March 2001

1  March          Nutation damping operations.

                  Maximum nutation 0.25 deg. half-cone.

2  March          Nutation damping operations.

                  Maximum nutation 0.19 deg. half-cone.

3  March          Nutation damping operations.

 062.18:38-19:07  29m 2048bps realtime data lost due to a time code translator problem at DSS-40.
                  DR G06793 refers. 

                  Maximum nutation 0.19 deg. half-cone.

4  March          Nutation damping operations.

                  Maximum nutation level occurred during Kourou pass where measurement of
                  the nutation angle using ARGOS is not possible.

 5 March          KEP IFC - 064.20:51 SCET.

 064.20:11-20:18  7m 2048bps realtime data lost due uplink resweep at DSS-34 after failed uplink 
                  transfer from Kourou.  DR A05177 refers. 

                  Maximum nutation 0.32 deg. half-cone.

6  March          Nutation damping operations.

                  Maximum nutation 0.26 deg. half-cone.

7  March          Nutation damping operations.

                  Maximum nutation 0.20 deg. half-cone.

8  March          GRU Routine Noise Test - 067.00:00 SCET.
                  BAM-E calibration - 067.19:43 SCET.
                  BAM-I calibration - 067.19:49 SCET.

 067.09:27-09:44  17m 512bps realtime data lost due to LMC problem at SPC40.  DR A05184 refers.

                  Maximum nutation 0.21 deg. half-cone.

9  March          Nutation damping operations.

 068.17:59-18:14  15m 2048 bps realtime data lost due to delay in re-acquiring after bit rate
                  change.

                  Maximum nutation 0.22 deg. half-cone.

10 March          KEP GAS CR#603: Star (5056), UV-mode - 069.04:00 SCET.

                  Maximum nutation 0.21 deg. half-cone.
                  
11 March          Nutation damping operations.

                  Maximum nutation 0.21 deg. half-cone.

12 March          KEP IFC - 071.19:11 SCET.

                  Maximum nutation 0.25 deg. half-cone.

13 March          KEP GAS CR#604: NG, NG-mode - 072.12:00 SCET.

                  Maximum nutation 0.23 deg. half-cone.

14 March          HED Calibration - 073.20:00 SCET.

 073.21:02-21:18  16m 1024bps realtime data lost due to LMC failure at DSS-34.
                  DR A05204 refers. 

                  Maximum nutation 0.24 deg. half-cone.

15 March          Nutation damping operations.

 074.01:26-02:34  68m 1024bps realtime data lost due to complex-wide power failure at SPC-40.
 074.03:07-03:12  Additional 5m 1024 bps realtime data lost due to extra 1 way -> 2 way switch.
                  DR A05208 refers.

 074.06:50-06:59  26m 1024bps realtime data lost due to antenna halt at DSS-34 and subsequent
 074.07:28-07:45  coherency switching.  DR A05212 refers.

 074.18:16-18:36  30m 2048bps realtime data lost due to antenna halt at DSS-24 and subsequent
 074.18:56-19:01  coherency switchings.  DR G06831 refers.
 074.19:57-20:02

                  Maximum nutation 0.24 deg. half-cone.

16 March          Nutation damping operations.

                  Maximum nutation 0.25 deg. half-cone.

17 March          Nutation damping operations.

 076.17:32-17:42  10m 2048 bps realtime data lost due to transmitter re-sweep at DSS-24 after
                  blown uplink transfer.  DR G06836 refers.

                  Maximum nutation 0.21 deg. half-cone.

18 March          Nutation damping operations.

                  Maximum nutation 0.25 deg. half-cone.

19 March          KEP IFC - 078.18:44 SCET.

                  Maximum nutation 0.20 deg. half-cone.

20 March          Nutation damping operations.

                  Maximum nutation 0.19 deg. half-cone.

21 March          SIM HET Calibration - 080.01:00 SCET.

                  Maximum nutation 0.21 deg. half-cone.

22 March          Nutation damping operations.

                  Maximum nutation 0.21 deg. half-cone.

                  EPD 10W switch-on
                   Dump PT & BT - 081.20:50 SCET.
                   Deschedule REC - 081.20:55 SCET.
                   Deschedule WDQ - 081.21:00 SCET.
                   Arm Watchdog - 081.21:04 SCET.
                   EPD 10W switch-on - 081.21:44 SCET.
                   Update PT & BT - 081.21:51 SCET.
                   Disarm Watchdog - 081.22:37 SCET.
                   Schedule WDQ - 081.22:40 SCET.
                   Schedule REC - 081.22:45 SCET.

23 March          Nutation damping operations.

                  CLC on command failed because DSS-63 was configured for LCP uplink.
                  Command transmitted 47m later resulting in larger than usual nutation.
                  DR L05131 refers.

                  Maximum nutation 0.34 deg. half-cone.

24 March          Nutation damping operations.

                  Maximum nutation 0.22 deg. half-cone.

25 March          Nutation damping operations.

                  Maximum nutation 0.23 deg. half-cone.

26 March          KEP IFC - 085.18:33 SCET.

                  Maximum nutation 0.26 deg. half-cone.

27 March          Nutation damping operations.

                  Maximum nutation 0.25 deg. half-cone.

28 March          HED Calibration - 087.01:00 SCET.
                  KEP GAS CR#605: NG - indirect orbits - 087.04:00 SCET.  

29 March          Nutation damping operations.

                  Maximum nutation 0.20 deg. half-cone.

                  DSS-14 used instead of DSS-24 due to DSS-24 Azimuth Wheel Axle Bearing
                  failure. ETRO: 091/2300Z. DR G06863 refers.

30 March          KEP GAS CR#607: NG - indirect orbits - 089.17:30 SCET.

                  CLC on with narrow deadbands was sent over DSS-75 to correct 
                  entry condition.

                  Due to DSS-24 failure, DSS-15 (downlink only) and DSS-74 
                  (uplink beacon only) were used instead. No uplink transfers 
                  performed into and from DSS-74.

089.16:47-16:55   8m realtime 512 bps data lost due to additional 1-way / 2-way switch. 
089.19:52-19:57   5m realtime 1024 bps data lost due to additional 1-way / 2-way switch.
                  
                  CLC on with wide deadbands was used during DSS-74 pass.

                  A DSS-74 uplink power drop caused a nutation build-up.
                  Maximum nutation 1.05 deg. half-cone.

                  Once on DSS-34 two McElrath manoeuvres were performed.

                  First McElrath manoeuvre reduced nutation level 
                  from 1.05 deg. to 0.40 deg. half-cone.

                  Second McElrath manoeuvre reduced nutation level 
                  from 0.45 deg. to 0.14 deg. half-cone.

31 March          Nutation damping operations.

                  Maximum nutation 0.23 deg. half-cone.

                  DSS-24 back in service.