United States Department of Transportation (USDOT) TRIS Online small green bullet TRT small green bullet NTL Catalogs
NTL Integrated Search
National Transportation Library
Transportation Research Board
Transportation Research Board
Of the National Academies
New Search Browse Advanced Search Search History Marked Records TRT Help

TRIS Online Record

Printable View
Title SPECIFICATIONS AND CONSTRUCTION CONTROLS TO OBTAIN SMOOTH- RIDING BRIDGE DECKS
Accession No 00208799
Authors Mcknight, J W
Journal Title Highway Research Board Bulletin information
Corp. Authors
/ Publisher
Highway Research Board information
Publication Date   19610000
Abstract CONSTRUCTION PROCEDURES AND SPECIFICATION PROVISIONS THAT WILL PRODUCE SMOOTH RIDING BRIDGE DECKS ARE PRESENTED. IT IS POINTED OUT THAT THE BASIC PRINCIPLES THAT PRODUCE SMOOTH- RIDING CONCRETE SURFACES ARE THE SAME FOR PAVEMENTS PLACED ON GRADE AND BRIDGE DECKS. THE NEED FOR UNIFORM AND ACCURATE SUBGRADES IS ANALAGOUS TO THE NEED FOR DETERMINING ELEVATIONS THAT REFLECT CORRECT USE OF ACTUAL CAMBER MEASUREMENTS AND CALCULATED DEFLECTIONS DUE TO DEAD LOADS APPLIED DURING BRIDGE DECK CONSTRUCTION. FOR BRIDGE DECKS TO RIDE AS SMOOTHLY AS ADJACENT PAVEMENTS, THE SCREED GUIDES OR RAILS THAT SUPPORT PAVING EQUIPMENT ON BRIDGE DECKS MUST BE SET WITH THE SAME ACCURACY AND PRECISION EMPLOYED IN SETTING SIDE FORMS FOR CONCRETE PAVEMENTS ON GRADE. THE CRITERIA FOR PROPER PLACING AND FINISHING OF CONCRETE PLACED ON GRADE SHOULD BE FOLLOWED IN PLACING AND FINISHING BRIDGE DECKS. THE IMPORTANT DIFFERENCE IN THE TWO PROCEDURES IS THE TECHNIQUE OF WORKING IN THE LIMITED SPACE ON A BRIDGE DECK. CAREFUL PLANNING IS REQUIRED TO INCLUDE ALL THE NECESSARY STEPS IN FINISHING. TO INSURE ADEQUATE PLANNING AND PROCEDURES ESSENTIAL TO PRODUCE SMOOTH-RIDING BRIDGE DECKS, THE SPECIFICATIONS SHOULD INCLUDE REQUIREMENTS REGARDING: (1) THE PLACING AND FINISHING EQUIPMENT, (2) THE SUPPORTS FOR SCREED GUIDES OR RAILS, AND DETERMINATION OF ELEVATIONS FOR GUIDES OR RAILS, (3) THE PROPERTIES OF THE CONCRETE MIX, (4) MINIMUM METHODS FOR PLACING, CONSOLIDATING, AND FINISHING BRIDGE DECK CONCRETE, (5) CURING METHODS, AND (6) PRECONSTRUCTION CONFERENCE OF ENGINEER AND CONTRACTOR LEADING TO PREPARATION OF DETAILED PLAN FOR BRIDGE DECK PLACING AND FINISHING. /AUTHOR/
Supplemental
Information
No 295, pp 6-18, 10 FIG
TRT Terms Bridge decks information; Concrete curing information; Concrete finishing information; Concrete mixing information; Construction management information; Curvature information; Deflection information; Measurement information; Pavements information; Riding qualities information; Screeds information; Smoothness information; Specifications information; Subgrade (Pavements) information
Other Terms Camber; Construction control; Curing methods; Finishing; Pavement smoothness; Riding quality; Screed guides; Subgrade
Subject Areas H25 STRUCTURES DESIGN AND PERFORMANCE
TRIS Files HRIS
Database TRIS Online
TRIS is a bibliographic database funded by sponsors of the Transportation Research Board (TRB), primarily the state departments of transportation and selected federal transportation agencies. TRIS Online is hosted by the National Transportation Library under a cooperative agreement between the Bureau of Transportation Statistics and TRB.
Privacy Policy | Accessibility
Plug-ins: PDF Reader | Flash Player | Excel Viewer | PowerPoint Viewer | Word Viewer | WinZip