Mark Hess Headquarters, Washington, DC January 20, 1995 (Phone: 202/358-1776) Doug Ward Johnson Space Center, Houston (Phone: 713/244-7926) RELEASE: 95-6 NASA SIGNS LEASE/PURCHASE PACT FOR CLEAR LAKE DEVELOPMENT FACILITY NASA today signed a firm, fixed-price $34 million lease/purchase agreement with the McDonnell Douglas Corporation to acquire real estate and facilities at the Clear Lake Development Facility, near the Johnson Space Center (JSC), Houston, TX. Under terms of the contract, McDonnell Douglas will turn over to NASA a group of three large, modern industrial buildings and surrounding property and will build the Neutral Buoyancy Laboratory (NBL) in one of the buildings. These facilities will be leased by NASA until authority to complete actual acquisition is secured from Congress. In addition to providing Shuttle operations training, NASA needs the NBL to train astronauts for Space Station assembly, which will involve the most extensive and complex EVAs ever attempted. Since existing weightless environment training facilities are inadequate to meet future extravehicular activities (EVA) training requirements, NASA developed plans to build the NBL. The existing 101,000 square foot Assembly and Test Building will house a 101-foot wide by 202-foot long water tank, 40 feet deep, where astronauts will simulate spacewalks such as those required to service the Hubble Space Telescope or assemble the 831,000 pound Space Station. Segments of the Space Station will be delivered to orbit beginning in November 1997 on U.S. Space Shuttles, Russian and European launch vehicles and assembled in space by astronauts. "This arrangement has numerous advantages," said Wilbur Trafton, Space Station Director. "It increases our confidence of delivering the NBL on schedule and on cost and it will be available earlier so that important training can begin." Trafton added that avionics facilities will be co-located with the NBL to increase program efficiency. -more- -2- NASA had planned to build the NBL on site at JSC. Under this new agreement, McDonnell Douglas will construct the NBL off site in the 101,000 square foot Assembly and Test Building and will deliver the NBL at least six months earlier than previously planned, allowing training not otherwise possible for early Space Station flights. Construction of the new facility will eliminate expensive dual shift training operations at JSC and the Marshall Space Flight Center, Huntsville, AL. The agreement also will produce additional savings from the early shut down of JSC's existing underwater training facility. The building that will house the NBL also is large enough to carry out more concurrent activities, increasing training efficiency. NASA will use the two other buildings - the 97,000 square foot Light Manufacturing Facility (LMF) and the 51,000 square foot Avionics Development Facility (ADF) -- for laboratory, technical support facilities and office space in excess of existing onsite and leased space. NASA will build, modify and store training mockups in the LMF. The ADF will provide contiguous laboratory space for avionics equipment and associated software development, integration and test activities. Under the agreement, NASA also will acquire the 13- acre property surrounding the Clear Lake Development Facility including a parking lot and private access to Ellington Field. -end- NASA press releases and other information are available automatically by sending an Internet electronic mail message to domo@hq.nasa.gov. In the body of the message (not the subject line) users should type the words "subscribe press-release" (no quotes). The system will reply with a confirmation via E-mail of each subscription. A second automatic message will include additional information on the service. Questions should be directed to (202) 358-4043.