Table 27. Flue Gas Desulfurization (FGD) Capacity in Operation at U.S. Electric Utility Plants as of December 2000
epav2t27.txt (page 7 of 11)
(Next Page)
(Previous Page)
(First Page)
(Last Page)
Public Service Co of Colorado
Arapahoe 4
232
100
9306
0.40
Spray Dry
Other
20.0
Cherokee 1
710
100
9802
.40
Spray Dry
Other
50.0
Cherokee 4
--
350
8905
.40
Spray Dry
Other
26.0
Hayden H1
465
190
9812
.40
Spray Dry
Lime/Alkaline Fly Ash
85.0
Hayden H2
--
275
9906
.40
Spray Dry
Lime/Alkaline Fly Ash
85.0
Public Service Company of NM
San Juan 1
1,848
369
9810
.90
Spray
Limestone
75.0
San Juan 2
--
369
9810
.90
Spray
Limestone
75.0
San Juan 3
--
555
9810
.90
Spray
Limestone
75.0
San Juan 4
--
555
9810
.90
Spray
Limestone
75.0
PECO Energy Company
Cromby 1
418
188
8212
2.60
Spray
Magnesium Oxide
95.0
Eddystone 1
1,489
354
8212
2.60
Spray
Magnesium Oxide
92.0
Eddystone 2
--
354
8212
2.60
Spray
Magnesium Oxide
92.0
PSI Energy, Inc
Gibson 4
3,340
668
9501
3.50
Spray
Limestone
92.0
Gibson 5
--
668
8210
4.40
Spray
Limestone
86.0
Reliant Energy HL&P
Limestone FGD1
1,627
813
8510
3.10
Spray
Limestone
90.0
Limestone FGD2
--
813
8610
3.10
Spray
Limestone
90.0
W A Parish FGD8
3,953
615
8212
.50
Spray
Limestone
85.0
Richmond City of
Whitewater Valley LFC
--
--
9410
2.10
Spray Dry
Limestone
72.5
Salt River Project
Coronado FGD1
822
411
7912
1.00
Spray
Limestone
82.5
Coronado FGD2
--
411
8011
1.00
Spray
Limestone
82.5
epav2t27.txt (page 7 of 11)
(Next Page)
(Previous Page)
(First Page)
(Last Page)
Notes: · Data for 2000 are final pending approval by the Environmental Protection Agency. · SO2 = Sulfur Dioxide; WT=weight; FGD=Flue Gas Desulfurization.
Source: Energy Information Administration, Form EIA-767, "Steam-Electric Plant Operation and Design Report."
Contact:
Roger Sacquety
(202)287-1745
Internet E-Mail: roger.sacquety@eia.doe.gov