Dry-dock & Repairs of CGC JARVIS (WHEC 725) and CGC RUSH (WHEC 723)

Solicitation Number: HSCG85-09-B-625022
Agency: Department of Homeland Security
Office: United States Coast Guard (USCG)
Location: Commander (vpl), USCG Maintenance and Logistics Command - Pacific
  • Print
:
HSCG85-09-B-625022
:
Award
:
February 10, 2009
:
HSCG85-09-C-625022
:
4643338.00
:
ALL DEFINITE ITEMS
:
NAUTICAL ENGINEERING, INC.
:
1790 11TH STREET
OAKLAND, California 94610
United States
:
Added: Sep 18, 2008 3:49 pm
USCG, Maintenance & Logistics Command, Pacific (vpl-1) in Oakland, CA, proposes to contract for Dry-Dock and Repairs of CGC JARVIS (WHEC 725) and CGC RUSH (WHEC 723), , a 378’ cutters, home moorage in Honolulu, HI. The period of performance to accomplish this requirement is 25 March 2009 through 02 June 2009. This is a 100% Small Business set aside. The CGC JARVIS work items are as follows, but not limited to, General Requirements — Drydock; Production Control, Gantt Bar Chart Provide; Aft Steering Deck , Hull Plating Renewal, Air Castle Stiffener Renewal, DC Void Hull Plating Renewal, Deck Grate Framing Renewal, Hull Plating Renewal, Hull Plating, Underwater Body Inspect, Hull Plating, Underwater Body Ultrasonic Testing, Longitudinal Renewal, Appendages (Underwater) Leak Test, Propulsion Shaft Fairwaters And Rope Guards Inspect And Repair, Voids Non-Accessible Leak Test, Tanks (Mp Fuel Stowage And Overflow) Clean And Inspect, Tanks (Chain Locker) Clean And Inspect, Propulsion Shaft Coating Inspect & Test, Propulsion Shaft Seals (Mechanical) Inspect And Clean, Propulsion Shaft Bearings (External) Check Clearances, Controllable Pitch Propeller System General Maintenance, Hubs General Maintenance, Propeller Clean And Inspect, Circuit Breakers (60 Hz) Inspect And Test, Fathometer Transducers General Maintenance, Circuit Breakers (400 Hz) Inspect And Test, Vent Ducts (Galley And Pantry) Commercial Cleaning, Vent Ducts (Laundry Exhaust) Commercial Cleaning, Turbine Inlet And Demister Screen Renewal, Sea Strainers (All Sizes) Overhaul, Sea Strainers (All Sizes) Renewal, Sea Valve (<= 2.5 Inches) Renewal, Sea Valve (> 2.5 Inches) Overhaul, Magazine Sprinkler Valves (< 2.5 Inches) Overhaul, Magazine Sprinkler Valves, >= 2.5 Inches, Overhaul, Fuel Oil Manifold Valve Overhaul, Renew Rudder Post Packing Housing, Rudder And Rudder Stock Removal And Inspection, Rudders Inspect And Repair, Thruster Unit (General) Overhaul, Thruster Unit Hydraulic Accumulators Inspect And Hydro Test, Commissary Hoist (Gen) Level 2 Inspect And Repair, Port Anchor Windlass (Gen) Level 2 Inspect And Repair, Starboard Anchor Windlass (Gen) Level 2 Inspect And Repair, Anchor Chain And Ground Tackle Inspect And Repair, Bilges (DC Void) Preserve, Bilges (Engine Room Bilge) Preserve, Bilges (Fire Pump Room) Preserve, Masts Preservation, Partial, Hull Plating, Underwater Body Preserve, Partial, Rudders (Exterior) Preserve, Hull Plating, Freeboard Preserve, Cathodic Protection Zinc Anode Renewal, Deck Coverings (Interior Polymeric) Reseal, Deck Coverings (Interior Quarry Tile) Reseal, Deck Coverings (Phoenix One-Step) Reseal, Ships Laundry Upgrade, Ammunition Hoists & Elevators (Gen) Level 2 Inspect& Repair, Temporary Services, Drydock Provide, Sea Trials, Drydocking Accomplish, Appendages (Underwater) Air Test, Appendages (Underwater) Preserve, Internal, Voids (Non-Accessible) Preserve, Internal, Voids (Underwater) Air Test, Tanks (Aviation Fuel Stowage) Clean And Inspect, Propulsion Shaft Coating Renewal, Replace Stern Tube Shaft, Replace Tailshaft, Skim Cut Propulsion Stern Tube Shaft Sleeve, Skim Cut Propulsion Tailshaft Sleeves, Propulsion Shafting Remove, Inspect And Reinstall, Propulsion Shaft Bearing (Aft Strut) Stave Renewal, Propulsion Shaft Bearing (Fwd Strut And Stern Tube) Stave Renewal, Remove And Reinstall Propeller Hub From Tailshaft, Renew Propeller Hubs, Main Diesel Engine Exhaust Stack Uptakes Commercial Clean, SSDG Exhaust Stack Uptakes Commercial Clean, Turbine Exhaust Stack Uptakes Commercial Clean, Decks Exterior Preserve, Chain Lockers Preserve, Mast(S) Preservation, Masts Preservation Additional, Hull Plating, Underwater Body Preserve (100%), Hull Plating, Underwater Body Preserve, Additional.
CGC RUSH work items are as follows, but not limited to, General requirements, drydock, production control,GANTt bar chart provide, box girder repair, fan space bulkhead repair, hull plate renewal-dc space, hull plating, underwater body inspect, hull plating, underwater body ultrasonic testing, appendages (underwater) leak test, propulsion shaft fairwaters and rope guards inspect and repair, voids (non-accessible) leak test, repair manhole rings, tanks (mp fuel service) clean and inspect, tanks (mp fuel stowage and overflow) clean and inspect, tanks (aviation fuel stowage) clean and inspect, tanks (chain locker) clean and inspect, bullhead plating renewal-mess deck, deck plating renewal-howser storage, deck plating renewal-AC flats, propulsion shaft coating renewal, propulsion shaft seals mechanical overhaul & inflatable renewal, propulsion shafting remove, inspect and reinstall, propulsion shaft bearings (external) check clearances, controllable pitch propeller system general maintenance, hubs general maintenance, propeller clean and inspect, renew a section of lube oil fill pipe and valve, inspect and test circuit breakers, fathometer transducers general maintenance, inspect and test circuit breakers, 400 hz, fuel oil tank 5-80-0-f vent pipe repairs, vent ducts (engine and motor rooms) commercial cleaning, vent ducts (galley and pantry) commercial cleaning, vent ducts (laundry exhaust) commercial cleaning, vent ducts (other) commercial cleaning, sea strainers (all sizes) overhaul, sea valve (<= 2.5 inches) renewal, sea valve (> 2.5 inches) overhaul, magazine sprinkler valves (< 2.5 inches) overhaul, magazine sprinkler valves, >= 2.5 inches, overhaul, renew CWIS salt water cooling piping, rudder stock bearings check clearances, rudders inspect and repair, thruster unit (general) overhaul, thruster unit hydraulic accumulators inspect and hydro test, anchor chain and ground tackle inspect and repair, hull plating, underwater body preserve, partial, rudders (exterior) preserve, cathodic protection, zinc anode renewal, deck coverings phoenix one step install, compartment insulation renewal, sea trials, drydocking accomplish, appendages (underwater) air test, appendages (underwater) preserve, internal, voids (non-accessible) preserve, internal, voids (underwater) air test, replace stern tube shaft, replace tailshaft, skim cut propulsion stern tube shaft sleeve, skim cut propulsion tailshaft sleeves, propulsion shaft bearing (aft strut) stave renewal, propulsion shaft bearing (fwd strut and stern tube) stave renewal, remove and reinstall propeller hub from tailshaft, renew propeller hubs, main diesel engine exhaust stack uptakes commercial clean, turbine exhaust stack uptakes commercial clean, renew rudder post packing housing, rudder and rudder stock removal and inspection, rudder and rudder stock renewal, rudder stock lower bearing renewal, chain lockers preserve, hull plating, underwater body preserve (100%), hull plating, underwater body preserve, additional, compartment insulation renewal.

On or about 03 October 2008, an Invitation for Bid (IFB) will be available electronically at http://www.fbo.gov. Only one award will be made to the responsive, responsible bidder under this solicitation.

The solicitation, specifications and other pertinent information will be posted at www.fbo.gov. In order to open and download the specifications offerors must be registered at www.fbo.gov. Offerors are encouraged to register immediately as authorization to access the documents may take up to 48 hours from the time of registration. Drawings may be requested through www.FBO.gov .


Added: Feb 17, 2009 1:21 pm
Award of the contract under Solicitation No. HSCG85-09-B-625022 has been made to Nautical Engineering of Oakland, CA in the amount $4,643,338.00.
Please consult the list of document viewers if you cannot open a file.

Solicitation 1

Type:
Solicitation
Posted Date:
November 6, 2008
Description: NOTICE TO OFFERORS HSCG85-09-B-625022
Description: SF-33 HSCG85-09-B-625022
Description: sOLICITATION PKG. - HSCG85-09-B-625022
Description: REQUEST FOR CLARIFICATION - HSCG85-09-B-625022

Amendment 1

Type:
Mod/Amendment
Posted Date:
November 10, 2008
SF30 (A0001).doc (50.50 Kb)
Description: Amendment A001

Amendment 2

Type:
Mod/Amendment
Posted Date:
December 3, 2008
SF30 (A0002).doc (50.50 Kb)
Description: SF-30 Amend. A002
Description: Page 2 through 5 of Amend. A002
Description: Attachment - Revised Section B, pages 2 through 7 of Sol. HSCG85-09-B-625022

Amendment 3

Type:
Mod/Amendment
Posted Date:
December 10, 2008
SF30 (A0003).doc (50.50 Kb)
Description: SF-30 Amend. A003
Description: Page 2 of Amend. A003

Amendment 4

Type:
Mod/Amendment
Posted Date:
December 16, 2008
SF30 (A0004).doc (50.50 Kb)
Description: SF-30, Amend. A004 HSCG85-09-B-625022
Description: Page 2 of SF-30, Amend. A004 HSCG85-09-B-625022
:
1301 Clay St.,
Suite 807N
Oakland, California 94612-5249
:
Contractor's facility

United States
:
Valerie S Rivera-Chase,
Contracting Officer
Phone: (510) 637-5972
Fax: (510) 637-5978
:
Gerald R Acock,
CONTRACT SPECIALIST
Phone: (808) 843-3876
Fax: (808) 843-3883