CEBAF
New procedure for
Manipulating Photogun High voltage Leads
·
SOP
High Voltage Conditioning CEBAF Photoguns
Injector Test Stand - Test Lab Bldg. 58, Rm. 127-129
·
LSOP
A-05-006-LSOP (9/7/05)
·
Fiber
Laser Addendum A-05-006-LSOP (9/5/05)
·
SOP
- Hardcopy only, posted in ITS Control Room, Rm. 129
·
LSOP
- Deactivated
·
SOP
A-03-007-SOP (7/29/06)
·
LSOP
A-06-009 (12/18/06), includes
signed cover sheet and signed LSS checklist
·
Laser Interlock Operating Procedures
Source Laboratory - EEL Bldg. 98, Rm. 118
Vacuum and Bake Documents – various locations
Laser Safety Documents
|