Proton Driver RF Meetings

3:00 PM Tuesdays in the Penthouse (FNAL Booster West Towers)

To get on email list, send mail to:  gwf@fnal.gov


Future RF Meetings


Next Meeting Jan 18th - Klystron Gallery Equipment Layouts

Past RF Meetings	

Jan 11, 2005 - Fast Phase shifter test results
Dec 21, 2004 - RF_Minutes_Dec_21.doc
High Power Test Results for Waveguide Style Phase Shifter (Iouri Terechkine) (.PPT)

NOV 2, 2004 - RF_Minutes_Nov_2.doc
Waveguide Phase Shifter Measurement and Simulations (Timergali Khabiboulline) (.PPT)
Discussion of SMTF EOI

OCT 26, 2004 - RF_Minutes_Oct_26.doc
SLAC Meeting
IQ Modulator Topologies
Waveguide Phase Shifter Status Report

OCT 12, 2004 - RF_Minutes_Oct_12.doc
Circulator test Results (Ding Sun)
Waveguide Yig Tuner Production Status & Photos (Iouri Terechkine)
Coax Tuner Status and Test Plans (Wildman)
325 MHz Front End Linac Collaboration Possibilities (Gennady Romanov) (.ppt)

SEPT 28, 2004 - Pulsed Power Supplies for High-Speed Coax Tuner Tests (Hays)
Thales visit report (Moretti)
Procurement Status for TESLA Modulator Transformers (Jensen/Pfeffer/Wolff)

SEPT 21, 2004 - RF_Minutes_Sept_21.doc
Circulator tests
YIG Tuner Status
325 MHz RF System R&D

SEPT 14, 2004 -
Ken Shepard (ANL) Talk on SRF Spoke Resonators (.PPT)

SEPT 7, 2004 - No Meeting (TESLA Collaboration Meeting)

AUGUST 31, 2004 - RF_Minutes_Aug_31.doc
Meson Area Layout Preliminary Drawings
http://tdserver1.fnal.gov/8gevlinacpapers/Meeting_Minutes/RF/Meson_SMTF_Layout_Concept.ppt
	http://tdserver1.fnal.gov/8gevlinacpapers/Meeting_Minutes/RF/Meson_Area_prelim_Layout.pdf
http://tdserver1.fnal.gov/8gevlinacpapers/Meeting_Minutes/RF/325_Linac_Area_Prelim_Layout.pdf
	Miniture Coax YIG test results (Wildman)
Modulator Transformer Procurement status
(Jensen/Pfeffer/Wolff)
Production Status of Fast Pulsed Bias Coils for Coax Tuner (Kashikhin)

AUGUST 24, 2004
Discussion of RF game plan in light of LC Technolgy Selection (Foster)
Procurement Status for two new TESLA Modulator Transformers (Jensen/Pfeffer/Wolff)
Waveguide Tuner Status Report (Terechkine)
Purchase Req's for Klystrons: Thales 1300 MHz and Toshiba 325 MHz (Apollinari)

AUGUST 10, 2004 - (LOCATION CHANGE - HUDDLE)
Yet Another Peak-Power Record in Coax Phase Shifter Tests (Wildman)
Waveguide Phase Shifter Update
325 MHz Linac Plans, Layout, etc.
AFT I/Q Modulator Procurement Status
A moment of Silent Prayer for the ITRP
Klystron Purchase Req's

AUGUST 3, 2004 -

Transient Analysis of Voltages in E-H Tuner Stubs (Shreyas Bhat)
S_Bhat_Simulation_8-2-04.ppt
Phase Shifter Prototype Status (Terechkine)
Yet Another High-Power Coax Phase Shifter Test (Wildman)
AFT Tuner Procurement Status (Moretti)


JULY 27, 2004 - (NO Meeting)

JULY 20, 2004 -
High-Power 1300 MHz Phase Shifter Test Results (Wildman)
WG Phase Shifter Prototype Status (Terechkine)
Specification for AFT IQ Modulator for PO going out this week (Moretti)
RF Component Footprints for Meson/SMTF Facility


JULY 13, 2004 -
Report on Toshiba visit re: 325 MHz Klystron
Phase Shifter Prototype Status
High-Power 1300 MHz Tests Status
Modulator Schedule for Meson/SMTF

JULY 6, 2004 -
Parameters of 325 MHz Linac RF System & RF Costs (Kustom)

JUNE 29, 2004 - RF_Minutes_June_29.doc
More Coax YIG Tuner Test Results (Wildman) Coax_Stub_Reflection_Data_Wildman_June_29.xls

JUNE 22, 2004 - RF_Minutes_June_22.doc
Coax YIG Tuner Low-Power Test Results (Wildman) Coax Tuner Measurement Data (.XLS)
Waveguide YIG Tuner Work Plan (Terechkine) Waveguide Tuner Work Plan (.DOC)
Commercial Tuner Procurement Specs & Status (Moretti) Draft 1300 MHz Tuner Spec (.DOC)

JUNE 15, 2004 - YIG Tuner Low-Power Test Results

RF_Minutes_June_15.doc
Waveguide Tuner Measurements (.ppt)
Waveguide Tuner HFSS Calculations (.ppt)

JUNE   8, 2004 -   YIG Tuner Test Plans
RF_Minutes_June_8.doc

JUNE   1, 2004 -   (NO Meeting: Alvin Fest & User's Meeting)
Proton Driver Talk at 2004 User's Meeting
MAY 25, 2004 - LINAC MODULATOR Development Plan  (D. Wolff)   (Agenda)
	RF_Minutes_May_25.doc
	Modulator Design & Development (.ppt) - Dan Wolff

MAY 18, 2004 -
Working meeting on ferrite tuner prototypes & calcs
IQ Modulator Settling Time Specification [Draft] (G.W. Foster)

MAY 11, 2004 - 325MHz RF for SCRF Front End, 1.3 GHz Klystrons, Ferrite Loss Calcs
Announcement

MAY 04, 2004 - Working meeting on ferrite tuner prototypes

RF_Minutes_May_04.doc

APRIL 27, 2004 - Waveguide-Style Ferrite Simulations (Terechkine/Gonin)
WG_Phase_Shifter_Terechkine_Gonin_April_21.doc
Combined_1300_MHz_805_MHz_shifter_coax_Ding.xls

APRIL 20, 2004 - A0 RF Systems & Tour (J. Reid, T. Berenc)

RF_Minutes_April_20.doc
A0_PhotoInjector_RF_John_Reid_April_20.doc
Berenc_A0_NorthCave_Presentation_April_20.pdf
 
APRIL 13, 2004 - History of SNS RF System Development (Bob Kustom)
- Standardizing on SNS 805 MHz or TESLA 1300 MHz (W. Foster)

Kustom_SNS_SCL_presentation_april_13.ppt
Frequency_Choice_for_the_SCRF_Proton_Driver_Apr_13.doc
Kustom_Comments_On_Choice_of_frequency_1300_vs_1207.doc

APRIL 6, 2004 - NO Meeting (TESLA Collaboration Meeting at DESY)
GWF_Comments on TESLA_Meeting.doc

MARCH 30, 2004 - PHASE SHIFTERS
RF_Minutes_March_30.doc

MARCH 23, 2004 - SCRF Resonance Control (Markus Huening)
Huening_Mar20_04_SC_Cavities_Feedback_Controls.doc

MARCH 16, 2004 - Solenoid Magnet Design (V. Kashikhin), Bias Power Supply (S. Hays)
RF_Minutes_March_16.doc
Solenoid_for_Bias_Field_Kashikhin_March_16.doc
 
MARCH 9, 2004 - Response Time & Bid Spec for 805 MHz Tuner (Bauer et. al.)
Announcement
RF_Minutes_March_9.doc

MARCH 2, 2004 - Coaxial Shorted-Stub Tuner (Wildman et. al)
Announcement
RF_Minutes_March_2.doc

February 24, 2004 - PHASE SHIFTERS
RF_Announce_Feb 24.txt

February 17, 2004 - KICKOFF MEETING
RF_Kickoff_Presentation_GWF.ppt