additional $1.50 per hr. FOOTNOTE: a. Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Christmas Day provided the employee has worked the working day before and after the holiday. TRUCK DRIVERS CLASSIFICATIONS GROUP 1: Pickups, panel trucks, flatboy material trucks (straight jobs), single axle dump trucks, dumpsters, receivers, greaser, truck tireman. GROUP 2: Tandems, batch trucks, mechanics. GROUP 3: Semi-trailers, low-boy trucks, asphalt distributors trucks, agitator, mixer trucks and dumpcrete type vehicles, truck mechanic, fuel truck. GROUP 4: Specialized earth moving equipment - Euclid type or similar off-highway equipment, where not self-loader, straddle (ross) carrier, self contained concrete unit. GROUP 5: Off-highway tandem back-dump, twin engine equipment and double hitched equipment where not self-loaded. ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION