August 1993 SPECIAL NOTE DSS61 is still red as of 8/01/93. Present predicted date of return of service is now day 93.238.00:00 (August 26th). There will continue to be periods of 256 bps record rate during the extended gaps caused by the loss of DSS61. Even with the use of DSS68 (Weilheim) following testing, it will still not be possible to perform all recording between passes at the nominal 512 bps. Scheduled periods of 256 bps record rate will be notified via this Bulletin Board. 1st Aug Earth pointing manoeuvre. 213.00:31-00:52 21m 256 bps data lost due to spacecraft going 2-way during SCET playback. 2nd Aug KEP IFC. 3rd Aug KEP RAM Dump. 4th Aug BAM-I Matrix 0 command. Earth pointing manoeuvre. 5th Aug Routine operations. 6th Aug 218.23:53 - 36m playback data lost due to spacecraft going 2-way during 219:00:29 SCET data playback via DSS43. 7th Aug Earth pointing manoeuvre. 8th Aug 220.07:27-07:42 15m bad realtime data due to TPA problems at DSS42 following SCET bitrate change. 220.10:29-19:42 9h13m playback data lost due to DNEL3 on DOY 93.221. SCET 9th Aug KEP IFC. Earth pointing manoeuvre. 221.00:39-01:19 40m playback data lost due to TPA problem at DSS42. SCET 221.05:08-05:24 16m realtime data lost due to TPA problem at DSS42 following SCET spacecraft going 2-way. DSS68 (Weilheim) scheduled to receive data at 1024 bps. 221.07:00:24 DNEL (Disconnect Non Essential Loads) occurred on board the SCET spacecraft. This coincided with the beginning of the planned routine Earth pointing manoeuvre. An estimated 30% of the planned pulses took place before onboard reconfiguration took place and halted the manoeuvre. The last frame of telemetry was received at 07:01:28 SCET. Telemetry was switched on again at 221:10:22 SCET. All experiment teams should examine their data for any unusual behaviour in the moments leading up to the DNEL. The Recovery from DNEL procedure has been implemented and is proceeding well. Individual experiment teams have been contacted to determine the desired switch on configuration. 221.07:01-10:22 3h11m realtime data lost due to DNEL. Additional loss of SCET recorded data as DNEL occurred during playback periods. 221.15:16 - Data at 256 bps for recording, due to lack of available 222.07:37 SCET playback periods due to DSS61 loss. 221.19:53 Experiment converter switch on. 221.20:36 HED reconfiguration completed. 221.20:39 LAN reconfiguration completed. 222.04.10 HUS reconfiguration completed. 222.05:46 GLG all heaters on. 222.08:13 STO reconfiguration completed. 10th Aug Continue DNEL recovery. DSS68 (Weilheim) scheduled to receive data at 1024 bps. 222.15:22 - Data at 256 bps for recording, due to lack of available 223.04:19 SCET playback periods due to DSS61 loss. 223.05:59 GLG HV on. 223.05:59 SIM reconfiguration completed. 223.06:30 Earth pointing manoeuvre. 11th Aug Continue DNEL recovery. 223.22:09 Return to AOCS1. 223.22:36 GRU Switch on. 223.22:59 Return to TX2. Earth pointing manoeuvre. HED calibration. 12th Aug DSS68 (Weilheim) scheduled to receive data at 1024 bps. 224.01:44 BAM-I reconfiguration completed. 224.02:00 BAM-E reconfiguration completed. 224.06:11 KEP reconfiguration completed. 224.07:43 GRU reconfiguration completed. 224.06:27-06:48 20m realtime data lost due to TPA failure following bitrate SCET change at DSS42. 13th Aug DSS68 (Weilheim) scheduled to receive data at 1024 bps. Earth pointing manoeuvre. 225.10:29 GAS Health check. 225.05:53 BAM-E Recovery from Sleep Mode. 225.07:43 GLG reconfiguration completed. 225.15:12 - Data at 256 bps for recording, due to lack of available 226.04:47 SCET playback periods due to DSS61 loss. 225.22:55-23:15 20m 256 bps recorded data lost due to spaceraft going 2-way SCET during playback. 14th Aug DSS68 (Weilheim) scheduled to receive data at 1024 bps. 15th Aug DSS68 (Weilheim) scheduled to receive data at 1024 bps. Earth pointing manoeuvre. 16th Aug KEP IFC. 17th Aug HET calibration. 229.19:03-19:19 16m recorded data lost due to spaceraft going 2-way SCET during playback. 18th Aug Earth pointing manoeuvre. 19th Aug GRU routine noise test. 20th Aug HUS Datation Test via DSS42. 21st Aug Earth pointing manoeuvre. 22nd Aug Routine operations. 234.23:19 - Period of intermittent bad data due to receiver glitches 234.23:28 SCET at DSS 42. 23rd Aug KEP IFC. Earth pointing manoeuvre. 24th Aug Routine operations. 25th Aug HED calibration. 26th Aug Earth pointing manoeuvre. DSS61 returns to service after bearing replacement. 27th Aug Routine operations. 28th Aug Routine operations. 29th Aug Earth pointing manoeuvre. 30th Aug KEP IFC. First Ulysses tracking pass using DSS61 following bearing replacement. 242.08:53-09:11 18m bad/missing realtime data due to TGC interface problems SCET at DSS61. 31st Aug KEP RAM Dump. Earth pointing manoeuvre. 243.06:02-06:29 27m playback data lost due to s/c going 2-way during 4K3 SCET interleaved playback.