#ReachSampleID SUID OrigSUID STAID Reach ReachCollectionDate SampleType ReviewStatus REFLOC Collector HABQUAL REACHCOM STAGE STAGEMD DISCH DISCHMD CHMOD REACHLEN TRANDIS USRCHEND DSRCHEND USBMBK DSBMBK USBMDESC DSBMDESC RCHGRAD THGRAD RCHGRAMD STRMTYP Comments InsertDate UpdateDate 3973 UIRB UIRB 05548105 A 7/14/1999 9:45 REACH R Bridge at upstream end of reach Fitzpatrick, Faith, Adolphson,Debbie,Woessner,Tegt Excellent Low flow ADR Not Modified 160 16 120 280 Left Both yellow flagging grass and yellow-capped rebar 2.5m from LEW GPS(center-channel): 42 23 15.56 88 23 21.17 yellow flagging in trees on LB, yellow-capped rebar on RB GPS: 42 23 19.70 88 23 18.90 0.001667 0.0002875 Surveying Level Low flow 1/25/2000 10:53 6/25/2003 17:06 67309 UIRB UIRB 05548105 A 7/20/2000 9:00 REACH R Bridge at Greenwood Road. by Wondermere Rd Adolphson, Debbie,Stensvold,Krista,Gaebler,Patty Good Cloudy, warm Not Modified 160 16 131 291 131 meters DS of Greenwood Road. Previous year ha 291 meters DS of Greenwood Road. Cloudy, warm 2/9/2001 17:11 6/25/2003 17:06 84702 UIRB UIRB 05548105 A 8/7/2001 12:30 REACH R Greenwood Rd bridge Adolphson, Debbie, L., Gaebler, Patty, Diebel,Matt Excellent very hot (heat index 100+) Not Modified 160 16 120 280 very hot (heat index 100+) 8/14/2001 14:12 6/25/2003 17:06