#ReachSampleID SUID OrigSUID STAID Reach ReachCollectionDate SampleType ReviewStatus REFLOC Collector HABQUAL REACHCOM STAGE STAGEMD DISCH DISCHMD CHMOD REACHLEN TRANDIS USRCHEND DSRCHEND USBMBK DSBMBK USBMDESC DSBMDESC RCHGRAD THGRAD RCHGRAMD STRMTYP Comments InsertDate UpdateDate 4113 UIRB UIRB 05520500 A 7/21/1999 9:20 REACH R "bridge @ Highway 17 in Momence, downstream side" "Fitzpatrick, Faith, Teyt,Sarah, Adolphson,Woessner" Good "Maybe should have had more than 30m between transects. Wadable, but wide enough that a boat would be required for excellent sampling." Not Modified 300 30 245 745 Both Both "rebar on left bank with orange flagging, flagging on right bank. located 3m south of LEW, 7m north of center of brick building, 4m east of large multiple trunked silver maple, and 2m northeast of red wood." "yellow-capped rebar in grass about 3m from LEW, 1.5m west of upright maple, 2.5m above GS. GPS: 41 09 34.65 87 40 07.36" 0.000467 Surveying Level "Maybe should have had more than 30m between transects. Wadable, but wide enough that a boat would be required for excellent sampling." 1/27/2000 12:03 6/25/2003 17:06 4041 UIRB UIRB 05525500 A 7/23/1999 8:30 REACH R Bridge at upstream end of reach "Fitzpatrick, Faith A." Excellent Not Modified 250 25 156 406 Right Left "yellow-capped rebar on RB in vegetation on terrace, about 4m upstream of twin-trunked elm, each trunk about 18in diameter, about 2m right of vegetation line/bankfull." "yellow-capped rebar with flagging on LB in ragweed, about 2m left of bankfull, right of dead tree on floodplain." 0.000036 0.001916 Surveying Level 1/25/2000 14:12 6/25/2003 17:06 98105 UIRB UIRB 05525500 A 9/5/2002 12:30 REACH R "Fazio, David J, Murphy, Elizabeth, Tetauer, Eric " Good 3.4 32 Not Modified 250 25 156 406 9/11/2002 9:15 6/25/2003 17:06 123283 UIRB UIRB 05525500 A 8/15/2003 10:30 REACH R "Harris,Mitchell A.,Hogan,Jennifer L.,Fazio,David J" "r040s0020 is one photo taken DS from right bank in middle of reach A; bank heights were estimated for TR5, 6, 10" 3.64 78 Gage 250 156 406 downstream of County Road 1100 N bridge "r040s0020 is one photo taken DS from right bank in middle of reach A; bank heights were estimated for TR5, 6, 10" 10/10/2003 9:36 12/23/2003 10:11 137953 UIRB UIRB 05525500 A 8/19/2004 9:15 REACH R US boundary begins downstream of the County Road 1100 N bridge "MA Harris, JL Hogan, DJ Fazio, DO Bratz" Fair "high stage, could not access thalweg points at some transects" 3.94 Wire-wt gage 80 Gage Not Modified 250 25 156 406 Both Both "Downstream of CR1100N bridge; rebar, blazed trees, tree tags" "rebar, blazed trees, tree tags" "high stage, could not access thalweg points at some transects" 9/8/2004 9:38 9/13/2005 17:17 4725 UIRB UIRB 05526000 A 7/22/1999 8:30 REACH R Light post in clearing on LB "Fitzpatrick, Faith, Adolphson DL,Tegt S,Woessner K" Good Large river - should probably use longer reach length Not Modified 300 30 -300 0 Left Left Yellow-capped rebar in patch of poison ivy "Light post in clearing on LB GPS: 41 03 06.58 " 0.000243 0.00404 Surveying Level Large river - should probably use longer reach length 2/8/2000 11:28 6/25/2003 17:06 21130 UIRB UIRB 05527675 A 7/18/2000 16:15 REACH R 45 Bridge "Adolphson, Debbie L.,Stensvold, Krista A., Gaebler" Excellent none 4.32 Wading Rod Lightly affected 150 15 20 170 Both Right 170 meters upstream of 45 bridge large bolder 20 meters DS of 45 bridge none 8/1/2000 12:26 6/25/2003 17:06 4443 UIRB UIRB 05527800 A 7/12/1999 13:00 REACH R Upstream side of bridge at Russell Road "Fitzpatrick,Faith,Adolphson,Debbie,Tegt S,Woessner" Excellent Low flow 1.78 ADR Not Modified 200 20 -290 -90 Right Right "orange flagging in reed canary grass along REW GPS: 42 29 30.49 87 55 35.20" "orange flagging in willow tree GPS: 42 29 23.99 87 55 35.90" 0.000115 0.00131 Surveying Level Low flow 2/1/2000 12:13 6/25/2003 17:06 4584 UIRB UIRB 05527800 B 7/13/1999 8:15 REACH R Bridge at Russell Road "Fitzpatrick,Faith,Tegt,Sarah,Woessner K,AdolphsonD" Good ADR Not Modified 200 20 -660 -440 Right "GPS (center channel): 42 29 30.34 87 55 24.21" "double orange flagging at top of right bank GPS (center channel): 42 29 33.77 87 55 30.88" 0.000185 0.000122 Surveying Level 2/3/2000 10:11 6/25/2003 17:06 4658 UIRB UIRB 05527800 C 7/13/1999 15:00 REACH R Downstream side of bridge at Russell Road "Fitzpatrick,Faith A.,Adolphson,Debbie,Woessner,Kim" Excellent Very mucky between top of reach and bridge Not Modified 300 30 257 557 Both Left "Lone willow tree on each side of stream GPS: 42 29 13.70 87 55 31.51" "Clump of willows on LB, lone willow on RB GPS: 42 29 06.34 87 55 38.73" 0.000542 0.000942 Surveying Level Very mucky between top of reach and bridge 2/8/2000 9:01 6/25/2003 17:06 59214 UIRB UIRB 05527800 A 7/18/2000 11:00 REACH R Russell Road Bridge "Adolphson,Debbie L.,Gaebler,Stensvold,Krista A." Good "water at level we called last year, or just under bankfull" Lightly affected 200 20 -290 -90 90 meters upstream of bridge 290 meters upstream of bridge "water at level we called last year, or just under bankfull" 10/31/2000 15:25 6/25/2003 17:06 84531 UIRB UIRB 05527800 A 8/8/2001 7:30 REACH R Russell Road Bridge "Adolphson, Debbie L.,Gaebler, Diebel, Matthew W." Good "water very slow if moving at all, green scum over all the water surface, start time 0822, temperature is hot already, hope to be gone before heat index hits - duck weed and algae abundant" Not Modified 200 20 -290 -90 Right "willow tree, 90m upstream of russell road bridge" "water very slow if moving at all, green scum over all the water surface, start time 0822, temperature is hot already, hope to be gone before heat index hits - duck weed and algae abundant" 8/14/2001 11:27 6/25/2003 17:06 21205 UIRB UIRB 05527960 A 7/18/2000 8:15 REACH R DS side of bridge at highway 41 "Stewart, Jana, Tegt, Sarah, Wolf, Julie" Excellent "Very Turbid, good depositional sites, good riparian corridor" Not Modified 170 17 51 221 51 meters DS of HWY 41 Bridge 221 meters ds of hwy 41 bridge "Very Turbid, good depositional sites, good riparian corridor" 8/1/2000 15:28 6/25/2003 17:06 22034 UIRB UIRB 05528032 A 7/17/2000 12:30 REACH R us side of bridge on abandoned road in the Forest Preserve "Stewart, Jana S.,Tegt,Sarah, Wolf,Julie A." Excellent "easy site for sampling, one bank stabilization structure near transect 11, water slightly turbid" 9.8 Wading Rod Lightly affected 150 15 -157.8 -7.8 Forest Preserve Bridge (off Milwaukee Ave) is 7.8 miles downstream of DSB "easy site for sampling, one bank stabilization structure near transect 11, water slightly turbid" 8/2/2000 16:42 6/25/2003 17:06 23121 UIRB UIRB 05530510 A 7/14/2000 15:00 REACH R "Far right bridge piling on us side of bridge, bridge is unnamed bridge that is first bridge us River Rd." "Fuller, Janice A., Stewart, Jana S., Tegt,Sarah" Good Did only 9 transects because confined by bridges. US end of reach begins 7.6 m ds from center piling of freeway bridge 47.1 Wading Rod Lightly affected 192 24 -226.5 -34.5 12m downstream of interstate 294 bridge 34.5 m upstream from bridge at north entrance to Westin Hotel Did only 9 transects because confined by bridges. US end of reach begins 7.6 m ds from center piling of freeway bridge 8/14/2000 10:02 6/25/2003 17:06 24964 UIRB UIRB 05531045 A 7/14/2000 14:00 REACH R Morrison drive "Adolphson, Debbie L." Good "Lots of aquatic Macrophytes, water was high on the tenth" Stabilized 300 30 -348 -48 Left Big tree up from hobo temp "Lots of aquatic Macrophytes, water was high on the tenth" 9/19/2000 17:26 6/25/2003 17:06 2705 UIRB UIRB 05531500 A 7/15/1999 8:20 REACH R 57 meters upstream of walking bridge just off of park parking lot "Fitzpatrick,Faith,Adolphson,Debbie,Tegt,Woessner" Excellent Smells like chlorine Not Modified 300 30 -357 -57 Right Right yellow capped rebar about 2m est of tripple trunk "yellow capped repbar, about 1 foot above surface. " 0.0006 0.00115 Surveying Level Smells like chlorine 1/11/2000 16:24 6/25/2003 17:06 3392 UIRB UIRB 05531500 B 7/15/1999 8:20 REACH R Walking bridge in forest preserve; 150 meters upstream of reach A "Fitzpatrick,Faith,Tegt,Sarah,Adolphson D,WoessnerK" Excellent "Low flow, thalweg in T6 too deep to determine substrate" ADR Not Modified 300 30 -807 -507 Right "GPS: 41 49 33.75 87 54 52.65 " "orange flagging in tree overhanging river. GPS (center channel): 41 49 33.75 87 54 41.07" 0.019 Clinometer "Low flow, thalweg in T6 too deep to determine substrate" 1/20/2000 10:51 6/25/2003 17:06 3520 UIRB UIRB 05531500 C 7/16/1999 8:00 REACH R Walking bridge in Bemis Woods "Fitzpatrick,Faith,Adolphson,Debbie,WoessnerK,TegtS" Excellent "T10 was too deep to wade across, so some data are estimated" Not Modified 300 30 100 400 "100 meters downstream of walking bridge GPS(center channel): 41 49 37.92 87 54 23.54" "400 meters from beginning of reach GPS(center channel): 41 29 31.60 87 54 15.51" 0.016 Hand Level "T10 was too deep to wade across, so some data are estimated" 1/20/2000 15:23 6/25/2003 17:06 95435 UIRB UIRB 05531500 A 7/18/2002 8:30 REACH R "Harris, Mitchell A., Fazio, David J., Murphy,Beth" Excellent Many dead corbicula soft parts floating 2.2 110 Gage Not Modified 300 -357 -57 Many dead corbicula soft parts floating 7/24/2002 17:30 6/25/2003 17:06 122188 UIRB UIRB 05531500 A 8/12/2003 13:45 REACH R "Harris,Mitchell,Scudder,Barb,Hogan,Jennifer,FazioD" Excellent "sampled TR1-TR7 on 08/12/03 from 16 00-17 40 with stage at 2.53 ft. and discharge of 167 ft3/s at 17 00 CDT, and TR8-TR11 on 08/13/03 from 13 45-14 45; sampling over 2 days with stage about 0.1 ft lower on 08/13/03 than on previous sampling day; for TR2, velocity recorded as 0 ft/s for point 2 should read -0.24 ft/s" 2.43 153 Gage Not Modified 300 30 "sampled TR1-TR7 on 08/12/03 from 16 00-17 40 with stage at 2.53 ft. and discharge of 167 ft3/s at 17 00 CDT, and TR8-TR11 on 08/13/03 from 13 45-14 45; sampling over 2 days with stage about 0.1 ft lower on 08/13/03 than on previous sampling day; for TR2, velocity recorded as 0 ft/s for point 2 should read -0.24 ft/s" 10/6/2003 15:33 12/23/2003 10:11 134836 UIRB UIRB 05531500 A 7/20/2004 8:00 REACH R "MA Harris, JL Hogan, DJ Fazio" DJ Fazio running robotic surveying equipment 2.02 Wire-wt gage 105 Gage Not Modified 300 30 -357 -57 DJ Fazio running robotic surveying equipment 7/27/2004 13:39 9/13/2005 17:17 152984 UIRB UIRB 05531500 A 7/27/2005 6:45 REACH R "An old footbridge crossing Salt Creek at the Bemis Woods 1-4 entrance off Wolf Road, north of Ogden intersection; located downstream from reach" "Hogan JL, Fazio DJ, Halfar TM" Excellent "High, falling stage; large thunderstorm occurred the night before ; JL Hogan sampled left bank, DJ Fazio sampled right bank, TM Halfar sampled mid-channel; DJ Fazio - scribe" 3.26 272 NWIS Web Not Modified 291 30 349 58 Both Both Rebar with yellow caps; at least one tree blazed Rebar with yellow caps; at least one tree blazed "High, falling stage; large thunderstorm occurred the night before ; JL Hogan sampled left bank, DJ Fazio sampled right bank, TM Halfar sampled mid-channel; DJ Fazio - scribe" 7/29/2005 15:55 9/13/2005 17:16 56761 UIRB UIRB 05532000 A 7/14/2000 8:45 REACH R Washington street Bridge "Adolphson,Debbie L.,Gaebler, Stensvold, Krista A." Excellent smells really gross! "Channelized, not stabilized" 150 15 -177 -27 Both 27 meters upstream of washington street bridge smells really gross! 10/10/2000 15:32 6/25/2003 17:06 3762 UIRB UIRB 05532500 A 7/19/1999 12:15 REACH R Upstream side of the Joliet Road Bridge "Fitzpatrick,Faith,Tegt,Sarah,Adolphson D,WoessnerK" Good "Large stream, but wadable. Used 300 m reach length. T1 also had a bank substrate of 4" ADR Not Modified 300 30 -450 -150 Left Left "yellow-capped rebar half way up slope, about 2m northeast of top LB and 2m northwest of sprawling hawthorn. GPS(mid-channel): 41 49 05.58 87 48 29.39" "yellow-capped rebar 1m east of LB top, about 2 feet above GS GPS(mid-channel): 41 48 57.20 87 48 33.58 " 0.000115 0.006157 Surveying Level "Large stream, but wadable. Used 300 m reach length. T1 also had a bank substrate of 4" 1/24/2000 14:46 6/25/2003 17:06 95549 UIRB UIRB 05532500 A 7/17/2002 11:15 REACH R Joliet Road Bridge "Harris, Mitchell A., Fazio, David J., Murphy,Beth" Good "Wide Stream, not completely wadeable at US end" 3.05 210 Gage Not Modified 300 -450 -150 "Wide Stream, not completely wadeable at US end" 7/25/2002 14:05 6/25/2003 17:06 122462 UIRB UIRB 05532500 A 8/12/2003 9:15 REACH R "Harris,Mitchell,Hogan,Jennifer,Scudder,Barb,FazioD" Good "reach between two bridges, pipes, paths" 3.26 316 Gage Lightly affected 300 30 Left Left rebar halfway up slope nr sprawling hawthorn at 41 49 05.58 87 48 29.39 rebar at top of bank at 41 48 57.20 87 48 33.58 "reach between two bridges, pipes, paths" 10/7/2003 15:03 12/23/2003 10:11 134765 UIRB UIRB 05532500 A 7/21/2004 14:00 REACH R Joliet Road bridge "MA Harris, JL Hogan, DJ Fazio" "wide stream, unwadeable at upstream end" 3.17 Wire-wt gage 284 Gage Not Modified 300 30 -450 -150 Left Left rebar halfway up slope nr sprawling hawthorn at 41 49 05.58 87 48 29.39 rebar at top of bank at 41 48 57.20 87 48 33.58 "wide stream, unwadeable at upstream end" 7/27/2004 11:55 9/13/2005 17:17 21246 UIRB UIRB 05533000 A 7/13/2000 14:45 REACH R us side of bridge at German Church Rd. "Tegt, Sarah, Stewart, Jana S., Fuller, Janice A." Excellent Stream falling after runoff event- slightly turbid 30.5 Wading Rod Not Modified 180 18 -191 -11 10.7 m ds of Auto Bridge entrance to Swimming pool 11m us of us side of bridge at German Church Rd. Stream falling after runoff event- slightly turbid 8/1/2000 16:55 6/25/2003 17:06 23987 UIRB UIRB 05533400 A 7/11/2000 15:40 REACH R DS of old bluff RD bridge "Adolphson, Debbie L., Gaebler" Excellent "no velocity readings, photos taken estimated at transect 6, actual transect was not noted" Not Modified 150 15 26 176 26 meters DS of old bluff Rd Bridge "no velocity readings, photos taken estimated at transect 6, actual transect was not noted" 9/5/2000 17:10 6/25/2003 17:06 67240 UIRB UIRB 05534460 A 7/17/2000 16:00 REACH R Deefield Road Bridge "Adolphson, Debbie L., Stensvold, Gaebler" Good "Deep muck with lots of debris, 3 crew members sick, site by Zion Lutheran Church" 150 15 -240 -90 90 meters upstream of Deerfield Road Bridge 240 meters upstream of Deerfield Road Bridge "Deep muck with lots of debris, 3 crew members sick, site by Zion Lutheran Church" 2/6/2001 16:16 6/25/2003 17:06 64359 UIRB UIRB 05535100 A 7/17/2000 9:00 REACH R Dundee Road (Exposed sewer pipe in the Chicago Botanical Gardens) "Adolphson, Debbie L., Stensvold, Gaebler" Excellent "beautiful day, photos taken estimated at transect 6, actual transect was not noted." 180 18 -190 -10 Left boundary marker is the exposed sewer pipe. We went 10 meters upstream because the sewer pipe has been known to leak. approximately 8/10 of a mile DS from Lake Cook Road and 4/10 of a mile US from Dundee Road "beautiful day, photos taken estimated at transect 6, actual transect was not noted." 1/2/2001 11:54 6/25/2003 17:06 23176 UIRB UIRB 05536176 A 7/12/2000 15:30 REACH R US side of bridge at Old Post Rd "Stewart, Jana S., Fuller, Janice A., Tegt,Sarah" Good Stream falling after storm runoff- extremely turbid (coffee colored) 13.8 Wading Rod Not Modified 180 18 -206 -26 206 m us of us side of bridge at Old Post Rd 26 m us of bridge at Old Post Rd Stream falling after storm runoff- extremely turbid (coffee colored) 8/14/2000 10:49 6/25/2003 17:06 21212 UIRB UIRB 05536236 A 7/12/2000 8:00 REACH R Cottage Grove bridge "Adolphson, Debbie L., Gaebler, Stensvold" Fair "Receding from high flow, terrible smell and sound, several little pipes or water sources " 19.5 Wading Rod 160 16 -185 -25 Both Both "185 meters US of cottage grove bridge, 10 meters U" 25 m US ofcottage grove bridge "Receding from high flow, terrible smell and sound, several little pipes or water sources " 8/1/2000 15:38 6/25/2003 17:06 21241 UIRB UIRB 05536248 A 7/12/2000 8:30 REACH R US side of bridge on Country Club Rd. (Just past golf course entrance) "Stewart, Jana S., Tegt, Sarah, Fuller, Janice A." Excellent "slightly turbid, runoff from storm, falling" 17.45 Wading Rod Not Modified 160 16 -350.3 -190.3 Left "Large cottonwood tree, near the end of the driving range" 190.3 m US from US side of concrete bridge on County Club Road "slightly turbid, runoff from storm, falling" 8/1/2000 16:48 6/25/2003 17:06 21616 UIRB UIRB 05536272 A 7/12/2000 13:30 REACH S Bridge on cottage grove road "Adolphson, Debbie L." Fair Bankfull maybe underwater large backwater area on flood plain Not Modified 200 20 11 211 Left mulberry 4 meters in Bankfull maybe underwater large backwater area on flood plain 8/2/2000 12:01 6/13/2003 10:21 21274 UIRB UIRB 05536355 A 7/13/2000 8:00 REACH R ds side of bridge at Dixie HWY "Stewart, Jana S., Tegt, Sarah, Fuller, Janice A." Excellent stream falling after storm event- turbid 2.57 Wading Rod Lightly affected 150 15 7 157 Left "end of rock wall, 7 meters DS of Dixie Hwy." 157 meters DS of Dixie Hwy. stream falling after storm event- turbid 8/1/2000 17:24 6/25/2003 17:06 21275 UIRB UIRB 05536500 A 7/13/2000 11:15 REACH R ds side of bridge at 135th st "Tegt, Sarah, Stewart, Jana S., Fuller, Janice A." Excellent "stream falling after storm event, water turbid" 7.94 Wading Rod Not Modified 190 19 203 393 203 m ds of us side of bridge at 135th st. 393 m ds of us side of bridge at 135th st "stream falling after storm event, water turbid" 8/1/2000 17:29 6/25/2003 17:06 24635 UIRB UIRB 05537550 A 7/11/2000 13:00 REACH R "Smith road bridge , DS, Big Run Golf Course" "Adolphson, Debbie L., Gaebler, Stensvold" Fair High water several of the pool transects too deep to cross 100.88 Wading Rod 270 27 30 300 Both Both t11 30 m DS Smith road bridge 5 meters US golf course bridge High water several of the pool transects too deep to cross 9/12/2000 16:34 6/25/2003 17:06 24897 UIRB UIRB 05538270 A 7/13/2000 10:30 REACH R School house road "Adolphson, Debbie L., Gaebler" Excellent Bridge crew removing debris from bridge pier DS of reach Not Modified 240 24 -288 -48 Left "288 meters US of the school house road bridge 266" Box elder on left bank 3 meters US of concrete un Bridge crew removing debris from bridge pier DS of reach 9/19/2000 15:28 6/25/2003 17:06 22595 UIRB UIRB 05538490 A 7/21/2000 8:15 REACH R "US side of bridge, RB on Draper Rd" "Tegt, Sarah, Stewart, Jana S., Wolf, Julie A." Excellent "Water turbid, very little flow and velocity" Not Modified 170 17 -187 -17 Right Right US end is 187 m from RB bridge abuttment on Draper Road DS end begins 17m US from RB bridge abuttment on Draper Road "Water turbid, very little flow and velocity" 8/3/2000 15:24 6/25/2003 17:06 21236 UIRB UIRB 05539335 A 7/11/2000 9:30 REACH R ds side of bridge at Mills Rd. "Stewart, Jana S., Fuller, Janice A., Tegt, Sarah" Excellent Runoff from 7/10/00 storm Lightly affected 200 20 5.8 205.8 Right "5.8 meters DS of Mills Road Bridge First elm tree" metal foot bridge is 16m DS from transect 11 Runoff from 7/10/00 storm 8/1/2000 16:42 6/25/2003 17:06 20296 UIRB UIRB 05539632 A 7/13/2000 15:30 REACH R Manhattan Road Bridge "Adolphson, Debbie L., Gaebler, Stensvold, Krista A" Fair "High water ~3.3 maters on July 10,2000 2 Septic discharges US" 300 30 -325 -25 Both Right 325 m US of Bridge "25 m US of Bridge, Bush ~ 5 m US of edge of ceme" "High water ~3.3 maters on July 10,2000 2 Septic discharges US" 7/27/2000 17:31 6/25/2003 17:06 22119 UIRB UIRB 05540032 A 7/10/2000 14:16 REACH R Gary`s mill road Bridge "Adolphson, Debbie L., Gaebler, Stensvold, Krista A" Good stream was in falling stage heavy rains the night before Lightly affected 300 30 20 320 Both 20 m DS of Garys Mill Road garys mill road bridge 320 meters downstream stream was in falling stage heavy rains the night before 8/2/2000 17:55 6/25/2003 17:06 21933 UIRB UIRB 05540260 A 7/14/2000 9:00 REACH R "DS side of Naperville Rd Bridge near Naperville, IL" "Tegt, Sarah, Stewart, Jana S., Fuller, Janice A." Excellent stream turbid from storm event- below bankful Not Modified 300 30 32 332 32 meters from DS side of the Bridge at Naperville Road 332 meters from DS side of the Bridge at Naperville Road stream turbid from storm event- below bankful 8/2/2000 15:39 6/25/2003 17:06 62014 UIRB UIRB 05540440 A 7/21/2000 13:00 REACH R walking bridge from park "Adolphson, Debbie L., Gaebler, Stensvold, Krista A" Excellent 8.1 m ds of bridge to transect 11 Lightly affected 200 20 8.1 208.1 8.1 meters DS of walking Bridge (transect 11) "208.1 meters DS of the walking bridge. T1 LB large willow, RB large green ash. Huge log jam DS of T1" 8.1 m ds of bridge to transect 11 11/15/2000 17:33 6/25/2003 17:06 22662 UIRB UIRB 05540660 A 7/21/2000 12:00 REACH R Mound Road Bridge- is 37m us of T-1 "Stewart, Jana S., Tegt, Sarah, Wolf, Julie A." Excellent "many log jams, turbid- mostly from our mud wallowing" Not Modified 150 15 37 187 T-1 is at a log jam 37m DS of Mound Rd. Bridge 187 meters DS of Mound Road Bridge "many log jams, turbid- mostly from our mud wallowing" 8/3/2000 16:36 6/25/2003 17:06 61189 UIRB UIRB 05543800 A 7/19/2000 10:00 REACH R Watertown Bridge "Adolphson, Debbie L., Stensvold, Krista A.,Gaebler" Good "water is cool some scattered showers yesterday afternoon, first transect area narrower than rest--should have made the reach 300 rather than zero" 260 26 -273 -13 Both Left 273 meters US of the Watertown Bridge 13 meters US of the Watertown Bridge on left bank "water is cool some scattered showers yesterday afternoon, first transect area narrower than rest--should have made the reach 300 rather than zero" 11/8/2000 14:59 6/25/2003 17:06 22379 UIRB UIRB 05544080 A 7/19/2000 13:30 REACH R "US side of bridge at HWY LO (HWY 99), RB concrete bridge support" "Stewart, Jana S., Tegt, Sarah, Wolf, Julie A." Excellent "clear water, a private out-pump and small in-pump near ds end of reach (not high volume)" 2.32 Not Modified 150 15 -150 0 Right 150 meters US of the RB Hwy 99 bridge abuttment DS end of reach is at the US end of RB bridge abutment "clear water, a private out-pump and small in-pump near ds end of reach (not high volume)" 8/3/2000 12:03 6/25/2003 17:06 22212 UIRB UIRB 05545955 A 7/18/2000 12:30 REACH R US side of bridge at Bassett Rd (Cty F) "Stewart, Jana S., Tegt, Sarah, Wolf, Julie A." Excellent "Slightly Turbid, Many frogs, recent sewage treatment plant overflow in early June, residential along lb" 3.03 Not Modified 150 15 -161.8 -11.8 Right 161.8 meters US from Bassett Road Bridge T-1 begins at the us side of a concrete block "Slightly Turbid, Many frogs, recent sewage treatment plant overflow in early June, residential along lb" 8/3/2000 9:42 6/25/2003 17:06 3973 UIRB UIRB 05548105 A 7/14/1999 9:45 REACH R Bridge at upstream end of reach "Fitzpatrick, Faith, Adolphson,Debbie,Woessner,Tegt" Excellent Low flow ADR Not Modified 160 16 120 280 Left Both "yellow flagging grass and yellow-capped rebar 2.5m from LEW GPS(center-channel): 42 23 15.56 88 23 21.17" "yellow flagging in trees on LB, yellow-capped rebar on RB GPS: 42 23 19.70 88 23 18.90" 0.001667 0.0002875 Surveying Level Low flow 1/25/2000 10:53 6/25/2003 17:06 67309 UIRB UIRB 05548105 A 7/20/2000 9:00 REACH R Bridge at Greenwood Road. by Wondermere Rd "Adolphson, Debbie,Stensvold,Krista,Gaebler,Patty" Good "Cloudy, warm" Not Modified 160 16 131 291 "131 meters DS of Greenwood Road. Previous year ha" 291 meters DS of Greenwood Road. "Cloudy, warm" 2/9/2001 17:11 6/25/2003 17:06 84702 UIRB UIRB 05548105 A 8/7/2001 12:30 REACH R Greenwood Rd bridge "Adolphson, Debbie, L., Gaebler, Patty, Diebel,Matt" Excellent very hot (heat index 100+) Not Modified 160 16 120 280 very hot (heat index 100+) 8/14/2001 14:12 6/25/2003 17:06 22461 UIRB UIRB 05548200 A 7/20/2000 8:00 REACH R "DS side of bridge at Hill Road, DS side of middle bridge piling" "Stewart, Jana S., Tegt, Sarah, Wolf, Julie A." Excellent "turbid, medium flow, sand and sandy gravel substrate, photos roll 3 # 30-35 of crew, bridge = 36 and 37" Not Modified 240 24 8.35 248.35 "3.5 m DS from old metal culvert, or 8.35 m DS from DS end of middle bridge support" 248.35 m DS from DS end of middle bridge support "turbid, medium flow, sand and sandy gravel substrate, photos roll 3 # 30-35 of crew, bridge = 36 and 37" 8/3/2000 13:50 6/25/2003 17:06 61602 UIRB UIRB 05549000 A 7/20/2000 16:00 REACH R Bull Valley Road Bridge "Adolphson,Debbie,Gaebler,Patty,Stensvold,Krista A." Good lots of woody debris Not Modified 160 16 12.3 172.3 big dead tree on left bank 12.3m down stream of bridge lots of woody debris 11/9/2000 16:35 6/25/2003 17:06 22112 UIRB UIRB 05549850 A 7/17/2000 11:00 REACH R Bridge US side of Kelsey Rd. "Tegt, Sarah, Stewart, Jana S., Wolf, Julie A." Excellent "Slightly turbid, bank stabilization structure on us end of reach, some banks undercut" Lightly affected 150 15 -164.4 -14.4 164.4 meters US of Kelsey Rd. Bridge t-1 is 14.4 m upstream of the bridge at Kelsey rd. "Slightly turbid, bank stabilization structure on us end of reach, some banks undercut" 8/2/2000 17:32 6/25/2003 17:06 60563 UIRB UIRB 05550290 A 7/15/2000 11:30 REACH R bridge at Randall Rd.--Frontage Rd. "Adolphson, Debbie L.,Tegt,Sarah,Stensvold,Krista A" Excellent beautiful day Not Modified 150 15 -157 -7 In line with concrete bridge drain 7 meters upstream 157 meters upstream of Randall Rd. beautiful day 11/7/2000 15:27 6/25/2003 17:06 60454 UIRB UIRB 05550500 A 7/15/2000 9:00 REACH R Bridge at Villa Creek "Adolphson,Debbie L.,Tegt, Sarah,Stensvold,Krista A" Excellent "falling conditions, water a little turbid from prior storms" Stabilized 150 15 -170.7 -20.7 big tree on LB 20.7m US of Villa "falling conditions, water a little turbid from prior storms" 11/7/2000 13:04 6/25/2003 17:06 22528 UIRB UIRB 05551200 A 7/20/2000 13:45 REACH R US side of bridge on Randal Rd "Stewart, Jana S., Tegt, Sarah, Wolf, Julie A." Excellent "turbid, medium stage, clear at upper transects- photos roll 4, 5-us, 6-ds, 7-rb, 8lb" Not Modified 200 20 -225 -25 Right DS boundary is fence marking road-right-of-way 25 "turbid, medium stage, clear at upper transects- photos roll 4, 5-us, 6-ds, 7-rb, 8lb" 8/3/2000 14:39 6/25/2003 17:06 21231 UIRB UIRB 05551340 A 7/10/2000 14:15 REACH R DS end of first low-head dam- US of highway 31 "Tegt, Sarah, Stewart, Jana S., Fuller, Janice A." Good "Runoff from storm--- 2 points were estimated because too deep, bank full measurments questionable, Transect 11 has an island, which created a problem with the canopy angles Left channel left 110 right 60 Right channel left 70 right 90" Lightly affected 300 30 -404 -104 us end of island at hiking trail # 2--- cliff across from end of island on RB "Runoff from storm--- 2 points were estimated because too deep, bank full measurments questionable, Transect 11 has an island, which created a problem with the canopy angles Left channel left 110 right 60 Right channel left 70 right 90" 8/1/2000 16:35 6/25/2003 17:06 21411 UIRB UIRB 05551548 A 7/21/2000 6:50 REACH R Hwy 25 bridge "Adolphson, Debbie L., Stensvold,Krista A.,Gaebler" Excellent downstream dam was removed and replaced with 4 cascading riffles Lightly affected 180 18 -550 -370 550 meters upstream of the Hwy 25 bridge "370 meters upstream of the Hwy 25 bridge Maple tr" downstream dam was removed and replaced with 4 cascading riffles 8/2/2000 10:08 6/25/2003 17:06 64186 UIRB UIRB 05551695 A 7/24/2000 11:00 REACH R "boxelder tree on island, white pump tank" "Adolphson,Debbie L.,Stensvold,Krista A.,Tegt,Sarah" Excellent "photos were taken at this site, unsure of which transect, but placed with transect 6" Not Modified 200 20 13 213 "big rock at transect 1, 13 meters DS from the boxe" 213 m DS of tree on island "photos were taken at this site, unsure of which transect, but placed with transect 6" 12/20/2000 11:53 6/25/2003 17:06 20953 UIRB UIRB 05551931 A 7/24/2000 13:25 REACH R Bridge @ jericho road "Adolphson, Debbie L.,Stensvold,Krista A,Tegt,Sarah" Excellent normal flow (below bank full) clear water 300 30 -320 -20 Both 320 meters US of Jericho Road bridge 20 meters US of Jericho Road bridge normal flow (below bank full) clear water 7/31/2000 17:44 6/25/2003 17:06 64119 UIRB UIRB 05551939 A 7/26/2000 8:00 REACH R confluence of Big Rock Creek "Adolphson, Debbie L.,Tegt, Sarah,Stensvold,Krista" Good Not Modified 220 22 -236 -16 236 meters US of confluence with Big Rock Creek 16 meters US of confluence with Big Rock Creek 12/20/2000 10:27 6/25/2003 17:06 62957 UIRB UIRB 05551985 A 7/25/2000 16:00 REACH R bridge at Somonauk Road "Adolphson, Debbie L.,Stensvold,Krista A.,Tegt,Sara" Excellent "land owner US RB - Creek Rd (430N), water clear, slow flow until walk bridge in between T8 and T9" Not Modified 180 18 -224 -44 224m US of bridge at Somonauk Rd 44 meters US of Somonauk Rd bridge "land owner US RB - Creek Rd (430N), water clear, slow flow until walk bridge in between T8 and T9" 11/28/2000 13:27 6/25/2003 17:06 20637 UIRB UIRB 05552190 A 7/25/2000 11:40 REACH R Bridge at N 41-50 "Adolphson,Debbie L.,Stensvold,Krista A.,Tegt,Sarah" Excellent "regular flow, clear water, pc" Not Modified 300 30 -628 -328 628 meters US of N 41-50 bridge 328 meters US of N 41-50 bridge "regular flow, clear water, pc" 7/31/2000 12:04 6/25/2003 17:06 64033 UIRB UIRB 05552450 A 7/25/2000 8:00 REACH R Bridge at 19th Rd "Adolphson,Debbie L.,Stensvold,Krista A.,Tegt,Sarah" Excellent "cows have been in the pasture, but not recently" Not Modified 150 15 150 300 T-11 is 150m DS of Bridge at 19th Rd T-1 is 300 m DS of 19th Rd. Bridge "cows have been in the pasture, but not recently" 12/19/2000 11:38 6/25/2003 17:06 30068 LIRB LIRB 05553500 A 9/9/1998 8:30 REACH R "Red buoy at the top of Hit Island, just downstream of the confluence of the Illinois and Fox Rivers. " "Harris,Mitchell,Adolphson,Debbie,Fazio,D,Stammer,S" Good Dredged 1200 -40 Both Both "located 40 m US of red buoy, which is located at top of Hitt Island DS of confluence of Fox and Illinois Rivers" 4 9/29/2000 21:39 7/2/2003 12:42 4181 UIRB UIRB 05553500 A 7/20/1999 9:30 REACH R "Red buoy marking upstream of Hitt Island, about 400m downstream of Ottawa trestle." "Fitzpatrick,Faith,Adolphson,Debbie,Woessner,Kim " Excellent Large river; aspect for transects 4 - 10 are calculated from RB; left canopy angles for transects 4-10 calculated from LB; right canopy angles for T 4-10 calculated from RB ADR Dredged 1000 100 0 1000 Left "Red buoy, double flagging on left bank GPS: 41 20 17.22 88 51 10.25" "150 m downstream of Ottawa light, Cemetery on RB across Hitt Island where island narrows. Didn`t get a GPS reading." Large river; aspect for transects 4 - 10 are calculated from RB; left canopy angles for transects 4-10 calculated from LB; right canopy angles for T 4-10 calculated from RB 1/27/2000 14:38 6/25/2003 17:06 30069 LIRB LIRB 05553800 A 9/11/1997 8:00 REACH R downstream of the Starved Rock Lock and Dam "Harris,Mitchell,Adolphson,Debbie,Fazio,D,Stammer,S" Good "Cool am. Dredgeing was being done DS of the Lock yesterday (09-10-97) in the barge channel. Large river site sampled using boat methods. Transects 2,3,4, and 5 actually only total two complete cross-sections. Transects 2 and 4 were in the main navigation " Dredged 1330 Left Right Where the bedrock meets the concrete wall at the park The daymarker located just below the island across from the boat launch 4 "Cool am. Dredgeing was being done DS of the Lock yesterday (09-10-97) in the barge channel. Large river site sampled using boat methods. Transects 2,3,4, and 5 actually only total two complete cross-sections. Transects 2 and 4 were in the main navigation " 9/29/2000 21:39 7/2/2003 12:42 30070 LIRB LIRB 05567000 A 9/5/1996 8:00 REACH R Bridge on Road 2465 "Adolphson,Debbie L.,Harris,Mitchell A.,Fazio,David" Good The morning was foggy. Lightly affected 140 -160 -20 Left Left "honey locust tree, tag number 8, DBH 40cm, Dist to" "silver maple tree, tag number 9, DBH 170cm, Dist. " 2 The morning was foggy. 9/29/2000 21:39 7/2/2003 12:42 30071 LIRB LIRB 05567000 D 9/6/1996 8:00 REACH R "Adolpson,Debbie L.,Harris,Mitchell A.,Fazio,David " Good Very low water. Site located 47 m downstream of 2325 road bridge. It may be outside of the true segment. Cows and a beaver dam at reaches B and C. Lightly affected 145.5 46.7 192.2 Left Left 5 Very low water. Site located 47 m downstream of 2325 road bridge. It may be outside of the true segment. Cows and a beaver dam at reaches B and C. 9/29/2000 21:39 7/2/2003 12:42 30072 LIRB LIRB 05567000 A 9/2/1997 9:40 REACH R "Adolphson, Debbie L." Good Stream length is estimated. The distance from transect 1 to transect 2 is from 1996 sampling. Lightly affected 132.5 -153.5 -21 Left Left "honey locust tree, tag number 8, DBH 40cm, Dist to" "silver maple tree, tag number 9, DBH 170cm, Dist. " 2 Stream length is estimated. The distance from transect 1 to transect 2 is from 1996 sampling. 9/29/2000 21:39 7/2/2003 12:42 30073 LIRB LIRB 05567000 A 9/15/1998 8:00 REACH R "Adolphson, Debbie L." Good Lightly affected 146 -165 -19 Left Left "honey locust tree, tag number 8, DBH 40cm, Dist to" "silver maple tree, tag number 9, DBH 170cm, Dist. " 2 9/29/2000 21:39 7/2/2003 12:42 30074 LIRB LIRB 05568000 A 9/9/1996 11:10 REACH R "Adolphson, Debbie L., Fazio,David J." Good "Weather foggy-hazy, air temp 25°C. Rain over the weekend. Reference location is the gage at the bridge downstream of the reach. ww 13.13, cb 34.97, @ 1957" Lightly affected 335 -945 -610 Both Left "Right: Tag 25, cottonwood tree, DBH 31cm, Dist to " "Tag number 15, Black walnut tree, DBH 30cm, Dist t" 1 "Weather foggy-hazy, air temp 25°C. Rain over the weekend. Reference location is the gage at the bridge downstream of the reach. ww 13.13, cb 34.97, @ 1957" 9/29/2000 21:39 7/2/2003 12:42 30075 LIRB LIRB 05568800 A 9/3/1996 8:00 REACH R "Adolphson, Debbie L., Fazio,David J." Good "Mod.to high turbidity, 100% humid., low stable cond., partly cloudy, 32 C. Bio. Site one mile upstream of SW site. Bio. site Referece bridge is on Road 450 N." Lightly affected 173 -358 -185 Left Left "Tag Number 2, boxelder tree, DBH 64.5cm, Dist to r" "Tag number 1, Silver Maple tree, DBH 52.5cm, Dist " 2 "Mod.to high turbidity, 100% humid., low stable cond., partly cloudy, 32 C. Bio. Site one mile upstream of SW site. Bio. site Referece bridge is on Road 450 N." 9/29/2000 21:39 7/2/2003 12:42 30077 LIRB LIRB 05568800 C 9/4/1996 REACH R "Adolphson,Debbie L., Fazio,David J." Good Reach C begins 692m upstream of TR1 of Reach A. TR1 of Reach C is 151m upstream of TR6 of Reach B. PLGR data was also recorded at each of the transects. Lightly affected 170 -1047 -877 Left Left "Tag number 5, Box-elder tree, DBH 29.7cm, Dist to " "Tag number 4, Box-elder tree, DBH 26.9cm, Dist to " 2 Reach C begins 692m upstream of TR1 of Reach A. TR1 of Reach C is 151m upstream of TR6 of Reach B. PLGR data was also recorded at each of the transects. 9/29/2000 21:39 7/2/2003 12:42 30076 LIRB LIRB 05568800 B 9/4/1996 8:00 REACH R "Adolphson,Debbie L.,Fazio,David J." Good "High humidity, sunny with fog in am. Transect 2 WD is a large rootwad . Reach B starts 369 m upstream of TR 1" Lightly affected 172 -726 -554 Right Left "Tag number 30, PLGR coords: N 41 02`40.60"", W 89 4" "Tag number 3, Silver Maple tree, DBH 131.9cm, Dist" 2 "High humidity, sunny with fog in am. Transect 2 WD is a large rootwad . Reach B starts 369 m upstream of TR 1" 9/29/2000 21:39 7/2/2003 12:42 30078 LIRB LIRB 05568800 A 9/3/1997 8:30 REACH R "Adolphson,Debbie L., Fazio,David J." Good "Mod.to high turbidity, 100% humid., low stable cond., partly cloudy, 32 C. Bio. Site one mile upstream of SW site. Bio. site Referece bridge is on Road 450 N." Lightly affected 157 -345 -188 Left Left "Tag Number 2, boxelder tree, DBH 64.5cm, Dist to r" "Tag number 1, Silver Maple tree, DBH 52.5cm, Dist " 5 "Mod.to high turbidity, 100% humid., low stable cond., partly cloudy, 32 C. Bio. Site one mile upstream of SW site. Bio. site Referece bridge is on Road 450 N." 9/29/2000 21:39 7/2/2003 12:42 30079 LIRB LIRB 05568800 A 9/16/1998 8:20 REACH R "Adolphson,Debbie L., Frothingham, David" Good "Mod.to high turbidity, 100% humid., low stable cond., partly cloudy, 32 C. Bio. Site one mile upstream of SW site. Bio. site Referece bridge is on Road 450 N." Lightly affected 154 -154 Left Left "Tag Number 2, boxelder tree, DBH 64.5cm, Dist to r" "Tag number 1, Silver Maple tree, DBH 52.5cm, Dist " 5 "Mod.to high turbidity, 100% humid., low stable cond., partly cloudy, 32 C. Bio. Site one mile upstream of SW site. Bio. site Referece bridge is on Road 450 N." 9/29/2000 21:39 7/2/2003 12:42 30080 LIRB LIRB 05572000 A 9/12/1996 8:00 REACH R "Bridge, just west of Monticello" "Adolphson, Debbie L.,Fazio,David J.,Sorenson,Steve" Good "Very low water, partly sunny, cool." Not Modified 289 -539 -250 Left Left "Tag 37, Silver Maple Tree, DBH 43.9cm, Dist to Reb" "Tag 32, Hackberry Tree, DBH 23cm, Dist to Rebar 1." 2 "Very low water, partly sunny, cool." 9/29/2000 21:39 7/2/2003 12:42 30081 LIRB LIRB 05572000 B 9/12/1996 14:40 REACH R "Adolphson,Debbie L.,Fazio,David J.,Sorenson,Steve " Good Very Low water started Reach B at 1442. Sunny moderate breeze. PLGR readings for the end of each transect were recorded. Not Modified 177 -865 -689 Left Left "Tag 39, Silver Maple Tree, DBH 29cm, Dist to Rebar" "Tag 38, Silver Maple Tree, DBH 48cm, Dist to Rebar" 2 Very Low water started Reach B at 1442. Sunny moderate breeze. PLGR readings for the end of each transect were recorded. 9/29/2000 21:39 7/2/2003 12:42 30082 LIRB LIRB 05572000 C 9/13/1996 8:00 REACH R "Adolphson,Debbie L., Fazio,David J., Tammi" Good "Cool morning, very low water, most areas wadeable. The PLGR readings for the ends of transects 2,3,4,5 were recorded." Not Modified 192 -1207 -1015 Left Left "Tag 41, Silver Maple Tree, DBH 69cm, Dist. to Reba" "Tag 40, Hackberry Tree, DBH 57.5cm, Dist to Rebar " 2 "Cool morning, very low water, most areas wadeable. The PLGR readings for the ends of transects 2,3,4,5 were recorded." 9/29/2000 21:39 7/2/2003 12:42 30083 LIRB LIRB 05572000 A 9/5/1997 8:50 REACH R "Bridge, just west of Monticello." "Adolphson,Debbie L.,Brown,Timothy A." Good Not Modified 279 Left Left "Tag 37, Silver Maple Tree, DBH 43.9cm, Dist to Reb" "Tag 32, Hackberry Tree, DBH 23cm, Dist to Rebar 1." 2 9/29/2000 21:39 7/2/2003 12:42 30084 LIRB LIRB 05572000 A 9/14/1998 9:20 REACH R "Bridge, just west of Monticello" "Adolphson,Debbie L.,Frothingham" Good "Warm, humid day, overcast with showers expected in the afternoon." Not Modified 279 -529 -250 Left Left "Tag 37, Silver Maple Tree, DBH 43.9cm, Dist to Reb" "Tag 32, Hackberry Tree, DBH 23cm, Dist to Rebar 1." 2 "Warm, humid day, overcast with showers expected in the afternoon." 9/29/2000 21:39 7/2/2003 12:42 96213 LIRB LIRB 05572000 A 8/1/2002 11:15 REACH R "Downstream Bridge, approximately 250 meters from bottom of reach." "Fazio, David J., Murphy, Elizabeth" Good The left bank on the lower half of the reach was hard to get to due to depth of the river. A boat was used to ferry collector across. Levee on LB. 5.22 53 NWIS WEB Lightly affected 300 30 -550 -250 The left bank on the lower half of the reach was hard to get to due to depth of the river. A boat was used to ferry collector across. Levee on LB. 8/12/2002 15:22 7/2/2003 12:42 123382 LIRB LIRB 05572000 A 8/18/2003 14:00 REACH R "Harris,Mitchell A, Hogan,Jennifer L.,Scudder,Fazio" depths of thalweg are estimated for TR2 and TR3 5 ADR 28 Gage 300 30 -550 -250 Left Left "tree tag, rebar" "tree tag, rebar" depths of thalweg are estimated for TR2 and TR3 10/10/2003 11:15 12/23/2003 10:05 137731 LIRB LIRB 05572000 A 8/16/2004 13:00 REACH R "DJ Fazio, JL Hogan, DO Bratz " 4.84 Wire-wt gage 51 Gage Not Modified 300 30 550 250 Left Left "tree tag, rebar" "tree tag, rebar" 9/7/2004 16:16 9/13/2005 17:00 154619 LIRB LIRB 05572000 A 8/10/2005 7:15 REACH R upstream of the Bridge Street bridge "JL Hogan, DJ Fazio, TM Halfar" Excellent Left bank measurements taken by DJ Fazio; right bank measurements taken by JL Hogan and TM Halfar; in-channel measurements taken by TM Halfar; scribe: JL Hogan 4.49 ADR 681 Gage Not Modified 300 30 Both Both "at least one tree tag, rebar with cap, blazed trees" "at least one tree tag, rebar with cap, blazed trees" Left bank measurements taken by DJ Fazio; right bank measurements taken by JL Hogan and TM Halfar; in-channel measurements taken by TM Halfar; scribe: JL Hogan 8/31/2005 11:37 9/13/2005 17:00 30085 LIRB LIRB 05583000 A 9/10/1996 REACH R "Adolphson,Debbie L.,Fazio,David J." Good Rained over weekend. USGS gage on downsteream side of bridge. The Reach is located upstream of bridge. PLGR coordinates recorded. 995 -1175 -180 Left Left "Tag 44, Walnut Tree, Dist to Rebar 2.5m, Azimuth t" "Tag 43, Old Snag Tree, Dist to Rebar 6.5m, Azimuth" 4 Rained over weekend. USGS gage on downsteream side of bridge. The Reach is located upstream of bridge. PLGR coordinates recorded. 9/29/2000 21:39 7/2/2003 12:42 30086 LIRB LIRB 05584500 A 9/11/1996 8:00 REACH R "Adolphson,Debbie L.,Fazio,Sandberg,Harris,Richards" Good Rained over the weekend. Sunny and warm.Water turbid. Reference location Gage on Hwy 136 Bridge. Not Modified 391 Right Right "Tag 50, Hickory Tree, DBH 2.27cm, Dist to Rebar 1m" "Tag 55, Black Walnut Tree, DBH 28.6cm, Dist to Reb" 2 Rained over the weekend. Sunny and warm.Water turbid. Reference location Gage on Hwy 136 Bridge. 9/29/2000 21:39 7/2/2003 12:42 30087 LIRB LIRB 05584500 A 9/4/1997 16:30 REACH R "Adolphson,Debbie L.,Brown,Stammer,Fazio,Harris " Good "Partial sampling on the 3rd, everything else on the 4th. 1715CDT, pH 7.69, SC 357, Temp 22.69°C, DO 7.19, DO % 83.4, 1710 CDT ww=3.56, CB=30.86" Not Modified 391 Left Left 2 "Partial sampling on the 3rd, everything else on the 4th. 1715CDT, pH 7.69, SC 357, Temp 22.69°C, DO 7.19, DO % 83.4, 1710 CDT ww=3.56, CB=30.86" 9/29/2000 21:39 7/2/2003 12:42 30088 LIRB LIRB 05584500 A 9/17/1998 9:00 REACH R "Adolphson,Debbie L.,Frothingham,David,Fazio,David " Good The GCU were estimated from survey data. Field measures were not taken because of the difficulty caused by the depth of the water. DLA 1999 Not Modified 391 404 795 Right Right 2 The GCU were estimated from survey data. Field measures were not taken because of the difficulty caused by the depth of the water. DLA 1999 9/29/2000 21:39 7/2/2003 12:42 30090 LIRB LIRB 05586100 A 9/9/1997 8:00 REACH R "Adolphson,Debbie L.,Harris,Mitchell,Stammer,Fazio" Good "Large river sampling with boat. A section with island was used. Transect one does not include side channel. Transects 2, 4, 6 are on the barge channel side" 750 0 750 Both Both 4 "Large river sampling with boat. A section with island was used. Transect one does not include side channel. Transects 2, 4, 6 are on the barge channel side" 9/29/2000 21:39 7/2/2003 12:42 30089 LIRB LIRB 05586100 A 9/10/1998 8:00 REACH R "Adolphson,Debbie L." Good 750 0 750 Both Both 4 9/29/2000 21:39 7/2/2003 12:42 123461 LIRB LIRB 05586100 A 8/21/2003 8:30 REACH R "Harris,Mitchell A.,Hogan,Jennifer L.,Fazio,David J" Fair channel widths of side and main channels were summed; the main channel aspect was recorded; the canopy angles of LB of side channel and RB of main channel were recorded ; bank canopy angles taken while standing on boat; eye height is height above floor of boat; island width approximated from topographical maps (within about 10 meters of accuracy) 2.46 ADR 7190 Gage 1000 100 Both Both channel widths of side and main channels were summed; the main channel aspect was recorded; the canopy angles of LB of side channel and RB of main channel were recorded ; bank canopy angles taken while standing on boat; eye height is height above floor of boat; island width approximated from topographical maps (within about 10 meters of accuracy) 10/10/2003 12:14 12/23/2003 10:04 154738 LIRB LIRB 05586100 A 8/4/2005 7:00 REACH R upstream of the Florence boat ramp "JL Hogan, DJ Fazio, TM Halfar, BJ Caskey " Excellent "For transects through the island, the aspect of the main channel was entered, the canopy angles of the LB side channel and RB main channel were entered, and channel widths were summed (consistent with 2003). Solar pathfinder measurements taken in side channel (in boat). In stream measurements consist of thalweg in side channel and midpoint in main channel. For depths and velocities, used ADCP measurements. For island measurements, used a digital map to estimate. - JLH" 2 ADR 6000 Gage Dredged 1000 100 Both Both Blazed trees Blazed trees "For transects through the island, the aspect of the main channel was entered, the canopy angles of the LB side channel and RB main channel were entered, and channel widths were summed (consistent with 2003). Solar pathfinder measurements taken in side channel (in boat). In stream measurements consist of thalweg in side channel and midpoint in main channel. For depths and velocities, used ADCP measurements. For island measurements, used a digital map to estimate. - JLH" 9/1/2005 10:41 9/19/2005 16:19 23320 UIRB UIRB 055438135 A 7/19/2000 12:45 REACH R "Busee Road bridge near pewaukee, WI" "Adolphson, Debbie L., Stensvold, Krista A.,Gaebler" Excellent beautiful sunny day Not Modified 200 20 -201 -1 201 meters US of Busee Road Bridge 1 meter US of Busee Road Bridge beautiful sunny day 8/18/2000 13:49 6/25/2003 17:06 22292 UIRB UIRB 055438845 A 7/19/2000 8:00 REACH R US side of bridge at Saylesville Rd "Tegt, Sarah, Stewart, Jana S., Wolf, Julie A." Excellent "water clear, lots of bugs, excellent riparian cover" 11 Wading Rod Not Modified 150 15 -180 -30 Right 180 meters US of Saylesville Rd Bridge 30m us of bridge at Saylesville Rd (at cut stump on RB) "water clear, lots of bugs, excellent riparian cover" 8/3/2000 11:17 6/25/2003 17:06