Requesting Beam Time

Proprietary Research

Proprietary research is work conducted under a Class Waiver for Proprietary Users of Energy Research Designated User Facilities. Such research may be conducted by private individuals, representatives from educational institutions, nonprofit organizations, or industry. 

Under the terms of the DOE Class Waiver, the user is obligated to pay the full-cost recovery rate for NSLS usage. In return, the user has the option to take title to any inventions made during the proprietary research program and to treat as proprietary all technical data generated during the proprietary research program.

Special procedures are in place for Proprietary Research and must be adhered to prior to performing any proprietary experiment at the NSLS. 

  • Proprietary User's Agreement

The terms and conditions under which proprietary research may be conducted at the NSLS are set forth in the NSLS Proprietary User's Agreement (pdf), which must be in place before any experiment can commence.

Such an Agreement is between the legal entity sponsoring the research (i.e., the private individual, university, or corporation) and Brookhaven Science Associates (BSA), operator of Brookhaven National Laboratory. A single User's Agreement can cover numerous research proposals over an extended period of time. The Agreement is prepared by the BNL's Office of Intellectual Property and Sponsored Research. Requests for a prepared copy of the Agreement and any questions pertaining to negotiating such an agreement should be directed to BNL's Patent Office, at (631) 344-3035.

  • Proprietary Research Performed During Participating Research Team (PRT) Operations

Proprietary work is most often conducted by PRTs or by those collaborating with PRTs. Proprietary research through this method requires the submission through the online Proposal, Allocation, Safety and Scheduling (PASS) system. 

Proprietary work is most often conducted by PRTs or by those collaborating with PRTs. Proprietary research through this method does not require a proposal and beam time is allocated and scheduled directly with the beamline personnel. 

If beam time is not available through PRT membership or collaboration, then beam time for proprietary work can be requested through the General User Program. 

  • Proprietary Research Performed under the General User Program
  • Proprietary Proposals

Proprietary research requested through the General User Program requires the submission through the online Proposal, Allocation, Safety and Scheduling (PASS) system. Principal investigators (PIs) must contact beamline staff prior to submitting a proposal to ensure the experiment may be performed on the beamlines requested. Beamline capabilities, techniques and staff members are listed in the Beamline Guide.

  • Submissions Deadlines

The same submission deadlines apply for proposals for proprietary research and general user research.

  • Proposal Review and Allocation

Proprietary proposals are reviewed and approved by the NSLS Chairman. 

The Beam Time Allocation Committee (BTAC) is charged with allocating beam time to both new Proposals and Beam Time Requests. The user will receive written notification of the beamline and beam time allocated.

Proprietary proposals are submitted to the Proposal Coordinator to be reviewed and approved by the NSLS Chairman. Once the proposal is approved, the Principal Investigator (PI) will receive email notifications indicating the assigned proposal number and information pertaining to the allocation.

  • Requesting Beam Time in subsequent cycles

A proposal does not automatically receive beam time for every cycle during its lifetime. A Beam Time Request must be submitted online through the PASS system on or before the deadline for each scheduling cycle during which beam time is desired. Beam Time Requests are not rated again, but are routed directly to the Beam Time Allocation Committee for beam time allocation.

  • Beam Time Scheduling

After the allocation process is complete, the Principal Investigator (PI) will receive an email notification of the beamline assigned and the number of days allocated for the cycle. 

Beam time is scheduled directly between the PI and the beamline.

  • Proprietary Research Rates and Accounts

Any beam time used for proprietary research purposes must be charged the full cost recovery rate (click on any file type >> scroll down Column B to National Synchrotron Light Source >> the follow row over to the "Total with FCR" column).

Users must set up a proprietary research account prior to submitting a Proprietary Research Proposal.

  • Safety Approval Form

The PI will be directed to verify or adjust the safety information submitted with the proposal and also to schedule beam time through the PASS system. Thereafter the PI will receive another email confirming the scheduled beam time.

A completed Safety Approval Form (SAF) must be submitted at least one week before the scheduled beam time through the Proposal, Allocation, Safety and Scheduling (PASS) system. Currently, PIs performing proprietary research are instructed to complete "SAF Only (Authorized Use Only)" under Type of Proposal.

  • Proposal Expiration

Proposals become inactive  after 1 year has elapsed.

  • Reporting Proprietary Usage

On December 31, April 30, and August 31, all proprietary users are required to report proprietary usage, or confirm non-usage, on the Proprietary Usage/Non-Usage Certification (.doc) and the NSLS Proprietary Reporting Form (.doc)

NSLS User Administration sends a letter and blank forms to the PI approximately one month in advance of the due date.

 

Users' Reference Guide