Western's banner shows transmission lines.
Link to Western's home page
Federal Register Notices 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995

1995 Federal Register notices

Note: All files are in PDF

Notice Date Published Citation

Completion of the Loveland Area Projects, Post-1999 Resource Study (211 kb pdf)

December 20, 1995

60 FR 65652

Notice of extension for the proposed rate adjustment for the Pacific NW-SW Intertie Project (100 kb pdf)

November 22, 1995

60 FR 57867

Placing into effect the rate methodology for determining the Annual Revenue Requirement, Base Charge, Forecast Capacity Rate and Forecast Energy Rate, and Calculated Energy Rate for the Boulder Canyon Project on an interim basis. Rate Order No. WAPA–70 (838 kb pdf)

November 22, 1995

60 FR 57859

Final rule on Energy Planning and Management Program, 10 CFR Part 925 (2,911 kb pdf )

October 20, 1995

60 FR 54151

Placing the revised nonfirm energy rates for energy from the Stampede Division, Washoe Project into effect on an interim basis. Rate Order No. WAPA–67 (418 kb pdf)

October 17, 1995

60 FR 53785

Placing decreased firm power rates for capacity and energy and decreased firm and nonfirm transmission rates from the Parker-Davis Project into effect on an interim basis. Rate Order No. WAPA–68 (677 kb pdf

October 17, 1995

60 FR 53778

Record of decision for the Energy Planning and Mangement Program (358 kb pdf)

October 12, 1995

60 FR 53181

Placing provisional commercial firm power rates for capacity and energy from the Central Valley Project into effect on an interim basis (476 kb pdf)

October 10, 1995

60 FR 52671

Requesting commetns on the proposed sale of firm transmission service available as a result of the completion of contruction of the Mead Phoenix/Adelanto Transmission Projects (198 kb pdf)

September 19, 1995

60 FR 48513

Announcing an extension of the consultation and comment period for the Boulder Canyon Project (100 kb pdf)S

August 21, 1995

60 FR 43468

Record of Decision for the Flatiron-Erie 115-kv Transmission Line Project (305 kb pdf)

August 21, 1995

60 FR 43465

Amended rate schedule CV-F7 from the Central Valley Project into effect on an interim basis ( 365 kb pdf)

August 16, 1995

60 FR 42560

Proposing two rates for nonfirm transmission service for the Pacific NW-SW Intertie Project (182 kb pdf)

July 31, 1995

60 FR 38995

Proposed commericial firm power rates for the Central Vally Project (154 kb pdf)

July 10, 1995

60 FR 35556

Proposed firm power rates, firm and nonfirm transmission service and transmission services for the Salt Lake Integrated Projects (167 kb pdf)

July 6, 1995

60 FR 35199

Final principles of Integrated Resource Planning for use in Resource Acquisiton and Transmission Planning (267 kb pdf)

June 9, 1995

60 FR 30533

Proposing a rate adjustment for nonfirm energy from the Stampede Division, Washoe Project (160 kb pdf)

June 5, 1995

60 FR 29586

Notice of order confirming and approving and extension of the existing step one firm and nonfirm transmission service rate of the Pacific NW-SW Intertie Project (184 kb pdf)

May 17, 1995

60 FR 26433

Notice of proposed Boulder Canyon Project power rate adjustment (284 kb pdf)

May 8, 1995

60 FR 22575

Notice of proposed rate adjustments for firm power and firm and nonfirm transmission service for the Parker-Davis Project (181 kb pdf)

March 21, 1995

60 FR 14935

Notice of intent that non-Federal funding will be obtained form Reclamation to perform rewinding with uprates on three generators at the Shasta Dam Powerplant in order to ensure reliability (221 kb pdf)

March 20, 1995

60 FR14754

Placing into effect a formula for determining annual, power-related payments for the Provo River Project on an interim basis. Rate Order No. WAPA–65 (504 kb pdf)

March 2, 1995

60 FR 11667