Fryingpan-Arkansas Project - Main Page
Facilities in Operation
Storage Dams |
5 |
Diversion dams and structures |
17 |
Canals |
4.3 mi |
Conduit (includes siphons) |
281.6 mi |
Powerplants |
2 |
Transmission lines |
11.6 mi |
Switchyards |
2 |
Substations |
2 |
Tunnels |
26.7 mi |
|
Storage Facilities
Mt. Elbert Forebay Dam Pueblo Dam Ruedi Dam Sugar Loaf Dam Twin Lakes Dam
Diversion Facilities
Chapman Diversion Dam
South Fork Diversion Dam
Location: |
On the South Fork of the Fryingpan River, about 7.5 miles south of Norrie, Colorado. |
Construction period: |
1965-1971 |
Dimensions: |
|
Height above streambed |
13 ft |
Weir crest length |
20 ft |
Weir crest elevation |
10,003.0 ft |
Spillway: |
Concrete gravity with retaining walls in combination with earth embankment. |
Capacity |
740 cfs |
Sluiceway: |
A 5-ft-square cast iron slide gate with a pedestal lift, and 5-ft-wide overflow section adjacent to gate structure. |
Headworks: |
Four 3.5-ft-square cast iron slide gates with pedestal lifts |
Capacity |
215 cfs |
|
Fryingpan Diversion Dam
Location: |
On the Fryingpan River, 9 miles south of Norrie, Colorado. |
Construction period: |
1965-1971 |
Dimensions: |
|
Height above streambed |
14 ft |
Weir crest length |
25 ft |
Weir crest elevation |
9,961.9 ft |
Spillway: |
Concrete gravity with retaining walls in combination with earth embankment. |
Capacity |
1,100 cfs |
Sluiceway: |
One 5- by 6-ft cast iron slide gate with pedestal lift, with 5-ft overflow section adjacent to gate. |
Headworks: |
Four 5- by 4-ft cast iron slide gates with pedestal lifts |
Capacity |
400 cfs |
|
Ivanhoe Diversion Dam
Lily Pad Diversion Inlet
Location: |
9.5 miles southeast of Norrie, Colorado; diverts water into the Nast Tunnel. |
Construction period: |
1970-1973 |
Dimensions: |
|
Interceptor ditch length |
230 ft |
Crest elevation |
10,207.0 ft |
Spillway: |
Dike, formed by an interceptor ditch, to drop inlet |
Capacity |
20 cfs |
Sluiceway: |
2-ft-diameter cast iron slide gate covering a 2-ft-diameter precast concrete sluiceway pipe |
Headworks: |
5- by 2.5-ft steel slide gate with a pedestal lift. |
Capacity |
20 cfs |
|
Halfmoon Diversion Dam
Location: |
On Halfmoon Creek, 9 miles southwest of Leadville, Colorado. |
Construction period: |
1977- (Under construction) |
Dimensions: |
|
Height of structure |
18 ft |
Spillway overflow length |
50 ft |
Spillway overflow elevation |
9,715.5 ft |
Sluiceway: |
One 5- by 3-ft cast iron slide gate with pedestal lift. |
Headworks: |
One 5-ft-square cast iron slide gate with pedestal lift. |
Capacity |
150 cfs |
Spillway: |
Concrete gravity |
Capacity |
510 cfs |
|
North Cunningham Creek Diversion Structure
Carter Creek Diversion Structure
Sawyer Diversion Structure
Location: |
On Sawyer Creek, 4.5 miles east of Norrie, Colorado. |
Construction period: |
1970-1973 |
Dimensions: |
|
Height above streambed |
6 ft |
Weir crest length |
20 ft |
Total crest length |
50 ft |
Weir crest elevation |
10,084.5 ft |
Spillway: |
Dike embankment with a concrete inlet. |
Capacity |
30 cfs |
Sluiceway: |
One 5-ft-diameter cast iron slide gate with a nonprojecting lift |
Headworks: |
One 2.5-ft-diameter cast iron slide gate with a nonprojecting lift. |
Capacity |
30 cfs |
|
Midway Creek Diversion Structure
Location: |
On Midway Creek, 7 miles east of Aspen, Colorado. |
Construction period: |
1976- (Under construction) |
Dimensions: |
|
Height above streambed |
12 ft |
Inlet size |
10 ft |
Overflow wier length |
20 ft |
Diversion elevation |
10,186.7 ft |
Weir length |
50 ft |
Weir crest elevation |
10,190.2 ft |
Spillway: |
Gated structure with an 8-ft diversion channel leading to an 8-ft diameter vertical shaft. |
Capacity |
85 cfs |
Sluiceway: |
One 10- by 12-ft cast iron radial gate with a walled channel. |
Headworks: |
One 5-ft-square cast iron slide gate with motor-operated lift and stem. |
Capacity |
85 cfs |
|
Middle Cunningham Creek Diversion Structure
Mormon Creek Diversion Structure
No Name Creek Diversion Structure
Location: |
On No Name Creek, 5.5 miles east of Aspen, Colorado. |
Construction period: |
1976- (Under construction) |
Dimensions: |
|
Height above streambed |
13 ft |
Diversion elevation |
10,167.0 ft |
Weir length |
26 ft |
Weir crest elevation |
10,170.5 ft |
Spillway: |
Gated structure with a 7- by 8-ft diversion channel to a vertical shaft. |
Capacity |
95 cfs |
Sluiceway: |
One 8- by 12-ft cast iron radial gate. |
Headworks: |
One 5-ft-square cast iron slide gate with motorized stem and hoist. |
Capacity |
95 cfs |
|
Hunter Creek Diversion Structure
Location: |
On Hunter Creek, 7.5 miles east of Aspen, Colorado. |
Construction period: |
1976- (Under construction) |
Dimensions: |
|
Height of shaft |
52 ft |
Drop inlet size (diameter) |
12 ft |
Top of inlet (elevation) |
10,175.5 ft |
Headworks crest length |
30 ft |
Headworks crest elevation |
10,179.0 ft |
Sluiceway crest length |
60 ft |
Sluiceway crest elevation |
10,182.5 ft |
Spillway: |
Gated structure with a 5- by 8-ft diversion channel to a vertical shaft. |
Sluiceway: |
One 8- by 10-ft cast iron radial gate. |
Headworks: |
One 6-ft-square cast iron slide gate with motorized stem and hoist. |
Capacity |
140 cfs |
|
North Fork Diversion Structure
South Cunningham Creek Diversion Structure
Granite Creek Diversion Structure
Location: |
6.5 miles southeast of Norrie, Colorado; diverts water into the Granite Siphon |
Construction period: |
1978-1980 |
Dimensions: |
|
Height above streambed |
4 ft |
Weir crest length |
10 ft |
Weir crest elevation |
10,078.0 ft |
Spillway: |
An overflow from drop inlet with a crest length of 10 ft. Auxiliary spillway is a 15-ft-wide concrete weir overflow section. |
Capacity |
50 cfs |
Sluiceway: |
One 1.5-ft-square cast iron slide gate with motor-operated lift and stem |
Headworks: |
One 3-ft-square cast iron slide gate with motor-operated lift and stem |
Capacity |
50 cfs |
|
Carriage Facilities
Mormon Tunnel
Location: |
7 miles east of Norrie, Colorado. |
Construction period: |
1976- (Under construction) |
Length |
1.4 mi |
Capacity |
190 cfs |
Cross section: |
Horseshoe |
Diameter |
8.0 and 8.25 ft |
Lining: |
Concrete and ShotCrete |
|
Cunningham Tunnel
Location: |
5.5 miles east of Norrie, Colorado. |
Construction period: |
1974-1976 |
Length |
2.9 mi |
Capacity |
270 cfs |
Cross section: |
Horseshoe |
Diameter |
7.5 and 8.75 ft |
Lining: |
Concrete and ShotCrete |
|
Nast Tunnel
Location: |
6 miles southeast of Norrie, Colorado. |
Construction period: |
1970-1974 |
Length |
3 mi |
Capacity |
360 cfs |
Cross section: |
Circular |
Diameter |
7.67 and 9.33 ft |
Lining: |
Concrete and ShotCrete |
|
Chapman Tunnel
Location: |
5 miles south of Norrie, Colorado on Chapman Gulch |
Construction period: |
1965-1971 |
Length |
2.8 mi |
Capacity |
300 cfs |
Cross section: |
Horseshoe |
Diameter |
7 ft |
Lining: |
Concrete |
|
South Fork Tunnel
Location: |
7 miles south of Norrie, Colorado, on South Fork Creek |
Construction period: |
1965-1971 |
Length |
3.1 mi |
Capacity |
450 cfs |
Cross section: |
Horseshoe |
Diameter |
8 ft |
Lining: |
Concrete |
|
Carter Tunnel
Location: |
7 miles northeast of Norrie, Colorado, on Carter Creek |
Construction period: |
1976- (Under construction) |
Length |
0.54 mi |
Capacity |
100 and 130 cfs |
Cross section: |
Horseshoe |
Diameter |
8 ft |
Lining: |
Concrete and ShotCrete |
|
Charles H. Boustead Tunnel
Location: |
About 5 miles southeast of Norrie, Colorado, on the Fryingpan River. |
Construction period: |
1965-1971 |
Length |
5.4 mi |
Capacity |
945 cfs |
Cross section: |
Horseshoe |
Diameter |
10.5 ft |
Lining: |
Concrete |
|
Hunter Tunnel
Location: |
5 miles east of Aspen, Colorado, on No Name Creek |
Construction period: |
1970- (Under construction) |
Length |
7.6 mi |
Capacity |
90, 175, and 270 cfs |
Cross section: |
Semi-horseshoe, horseshoe |
Diameter |
8.5 and 7.33 ft |
Lining: |
Concrete |
|
Granite Adit
Location: |
3 miles southeast of Nast, Colorado. |
Construction period: |
1970-1974 |
Length |
0.14 mi |
Capacity |
50 cfs |
Cross section: |
Horseshoe |
Diameter |
7.67 and 9.33 ft |
Lining: |
Concrete and ShotCrete |
|
Granite Siphon
Location: |
6.5 miles southeast of Norrie, Colorado between Granite Creek and Granite Adit |
Construction period: |
1978-1980 |
Length |
0.76 mi |
Capacity: |
50 cfs |
Cross section |
Circular |
Diameter |
30 and 36 in |
|
Fryingpan Conduit
Location: |
9 miles southeast of Norrie, Colorado, between Nast Tunnel and South Side Collection System |
Construction period: |
1970-1974 |
Length |
2,481 ft |
Capacity |
360 cfs |
Cross section: |
Circular |
Diameter |
84 in |
|
Sawyer Conduit
Location: |
4 miles south of Norrie, Colorado, between Sawyer Creek and Hunter Tunnel. |
Construction period: |
1970-1973 |
Length |
3,098 ft |
Capacity |
30 cfs |
Cross section: |
Circular |
Diameter |
27 in |
|
Chapman Feeder Conduit
Location: |
5 miles south of Norrie, Colorado, between Chapman Diversion Dam and the Chapman Tunnel. |
Construction period: |
1970-1973 |
Length |
0.05 mi |
Capacity |
300 cfs |
Cross section: |
Rectangular |
Diameter |
8.33 by 11.00 ft |
Lining: |
Concrete |
|
Mt. Elbert Conduit
Location: |
4 miles west of Leadville, Colorado, in Lake County from Turquoise Lake to Mt. Elbert Forebay. |
Construction period: |
1977- (Under construction) |
Length |
10.7 mi |
Capacity |
370 cfs |
Cross section: |
Circular |
Diameter |
90 in |
|
Mormon Conduit
Location: |
7 miles east of Norrie, Colorado, between the Carter Tunnel and Mormon Tunnel |
Construction period: |
1976- (Under construction) |
Length |
0.33 mi |
Capacity |
130 cfs |
Cross section: |
Circular |
Diameter |
45 in |
|
Cunningham Conduit
Location: |
5.5 miles east of Norrie, Colorado, between Mormon Tunnel and Cunningham Tunnel |
Construction period: |
1976- (Under construction) |
Length |
4,170 ft |
Capacity |
220 cfs |
Cross section: |
Circular |
Diameter |
60 in |
|
South Fork Feeder Conduit
Location: |
7 miles south of Norrie, Colorado, between Chapman Tunnel and South Fork Tunnel |
Construction period: |
1970-1973 |
Length |
0.07 mi |
Capacity |
215 cfs |
Cross section: |
Rectangular |
Size |
7.5 by 9.0 ft |
Type: |
Concrete |
|
Fryingpan Feeder Conduit
Location: |
8.5 miles southeast of Norrie, Colorado, between South Fork Tunnel and Charles H. Boustead Tunnel |
Construction period: |
1970-1973 |
Length |
0.06 mi |
Capacity |
400 cfs |
Cross section: |
Rectangular |
Size |
9.25 by 13.0 ft |
Type: |
Concrete |
|
Ivanhoe Feeder Conduit
Location: |
8.5 miles southeast of Norrie, Colorado, between Cunningham Tunnel and Nast Tunnel |
Construction period: |
1975-1976 |
Length |
0.05 mi |
Capacity |
150 cfs |
Cross section: |
Circular |
Diameter |
84 in |
Type: |
Concrete |
|
South Cunningham Conduit
Location: |
5.5 miles east of Norrie, Colorado, between Cunningham Tunnel and Nast Tunnel |
Construction period: |
1976- (Under construction) |
Length |
0.4 mi |
Capacity |
20 cfs |
Cross section: |
Circular |
Diameter |
18, 21, and 24 in |
Type: |
Precast concrete pressure pipe |
|
Mt. Elbert Pumped-Storage Powerplant Penstocks
Location: |
13 miles southwest of Leadville, Colorado, between Mt. Elbert Forebay and Mt. Elbert Powerplant on Twin Lakes Reservoir |
Construction period: |
1972- (Under construction) |
Length (each) |
0.57 mi |
Capacity (each) |
3,400 cfs |
Cross section: |
Circular |
Diameter (two) |
15 ft |
Type: |
Steel pipe |
|
Fountain Valley Conduit
Location: |
6 miles west of Pueblo, Colorado, to 2 miles south of Colorado Springs, Colorado. |
Construction period: |
(Construction pending issuance of specifications) |
Length |
45 mi |
Capacity |
31 cfs |
Diameter |
42 to 14 in |
|
Otero Canal
Location: |
From Twin Lakes to the Otero Powerplant and the Homestake Turnout |
Construction period: |
Proposed |
Length1 |
5.5 mi |
Capacity |
725 cfs |
|
1 0.7 mi (bench flume), 0.2 mi (pipe siphon), 0.3 mi (tunnel), 4.3 mi (open trapezoidal concrete-lined canal). |
Power Facilities
Mt. Elbert Pumped-Storage Powerplant Otero Powerplant
|