1963-1965 News Releases + 1963 + 1964 + 1965 + 1963 News Releases (21.1 Mb PDF file) |
|
Date | Title |
Jan. 2, 1963 | 63-001 -- CONTRACT AWARDED TO RCA SERVICES COMPANY |
Jan. 3, 1963 | 63-002 -- UNITED FUND CAMPAIGN |
Jan. 2, 1963 | 63-003 -- DESIGN STUDY - DATA REDUCTION COMPLEX |
Jan. 8, 1963 | 63-004 -- PASTE FOR ATTACHING ELECTRODES |
Jan. 8, 1963 | 63-005 -- ROBERT O. PILAND AWARDED SPERRY AWARD |
Jan. 10, 1963 | 63-006 -- JAMES C. ELMS TO ADDRESS PROFESSIONAL GROUP FOR ENGINEERING MANAGEMENT (PGM) |
Jan. 10, 1963 | 63-007 -- SPACE CONTEST |
Jan. 22, 1963 | 63-012 -- GEMINI MANAGEMENT AGREEMENT |
Jan. 14, 1963 | 63-008 -- MERCURY SPACECRAFT TO BE DISPLAYED IN MINNEAPOLIS, MN |
Jan. 14, 1963 | MERCURY SPACECRAFT TO BE DISPLAYED IN EAST LANSING, MICH |
Jan. 14, 1963 | NASA TO DISPLAY SEVERAL SPACE EXHIBITS DURING HOUSTON BOAT SHOW |
Jan. 14, 1963 | MERCURY SPACECRAFT AND ROCKET MOTOR ON DISPLAY AT YUMA, AZ |
Jan. 14, 1963 | BIG JOE CAPSULE AND OTHER EXHIBITS IN GALVESTON |
Jan. 24, 1963 | 63-009 -- INSTITUTE OF RADIO ENGINEERS (IRE) PRESENTS AWARD TO FREDERICK J. BAILEY |
Jan. 26, 1963 | 63-010 -- TRAINING OF ASTRONAUT CANDIDATES |
63-011 -- APOLLO CONTRACTS | |
Jan. 22, 1963 | 63-012 -- GEMINI MANAGEMENT AGREEMENT |
Jan. 26, 1963 | 63-013 -- ASTRONAUT ASSIGNMENTS |
Jan. 28, 1963 | 63-014 -- PHILCO TO DEVELOP MANNED FLIGHT MISSION CONTROL CENTER AT HOUSTON |
Jan. 30, 1963 | 63-014 -- GRUMMAN RELEASE |
Jan. 31, 1963 | 63-015 -- LEM CONTRACT |
Feb. 1, 1963 | 63-017 -- PURSER W/BRITISH CONSUL - PHOTO |
Feb. 11, 1963 | 63-018 -- RAYTHEON CONTRACT FOR LUNAR COMMAND MODULE WORK |
Feb. 8, 1963 | 63-019 -- SUMMER INTERN PROGRAM |
Feb. 5, 1963 | 63-020 -- MA-9 DELAY |
Feb. 8, 1963 | 63-021 -- GILRUTH NAMED AS VISITING PROFESSOR - TEXAS A & M |
Feb. 9, 1963 | 63-022 -- CONGRESSIONAL COMMITTEE VISITS MSC |
Feb. 11, 1963 | 63-023 -- ASTRONAUTS STUDY ORBITAL MECHANICS - PHOTO |
Feb. 11, 1963 | 63-024 -- MARION POWER SHOVEL COMPANY AWARDED CRAWLER TRANSPORT CONTRACT |
Feb. 11, 1963 | 63-025 -- GEMINI PARACHUTE TESTS |
Feb. 12, 1963 | 63-026 -- MA-9 DELAY |
Feb. 13, 1963 | 63-027 -- REORGANIZATION OF APOLLO OFFICE |
Feb. 20, 1963 | 63-032 -- MSC AWARDS FIRE PREVENTION, PROTECTION CONTRACT |
Feb. 27, 1963 | 63-028 -- ROTATING SPACE STATION |
Feb. 20, 1963 | 63-030 -- U. S. ORBITAL FLIGHT ANNIVERSARY |
Feb. 20, 1963 | 63-031 -- LITTLE JOE II CONTRACT |
Feb. 26, 1963 | 63-035 -- DR. JOHN BILLINGHAM JOINS MSC |
Feb. 26, 1963 | 63-036P -- DR. BILLINGHAM PORTRAIT Feb. 26 |
March 12, 1963 | 63-037P -- ASTRONAUTS IN APOLLO COMMAND MODULE |
March 4, 1963 | 63-038 -- MSC ACQUIRES TEST VESSEL |
March 3, 1963 | 63-039 -- SCHOOL HAS SPACE SPEAKER -JACK K. POUND |
63-040 -- ASTRONAUT PHOTO -ALL 16 | |
March 4, 1963 | 63-041 -- PTA TO HEAR SPACE OFFICIAL - JACK G. CAIRL |
March 4, 1963 | 63-043 -- SPACE OFFICIAL TO SPEAK - JACK R. LISTER |
March 4, 1963 | 63-044P -- CUB SCOUTS SEE SPACE FLIGHT EQUIPMENT |
March 5, 1963 | 63-045 -- FACILITY SUPPORT CONTRACT NEGOTIATED |
March 7, 1963 | 63-046 -- HUNTSVILLE PRISON RELEASE |
March 8, 1963 | 63-047P -- GLENN RELAY PHOTO |
March 11, 1963 | 63-048P -- JOSEPH A. KRATOVIL IS NEW MSC FINANCE OFFICER |
March 11, 1963 | 63-049 -- LEM CONTRACT IS AWARDED TO GRUMMAN |
March 15, 1963 | 63-050 -- NORMAN G. FOSTER TO SPEAK AT A & M |
March 14, 1963 | 63-051P -- SPACE SCIENCES WORKSHOP FOR HOUSTON SCHOOLS |
March 20, 1963 | 63-052 -- HARNESSING LASERS FOR SPACE |
March 20, 1963 | 63-053P -- LASER PHOTO |
March 19, 1963 | 63-052 -- LEAR SIEGLER DELIVERS SLOW SCAN TV CAMERA TO BE USED ON MERCURY FLIGHT |
March 20, 1963 | 63-054 -- GODDARD TROPHY AWARDED TO JOHN H. GLENN, JR. |
March 21, 1963 | 63-055 -- MSC WEATHER ADVISORY GROUP FORMED |
March 22, 1963 | 63-056 -- SPACE FOODS |
March 20, 1963 | 63-057P -- INTEGRATED MISSION CONTROL CENTER |
March 20, 1963 | 63-058 -- JAMES CORREALE DEVELOPS CRASH HELMET |
March 20, 1963 | 63-059P -- DISPLAY AT WORLD TRADE CENTER - PHOTO |
March 19, 1963 | 63-060 -- PERSONNEL CHANGES - CHAMBERLIN & MATHEWS |
March 26, 1963 | 63-061 -- ECS -AIRESEARCH |
March 22, 1963 | 63-062 -- HAYES GRAPHIC ARTS CONTRACT |
March 27, 1963 | 63-063 -- SPACE SUIT PERFORMANCE DEVICE |
March 27, 1963 | 63-064P -- SPACE SUIT PHOTO |
63-065P -- MERCURY SPACECRAFT ROLLED INTO VACUUM CHAMBER AT MSC | |
March 27, 1963 | 63-066 -- PHILCO FORD'S CONTRACT FOR MSC SIGNED |
April 4, 1963 | 63-067 -- DRAG BALLOON IN DEVELOPMENT |
March 29, 1963 | 63-068 -- SPACE CONTEST |
March 31, 1963 | 63-069 -- MSC EXHIBIT IN WORLD TRADES CENTER IN HOUSTON |
April 2, 1963 | 63-070 -- DR. CHARLES A. BERRY TO SPEAK IN NEW YORK |
April 2, 1963 | 63-071 -- NASA SIGNS GEMINI CONTRACT WITH MCDONNELL AIRCRAFT CORPORATION |
April 3, 1963 | 63-072 -- CHARLES W. FRICK RESIGNS FROM NASA MSC |
April 5, 1963 | 63-073 -- CONTRACT TO WILLIAM J. GRAHAM AND SON COMPANY FOR FACILITIES |
April 10, 1963 | 63-074 -- JOHN B. LEE AND WALTER C. WILLIAMS TO PRESENT PAPER TO ADVISORY GROUP OF AERONAUTICAL RESEARCH AND DEVELOPMENT (AGARD) |
April 10, 1963 | 63-075 -- JOE T. DOKE TO SPEAK TO KIWANIS |
April 12, 1963 | 63-076 -- DR. STANLEY C. WHITE IS REASSIGNED |
April 19, 1963 | 63-077 -- HOUSTON'S WORLD TRADE CENTER |
April 25, 1963 | 63-078 -- COOK BIOMEDICAL TAPE RECORDERS TO BE FLOWN ON GEMINI |
63-078A -- PHYSICAL EFFECTS OPERATIONS OF CLEAR LAKE | |
April 30, 1963 | 63-079 -- APOLLO MISSION TRAINERS |
63-080 -- GLENN TO JAPAN | |
63-081 -- LEM SYSTEMS SIMULATION | |
May 2, 1963 | 63-082 -- CREWS SYSTEMS DIVISION HARDWARE DEV. |
May 3, 1963 | 63-083 -- JOE DOKE FEATURE |
May 3, 1963 | 63-084 -- ELMS TO SPEAK IN CHICAGO |
May 3, 1963 | 63-085 -- DROP TEST OF PROJ. APOLLO EARTH LANDING SYSTEM |
May 7, 1963 | 63-086 -- GEMINI SPACECRAFT WATER LANDING |
May 9, 1963 | 63-087 -- TECHNICAL SVCS CONT. TO LOCKHEED |
May 10, 1963 | 63-088 -- SPECIFIC DIVISION OF MANAGEMENT RESPONSIBILITIES |
May 13, 1963 | 63-089 -- MA-9 ADVISORY MAY 13 |
May 15, 1963 | 63-090 -- AEROMEDICAL RECORDERS |
May 28, 1963 | 63-091 -- WESTINGHOUSE CONTRACT AWARD |
May 29, 1963 | 63-092 -- LEM DESCENT ENGINE AWARD TO STL |
May 28, 1963 | 63-093 -- ELECTRICAL AMPLIFIER IN "FAITH 7" |
63-094 -- REALIGNMENT OF HJORNEVIKS ADMINISTRATION | |
June 5, 1963 | 63-095 -- 15 NEW ASTRONAUT TRAINEES TO BE SELECTED |
June 6, 1963 | 63-096 -- ASTRONAUT'S JUNGLE TRAINING |
June 10, 1963 | 63-097 -- PRINTING AND REPRODUCTION CONTRACT |
June 12, 1963 | 63-098 -- MARTIAN "TAXI" |
June 10, 1963 | 63-099 -- PETERSON AS SPEAKER IN NORMAN, OKALHOMA |
June 12, 1963 | 63-100 -- HAMILTON STD. ENVIRONMENTAL CONTROL CONT. |
June 12, 1963 | 63-101 -- GILRUTH'S COMMENTS ON HOLMES RESIGNATION |
June 18, 1963 | 63-102 -- MSC'S EFFORT TO FIND NEW ASTRONAUTS |
June 18, 1963 | 63-103 -- MSC'S HIRING OF 190 TEMPORARY STUDENTS |
June 19, 1963 | 63-104 -- THOMPSON AS SPEAKER IN MISSISSIPPI |
June 20, 1963 | 63-105 -- MANAGEMENT INTERN PROGRAM |
June 22, 1963 | 63-106 -- OWEN MAYNARD FEATURE BIOGRAPHY |
June 26, 1963 | 63-107 -- GEMINI SYSTEMS TRAINERS |
June 26, 1963 | 63-108 -- FRICTIONLESS PLATFORM |
July 3, 1963 | 63-109 -- JOHN STONESIFER FEATURE |
July 5, 1963 | 63-110 -- ASTRONAUT SPACE SUIT TESTS |
July 3, 1963 | 63-111 -- GEMINI EJECTION SEAT TESTS ON ROCKET SLED |
July 6, 1963 | 63-112 -- BRINKMAN, EDMONDS & HOLLAND TO PHOTO CONV. |
July 14, 1963 | 63-113 -- SOLAR ECLIPSE |
July 14, 1963 | 63-114 -- SECOND INDUSTRY AEROSPACE SYMPOSIUM |
July 16, 1963 | 63-115 -- LITTLE JOE II LAUNCH VEHICLE |
July 16, 1963 | 63-116 -- DICK JOHNSTON'S NEW ASSIGNMENT |
July 16, 1963 | 63-117 -- PROFESSIONAL PHOTO EXHIBIT IN DALLAS |
July 16, 1963 | 63-118 -- MAJ. GEN. O. K. NEISS NEW ASSIGNMENT |
July 22, 1963 | 63-119 -- RADNOFSKY & SHEWMAKE LIFE RAFT AWARD |
July 24, 1963 | 63-120 -- WILLIAM E. STONEY, JR. NAMED CHIEF OF SPACECRAFT TECHNOLOGY DIVISION AT MSC'S OFFICE OF ENGINEERING AND DEVELOPMENT |
July 25, 1963 | 63-121 -- DAVE W. LANG JR. WILL SPEAK AT THE SECOND INDUSTRY ASSISTANCE SYMPOSIUM AT RICE UNIVERSITY |
July 29, 1963 | 63-122 -- ROBERT T. RODRIGUEZ, SHORTAGE IN FINANCIAL MGMT. |
Aug. 1, 1963 | 63-123 -- DR. CHARLES A. BERRY ACCEPTS CIVILIAN APPOINTMENT TO MSC |
Aug. 7, 1963 | 63-124 -- KRAFT TO SPEAK AT SATELLITE CONFERENCE |
Aug. 8, 1963 | 63-125 -- GEMINI WATER RECOVERY TEST COMPLETED AT SALTON SEA, CA |
Aug. 16, 1963 | 63-126 -- PORTIONS OF CHRIS KRAFT'S SPEECH |
Aug. 18, 1963 | 63-127 -- ASTRONAUT WORK WEEK FOR VIRGIL I. "GUS" GRISSOM |
Aug. 13, 1963 | 63-128 -- EMMIT E. FISHER SPECIAL RELEASE |
Aug. 13, 1963 | 63-129 -- ELTON A. WILBORN SPECIAL RELEASE |
Aug. 13, 1963 | 63-130 -- DANIEL G. NICHOLS SPECIAL RELEASE |
Aug. 13, 1963 | 63-131 -- CARRINGTON H. STEWART SPECIAL RELEASE |
Aug. 13, 1963 | 63-132 -- TOMMIE LEE WALTON SPECIAL RELEASE |
Aug. 13, 1963 | 63-133 -- VICTOR RHODER SPECIAL RELEASE |
Aug. 13, 1963 | 63-134 -- JOSEPH T. BARKER SPECIAL RELEASE |
Aug. 15, 1963 | 63-135 -- GEMINI SPECIAL TRAINER |
Aug. 21, 1963 | 63-137 -- MA-9 CONFERENCE |
Aug. 23, 1963 | 63-138 -- JINICHI OHTSUKI VISIT |
Aug. 23, 1963 | 63-139 -- DONALD T. GREGORY'S SPEECH IN MIAMI |
Aug. 27, 1963 | 63-140 -- AIR ATMOSPHERE FURNANCE |
Aug. 28, 1963 | 63-141 -- WESLEY J. HJORNEVIK'S SPEECH IN DECATUR |
Aug. 28, 1963 | 63-142 -- PROJECT SPARE |
Aug. 28, 1963 | 63-143 -- RADIO FREQUENCY SHIELDED ENCLOSURE |
Sept. 4, 1963 | 63-144 -- VACUUM CHAMBER TO SIMULATE SPACE ENVIRONMENT |
Sept. 5, 1963 | 63-145 -- SYNOPSIS OF WESLEY J. HJORNIVIK'S SPEECH |
Sept. 6, 1963 | 63-147 -- KOLLSMAN INSTRUMENT CORPORATION CONTRACT |
Sept. 10, 1963 | 63-146 -- NORMAN BALESCO SPEECH |
Sept. 10, 1963 | 63-149 -- WALTER C. WILLLIAMS TO SPEAK IN MEXICO |
Sept. 11, 1963 | 63-150 -- CONSTRUCTION OF MSC SITE 75%COMPLETE |
Sept. 12, 1963 | 63-152 -- GEMINI/APOLLO SEA RETRIEVAL EQUIPMENT |
Sept. 13, 1963 | 63-148 -- FIRST SUMMER INTERN PROGRAM OVER |
Sept. 13, 1963 | 63-151 -- ASTRONAUT PARACHUTE LAND AND WATER LANDINGS AT MSC |
Sept. 17, 1963 | 63-153 -- PROJECT MERCURY SUMMARY CONFERENCE AT MSC |
Sept. 23, 1963 | 63-154 -- PAPERS TO BE PRESENTED AT NATIONAL BUSINESS AIRCRAFT ASSOCIATION |
Sept. 24, 1963 | 63-155 -- JOHN J. PETERSON'S ASSIGNED EXECUTIVE ASSISTANT TO THE PUBLIC AFFAIRS OFFICER |
Sept. 25, 1963 | 63-156 -- FACILITIES MANAGEMENT CONFERENCE |
Sept. 25, 1963 | 63-157 -- SECOND GROUP OF ASTRONAUTS COMPLETE WATER SURVIVAL TRAINING |
Oct. 2, 1963 | 63-159 -- GEMINI PARAGLIDER CONTRACT AWARDED TO NORTH AMERICAN AVIATION |
Oct. 4, 1963 | 63-160 -- DELIVERY OF 1ST GEMINI SPACECRAFT TO CAPE |
Oct. 7, 1963 | 63-161 -- AVCO TO BUILD ENVIRONMENTAL CHAMBER AT MSC |
Oct. 8, 1963 | 63-162 -- EDWARD MANUFACTURING COMPANY TO BUILD APOLLO RECOVERY DAVIT ASSEMBLY TO BE USED ON THE LANDING CRAFT RETRIEVER |
Oct. 9, 1963 | 63-163 -- DR. JOSEPH P. SHEA TO HEAD UP APOLLO OFFICE |
Oct. 4, 1963 | 63-164 -- FAITH 7 TO BE DISPLAYED IN LITTLE ROCK |
Oct. 10, 1963 | 63-165 -- CONTRACT AWARDED TO NORTH AMERICAN AVIATION TO STUDY MODIFICATIONS TO APOLLO SPACECRAFT THAT WILL PERMIT IT TO PERFORM AS A SPACE SCIENCES LABORATORY |
Oct. 9, 1963 | 63-166 -- LOGISTICS DIVISION MOVE TO CLEAR LAKE AT MSC |
Oct. 10, 1963 | 63-167 -- FAITH 7 IN JEFFERSON CITY, MO |
Oct. 11, 1963 | 63-168 -- $100,000 CONTRACT TO AMERICAN GYROS FOR LITTLE JOE II GUIDANCE SYSTEM |
Oct. 11, 1963 | 63-170 -- NEWS BUREAU COMBINES FUNCTIONS OF THREE PAO BRANCHES INTO ONE UNIT |
Oct. 16, 1963 | 63-171 -- TEXAS INSTRUMENTS CONTRACT AWARDED TO STUDY METHODS OF GATHERING LUNAR SAMPLES |
63-172 -- FAITH 7 IN SPRINGFIELD, IL | |
Oct. 17, 1963 | 63-173 -- REPORT ON GORDON COOPER'S VISUAL SIGHTINGS |
Oct. 16, 1963 | 63-174 -- NOTE TO EDITORS: NEW ASTRONAUT GROUP PRESS CONFERENCE |
Oct. 18, 1963 | 63-175 -- LEM GUIDANCE AND NAVIGATION CONTRACT |
Oct. 18, 1963 | 63-180 -- NEW GROUP OF ASTRONAUTS INTRODUCED AT PRESS CONFERENCE |
Oct. 18, 1963 | 63-181 -- WHERE NEW GROUP OF ASTRONAUTS COME FROM |
Oct. 18, 1963 | 63-182 -- DONN F. EISELE BORN IN COLUMBUS, OH |
Oct. 18, 1963 | 63-183 -- DONN F. EISELE AND WILLIAM A. ANDERS |
Oct. 18, 1963 | 63-184 -- EUGENE A. CERNAN |
Oct. 18, 1963 | 63-185 -- CHARLES A. BASSETT II |
Oct. 18, 1963 | 63-186 -- DONN F. EISELE |
Oct. 18, 1963 | 63-187 -- CHARLES A. BASSETT II |
Oct. 18, 1963 | 63-188 -- RICHARD F. GORDON, JR. |
Oct. 18, 1963 | 63-189 -- RUSSELL L. SCHWEICKART |
Oct. 18, 1963 | 63-190 -- EDWIN E. ALDRIN, JR. |
Oct. 18, 1963 | 63-191 -- RUSSELL L. SCHWEICKART |
Oct. 18, 1963 | 63-192 -- R. WALTER CUNNINGHAM |
Oct. 18, 1963 | 63-193 -- DAVID R. SCOTT AND WILLIAM A. ANDERS |
Oct. 18, 1963 | 63-194 -- DAVID R. SCOTT AND WILLIAM A. ANDERS |
Oct. 18, 1963 | 63-195 -- RUSSELL L. SCHWEICKART |
Oct. 18, 1963 | 63-196 -- RICHARD F. GORDON, JR. |
Oct. 18, 1963 | 63-197 -- THEODORE C. FREEMAN |
Oct. 18, 1963 | 63-198 -- THEODORE C. FREEMAN |
Oct. 18, 1963 | 63-199 -- ALAN L. BEAN |
Oct. 18, 1963 | 63-200 -- EUGENE A. CERNAN |
Oct. 18, 1963 | 63-201 -- ROGER B. CHAFFEE |
Oct. 18, 1963 | 63-202 -- ROGER B. CHAFFEE SPECIAL TO GRAND RAPIDS PRESS |
Oct. 18, 1963 | 63-203 -- ROGER B. CHAFFEE |
Oct. 18, 1963 | 63-204 -- CLIFTON C. WILLIAMS, JR. |
Oct. 22, 1963 | 63-176 -- FAITH 7 TO BE IN INDIANAPOLIS, IN |
Oct. 22, 1963 | 63-178 -- APOLLO BOILERPLATE DROP TEST AT EL CENTRO, CA |
Oct. 22, 1963 | 63-179 -- WALTER C. WILLIAMS NAMED OPERATIONS DIRECTOR FOR ALL MANNED SPACE FLIGHT MISSIONS |
Oct. 23, 1963 | 63-177 -- HAMILTON STANDARD CONTRACT ONE-MAN ROCKET FOR USE ON THE MOON |
Oct. 23, 1963 | 63-206 -- ADDITIONAL FACILITIES CONSTRUCTION BID |
Oct. 24, 1963 | 63-205 -- REQUEST FOR PROPOSALS -MOULING AND CRATING |
Oct. 24, 1963 | 63-207 -- APOLLO PROTOTYPE SPACE SUIT W/PHOTO |
Oct. 26, 1963 | 63-169 -- DONALD T. GREGORY TO SPEAK AT MONTONA |
Oct. 28, 1963 | 63-208 -- EDWIN SAMFIELD NEW CHIEF OF ENGINEERING DIVISION |
Oct. 28, 1963 | 63-209 -- ASTRONAUTS MOVE TO ELLINGTON FIELD |
Oct. 28, 1963 | 63-210 -- MARTIN A. BYRNES, JR. TO SPEAK AT MILK CONVENTION |
Oct. 29, 1963 | 63-216 -- AVCO GETS CONTRACT STUDY FOR $197,940 |
Oct. 30, 1963 | 63-211 -- FAITH 7 TO BE IN COLUMBUS, OH |
Oct. 30, 1963 | 63-212 -- FAITH 7 TO BE IN FRANKFORT, KY |
Oct. 30, 1963 | 63-217 -- SUBMISSION OF BIDS ON CUSTODIAL SERVICES |
Oct. 30, 1963 | 63-218 -- CONTRACT AWARD TO ZIA COMPANY FOR MAINTENANCE AND SUPPORT AT WHITE SANDS |
Oct. 30, 1963 | 63-219 -- LIGHT WEIGHT LIFE SUPPORT SYSTEM |
Oct. 31, 1963 | 63-220 -- RADIATION INC. $9,000 CONTRACT |
Oct. 31, 1963 | 63-221 -- SPACE ORDNANCE SYSTEMS CONTRACT |
Oct. 31, 1963 | 63-222 -- MARQUARD CORPORATION CONTRACT |
Nov. 1, 1963 | 63-223 -- LITTLE JOE II CONTRACT WITH GENERAL DYNAMICS CONVAIR |
Nov. 8, 1963 | 63-213 -- FAITH 7 TO BE IN CHARLESTON, WV |
Nov. 5, 1963 | 63-224 -- LING-TEMCO-VOUGHT CONTRACT $237, 000 |
Nov. 5, 1963 | 63-225 -- WYLE LABORATORIES $183,152 CONTRACT |
Nov. 5, 1963 | 63-227 -- REORGANIZATION OF MSC |
Nov. 8, 1963 | 63-226 -- VIBRATION TEST LAB INVITATION TO BID 11/8/63 GENERAL |
Nov. 8, 1963 | 63-228 -- MARGARET CATHERINE HILL WINS SCIENCE YOUTH AWARD |
Nov. 8, 1963 | 63-229 -- GERALD A. SERWER WINS SCIENCE YOUTH AWARD |
Nov. 8, 1963 | 63-230 -- ROBERT MOORE WINS SCIENCE YOUTH AWARD |
Nov. 12, 1963 | 63-231 -- JOSE OLIVAREZ WINS SCIENCE YOUTH AWARD |
Nov. 12, 1963 | 63-232 -- SANDRA K. TOMLIN WINS SCIENCE YOUTH AWARD |
Nov. 12, 1963 | 63-233 -- MARY K. MALINS WINS SCIENCE YOUTH AWARD |
Nov. 12, 1963 | 63-234 -- H.T. CHRISTMAN TO SPEAK AVIATION DISTRIBUTORS |
Nov. 12, 1963 | 63-235 -- BIDS ON COMPACT MEASURING BEACON |
Nov. 13, 1963 | 63-236 -- NEW PROCUREMENT METHODS |
Nov. 13, 1963 | 63-237 -- $80,000 CONTRACT TO SECURITY GUARD SERVICES |
Nov. 14, 1963 | 63-238 -- LING-TEMCO-VOUGHT STUDY SPACE RENDEZVOUS |
Nov. 14, 1963 | 63-239 -- CONTRACT FOR COMPUTER PROGRAMMING |
Nov. 15, 1963 | 63-214 -- FAITH 7 TO BE IN RICHMOND, VA |
Nov. 18, 1963 | 63-240 -- DR. ROBERT B. VOAS TO SPEAK IN ATHENS, OH |
Nov. 18, 1963 | 63-241 -- ACCESS ROAD AND GUARD STATIONS AT MSC |
Nov. 21, 1963 | 63-242 -- SLAYTON BECOMES NASA CIVILIAN |
Nov. 22, 1963 | 63-215 -- FAITH 7 TO BE IN RALEIGH, NC |
Nov. 23, 1963 | 63-243 -- METEORITE STUDIES |
Nov. 26, 1963 | 63-244 -- ARIZONA SPECIAL |
Nov. 26, 1963 | 63-245 -- ARIZONA SPECIAL |
Nov. 26, 1963 | 63-246 -- ARIZONA SPECIAL |
Nov. 27, 1963 | 63-249 -- $49,000 CONTRACT TO NORTH AMERICAN AVIATION |
Nov. 31, 1963 | 63-248 -- FAITH 7 TO BE IN NASHVILLE, TN |
Dec. 1, 1963 | 63-250 -- CENTRAL DATA BUILDING ACCEPTED AT MSC |
Dec. 2, 1963 | 63-247 -- FAITH 7 TO BC IN COLUMBIA, SC |
Dec. 6, 1963 | 63-251 -- DR. ROBERT B. VOAS TO SPEAK IN NEW ORLEANS |
Dec. 12, 1963 | 63-252 -- CENTRAL HEATING AND COOLING PLANT ACCEPTED |
Dec. 12, 1963 | 63-253 -- TRUCKING FIRMS AWARDED CONTRACT |
Dec. 13, 1963 | 63-254 -- CENTRAL DATA OFFICE BUILDING MOVE |
Dec. 23, 1963 | 63-255 -- TECHNICAL INFORMATION DIVISION MOVE TO CLEAR LAKE |
Dec. 20, 1963 | 63-257 -- LEM CONTRACT $8,370,000 FOR ENVIRONMENTAL CONTROL SYSTEM TO HAMILTON STANDARD |
Dec. 19, 1963 | 63-258 -- BOWLAND JANITORIAL SERVICES CONTRACT |
Dec. 24, 1963 | 63-259 -- GEMINI MISSION SIMULATOR |
Dec. 21, 1963 | 63-260 -- TECHNICAL SERVICES SHOP NEARING COMPLETION |
Dec. 23, 1963 | 63-261 -- SPACECRAFT CONTROL LAB INVITE TO BID |
Dec. 27, 1963 | 63-262 -- FUEL CELL DELIVERED BY PRATT AND WHITNEY AIRCRAFT |
Dec. 28, 1963 | 63-263 -- SPACE ENVIRONMENT CHAMBER AWARD |
+ 1964 News Releases (16.5 Mb PDF file) | |
Date | Title |
Jan. 7, 1964 | 64-001 -- GEMINI FLASHING BEACON |
Jan. 3, 1964 | 64-001A -- RCA CONTRACT FOR HIGH VACUUM CHAMBER |
Jan. 6, 1964 | 64-002 -- GEMINI TEST VEHICLE ARRIVAL |
64-002A -- FAITH 7 ON DISPLAY IN ATLANTA, GA | |
Jan. 7, 1964 | 64-003 -- LASER TRACKING STUDY FOR DEEP SPACE |
64-003A -- FAITH 7 ON DISPLAY IN TALLAHASSEE, FL | |
Jan. 7, 1964 | 64-004 -- GEMINI STATIC FIRING TESTS |
Jan. 8, 1964 | 64-005 -- DR. CHARLES A. BERRY'S SPEECH TO CHAMBER OF COMMERCE, ALICE, TEXAS |
Jan. 10, 1964 | 64-006 -- MARS MISSION STUDY |
Jan. 9, 1964 | 64-007 -- TECH SERVICES DIVISION MOVE |
Jan. 11, 1964 | 64-008 -- PROGRESS OF MCC AT CLEAR LAKE |
64-008A -- FAITH 7 ON DISPLAY IN MONTGOMERY, AL | |
Jan. 15, 1964 | 64-009 -- BENDIX CONTRACT FOR SHOCK ABSORBING DEVICE |
Jan. 21, 1964 | 64-009A -- TITAN II STATIC-FIRING |
Jan. 17, 1964 | 64-010 -- ENVIRONMENTAL CHAMBER DOOR FRAME IN PLACE |
Jan. 16, 1964 | 64-011 -- MAIN DRIVE MOTOR IN FLIGHT ACCELERATION FACILITY |
Jan. 16, 1964 | 64-012 -- TRANSISTORIZED MICRO-CIRCUIT SIGNAL IN GEMINI MEASURING SYSTEM (BLOOD) |
Jan. 17, 1964 | 64-013 -- JAMES C. ELMS RESIGNS |
Jan. 19, 1964 | 64-014 -- GEORGE M. LOW NAMED DEPUTY DIRECTOR |
Jan. 22, 1964 | 64-015 -- AMERICAN MACHINE AND FOUNDRY COMPANY CONTRACT FOR FREE FALL PLATFORM |
64-016 -- EDUCATIONAL - MERCURY ENVIRONMENTAL CONTROL SYSTEM | |
Jan. 23, 1964 | 64-017 -- CONTRACT AMENDMENT FOR CONSTRUCTION AND MODIFICATION OF BLDGS. AT DOWNEY, TO S & TD, NAA |
Jan. 24, 1964 | 64-018 -- ACCEPTANCE OF 7 FLOORS OF PROJECT MANAGEMENT BLDG. AT CLEAR LAKE |
Jan. 24, 1964 | 64-019 -- TRAINING ASTRONAUTS EGRESS FROM GEMINI SPACECRAFT |
64-020 -- FAITH 7 SPACECRAFT TO JACKSON, MS | |
Jan. 27, 1964 | 64-021 -- WESTINGHOUSE CONTRACT FOR STUDY TO PRODUCE UNLIMITED ANGULAR MOTION |
Jan. 31, 1964 | 64-022 -- RAZOR AND VACUUM CLEANER TO BE USED IN SPACE SHAVER, PATENTED BY SHAV-AIR INTERNATIONAL |
Jan. 31, 1964 | 64-023 -- ASTRONAUTS' PHYSICAL STRESS |
Feb. 3, 1964 | 64-024 -- 14 NEW ASTRONAUTS REPORTING IN FOR TRAINING |
Feb. 4, 1964 | 64-024A -- FAITH 7 TOUR IN BATON ROUGE, LA |
Feb. 6, 1964 | 64-025 -- AIRESEARCH MFG. CO. CONTRACT FOR EXTRA-VEHICULAR PRESSURIZATION VENTILATION SYSTEM FOR GEMINI |
64-026 -- FAITH 7 TOUR IN AUSTIN, TX | |
Feb. 12, 1964 | 64-027 -- FLYING THE LEM STANDING IN HARNESS |
Feb. 15, 1964 | 64-028 -- ASTRONAUTS RECEIVE STATUETTES FROM BOY SCOUTS |
Feb. 11, 1964 | 64-029 -- MASS MOVE OF PERSONNEL BEGINS Feb. 20, 1964 |
Feb. 17, 1964 | 64-030 -- APOLLO SPACECRAFT LEAVES NAA FOR CAPE |
64-031 -- FAITH 7 IN SANTA FE, NM | |
Feb. 17, 1964 | 64-032 -- FUEL CELL FOR THE APOLLO PROGRAM |
Feb. 19, 1964 | 64-033 -- APOLLO BOILERPLATE ARRIVED CAPE FROM NAA |
64-034 -- FAITH 7 IN PHOENIX, AZ | |
Feb. 20, 1964 | 64-000 -- NOTE TO EDITORS: NEWS SERVICES BRANCH OF PAO MOVING TO CLEAR LAKE |
Feb. 24, 1964 | 64-035 -- 300 TO MOVE ON Feb. 28, 1964 TO SITE |
Feb. 26, 1964 | 64-036 -- WESLEY HJORNEVIK AND CHARLES W. MATHEWS TO SPEAK IN FORT WORTH |
Feb. 26, 1964 | 64-037 -- PROPOSAL FOR LUNAR SURVEY EXPERIMENTS |
Feb. 27, 1964 | 64-038 -- MSC ACCEPTS LIFE SYSTEMS LAB |
March 2, 1964 | 64-039 -- APOLLO BOILERPLATE CM ARRIVED WHITE SANDS |
March 2, 1964 | 64-040 -- DR. CHARLES BERRY NAMED CHIEF OF CENTER MEDICAL PROGRAMS |
64-041 -- FAITH 7 IN SACRAMENTO, CA | |
64-042 -- FAITH 7 IN CARSON CITY, NV | |
64-043 -- FAITH 7 IN HONOLULU, HA | |
64-044 -- FAITH 7 IN JUNEAU, AK | |
March 9, 1964 | 64-045 -- ROBERT GILRUTH AND 500 MOVED TO MSC ON MARCH 6, 1964 |
March 5, 1964 | 64-046 -- 8 CONTRACTORS IN EXCESS OF $25,000 AWARDED IN Jan. |
March 5, 1964 | 64-047 -- MECHANICAL MATING OF G-1 AND GLV-1 ON LAUNCH COMPLEX NO. 19 AT CAPE |
March 6, 1964 | 64-048 -- 18 ASTROS IN GRAND CANYON TO LEARN GEOLOGY |
March 6, 1964 | 64-049 -- SALT WATERPROOF RECOVERY INTERPHONE FOR USE IN GEMINI PROGRAM |
March 9, 1964 | 64-050 -- DON GREEN TO SPEAK IN GALVESTON |
March 10, 1964 | 64-051 -- 225 PERSONNEL TO MOVE WEEK OF MARCH 9 |
March 11, 1964 | 64-052 -- COST REDUCTION PROGRAM BY CENTER |
March 1, 1964 | 64-053 -- RECLAIMED URINE, SOMEDAY DRINKABLE |
March 17, 1964 | 64-054 -- HARD-VACUUM WILL BE SOUGHT IN AN ULTRA-HIGH VACUUM CHAMBER TO BE BUILT |
March 23, 1964 | 64-055 -- JACK LISTER TO SPEAK IN HEARNE, TX |
March 13, 1964 | 64-056 -- LARGE ORBITAL RESEARCH LABORATORY (LORL) DOUGLAS AIRCRAFT COMPANY |
64-057 -- AIR-DROP TEST OF GEMINI PARASAIL | |
March 24, 1964 | 64-058 -- XENON FLASHING LIGHT |
March 25, 1964 | 64-000 -- NOTE TO EDITORS: 14 ASTROS AT MOREHEAD PLANETARIUM, CHAPEL HILL, NC |
March 25, 1964 | 64-059 -- PERSONNEL AT CLEAR LAKE SITE REACHES APPROXIMATELY 2,000 |
March 27, 1964 | 64-060 -- $100,000 MAINTENANCE CONTRACT TO LINK FOR GEMINI |
March 31, 1964 | 64-000 -- NOTE TO EDITORS: 16 ASTROS TO ALPINE TEXAS FOR TRAINING IN GEOLOGY |
March 25, 1964 | 64-060A -- SHORTAGE OF "GIRLS FRIDAY" AT MSC |
March 30, 1964 | 64-061 -- METEORITE FOUND IN FISHER COUNTY, TX |
March 30, 1964 | 64-062 -- REORGANIZATION OF MSC OPERATIONS AT CAPE |
March 31, 1964 | 64-063 -- DR. CHARLES BERRY TO ADDRESS TEACHERS ASSOCIATION IN ST. LOUIS |
64-064 -- FAITH 7 IN OLYMPIA, WA | |
April 2, 1964 | 64-000 -- FIRST GEMINI-TITAN LAUNCH POSTPONED UNTIL NO EARLIER THAN APRIL 8. |
April 8, 1964 | 64-065 -- HARD SUIT (WITH PIX) |
April 9, 1964 | 64-066 -- DR. JEANNETTE PICCARD APPOINTED NASA CONSULTANT AT MSC |
April 7, 1964 | 64-067 -- SPACE ENVIRONMENTAL SIMULATION LAB (SESL) CAPPED |
April 7, 1964 | 64-068 -- LLRV COMPLETED BY BELL AEROSYSTEMS |
May 8, 1964 | 64-069 -- GEMINI ASTRONAUTS WILL CHEW GUM |
64-070 -- FAITH 7 SPACECRAFT DISPLAY IN SALEM, OR | |
64-071 -- FAITH 7 SPACECRAFT DISPLAY IN BOISE, ID | |
64-072 -- FAITH 7 SPACECRAFT DISPLAY IN HELENA, MT | |
April 9, 1964 | 64-073 -- ROBERT J. WARD SPEAKS TO LIBERTY CHAMBER OF COMMERCE |
April 10, 1964 | 64-074 -- STRUCTURES AND MECHANICS LAB MOVES TO SITE |
April 11, 1964 | 64-000 -- MEMO TO EDITORS: NEWS SERVICES BRANCH OF PAO PHONE NUMBERS |
April 13, 1964 | 64-000 -- RESPONSE TO QUERY FROM NASA HQS: GT-1 SPACECRAFT AND BOOSTER REENTERED |
April 11, 1964 | 64-075 -- MSC MOVED FIRST REAL-TIME COMPUTER TO MCC |
April 14, 1964 | 64-076 -- ENGINEERS AND TECHNICAL AUTHORS OUTLINE LATEST TECHNOLOGIES IN RACE FOR THE MOON |
April 14, 1964 | 64-077 -- JOE T. DOKE ADDRESSES LIVINGSTON CLUB |
April 16, 1964 | 64-078 -- MSC PARTICIPATES IN REGIONAL AND STATE SCIENCE FAIRS |
64-079 -- FAITH 7 SPACECRAFT IN MAINE | |
April 20, 1964 | 64-080 -- APPRENTICE TRAINING PROGRAM |
April 21, 1964 | 64-081 -- G AND C DIV. MOVES - AUDITORIUM BAPTIZED |
April 20, 1964 | 64-082 -- TV PRESENTATION - MEDICAL SUPPORT OF MAN, PARASAIL TEST SCHEDULE |
April 22, 1964 | 64-000 -- MEMO TO EDITORS: PARASAIL TEST SCHEDULED FOR APRIL 23. |
April 22, 1964 | 64-083 -- DR. GILRUTH AND DR. SHEA PRESENT PAPERS AT 4TH NATIONAL CONFERENCE ON PEACEFUL USES OF SPACE |
April 24, 1964 | 64-084 -- THREE AEROSPACE PHYSICIANS PRESENTS TV PROGRAM |
April 29, 1964 | 64-000 -- GEMINI-SIZED BOILERPLATE DROP TEST |
April 30, 1964 | 64-085 -- FULL-SCALE PARAGLIDER DEPLOYMENT TEST FLIGHT |
May 1, 1964 | 64-086 -- APOLLO BOILERPLATE SM AND A ARRIVES FOR TEST |
May 5, 1964 | 64-087 -- DR. SHEA ADDRESSES EDITORIAL CARTOONISTS |
May 5, 1964 | 64-088 -- DON GREEN ADDRESSES SAN LEON C OF C |
May 6, 1964 | 64-089 -- 29 DISTINGUISHED FOREIGN VISITORS GUESTS MSC |
64-091 -- FAITH 7 SPACECRAFT DISPLAY IN DENVER CO | |
64-092 -- FAITH 7 SPACECRAFT DISPLAY IN CHEYENNE, WYOMING | |
May 9, 1964 | 64-093 -- GEMINI SPACECRAFT BOILERPLATE ROUGH WATER EGRESS TEST |
64-094 -- CANCELLED | |
May 14, 1964 | 64-095 -- CARPENTER TO PARTICIPATE IN NAVY'S PROJECT SEA LAB I |
64-096 -- NOT ISSUED | |
May 13, 1964 | 64-097 -- A.J. MAYER SPEAK TO WICHITA, KS CLUBS |
May 26, 1964 | 64-000 -- RESPONSE TO QUERY, SA-6 LAUNCH POSTPONED - EQUIPMENT FAILED |
May 14, 1964 | 64-098 -- C.D. SWORD RESIGNS |
May 25, 1964 | 64-099 -- NASA MSCS OPEN HOUSE |
64-100 -- FAITH 7 SPACECRAFT DISPLAY - MISSING | |
64-101 -- FAITH 7 SPACECRAFT DISPLAY IN BISMARK, ND | |
64-102 -- FAITH 7 SPACECRAFT DISPLAY IN ST. PAUL, MN | |
64-103 -- FAITH 7 SPACECRAFT DISPLAY IN LINCOLN, NB | |
May 27, 1964 | 64-104 -- CENTRIFUGE IS ABOUT 50% FINISHED |
May 28, 1964 | 64-105 -- T-38 HIGH PERFORMANCE JETS ARRIVES AT ELLINGTON |
May 28, 1964 | 64-106 -- 2ND FULL-SCALE PARAGLIDER TEST AT EDWARDS |
June 1, 1964 | 64-107 -- DR. COONS SPEAKS IN MONTREAL, CANADA |
June 8, 1964 | 64-108 -- CONTROL DATA CORPORATION OF MINNEAPOLIS GETS CONTRACT FOR AEC GROUND STATIONS |
June 9, 1964 | 64-109 -- GEONAUTICS INC. GETS CONTRACT TO STUDY HOW LUNAR SPACECRAFT MIGHT BE FLOWN BY REFERENCE TO LANDMARKS ON THE MOON |
June 10, 1964 | 64-110 -- BOILERPLATE L5 ARRIVES AT KSC |
June 11, 1964 | 64-111 -- GEMINI SPACECRAFT IS ESSENTIALLY COMPLETE |
June 22, 1964 | 64-112 -- FIRST GEMINI RECOVERY OPERATIONS SCHOOL |
July 1, 1964 | 64-113 -- LOVELL PRACTICED LANDING 1/3 SCALE PARASAIL GEMINI |
June 24, 1964 | 64-114 -- OVER 700 MSC EMPLOYEES MOVE |
June 24, 1964 | 64-115 -- ROBERT O. PILAND RECEIVES GOLDEN PLATE AWARD |
June 23, 1964 | 64-116 -- SECURITY CONTRACT TO M AND T OF PHILADELPHIA |
64-117 -- FAITH 7 SPACECRAFT ON DISPLAY AT TOPEKA, KS | |
64-118 -- FAITH 7 SPACECRAFT ON DISPLAY IN DES MOINES, IA | |
64-119 -- FAITH 7 SPACECRAFT ON DISPLAY IN MADISON, WI | |
64-120 -- FAITH 7 SPACECRAFT ON DISPLAY IN LANSING, MI | |
July 1, 1964 | 64-000 -- NASA NEWS RELEASE: SCIENCE AND TECH ADVISORY COMMITTEE FOR MANNED SPACE FLIGHT MEETS |
July 8, 1964 | 64-121 -- WATER-COOLED UNDERGARMENT TESTED |
July 1, 1964 | 64-122 -- LIN-TEMCO-VOUGHT TO DELIVER SIMULATOR |
July 2, 1964 | 64-123 -- NASA REPORTS SATURN LAUNCH RESULTS |
July 8, 1964 | 64-124 -- DR. GILRUTH SPEAKS AT PLANETARIUM OPENING |
July 9, 1964 | 64-125 -- NEW ASTRONAUT ASSIGNMENTS |
July 10, 1964 | 64-126 -- NASA'S GEMINI LAUNCH VEHICLE |
July 14, 1964 | 64-127 -- GEMINI LAUNCH VEHICLE IS ERECTED |
64-128 -- FAITH 7 DISPLAY IN HARRISBURG, PA | |
64-129 -- FAITH 7 SPACECRAFT ON DISPLAY IN ALBANY, NY | |
64-130 -- FAITH 7 SPACECRAFT ON DISPLAY IN MONTPELIER, VERMONT | |
July 21, 1964 | 64-131 -- DESERT SURVIVAL TRAINING |
July 22, 1964 | 64-132 -- PROJECT APOLLO SPACE TRAVELERS |
July 23, 1964 | 64-133 -- APPOINTMENT OF WESLEY E. MESSING |
July 29, 1964 | 64-134 -- APPOINTMENT OF CHRISTOPHER C. KRAFT |
July 29, 1964 | 64-135 -- TWO SUCCESSFUL TEST FLIGHTS |
July 30, 1964 | 64-136 -- A STUDY TO GET MORE MILEAGE-APOLLO |
Aug. 3, 1964 | 64-137 -- AN IMPACT ATTENUATION EXPERIMENT |
Aug. 5, 1964 | 64-138 -- COMPUTER COMPLEX OF GEMINI MISSION SIMULATOR ARRIVES AT MANNED SPACECRAFT CENTER |
Aug. 14, 1964 | 64-139 -- TWO TEST VEHICLES ARRIVE AT CAPE |
Aug. 20, 1964 | 64-140 -- APOLLO MISSIONS SIMULATIONS |
64-141 -- FAITH 7 SPACECRAFT ON DISPLAY IN CONCORD, NH | |
64-142 -- FAITH 7 SPACECRAFT ON DISPLAY IN BOSTON, MA | |
64-143 -- FAITH 7 SPACECRAFT ON DISPLAY IN PROVIDENCE, RI | |
64-144 -- FAITH 7 SPACECRAFT ON DISPLAY HARTFORD, CT | |
64-145 -- NASA SPACEMOBILE IN SOUTH DAKOTA | |
Aug. 28, 1964 | 64-146 -- TESTING STATION DECLARED OPERATIONAL |
Aug. 27, 1964 | 64-147 -- SPACE TECHNOLOGY STARTS APPRENTICE |
Aug. 17, 1964 | 64-148 -- NEW MERRITT ISLAND COMPLEX |
Sept. 4, 1964 | 64-149 -- EXTENSION OF PROJECT APOLLO SPACECRAFT CONTRACT |
Sept. 4, 1964 | 64-150 -- NEW FLIGHT DIRECTORS TO SERVE DURING GEMINI AND APOLLO SPACEFLIGHT MISSIONS |
Sept. 10, 1964 | 64-000 -- LAUNCH OF THE 7TH SATURN |
Sept. 11, 1964 | 64-151 -- DESIGN AND INSTALLATION OF DATA ACQUISITION EQUIPMENT |
Sept. 11, 1964 | 64-152 -- CORRECTION ON RELEASE NO. 64-149 |
Sept. 15, 1964 | 64-153 -- RANDOLPH HESTER IN A TEST |
Sept. 17, 1964 | 64-000 -- NASA TO NEGOTIATE WITH BROWN AND ROOT/NORTHROP FOR MSC CONTRACT |
Sept. 17, 1964 | 64-000 -- SCOTT CARPENTER AS EXECUTIVE ASSISTANT |
Sept. 16, 1964 | 64-000 -- DONN EISELE - A SIMPLE DISLOCATION OF LEFT SHOULDER DURING TRAINING |
Sept. 17, 1964 | 64-000 -- DELIVERY OF GEMINI SPACECRAFT #2 |
Sept. 21, 1964 | 64-153B -- WILLIAM A. ANDERS GROUND BY DOCTOR |
Sept. 24, 1964 | 64-154 -- SUNDAY OPEN HOUSE AT NASA |
64-155 -- FAITH 7 SPACECRAFT ON DISPLAY TRENTON, NJ | |
64-156 -- FAITH 7 SPACECRAFT ON DISPLAY DOVER, DELAWARE | |
64-157 -- FAITH 7 SPACECRAFT ON DISPLAY ANNAPOLIS, MD | |
Sept. 25, 1964 | 64-159 -- NASA HAS CONTRACT WITH SPACE AND INFORMATION SYSTEMS DIVISION |
Sept. 28, 1964 | 64-160 -- GEMINI WATER SUITABILITY TEST |
Oct. 1, 1964 | 64-161 -- INSPECTION OF A FULL-SCALE MOCK-UP OF THE APOLLO COMMAND AND SERVICE MODULES |
Oct. 3, 1964 | 64-162 -- NEW MANAGER OF NASA WHITE SANDS OPERATION |
Oct. 5, 1964 | 64-163 -- MAJOR TEST OF TRACKING NETWORK |
Oct. 8, 1964 | 64-164 -- A FULL-SCALE METAL MOCK-UP OF THE LUNAR EXCURSION MODULE LEM LM |
Oct. 8, 1964 | 64-165 -- CONTROL AND GUIDANCE FOR THE LITTLE JOE II BOOSTER |
Oct. 7, 1964 | 64-166 -- SYSTEMS TEST ON GEMINI TITAN II LAUNCH VEHICLE |
64-167 -- NASA SPACEMOBILE | |
64-168 -- NATION'S SPACE EFFORT TO BE EXPLAINED AT DEMONSTRATION | |
64-169 -- NASA SPACEMOBILE | |
Oct. 13, 1964 | 64-170 -- OVER-WATER TEST FIRING |
64-171 -- NASA SPACEMOBILE TO BE SCHEDULED IN NORTH DAKOTA | |
Oct. 19, 1964 | 64-000 -- NASA WILL RECRUIT 10 TO 20 SCIENTIST-ASTRONAUTS |
Oct. 21, 1964 | 64-172 -- THIRD MANNED SPACE FLIGHT MEETING TO BE HELD Nov. 4-6, 1964 AT RICE HOTEL |
Oct. 27, 1964 | 64-173 -- APOLLO ASTRONAUTS TO BEGIN TRAINING ON NEW MSC CENTRIFUGE |
Oct. 25, 1964 | 64-174 -- ASTRONAUT RUSSEL L. SCHWEICKART CELEBRATES 29TH BIRTHDAY |
Oct. 31, 1964 | 64-000 -- ASTRONAUT THEODORE C. FREEMAN KILLED IN T-38 CRASH |
Nov. 4, 1964 | 64-175 -- GEMINI SPACE SUIT QUALIFICATION PROGRAM FOR FIRST MANNED FLIGHTS |
Nov. 2, 1964 | 64-175A -- WESTINGHOUSE AWARDED $2.29 MILLION FOR LUNAR TV CAMERA |
Nov. 3, 1964 | 64-176 -- GEMINI MISSION SIMULATOR NOW OPERATIONAL AT CAPE KENNEDY |
Nov. 16, 1964 | 64-177 -- ELECTRON MICROPROBE ANALYZER BEGINS OPERATION AT MSC |
Nov. 16, 1964 | 64-178 -- REPORT ON INVESTIGATION OF ASTRONAUT THEODORE C. FREEMAN T-38 CRASH |
Nov. 17, 1964 | 64-179 -- NASA MEETS EDUCATIONAL CHALLENGE |
Nov. 18, 1964 | 64-180 -- HENRY E. "PETE" CLEMENTS |
64-181 -- NASA SPACEMOBILE TO BE SCHEDULED IN KANSAS | |
Nov. 20, 1964 | 64-182 -- TEXAS GOVERNOR JOHN CONNALLY TO VISIT MSC ON Nov. 23, 1964 |
Nov. 30, 1964 | 64-183 -- ARMY CH-47A (CHINOOK) HELICOPTER TO LIFT APOLLO SATURN SLA |
Nov. 24, 1964 | 64-185 -- CONFERENCE FOR SUMMER SESSION ADMINISTRATORS HELD AT MSC Nov. 22-24, 1964 |
Dec. 3, 1964 | 64-186 -- CHRISTMAS TREE LIGHTING CEREMONY HELD AT MSC |
Dec. 4, 1964 | 64-187 -- NASA TO RERUN GEMINI SIMULATION FOR UPCOMING GT-2 FLIGHT |
Dec. 7, 1964 | 64-188 -- MISSION REVIEW OF GT-2 MISSION |
64-000 -- WEATHER REPORT FOR UPCOMING GT-2 FLIGHT | |
Dec. 7, 1964 | 64-189 -- FOUR-DAY GEMINI SUIT COMFORT TEST PERFORMED BY TEST SUBJECT HOYT MAPLES |
Dec. 7, 1964 | 64-190 -- GT-2 SUBORBITAL LAUNCH TEST |
Dec. 8, 1964 | 64-191 -- APOLLO SYSTEMS TRAINERS DELIVERED TO MSC |
Dec. 8, 1964 | 64-192 -- HOYT MAPLES BEGINS SECOND DAY OF GEMINI SUIT COMFORT TESTING |
Dec. 10, 1964 | 64-193 -- MSC AWARDED CONTRACT TO BAARTOL COMPANY, INC. |
Dec. 21, 1964 | 64-194 -- "MOONPLOT" IS READY FOR ASTRONAUT USE |
Dec. 16, 1964 | 64-195 -- MORE THAN 900 APPLICANTS RECEIVED FOR SCIENTISTS-ASTRONAUT PROGRAM |
Dec. 16, 1964 | 64-196 -- MSC SOLICITS BID FOR ELECTRONICS SERVICE AND TECHNICAL SUPPORT CONTRACTS |
Dec. 18, 1964 | 64-197 -- ARMY CH-47A (CHINOOK) HELICOPTER TO LIFT APOLLO SATURN SLA |
Dec. 29, 1964 | 64-198 -- A TEAM OF ARMY CH-47A (CHINOOK) HELICOPTERS DELIVERED FIRST DUMMY SLA TO MSC OPERATIONS IN FLORIDA |
Dec. 18, 1964 | 64-199 -- ASTRONAUT EMERGENCY ESCAPE SLIDE WIRE SYSTEM TESTED AT COMPLEX 19 |
Dec. 24, 1964 | 64-000 -- MANNED SPACE FLIGHT REORGANIZATION |
+ 1965 News Releases (8 Mb PDF file) | |
Date | Title |
Jan. 10, 1965 | 65-002 -- MODIFICATION OF TITAN LAUNCH COMPLEX AT CAPE AT SAVING OF $5 MILLION |
Jan. 11, 1965 | 65-003 -- ADDITIONAL PARASAIL TESTS SCHEDULED THIS MONTH |
Jan. 11, 1965 | 65-004 -- MSC OPEN HOUSE FOR EMPLOYEE FAMILIES ON 1/16/65 |
Jan. 13, 1965 | 65-005 -- SPEECH IN BIG SPRING, TEXAS |
Jan. 20, 1965 | 65-006 -- CSD USING X-RAYS TO TAKE "INSIDE LOOK" AT PRESSURE SUIT MOBILITY AND COMFORT |
Jan. 15, 1965 | 65-007 -- LECTURES PLANNED UNDER SPONSORSHIP OF GULF COAST SCIENCE FOUNDATION |
Jan. 15, 1965 | 65-008 -- WARDELL TO SPEAK NATIONAL ELECTRICAL MANUFACTURER ASSOCIATION |
Jan. 18, 1965 | 65-009 -- 35 MEMBERS OF FLIGHT ACCELERATION BRANCH OF CSD MOVING INTO BLDG. 29 ON 1/19/65 |
Jan. 18, 1965 | 65-010 -- RESULTS OF GT-2 ATTEMPT ON Dec. 9, 1964 (CAPE DATELINE) |
Jan. 30, 1965 | 65-011 -- DEVICE FOR SIMULATING ZERO AND LUNAR GRAVITY MOTION PROBLEMS UNDERGOING CHECKOUT AT MSC CSD. |
Jan. 21, 1965 | 65-012 -- GLV-3 SHIPPED TO CAPE KENNEDY TODAY FROM MARTIN CO. AT BALTIMORE (CAPE DATELINE) |
Jan. 29, 1965 | 65-013 -- SEVENTH TEST OF GEMINI RECOVERY SYSTEM COMPLETED |
Jan. 19, 1965 | 65-014 -- RESULTS ON MISSION CONTROL CENTER OPERATION DURING GT-2 MISSION |
Jan. 28, 1965 | 65-015 -- RESULTS ON 3 TESTS OF GEMINI SPACECRAFT ESCAPE AND RECOVERY SYSTEM AT EL CENTRO, CALIFORNIA |
Jan. 28, 1965 | 65-000 -- NOTE TO EDITORS: GT-3 PRIME AND BACKUP CREWS AVAILABLE FOR INTERVIEWS AT MSC |
Feb. 2,1965 | 65-016 -- 3 GEMINI ASTRONAUT'S PERSONAL PARACHUTE TESTS COMPLETED SUCCESSFULLY AT EL CENTRO, CA |
Feb. 11,1965 | 65-017 -- MSC ASK FOR PROPOSAL ON HEAD-AND-SHOULDERS DUMMY CAPABLE OF HEARING AND SPEAKING ELECTRONICALLY |
Feb. 5,1965 | 65-018 -- SHAKEDOWN TEST AT WSO OF 1ST MAJOR PIECE OF APOLLO FLIGHT TYPE HARDWARE, LAS CRUCES, NM |
Feb. 5,1965 | 65-019 -- GEMINI SPACECRAFT 3 BEING PREPARED FOR SERIES OF TESTS BEFORE BEING MATED TO LAUNCH VEHICLE |
Feb. 5,1965 | 65-020 -- EIGHT TEST OF GEMINI SPACECRAFT RECOVERY SYSTEM CONDUCTED SUCCESSFULLY AT EL CENTRO, CA |
Feb. 8, 1965 | 65-021 -- FOREIGN SCIENTIST INVITED TO CONFERENCE ON APOLLO EXPERIMENTS |
Feb. 10, 1965 | 65-022 -- AVERAGE ASTRONAUT |
Feb. 12, 1965 | 65-023 -- TRANSFER OF 41 ENGINEERS AND MATHEMATICIANS FROM KSC TO MSC |
Feb. 12, 1965 | 65-024 -- ASTRONAUTS CONTINUE SERIES OF GEOLOGICAL FIELD TRIPS IN AEC'S NEVADA TEST SITE BEGIN 2/16/65 |
Feb. 12, 1965 | 65-025 -- TWO MEN FROM MSC WINNERS OF 1965 ARTHUR S. FLEMING AWARD |
Feb. 12, 1965 | 65-026 -- QUALIFICATION SEAT EJECTION ESCAPE SYSTEM TEST SUCCESSFUL |
Feb. 16, 1965 | 65-027 -- ASTRONAUT ASSIGNMENTS |
Feb. 16, 1965 | 65-028 -- "IN THE BARREL" ASTRONAUTS |
Feb. 16, 1965 | 65-029 -- DR. REYNOLDS NAMED ASSISTANT MANAGER ASPO |
Feb. 16, 1965 | 65-030 -- SHEA TO SPEAK AT GULF COAST SCIENCE LECTURE SERIES |
Feb. 18, 1965 | 65-031 -- GEMINI SPACECRAFT NO. 3 JOINED TO LAUNCH VEHICLE |
Feb. 23, 1965 | 65-032 -- PARASAIL SYSTEM LAND TEST AS WATER DROP IN GALVESTON BAY ON 2/24/65 |
March 3, 1965 | 65-033 -- AC SPARK PLUG SIGNED 5 YEAR CONTRACT FOR GUIDANCE AND NAVIGATION SYSTEMS ($235 MILLION CONTRACT) |
Feb. 26, 1965 | 65-034 -- WILLIAMS LEE NAMED ASSISTANT APOLLO PROGRAM MANAGER |
March 1, 1965 | 65-035 -- PROBLEMS |
65-036 -- GEMINI MISSION PROFILE | |
March 4, 1965 | 65-037 -- LANDING ROCKET SYSTEM TEST SCHEDULED EAFB 3/5/65 |
March 5, 1965 | 65-038 -- PRESSURE SUIT QUALIFICATION TEST PROGRAM COMPLETED |
March 8, 1965 | 65-039 -- SOLAR TELESCOPE TO BE INSTALLED AT MSC |
March 12, 1965 | 65-040 -- MISSION CONTROL CENTER - HOUSTON |
March 8, 1965 | 65-041 -- DR. WALTER C. RANDALL, CHAIRMAN OF DEPARTMENT OF PHYSIOLOGY, LOYOLA UNIVERSITY, TO SPEAK |
March 11, 1965 | 65-042 -- SIMULATED LANDINGS ON LUNAR SURFACE MADE |
March 15, 1965 | 65-043 -- BAD WEATHER COULD DELAY GT-3 |
65-044 -- FLIGHT CONTROLLERS | |
March 31, 1965 | 65-045 -- DR. LEWIS F. HATCH, GRADUATE PROFESSOR OF CHEMISTRY, UNIVERSITY OF TEXAS, TO SPEAK |
March 31, 1965 | 65-046 -- SUMMER FACULTY FELLOWSHIP PROGRAM |
April 6, 1965 | 65-047 -- REGIONAL FINALS OF A SCIENCE CONGRESS AT MSC |
April 9, 1965 | 65-000 -- MIT GETS NEW CONTRACT FOR APOLLO GUIDANCE, NAVIGATION SYSTEM |
April 9, 1965 | 65-000 -- GT-4 TO BE CONTROLLED FROM MCC-H |
April 9, 1965 | 65-048 -- ART EXHIBIT IN AUDITORIUM |
April 12, 1965 | 65-000 -- EDITORS NOTE: FIRST FULL SCALE PARASAIL-LANDING ROCKET TEST SCHEDULED 4/21/65 AT FORT HOOD |
65-000 -- HISTORY OF FULL SCALE PARASAIL AND LANDING ROCKET DROP TESTS | |
April 13, 1965 | 65-049 -- ANNOUNCEMENT OF PARASAIL-LANDING ROCKET AT FORT HOOD |
April 15, 1965 | 65-050 -- CHAMBER "A" PASSES STRUCTURAL INTEGRITY TEST |
April 21, 1965 | 65-051 -- PRESS CONFERENCE WITH MCDIVITT AND WHITE SCHEDULED |
April 21, 1965 | 65-000 -- MEMO TO PRESS: SERIES OF BRIEFINGS AND DEMONSTRATIONS SHOWING ASTRONAUT TRAINING DEVICES AND FACILITIES |
April 23, 1965 | 65-052 -- OPERATION ON ALDRIN'S RIGHT KNEE SUCCESSFUL |
April 22, 1965 | 65-053 -- ASTRONAUT ALDRIN TO UNDERGO SURGERY TOMORROW |
April 29, 1965 | 65-054 -- MSC/U OF H GRADUATE EDUCATION CENTER |
65-055 -- C.W. MATHEWS' NOTES FOR PRESS BRIEFING - PREFLIGHT ACTIVITIES | |
May 3, 1965 | 65-056 -- TRANSCRIPT OF MATHEWS' PRESS BRIEFING ON GT-3 |
May 7, 1965 | 65-057 -- DEVELOPMENT OF LANDING ROCKET SYSTEM FOR APOLLO TEST TO TAKE PLACE TUESDAY MAY 11, 1965 |
May 8, 1965 | 65-058 -- DR. PICCARD TO BE PRINCIPAL SPEAKER AT AWARDS CEREMONY AT HIGH SCHOOL SCIENCES SEMINAR 5/8/65 |
May 12, 1965 | 65-059 -- APOLLO SPACE SUIT |
May 24,1965 | 65-060 -- SPARC |
June 10,1965 | 65-061 -- LSEP PROPOSALS BEING SOUGHT |
June 10,1965 | 65-062 -- PILAND NAMED MANAGER OF EXPERIMENT PROGRAM OFFICE |
June 29,1965 | 65-063 -- SIX SCIENTIST-ASTRONAUTS NAMED WITH PHOTOS |
June 26,1965 | 65-000 -- THOMPSON APPOINTED MISSION DIRECTOR |
July 1,1965 | 65-064 -- RENDEZVOUS ATTEMPT TO BE MADE BY GUIDANCE AND CONTROL |
July 1,1965 | 65-065 -- NASA TO NEGOTIATE WITH FEDERAL ELECTRIC CORP FOR MSC SUPPORT SERVICES |
July 1,1965 | 65-066 -- GEMINI 7 GROUP NAMED |
July 8,1965 | 65-228 -- HQ: NASA EQUIPS PEGASUS C WITH DETACHABLE PANELS |
July 1,1965 | 65-000 -- GLENN MCAVOY OF NASA INSPECTIONS DIVISION TO HEAD NEW SOUTHWESTERN REGIONAL OFFICE AT MSC |
July 8,1965 | 65-067 -- MSC PRESENTS VAUDEVILLE REVISITED |
Aug. 2,1965 | 65-068 -- PLSS DELIVERED TO THE CREW SYSTEMS DIVISION |
Aug. 2,1965 | 65-069 -- CONTRACT TO DYNALECTRON MAINTENANCE SUPPORT FOR AIRCRAFT |
July 21,1965 | 65-070 -- HELICOPTER DAMAGED DURING TRAINING |
Aug. 4, 1965 | 65-260 -- HQ: THREE FIRMS SELECTED TO DESIGN APOLLO LUNAR SURFACE PACKAGE |
Aug. 4, 1965 | 65-072 -- 200 PERSONNEL TO BE TRANSFERRED FROM MSFC |
Aug. 13, 1965 | 65-073 -- 128 AF OFFICERS ASSIGNED TO NASA'S MSC |
Aug. 13, 1965 | 65-074 -- NASA SELECTS LOCKHEED FOR SUPPORT SERVICES AT HOUSTON |
Aug. 13, 1965 | 65-075 -- GEMINI 5 CREW TO UNDERGO 11 DAYS OF DEBRIEFING |
Aug. 16, 1965 | 65-076 -- SCIENCE FAIR WINNERS TO VIEW GEMINI 5 FROM MSC |
65-000 -- COOPER AND CONRAD BEGIN DEBRIEF | |
Aug. 31, 1965 | 65-000 -- WHITE HOUSE: ASTRONAUT PROMOTION AND DECORATION POLICY |
Aug. 31, 1965 | 65-000 -- GEMINI 5 DEBRIEF STATUS NOON 8-31-65 |
Sept. 2, 1965 | 65-077 -- MANNED PARAGLIDER TESTING AT EDWARDS AFB RESUMED |
Sept. 15, 1965 | 65-078 -- RETRIEVAL OF LOST MERCURY BOILERPLATE, LOST SINCE 5/31/62 |
Sept. 9, 1965 | 65-000 -- NOTE TO EDITORS: SUPER GUPPY ON DISPLAY AT ELLINGTON AFB |
Sept. 10, 1965 | 65-079 -- NASA TO SELECT ADDITIONAL PILOT ASTRONAUTS |
Sept. 13, 1965 | 65-080 -- WESTINGHOUSE ENGINEERS BEGIN TESTS ON CENTRIFUGE FACILITY |
Sept. 17, 1965 | 65-081 -- FLIGHT HARDWARE FOR APOLLO |
Sept. 20, 1965 | 65-082 -- GEMINI 7 SPACECRAFT SUCCESSFULLY COMPLETES ALTITUDE CHAMBER TESTS |
Sept. 22, 1965 | 65-083 -- LING TIMCO VOUGHT SELECTED AS CONTRACTOR FOR ENGINEERING SUPPORT SERVICES AT WHITE SANDS TEST FACILITY |
Sept. 24, 1965 | 65-084 -- RADIATION CONTRACT SIGNED WITH TRACERLAB |
Sept. 25, 1965 | 65-085 -- GT-6 LAUNCH DATE ANNOUNCED |
Oct. 7, 1965 | 65-086 -- THREE CONTRACTS AWARDED FOR ANALYTICAL STUDIES OF PARASAIL |
Oct. 8, 1965 | 65-087 -- PHOTOGRAPHY IN SPACE FLIGHT |
Oct. 8, 1965 | 65-088 -- CHOP TO ADDRESS OFFICIALS IN SAN ANTONIO |
Oct. 11, 1965 | 65-089 -- LIGHTWEIGHT GEMINI SPACE SUIT UNDERGOING TESTS |
Oct. 11, 1965 | 65-090 -- SCHULTSE AND MEMBERS OF BUREAU OF BUDGET TO VISIT MSC |
Oct. 12, 1965 | 65-091 -- NATO COLLEGE TO VISIT MSC |
Oct. 14, 1965 | 65-092 -- REMOTE FLIGHT CONTROLLERS ON WAY TO TRACKING STATIONS |
Oct. 15, 1965 | 65-093 -- NASA TO NEGOTIATE WITH LOCKHEED FOR COMPUTER PROGRAMMING SUPPORT |
Oct. 18, 1965 | 65-094 -- TEST SERIES ON EXTRAVEHICULAR ACTIVITY COMPLETED BY ENGINEERS OF CREW SYSTEMS |
Oct. 18, 1965 | 65-095 -- BERRY TO RECEIVE EXCEPTIONAL SERVICE MEDAL |
Oct. 21, 1965 | 65-096 -- NEW BUBBLE HELMET |
Oct. 21, 1965 | 65-097 -- CONTRACT EXTENSION FOR SUPPORT OF REAL-TIME COMPUTER COMPLEX |
Oct. 28, 1965 | 65-098 -- METEORITE FINDS IN TEXAS INCREASING |
Oct. 27, 1965 | 65-099 -- AGENA REVIEW BOARD NAMED |
Oct. 28, 1965 | 65-100 -- TEST SCHEDULED OF PARAGLIDER RECOVERY SYSTEM |
Nov. 5, 1965 | 65-101 -- LCU UNDERGOES FACE LIFTING (RETRIEVER) |
Nov. 5, 1965 | 65-102 -- DEVELOPMENT WORK ON APOLLO SPACE SUITS AND PORTABLE LIFE SUPPORT SYSTEM |
Nov. 9, 1965 | 65-103 -- NASA ANNOUNCES LAUNCH OF GEMINI 7 ON Dec. 4, 1965 |
Nov. 12, 1965 | 65-104 -- QUALIFICATION TEST SCHEDULED FOR CHAMBER B |
Nov. 18, 1965 | 65-105 -- EXTRAVEHICULAR LIFE SUPPORT SYSTEM AND EXTRAVEHICULAR SUPPORT PACK QUALIFICATION TESTS SCHEDULED |
Nov. 22, 1965 | 65-106 -- SOLAR PARTICLE ALERT NETWORK TO STUDY RADIATION COMING FROM SUN |
Nov. 22, 1965 | 65-107 -- FY 65 PROCUREMENTS AT MSC TOTALS $1,487.4 MILLION |
Nov. 22, 1965 | 65-108 -- FOUR COMPANIES, LOCKHEED, MCDONNELL, MARTIN AND NORTHROP, TO PERFORM 4-MONTH DESIGN STUDIES ON EXPERIMENTS PALLET FOR APOLLO |
Nov. 24, 1965 | 65-109 -- FLIGHT CONTROLLERS DEPLOY FOR LOCATIONS FOR GT7/6 MISSIONS |
Nov. 23, 1965 | 65-110 -- ICE CREAM BEING STUDIED AS SPACE FOOD |
Dec. 21, 1965 | 65-111 -- MEDICAL REPORT ON RESULTS OF MEDICAL TESTS OF GEMINI 7 ASTRONAUTS |