TIDE Operations History - 2003

068/2003 03/09/03 16:00 - HV shutdown for semi-annual Polar flip.
076/2003 03/17/03 21:35 - HV ramp.
215/2003 08/03/03 21:07 - HV shutdown due to high counts in the radiation belt.
217/2003 08/05/03 20:20 - HV ramp.
227/2003 08/15/03 Radiation Belt L-Shell Cutoffs set to 4 (np-eq), 5 (eq-sp), 6 (sp-eq), 7 (eq-np).
243/2003 08/31/03 14:45 - HV shutdown for semi-annual Polar flip.
250/2003 09/07/03 15:11 - HV ramp.
251/2003 09/08/03 Radiation Belt L-Shell Cutoffs set to 4 (np-eq), 5 (eq-sp), 6.5 (sp-eq), 7 (eq-np).
252/2003 09/09/03 Begin use of new energy sweeps during fall eclipses. Eclipse season ended 09/19/03.
309/2003 11/05/03 22:00 - Instrument reset.
310/2003 11/06/03 16:40-19:07 Load software patches and ramp HV.
314/2003 11/10/03 18:26 - Polar GGS Telemetry Module (GTM) upset. GTM reset 11/11/03 at 17:50.
315/2003 11/11/03 18:25 - HV shutdown and instrument reset because TIDE did not come back correctly after GTM reset.
316/2003 11/12/03 21:55-23:10 Load software patches and ramp HV.
321/2003 11/17/03 15:13 - Polar GGS Telemetry Module (GTM) upset. GTM reset at 15:29. TIDE HV was off after reset. TIDE error flags cleared at 16:41.
322/2003 11/18/03 20:31-21:55 TIDE reset, software patches loaded, and HV ramped.
328/2003 11/24/03 16:38 - Polar GGS Telemetry Module (GTM) upset. GTM reset at 19:16. TIDE was fully operational after the reset.
340/2003 12/06/03 21:44 - Polar GGS Telemetry Module (GTM) upset. GTM reset on 12/07/03 at 00:59. TIDE did not come back so high voltage was turned off.
342/2003 12/08/03 TIDE reset after GTM upset at 17:12, software patches loaded at 22:10-22:30, and HV ramped 12/09/03 at 16:14-16:53.
351/2003 12/17/03 TIDE entered the High Angular Resolution (HAR) mode at 17:15 UT. There were also IMP ROM, MLUT, and energy sweep error flags set. The error flags were cleared at 19:08 UT.
352/2003 12/18/03 09:37 - Polar GGS Telemetry Module (GTM) upset. GTM reset at 17:44. TIDE did not come back after the GTM reset so high voltage was turned off and TIDE reset at 18:22. Software patches loaded and HV ramped 12/19/03 at 14:54-15:46.