SOHO DAILY REPORT Operations Day -- 132/1997 (12 MAY 97) Mission Day 528 SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC Ref. #: SH-FOT-DR-970512 ===================================================================== The 3-month continuous operations period started on day 103 at 1105 UT, and will continue until day 195 at 0050 UT. PASS #1 Canberra DSS46 0235 - 0347 PASS #2 Canberra DSS42 0336 - 0750 PASS #3 Madrid DSS66 0709 - 1232 PASS #4 Madrid DSS61 1224 - 1727 PASS #5 Goldstone DSS24 1658 - 133/0234 Pass #1 Summary --------------------- Anomalies: None NRT: None Activity Summary: - Collect MDI-H (0235 - 0347) - SSR SEF Reset Pass #2 summary --------------------- Anomalies: S97-0071 0446 Sumer Limit Violation NRT: None Activity Summary: - Collect MDI-H (0336 - 0750) - OBT Distribution to Celias/Swan - Collect Min/Max Parameters Pass #3 summary --------------------- Anomalies: None NRT: 1538 - 1742 Activity Summary: - Collect MDI-H (0709 - 1232) - SSR SEF Reset Pass #4 summary --------------------- Anomalies: None NRT: 1325 - 1430 1458 - 1712 Activity Summary: - Collect MDI-M (1320 - 1432) Via TSTOL Procedure - Collect MDI-H (1224 - 1320, 1432 - 1727) - Uplink RSL Table - Uplink Delayed Loads (VIRA70513,SWA970512121,SWA970512152) - SSR SEF Reset Pass #5 summary --------------------- Anomalies: G97-0337 0142 D24 Antenna Off-point (4 min data loss, nonrecoverable) NRT: 1733 - 2230 Activity Summary: - Collect MDI-M (0102 - 0204) Via TSTOL - Collect MDI-H (1658 - 132/0102, 0204 - 0234) - SSR SEF Reset -- End of Report --