CA2458 1. SPILLWAY FACE, FROM BELOW MAIN EMBANKMENT.Y 2. LOOKING SOUTH OVER FACE OF SPILLWAY. 3. EAST END OF SPILLWAY, SHOWING OGEE LIP, LOOKING SOUTHEAST. 4. EAST END OF SPILLWAY, NORTH END, SHOWING ROCK AND CONCRETE DRAINAGE CHANNEL 5. CONCRETE WING WALL AT BASE OF SPILLWAY FACE, FROM ABOVE. 6. CONCRETE WING WALL AT NORTHWEST END OF SPILLWAY; DAM EMBANKMENT AT LEFT. 7. CONCRETE AND GRADED ABUTMENT AT SOUTHEAST END OF SPILLWAY. 8. VIEW TO SOUTH ALONG LENGTH OF OGEE WALL. 9. NORTHWEST END OF OGEE WALL; VIEW TO NORTHWEST FROM GRASSED AREA NORTHEAST OF SPILLWAY. 10. VIEW TO NORTHEAST ALONG NORTHWEST SPILLWAY ABUTMENT; SERVICE VEHICLE GARAGE IN BACKGROUND. 11. DETAIL, ROCK AND CONCRETE DRAINAGE DITCH ON SPILLWAY ABUTMENT. 12. ...CONCRETE IS BEING PLACED FOR THE FOUNDATION FOR THE WEST END OF THE OGEE SECTION OF SPILLWAY STRUCTURE. Volume XVI, No. 20, September 29, 1939. 13. AERIAL VIEW SHOWING IN THE FOREGROUND, EXCAVATION FOR THE SPILLWAY APRON.... Volume XVII, No. 12, December 26, 1939. 14. A VIEW ALONG AXIS OF OGEE SECTION OF THE SPILLWAY STRUCTURE... Volume XVII, No. 14, November 29, 1939. 15. AERIAL PHOTOGRAPH OF DAM SITE SHOWING SPILLWAY OGEE SECTION AND SPILLWAY APRON EXCAVATION IN FOREGROUND.... Volume XVIII, No. 10, January 18, 1940. 16. VIEW EASTERLY ALONG THE UPSTREAM SIDE OF THE OGEE SECTION OF THE SPILLWAY.... Volume XVIII, No. 13, January 29, 1940. 17. VIEW EASTERLY ALONG DOWNSTREAM END OF THE SPILLWAY, SHOWING CELL WALL CONSTRUCTION IN THE CRIB CUTOFF.... Volume XX, No. 4, August 3, 1940. 18. EASTERLY VIEW ALONG THE SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS.... Volume XX, No. 5, September 5, 1940. 19. WESTERLY VIEW ALONG SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS IN PROGRESS. THE DAM EMBANKMENT IS SHOWN IN THE LEFT DISTANCE.... Volume XX, No. 6, September 5, 1940. 20. WESTERLY VIEW SHOWING SPILLWAY BUCKET COMPLETED, EXCEPT FOR WING WALL IN THE FOREGROUND.... Volume XX, No. 7, September 25, 1940. 21. SPILLWAY CHANNEL OGEE DETAILS. Sheet S-2, March, 1939. File no. SA 343/66. 22. SPILLWAY CHANNEL SLAB REINFORCEMENT DETAILS, NO. 1. Sheet S-4, February, 1939. File no. SA 343/67. 23. SPILLWAY CHANNEL DRAINAGE PLAN AND DETAILS. Sheet S-8, July, 1939. File no. SA 343/71. 24. SPILLWAY CHANNEL WALLS - REINFORCEMENT DETAILS; MONOLITHS E-1 TO F-4 INCL. & NO. 34. Sheet S-11, June, 1939. File no. SA 342/24(?). 25. PLAN OF SPILLWAY SHOWING INDEX TO MONOLITHS. Sheet S-18, July, 1939. File no. SA 342/15. 26. SPILLWAY CHANNEL WALLS - REINF. DETAILS; MONOLITHS W-1 TO W-4 INCL. Sheet S-26, July, 1939. File no. SA 342/34. 27. SPILLWAY CHANNEL: PLAN AND SECTIONS OF CRIB CUTOFF. Sheet S-27, May, 1939. File no. SA 342/36. 28. SPILLWAY BUCKET SLAB: REINFORCEMENT DETAILS NO. 1. Sheet S-37, December, 1939. File no. SA 342/47. 29. SPILLWAY BUCKET SLAB: REINFORCEMENT DETAILS NO. 3. Sheet S-40, December, 1939. File no. SA 342/49. 30. SPILLWAY BUCKET SLAB: REINFORCEMENT DETAILS NO. 4. Sheet S-44, December, 1939. File no. SA 342/50. 31. SPILLWAY CHANNEL WALLS REINF - DETAILS; MONOLITHS E-21 AND W-21. Sheet S-45, May, 1940. File no. 342/58. 32. SPILLWAY CHANNEL WALLS REINF. DETAILS; MONOLITHS E-22, E-23, W-22, AND W-23. Sheet S-46, May, 1940. File no. 342/59. 33. SPILLWAY CHANNEL - BACKFILL DETAILS NO. 2. Sheet S-52, May, 1940. File no. SA 342/66. 34. SPILLWAY CRIB CUTOFF WALL STA. 22+65.23 TO STA. 24+30. Sheet S-61, May, 1940. File no. SA 342/71. 35. SPILLWAY CRIB CUTOFF: WEST SECTION REINFORCEMENT DETAILS NO. 4. Sheet S-63, June, 1940. File no. SA 342/74.