Helium Vessel Engineering Note for 3.9-GHz Dressed Cavity #3 -- signed

This is the final version of the engineering note with all required signatures for approval. This shortened engineering note refers to the Cavity #5 engineering note. This note highlights the differences between Cavity #3 and #5. The fabrication process, the pressure test results, and the cavity processing data are included.