Alternatives to High-VOC Chrome Coatings Identification of Suitable Alternatives to Hexavalent Chrome in Conversion Coating Alodine 1200 on Aluminum 2024, 7075,
and 6061 C3P Project
POC: Matt Rothgeb, NASA TEERM Principal Center (321-867-8476)
matthew.j.rothgeb@nasa.gov
Background
A common coating system for aerospace applications on aluminum substrates consists of a chromated conversion
coating, a primer (typically chromated) and a topcoat. Chromate conversion
coatings and primers offer excellent corrosion protection and adhesion
characteristics. However, hexavalent chromium is a known carcinogen and is
being regulated heavily in both the United States and the European Union. The
identification of replacements for chromium containing coatings that offer
similar corrosion protection is very important to the aerospace industry as a
whole. Also, paints that contain high levels of volatile organic compounds
(VOCs) are being regulated and are hazardous to the environment and to human
health.
Through its European partnerships, notably the Portuguese Center for Pollution
Prevention (C3P), TEERM and two Portuguese entities—TAP Portugal (the Portuguese
national airline) and OGMA Indústria Aeronáutica de Portugal—targeted hexavalent
chromium and VOCs as hazardous materials for possible elimination or reduction.
Objective
The objective of this project is to meet the challenges of the United States,
European Union (EU) and Portuguese Directives to reduce and eliminate VOC
emissions as well as reduce or eliminate the presence of hexavalent chromium in
aircraft painting processes at TAP Portugal and OGMA. This is to be
accomplished by testing and implementing alternative coating systems that have
the desired performance characteristics and meet or exceed EU and Portuguese
environmental objectives.
In November 2004, two coating systems that consisted of non-chromate
pretreatments and low-VOC coatings were applied to the exterior of and Airbus
A319 aircraft door for flight testing. Simultaneously, test panels were also
prepared for a series of laboratory testing.
Period of Performance
Stakeholders
NASA (Kennedy Space Center, Marshall Space Flight Center), Portuguese Center for Pollution Prevention,
OGMA (Aeronautic Industry of Portugal), TAP (Air Portugal), and Instituto de Soldadura e Qualidade
(Institute of Welding and Quality) [ISQ]
Benefits
- Decreased risk of worker exposure to hexavalent chromium and hazardous volatile organics.
- Decreased risk of worker exposure to hexavalent chromium and hazardous volatile organics.
- Prevent environmental releases of toxic and ozone depleting materials.
Document Status
- Joint Test Protocol – Complete
- Potential Alternatives Report – Complete
Recent Progress
- The follow-up reports of the aircraft door show that both painting systems
to date are in perfect conditions:
- No peeling-off;
- No defects were observed;
- Present high gloss and Distinctness of Image. To date there is no significant difference between the
two paint schemes. The performance in the field remains encouraging, and the
team shall continue to conduct periodic field inspections on the door.
- The following laboratory testing has been initiated.
- Completed Gloss - ISO 2813 – NASA
- Completed Initial Color - ISO 7724 - NASA
- Completed Adhesion (Cross Hatch) - ISO 2409 – ISQ
- Completed Impact (Reverse) - ISO 6272 – ISQ
- Completed Flexibility (Conical Mandrel) - ISO 6860 - ISQ
- Completed Flexibility (Cylindrical Mandrel) – ISO 1519 - NASA
- Competed Blistering - ISO 4628 – ISQ
- Completed Grade - ISO 2409 – ISQ
- Completed Penetration - ISO 1518 – ISQ
- Completed Fluid Resistance - ISO 1518 – ISQ
- Completed (1000 hours) Corrosion Resistance (Filiform) - EN 3665
- Completed (300 hours) Corrosion Resistance (Salt Spray) - ISO 7253 – ISQ
- Completed Artificial Weathering - ISO 2813 - ISO 7724 – NASA
- Completed Washability (Cleaning Efficiency) - ISO 2813 - ISQ
- Completed Strippability - AMS 3095 - ISQ
- Repeat all tests Restoration - AMS 3095 – ISQ
- Completed Heat Stability- ISO 1519 - ISO 3270- NASA.
Milestones
- Identified potential alternatives – September, 2004
- Developed Joint Test Plan and assigned testing to each stakeholder – October 2004 – February 2005
- Applied test coatings to access door on TAP aircraft for flight testing – November, 2004
- NASA completed its assigned testing from the JTP – February, 2007
- ISQ completed its assigned testing from the JTP – June, 2007
- Third evaluation of TAP Airbus A319 door after 2 years 8 months in service – June 27, 2007
- Draft Joint Test Report Completed - July 2007
Near-Term Goals
- Final Joint Test Report - (Data to be included with Non-Chrome Systems Project Final Report)
+
Reports
Printer Friendly Version
Link to
C3P web site for more information |