Laws and Regulations/Legal Documents
Referenced Laws, Regulations, and Agreements
Easement Agreement, Reference #6-1997-001, Parcels 1 and 2, March 26, 1999.
Consent Decrees/Related Documents
Consent Decree, United States, et al.
v. the City of Seattle and Municipality of
Metropolitan Seattle, Civ. No. C90-395WD (W.D.
Wash., Dec. 23, 1991).
Amended Consent Decree, United States, et al. v. the City of
Seattle and Municipality of Metropolitan
Seattle, Civ. No. C90-395WD (W.D. Wash., Oct. 13, 1999).
File 1, File 2. Attachment:
File 1, File 2, and File
3.
Consent Decree, United States et al.
v. Pacific Sound Resources et al., Civ. No. C94-687 (W.D. Wash., Aug.
29, 1994).
Trustee Coordination and Management
Correspondence
U.S. Fish and Wildlife Service (FWS) (biological assessment concurrence letter),
April 13, 1999.
Draft Duwamish/Diagonal CSO/SD Cleanup Study Report, December 2001.
Report without appendices and Executive Summary.
State Determination of Nonsignificance Regarding Herring's House/Seaford Lumber
Site, August 13, 1998.
Seaford Lumber Site: Draft Phase III Site Investigation, June 1997.
Limited Scope Real Estate Assessment, North Wind Weir Habitat Mitigation
Project, June 20, 1997.
Limited Scope Real Estate Appraisal, Duwamish Hamm Creek Restoration, Seattle
City Light Property, June 10, 1997.
Limited Scope Real Estate Assessment, Turning Basin No. 3 Restoration Project,
April 7, 1997.
Seaford Lumber Site: Draft Phase II Site Investigation, May 1996.
Seaford Lumber Site: Draft Phase II Site Investigation Work Plan, Sampling and
Analysis Plan, Quality Assurance Project Plan, June 1995.
Duwamish/Diagonal Sampling and Analysis Plan: Pre-Phase
II Addendum, September 1994.
Appraisal of Seaboard Lumber Company, January 27, 1993.
Aquatic Resources (Benthic, Fish and Shellfish
Resources)
Amendments to the Biological Assessment Prepared for a Habitat Development
Project on the Duwamish River, May 17, 2000. File 1.
Environmental Assessment and Finding of No Significant Impact for Turning Basin
No. 3 Restoration Project, June 26, 2000. File 1,
File 2, File 3.
Duwamish Waterway Sediment Characterization Study Report,
December 10, 1998. Includes Appendix A (Part 1),
Appendix A (Part 2), Appendices B and C,
Figures.
Construction of Oyster Shell Habitat Plots in Elliott Bay: Evaluation of Crab
Settlement and Habitat Utilization, November 1998.
Seaboard Lumber Site Aquatic Habitat Restoration
Project: Environmental Assessment, October 15, 1998. Appendices in two
files: File 1, File 2.
Programmatic Biological Assessment of Habitat Restoration on the Green/Duwamish
River (Porter Levee and Hamm Creek), March 17, 1998, and Finding of No
Significant Impact, July 22, 1998.
U.S. Army Corps of Engineers, Seattle District, Duwamish River Turning Basin
No. 3 (Hamm Creek) Section 1135 Ecosystem Restoration and Environmental
Assessment Report, 07/98, King County, WA. Partial document.
File 1, File 2.
Elliott Bay Waterfront Recontamination Study, Volume 1: Field Investigation
Report, July 1995. File 1,
File 2, File 3.
Elliott Bay Waterfront Recontamination Study, Volume II: Data Evaluation and
Remedial Design Recommendations Report, August 1995. File
1, File 2, File 3.
Restoration
Restoration Planning/Restoration Plan
Finding of No Significant Impact Environmental
Assessment for the Duwamish/Diagonal Sediment Remediation Project,
September 2003.
Finding of No Significant Impact and Environmental Assessment for the North
Wind's Wier Aquatic Habitat Restoration Project, August 13, 2001.
File 1, File 2, File
3.
Seaboard Aquatic Habitat Restoration Project, City of Seattle Parks and
Recreation, August 5, 1999.
Draft Concept Document, Elliott Bay/Duwamish Restoration
Program, August 1993.
Concept Document: Elliott Bay/Duwamish Restoration
Program, June 1994. Abridged version.
Concept Document Addenda No. 1 and No. 2, 11/96 and 12/97.
Restoration Implementation/Statements of Work
Monitoring Plan
Washington Joint Aquatic Resource Permits (Jarpa)
Application For: Hydraulic Project Approvals, Shoreline Management Permits,
Water Quality Certification, Approval for Exceedance of Standards, and U.S.
Army Corps of Engineers Section 404 and 10 Permits, January 14, 1998.
Norfolk CSO Sediment Remediation Project: Six-Month Post-Construction
Monitoring Report October 1999, April 2000.
Norfolk CSO Sediment Remediation Project Five-Year Monitoring Program: Annual
Monitoring ReportYear One Monitoring Report, April 2000.
Hydraulic Project Approval, Washington State Department of Fish and Wildlife.
Temporary Permit and Construction Right of Entry, P.M. no. 230404-2-409, Seattle
City Light Department, May 17, 1999.
Stormwater General Permit S03-003538, Washington State Department of Ecology,
March 8, 1999.
Shoreline permit.
Grading and clearing permit.
Public Agency Utility Exception Report and Decision.
Draft Duwamish/Diagonal CSO/SD Cleanup Study Report,
December 2001. Also available: executive summary and
report without appendices.
Elliott Bay Nearshore Substrate Enhancement Monitoring Report: Evaluation of
the Utilization of Substrate Diversity and the Production of Prey Taxa
Important to Juvenile Salmonids in 1998 and 1999, December 2000. Available as
one file or in sections: report,
appendices.
Elliott Bay/Duwamish Restoration Program: Elliott Bay
Nearshore Substrate Enhancement Monitoring Plan, May 2000.
Intertidal Habitat Projects Monitoring Program, March 2000. Available in
one file or in sections: File 1,
File 2, File 3.
Norfolk CSO Remediation Project Five-Year Monitoring Program: April 1999
Monitoring Report, August 1999. Available in one file
or in sections: File 1, File
2, File 3, File 4.
Norfolk CSO Sediment Cleanup Study, October 1996. File 1,
File 2, File 3.
Appendices not included.
Norfolk CSO Sediment Remediation Project Closure Report,
August 1999.
Norfolk CSO Sediment Remediation Project Five-Year Monitoring Program: Annual
Monitoring ReportYear Two, April 2001, November 2001. Available in
one file or in sections: File 1,
File 2.
Pier 53/55 Sediment Cap and Enhanced Natural Recovery Area Remediation Project,
1996 Data (monitoring report), December 1997. File 1,
File 2.
Pier 53/55 Sediment Cap and Enhanced Natural Recovery Area Remediation
Project,1993 Data (monitoring report), December 1995. File
1, File 2. Appendices not included.
Pier 53/55 Sediment Cap and Enhanced Natural Recovery Area Remediation Project
(monitoring report), November 1993. File 1,
File 2. Appendices not included.
Public Outreach and Involvement
Public Outreach
EPA Proposes Lower Duwamish Waterway to the National
Priorities List, December 2000.
Duwamish Waterway Sediment Characterization Report:
Summary of Findings, handouts from a public meeting on October 7, 1998.
Includes color figures.
Central Waterfront Cleanup 02/24/98 Fact Sheet.
Diagonal/Duwamish 02/24/98 Fact Sheet.
U.S. Environmental Protection Agency (EPA) fact sheet, EPA
Sampling.
EPA issued another fact sheet (EPA Sampling, 8/98)
describing their planned sampling activities and announcing the availability of
the sampling plan.
Elliott Bay Nearshore 02/24/98 Fact Sheet.
Hamm Creek 02/24/98 Fact Sheet.
Herrings House Restoration Site 02/24/98 Fact Sheet.
Norfolk Combined Sewer Overflow 02/24/98 Fact Sheet.
North Winds Wier 02/24/98 Fact Sheet.
Pier 53-55 Sediment Cap 02/24/98 Fact Sheet
Porter Levee Phase I 1998 Fact Sheet.
Turning Basin No. 3, 02/24/98 Fact Sheet.
Public Participation Plan: Elliott Bay/Duwamish
Restoration Program, June 1994.
Elliott Bay/Duwamish Restoration Program 1992 Annual
Report, May 1993.
Elliott Bay/Duwamish Restoration Program 1993 Annual
Report, April 1994.
Elliott Bay/Duwamish Restoration Program 1994 Annual
Report, June 1995.
Elliott Bay/Duwamish Restoration Program 1995 Annual Report, June 1996.
Elliott Bay/Duwamish Restoration Program 1996 Annual
Report, June 1997.
Elliott Bay/Duwamish Restoration Program 1997 Annual
Report, May 1998.
Elliott Bay/Duwamish Restoration Program 1998 Annual
Report, May 1999.
Elliott Bay/Duwamish Restoration Program 1999 Annual Report, April 2000.
Available in one file or in sections:
File 1, File 2, File
3.
Elliott Bay/Duwamish Restoration Program 2000 Annual Report, July 2001.
Available in one file or in sections:
File 1, File 2, File
3, File 4.
Press Releases
August 2000, "Comments Requested on the Lower
Duwamish Waterway Site: Public Meeting Scheduled for August 16, 2000."
Public Comments
Elliott Bay/Duwamish River Restoration Program Summary of
Stakeholder Interviews, December 1992.