#ReachSampleID SUID OrigSUID STAID Reach ReachCollectionDate SampleType ReviewStatus REFLOC Collector HABQUAL REACHCOM STAGE STAGEMD DISCH DISCHMD CHMOD REACHLEN TRANDIS USRCHEND DSRCHEND USBMBK DSBMBK USBMDESC DSBMDESC RCHGRAD THGRAD RCHGRAMD STRMTYP Comments InsertDate UpdateDate 3973 UIRB UIRB 05548105 A 7/14/1999 9:45 REACH R Bridge at upstream end of reach "Fitzpatrick, Faith, Adolphson,Debbie,Woessner,Tegt" Excellent Low flow ADR Not Modified 160 16 120 280 Left Both "yellow flagging grass and yellow-capped rebar 2.5m from LEW GPS(center-channel): 42 23 15.56 88 23 21.17" "yellow flagging in trees on LB, yellow-capped rebar on RB GPS: 42 23 19.70 88 23 18.90" 0.001667 0.0002875 Surveying Level Low flow 1/25/2000 10:53 6/25/2003 17:06