SURFACE TRANSPORTATION BOARD DECISION DOCUMENT | |||
Decision Information | |||
Docket Number:   | AB_871_0_X | ||
Case Title:   | STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION--ABANDONMENT EXEMPTION--IN BELKNAP COUNTY, NH | ||
Decision Type:   | Decision | ||
Deciding Body:   | Director Of Proceedings | ||
Decision Summary | |||
Decision Notes:   | REOPENED THIS PROCEEDING; IMPOSED A CONDITION FOR THE ABANDONMENT EXEMPTION. | ||
Decision Attachments | |||
9 KB | |||
Approximate download time at 28.8 kb: 22 Seconds | |||
Note: If you do not have Acrobat Reader, or if you have problems reading our files with your current version of Acrobat Reader, the latest version of Acrobat Reader is available free at www.adobe.com. | |||
Full Text of Decision | |||
37402 SERVICE DATE – LATE RELEASE OCTOBER 24, 2006 DO SURFACE TRANSPORTATION BOARD DECISION STB Docket No. AB-871X STATE OF NEW HAMPSHIRE
DEPARTMENT OF TRANSPORTATION—ABANDONMENT EXEMPTION—IN Decided: October 24, 2006 The State of New Hampshire, Department of Transportation, Bureau of Rail and Transit (NHDOT), filed an amended notice of exemption[1] under 49 CFR 1152 Subpart F—Exempt Abandonments to abandon a portion of rail line known as the Lakeport Spur, in Belknap County, NH, extending from engineering station 1 + 70 to engineering station 11 + 28.11 (on Valuation Section V.21, Map 65-A). Notice of the exemption was served and published in the Federal Register on September 25, 2006 (71 FR 55826-27). The exemption is scheduled to become effective on October 25, 2006. SEA served an environmental assessment (EA) in this proceeding on September 29, 2006. In the EA, SEA states that the New Hampshire Department of Environmental Services (NHDES) has identified 12 hazardous materials remediation sites near the area of the proposed abandonment. Therefore, SEA recommends that a condition be imposed requiring NHDOT to consult with NHDES before beginning any salvage activities regarding the remediation sites and comply with NHDES’s recommendations during salvage activities. Comments to the EA were due by October 16, 2006. No comments to the EA were received by the due date. Accordingly, the condition recommended by SEA in the EA will be imposed. Based on SEA’s recommendation, the proposed abandonment, if implemented as conditioned, will not significantly affect either the quality of the human environment or the conservation of energy resources. It is ordered: 1. This proceeding is reopened. 2. Upon reconsideration, the exemption for abandonment of the line described above is subject to the condition that NHDOT consult with NHDES regarding the remediation sites before beginning any salvage activities and comply with NHDES’s recommendations during salvage activities. 3. This decision is effective on its service date. By the Board, David M. Konschnik, Director, Office of Proceedings. Secretary [1] NHDOT
originally filed its notice of exemption on |