File Description
|
Posting Date
|
Creation Date
|
File Types
|
Final rpt. other bene.& costs 6/19/97 |
6-23-97 |
xx-xx-xx |
225 kb |
Non-Utility pt recommen. 6/12/97 |
6-13-97 |
xx-xx-xx |
4 kb |
Cost tables relating to Lopez's tables |
6-13-97 |
xx-xx-xx |
933 kb |
revised drft matrix "other bene. & costs" |
6-11-97 |
xx-xx-xx |
89 kb |
rev. drft refer.list other bene.&costs |
6-11-97 |
xx-xx-xx |
97 kb |
EPA's 6/97 Cost Analysis/Compare to Lopez |
6-11-97 |
xx-xx-xx |
182 kb |
Latest Non-utility point recommendation |
6-11-97 |
xx-xx-xx |
4 kb |
drt sum. Other Bene.&$.KAHAGGX0@WCC.COM |
6-4-97 |
xx-xx-xx |
30 kb |
value-only spreadsheets |
6-4-97 |
xx-xx-xx |
268 kb |
cost summary memo |
6-4-97 |
xx-xx-xx |
39 kb |
cost summary report |
6-4-97 |
xx-xx-xx |
37 kb |
Table #3 |
6-4-97 |
xx-xx-xx |
8 kb |
13 kb |
Table #4 |
6-4-97 |
xx-xx-xx |
8 kb |
13 kb |
Table #5 |
6-4-97 |
xx-xx-xx |
8 kb |
13 kb |
Table #6 |
6-4-97 |
xx-xx-xx |
9 kb |
13 kb |
Non-Utility Point source prop. |
6-2-97 |
xx-xx-xx |
18 kb |
Non-Util. costs 5/29 fin.rept Pechan f/OTAG |
6-2-97 |
xx-xx-xx |
354 kb |
memo from co-chairs on Prop. for Util. |
5-30-97 |
xx-xx-xx |
24 kb |
Non-Utility Point Source Proposal |
5-29-97 |
xx-xx-xx |
38 kb |
State of IN recommendations |
5-21-97 |
xx-xx-xx |
17 kb |
Proposals for 6/2-3 mtg.Cleveland, OH |
5-27-97 |
xx-xx-xx |
5 kb |
OTAG other bene.&Costs of Ref.&Abst. |
6-11-97 |
xx-xx-xx |
97 kb |
matrix of above ref. present.at Chicago |
6-11-97 |
xx-xx-xx |
89 kb |
Culp.memo from J.Underhill |
5-20-97 |
xx-xx-xx |
2 kb |
culpability plots |
5-20-97 |
xx-xx-xx |
211 kb |
memo "Proc for submis.of prop Utility con" |
5-15-97 |
xx-xx-xx |
8 kb |
drft Cost Para.applied to reduce trans |
5-8-97 |
xx-xx-xx |
440 kb |
Pro.for coarse grid states 4/30/97 |
5-5-97 |
xx-xx-xx |
23 kb |
D. Thornton coarse grid prop. 4/28/97 |
5-5-97 |
xx-xx-xx |
28 kb |
Lopez's Utility Cost Matrices |
4-23-97 |
xx-xx-xx |
1771 kb |
Announcement for ISI 3/27 call at 11 |
3-26-97 |
xx-xx-xx |
1 kb |
Criteria for eval runs memo |
3-24-97 |
xx-xx-xx |
257 kb |
Outline for Criteria Report |
3-19-97 |
xx-xx-xx |
2 kb |
Final Draft Criteria Memo--Theiler |
3-19-97 |
xx-xx-xx |
289 kb |
Agenda for 3/19/97 ISI call |
3-19-97 |
xx-xx-xx |
1 kb |
Backgrd info on ICF's model pres. 2/26/97 |
3-4-97 |
xx-xx-xx |
56 kb |
Proposed Costing Methodology |
2-25-97 |
xx-xx-xx |
104 kb |
Table fo Round 3 control strategies |
2-12-97 |
xx-xx-xx |
3 kb |
Proposed costing method. prepared by Pechan |
2-25-97 |
xx-xx-xx |
104 kb |
Matrix of Round 3 proposals |
1-8-97 |
xx-xx-xx |
78 kb |
ZIPPED version of part II |
1-6-97 |
xx-xx-xx |
151 kb |
Round 3 proposals--part II |
1-6-97 |
xx-xx-xx |
303 kb |
Not zipped file |
1-3-97 |
xx-xx-xx |
308 kb |
Round 3 proposals--first batch |
1-3-97 |
xx-xx-xx |
118 kb |
Localized ozone inc. dur to NOx control |
12-16-96 |
xx-xx-xx |
70 kb |
Critera for eval results of OTAG runs |
12-16-96 |
xx-xx-xx |
252 kb |
EPA's draft nitrogen oxides impacts document |
12-12-96 |
xx-xx-xx |
849 kb |
Strat. Eval. Worksheet Add. Cont. meas. |
12-11-96 |
xx-xx-xx |
6 kb |
Memo on steering committee for cost |
12-10-96 |
xx-xx-xx |
1 kb |
Group A memo and document for 12/10 call |
12-10-96 |
xx-xx-xx |
109 kb |
Crit. for eval. results of OTAG run |
12-3-96 |
xx-xx-xx |
10 kb |
Group C issue:Sequenece of Controls |
11-22-96 |
xx-xx-xx |
28 kb |
Implem.issue: I/M:Thresholds & Variations |
11-19-96 |
xx-xx-xx |
15 kb |
Implem. issue: fuel sel., distri, & standard. |
11-19-96 |
xx-xx-xx |
34 kb |
Brady memo Ozone Attain. Coal. |
11-15-96 |
xx-xx-xx |
25 kb |
EPA comments on Round 2 |
11-6-96 |
xx-xx-xx |
19 kb |
Revised Group A paper--11/5 |
11-6-96 |
xx-xx-xx |
6 kb |
Draft 10/11 call summary |
11-6-96 |
xx-xx-xx |
25 kb |
Revised Group A paper from Bret |
10-29-96 |
xx-xx-xx |
5 kb |
6 round 2 strategy proposals and memo from Koerber |
10-29-96 |
xx-xx-xx |
44 kb |
memo Ozone Attain. Coal. position |
11-15-96 |
xx-xx-xx |
25 kb |
Grp. B-fuel sel. distri. & Standard. |
10-29-96 |
xx-xx-xx |
35 kb |
Group A paper for 10/22 call |
10-18-96 |
xx-xx-xx |
4 kb |
Final 9/20 ISI call minutes |
10-18-96 |
xx-xx-xx |
10 kb |
Final 8/20 ISI call minutes |
10-18-96 |
xx-xx-xx |
18 kb |
NESCAUM Round 2 proposal--for 10/11 |
10-11-96 |
xx-xx-xx |
1 kb |
Flux/Criteria--Memo from Theiler 10/11 |
10-11-96 |
xx-xx-xx |
7 kb |
Draft disbenefit criteria-Theiler |
10-10-96 |
xx-xx-xx |
1 kb |
Draft minutes from 9/20 call |
10-10-96 |
xx-xx-xx |
10 kb |
Agenda for 10/11/96 ISI call |
10-8-96 |
xx-xx-xx |
2 kb |
Attachment A to packets |
10-8-96 |
xx-xx-xx |
21 kb |
Final Control Strategy Packets--8/23/96 |
10-8-96 |
xx-xx-xx |
73 kb |
Emissions for Strategy Runs 1-4 |
10-4-96 |
xx-xx-xx |
8 kb |
Memo from Koerber-Dev't of Round 2 strategies |
10-3-96 |
xx-xx-xx |
3 kb |
Options for geog. eval. of strategies |
10-3-96 |
xx-xx-xx |
4 kb |
Group C implementation issues paper |
9-24-96 |
xx-xx-xx |
61 kb |
Minutes of 8/29 Group A call |
9-24-96 |
xx-xx-xx |
9 kb |
Group A implementation issues paper |
9-24-96 |
xx-xx-xx |
8 kb |
Inv. coordination taskforce material |
9-23-96 |
xx-xx-xx |
6 kb |
Attachment to letter from API |
9-23-96 |
xx-xx-xx |
22 kb |
Ltr. from API on MOG comments-Word 6.0 |
9-23-96 |
xx-xx-xx |
40 kb |
Group D implementation issues paper |
9-21-96 |
xx-xx-xx |
8 kb |
Group B implementation issues paper |
9-21-96 |
xx-xx-xx |
11 kb |
Draft minutes of 8/20 ISI WG call |
9-19-96 |
xx-xx-xx |
19 kb |
Agenda for 9/20 ISI WG call |
9-19-96 |
xx-xx-xx |
1 kb |
Attachment to letter from API |
9-16-96 |
xx-xx-xx |
14 kb |
Letter to ISI WG from API |
9-16-96 |
xx-xx-xx |
24 kb |
Minutes of 8/19 ISI WG conf. call |
9-16-96 |
xx-xx-xx |
24 kb |
Minutes of 8/9 ISI WG conf. call |
9-16-96 |
xx-xx-xx |
19 kb |
Set 2 eval. criteria & initial strat. |
8-28-96 |
xx-xx-xx |
6 kb |
Memo on control factors for utilities |
8-27-96 |
xx-xx-xx |
41 kb |
Attachment C to Packets |
8-21-96 |
xx-xx-xx |
14 kb |
Revised Strategy Packets from Brock |
8-21-96 |
xx-xx-xx |
32 kb |
7/26 memo from D. Parks on sens. tests |
8-20-96 |
xx-xx-xx |
1 kb |
Minutes of 7/31 Broad Approaches call |
8-20-96 |
xx-xx-xx |
21 kb |
Memo from S. Gerritson on proposal 2 |
8-20-96 |
xx-xx-xx |
5 kb |
Set 2 evaluation criteria |
8-19-96 |
xx-xx-xx |
4 kb |
Straw proposals for control strat. mod. |
8-16-96 |
xx-xx-xx |
14 kb |
Summary of 8/8 Impl. Issues call |
8-15-96 |
xx-xx-xx |
2 kb |
Announcement of 8/16 Impl. Issues Group A |
10-18-96 |
xx-xx-xx |
4 kb |
Announcement of 8/14 Impl. Issues Group C |
8-13-96 |
xx-xx-xx |
1 kb |
Revised schedule of Aug. ISI WG calls |
8-12-96 |
xx-xx-xx |
1 kb |
Memo on 8/7 Implem. Issues call |
8-6-96 |
xx-xx-xx |
2 kb |
Memo from Mike Koerber and David Parks |
7-31-96 |
xx-xx-xx |
59 kb |
Announcement of 7/31 3:00 B/A miniwg call |
7-31-96 |
xx-xx-xx |
1 kb |
Minutes of 6/21 ISI WG call |
7-22-96 |
xx-xx-xx |
15 kb |
Attachment to NOx control packet table |
10-8-96 |
xx-xx-xx |
21 kb |
Control packet tables (WP 5.1/5.2) |
7-22-96 |
xx-xx-xx |
26 kb |
Control packet tables (WP 6.0) |
7-22-96 |
xx-xx-xx |
36 kb |
2/28 memo on criteria ratings |
7-9-96 |
xx-xx-xx |
12 kb |
Memo on 6/21 ISI & RUSM WG's call |
6-20-96 |
xx-xx-xx |
4 kb |
Utility optim. matrix w/alt. limits |
6-11-96 |
xx-xx-xx |
294 kb |
Utility optim. matrix, version 8L |
6-11-96 |
xx-xx-xx |
200 kb |
Utility optim. matrix, version 8L |
6-11-96 |
xx-xx-xx |
45 kb |
Utility optim. matrix, version 8L |
6-11-96 |
xx-xx-xx |
191 kb |
Utility optim. matrix, version 8L |
6-11-96 |
xx-xx-xx |
191 kb |
Utility optim. matrix, version 8L |
6-11-96 |
xx-xx-xx |
23 kb |
Utility optim. martix, version 8H |
6-7-96 |
xx-xx-xx |
200 kb |
Utility optim. matrix, version 8H |
6-7-96 |
xx-xx-xx |
45 kb |
Utility optim. matrix, version 8H |
6-7-96 |
xx-xx-xx |
192 kb |
Utility optim. matrix, version 8H |
6-7-96 |
xx-xx-xx |
192 kb |
Utility optim. matrix, version 8H matrices |
6-7-96 |
xx-xx-xx |
23 kb |
Please read BEFORE downloading utility |
6-13-96 |
xx-xx-xx |
1 kb |
Minutes of 5/10 ISI WG call |
6-6-96 |
xx-xx-xx |
20 kb |
Attachment to growth factor memo |
5-31-96 |
xx-xx-xx |
41 kb |
Memo on default growth & control factors |
5-31-96 |
xx-xx-xx |
1 kb |
Minutes of 4/24 ISI WG conf. call |
5-22-96 |
xx-xx-xx |
26 kb |
Revised memo on 5/10 ISI WG call |
5-10-96 |
xx-xx-xx |
1 kb |
Minutes of 4/9 ISI WG conf. call |
5-7-96 |
xx-xx-xx |
35 kb |
Memo on matrix for utilities |
5-2-96 |
xx-xx-xx |
6 kb |
Minutes of 4/4 ISI WG conf. call |
4-30-96 |
xx-xx-xx |
13 kb |
Matrix for utilities (Quatro Pro 6) |
4-24-96 |
xx-xx-xx |
164 kb |
Memo on 4/24 conf. call |
4-23-96 |
xx-xx-xx |
1 kb |
Summary of 3/27 ISI call |
4-10-96 |
xx-xx-xx |
19 kb |
3/22 conf. call summary |
4-5-96 |
xx-xx-xx |
10 kb |
Memo on sensitivity run explanation |
3-28-96 |
xx-xx-xx |
1 kb |
Directions to 4/1 ISI WG meeting |
3-28-96 |
xx-xx-xx |
1 kb |
Memo on cost effectiveness |
3-26-96 |
xx-xx-xx |
3 kb |
Announcement for 3/22 conference call |
3-21-96 |
xx-xx-xx |
1 kb |
Memo on baseline modeling assumptions |
3-21-96 |
xx-xx-xx |
2 kb |
Announcement for 3/20 call |
3-13-96 |
xx-xx-xx |
1 kb |
Memo from RUSM WG on sensitivity tests |
3-8-96 |
xx-xx-xx |
4 kb |
Minutes from 2/23 conf. call |
3-8-96 |
xx-xx-xx |
12 kb |
Handouts from 3/1 meeting (WP 5.1/5.2) |
3-7-96 |
xx-xx-xx |
23 kb |
Recommended Definition of Relative CE |
2-21-96 |
xx-xx-xx |
2 kb |
Info for 2/23 ISI conf. call |
2-20-96 |
xx-xx-xx |
1 kb |
Issue Paper for Joint ISI and T/I call |
12-12-95 |
xx-xx-xx |
5 kb |
Minutes from 11/28/95 call |
12-11-95 |
xx-xx-xx |
13 kb |
Info. for ISI calls on 12/11/95 |
12-11-95 |
xx-xx-xx |
8 kb |
Revised mission and goal--10/3/95 |
10-4-95 |
xx-xx-xx |
1 kb |
Proposed workgroup goal statement |
9-25-95 |
xx-xx-xx |
1 kb |