CERN ISR Test For the MUON Alignment System


Test was performed in 3 periods: June, July/Aug, and Sept. 2000.  We are currently analysing data.

General Documents Relating to ISR Tests:
Link to:  a (cartoon) drawing of sensor/laser locations
 

Link to:  EMU Alignment ISR Photo Gallery

Link to:  "RUN PLAN" proposal by Dick Loveless (May 08, 2000)


Documents Relating to ISR Test Hardware:

Link to:  "summary of filters for the sensors"

Link to:  Photogrametry, CMM, and Analog Sensor Calibration


Documents Relating to ISR Test Software:

Link to:  SLM & ISR test DAQ Home Page
Link to:  ISR test DAQ Program Documentation


Documents Relating to ISR Test Data:

Link to: Discription of the Raw Data Format

Link to: Run Sumary_june (headers)    Run Sumary2_June (extract from the logbook)
Link to: Run Sumary_july(headers)    Run Sumary2_July (extract from the logbook)

Location of RAW Data from the ISR Test in June 2000  is:
cmsun1: /usr/cmsun1/r5data09/maeshima/alignment/isr_data_june2000
Location of RAW Data from the ISR Test in July-Aug 2000  is:
cmsun1: /usr/cmsun1/r5data09/maeshima/alignment/isr_data_july2000
Location of RAW Data from the ISR Test in Sept 2000  is:
cmsun1: /usr/cmsun1/r5data09/maeshima/alignment/isr_data_sept2000

Outputs from FLAP (First Level Analysis Program) of these data can be found
in a subdirectry called "centroids" under each of above locations.

Some sample output from FLAP from the Sept. runs:  r485_001, r500_001, r510_001

Signal/Background of es9 (L302 and L303)  profiles: (.htm)


Documents Relating to COCOA Reconstruction:

Link to: Cocoa Derived ISR Sensor Positions

Link to: EMU ISR Survey Page  (contains CMM and MAB definitions, some Netscape problems !)

Link to:  Photogrametry, CMM, and Analog Sensor Calibration
 
 

Back to: EMU Alignment Home Page
Last update date:  Feb. 27th , 2001
by Kaori Maeshima   maeshima@fnal.gov