; This file contains the CELIAS CRUISE PHASE TIME-LINE. ; Time-line has the required format: TIME # ACTION # TLM # COMMENT ; Time has the format: ddd & hh:mm:ss, or ddd, or ddd & hh, or ddd & hh:mm ; The purpose of this is to make the file machine readable for input to ; the SOHO timeline IDL program ; Blank lines and comment lines -- preceeded by ";" -- are ignored ; CELIAS would like HK data (VC0) as soon as possible for thermal monitoring. ; This can be at any telemetry rate. ; For all CELIAS command procedures during commissioning (other than ; the initial non-ops heaters commands before actual turn on) both ; HK and SCI (VC0 and VC1) telemetry are needed in Near Real Time (NRT), ; but any telemetry rate containing VC0 & VC1 is ok. ; The number of days required for some of the high voltage procedures may ; depend on how much NRT commanding and telemetry is available (24-hr ; hour coverage? eight hour coverage?) during the commissioning phase. ; Start times each day are arbitrary, as long as NRT commanding and Tlm ; available at those times. Estimated delta times between procedures are ; being sent by mail (FedEx). ; Whenever thermal control begins # CELIAS non-ops heaters ON # VC0 Tlm 4 & 00:08 # CELIAS DPU Initial Turn On # DPU functional test 4 & 00:48 # CELIAS CTOF Initial Turn On # 4 & 01:18 # Initial CELIAS CTOF Checkout IFC # CTOF electronics test 4 & 01:48 # Initial CELIAS CTOF Checkout SSD # CTOF detector test 4 & 02:18 # CELIAS CTOF Bakeout and Outgassing Begins # 4 & 02:48 # CELIAS STOF Initial Turn On # # 4 & 03:18 # Initial CELIAS STOF Checkout IFC # STOF electronics test 4 & 04:48 # Initial CELIAS STOF Checkout SSD # STOF detector test 5 & 00:18 # CELIAS CTOF SWITCH OFF # Preparation for MTOF cover release 5 & 00:18 # CELIAS STOF SWITCH OFF # Preparation for MTOF cover release 5 & 00:48 # CELIAS MTOF Initial Turn On # # 5 & 01:18 # CELIAS MTOF Cover Release # # 5 & 01:48 # Initial CELIAS MTOF Checkout IFC # MTOF electronics test 5 & 02:18 # CELIAS MTOF Bakeout and Outgassing Begins # 5 & 02:48 # CELIAS CTOF Switch On # After MTOF cover release 5 & 03:18 # CELIAS STOF Switch On # After MTOF cover release 6 & 03:48 # CELIAS CTOF Bakeout Ends # Heater OFF 7 & 04:18 # CELIAS CTOF Outgassing Ends - Reconfigure # 7 & 06:18 # CELIAS CTOF MCP Initial Turn On # 7 & 06:48 # CELIAS MTOF Bakeout Ends # Heater OFF 8 & 00:18 # CELIAS CTOF MCP Turn On Continues # 8 & 00:48 # CELIAS MTOF Outgassing Ends - Reconfigure MAIN # 8 & 01:18 # CELIAS MTOF Outgassing Ends - Reconfigure PM # 8 & 01:48 # CELIAS MTOF MCP Initial Turn On # 9 & 00:18 # CELIAS CTOF E/Q Initial Turn On # 9 & 01:18 # CELIAS MTOF MCP Turn On Continues # 10 & 00:18 # CELIAS MTOF MCP Turn On Continues # 10 & 01:18 # CELIAS CTOF PAPS Initial Turn On # 11 & 00:18 # CELIAS MTOF MCP Turn On Continues # 11 & 00:18:30 # CELIAS CTOF PAPS Turn On Continues # 12 & 00:18 # CELIAS CTOF PAPS Turn On Continues # 12 & 00:48 # CELIAS CTOF SWITCH OFF # Preparation for STOF shutter release 12 & 01:48 # CELIAS MTOF SWITCH OFF # Preparation for STOF shutter release 12 & 02:48 # CELIAS STOF Shutter Release # 12 & 03:18 # CELIAS STOF Bakeout and Outgassing Begins # 12 & 04:18 # CELIAS CTOF Switch On # After STOF shutter release 12 & 05:18 # CELIAS MTOF Switch On # After STOF shutter release 13 & 00:18 # CELIAS STOF Bakeout Ends # Heater OFF 13 & 00:48 # CELIAS CTOF PAPS Turn On Continues # 13 & 01:18 # CELIAS MTOF PM E/Q Initial Turn On # 14 & 00:18 # CELIAS STOF Outgassing Ends - Reconfigure # 14 & 00:48 # CELIAS SEM Initial Turn On # 14 & 00:48:30 # CELIAS CTOF PAPS Turn On Continues # 14 & 00:18 # CELIAS MTOF MAIN WAVE E/Q Initial Turn On # 14 & 03:18 # CELIAS STOF MCP1 Initial Turn On # 14 & 05:18 # CELIAS STOF MCP2 Initial Turn On # 15 & 00:18 # CELIAS CTOF PAPS Turn On Continues # 15 & 00:18:30 # CELIAS MTOF WAVE/PM Flight Configuration # 15 & 00:19 # CELIAS STOF MCP1 Turn On Continues # 15 & 00:19:30 # CELIAS STOF MCP2 Turn On Continues # 15 & 00:48 # CELIAS HSTOF E/Q Initial Turn On # 16 & 00:18 # CELIAS CTOF PAPS Turn On Continues # For several days 16 & 00:48 # CELIAS MTOF Hyperbola (HPS) Initial Turn On # Continues for days, also during MCC2 16 & 00:18:30 # CELIAS STOF MCP1 Turn On Continues # For several days 16 & 00:19 # CELIAS STOF MCP2 Turn On Continues # For several days 16 & 03:18 # CELIAS STOF E/Q Initial Turn On # 19 & 00:18 # CELIAS CTOF HV Turn Off # For MCC2 19 & 00:48 # CELIAS MTOF HV Turn Off # For MCC2 19 & 00:18 # CELIAS STOF HV and SEM Turn Off # For MCC2 23 & 00:18 # CELIAS CTOF HV turn ON # After MCC2 23 & 02:18 # CELIAS MTOF HV turn ON # After MCC2 23 & 04:18 # CELIAS STOF HV and SEM turn ON # After MCC2 24 & 00:18 # CELIAS MTOF HPS Turn On Continues # For one more week at least 30 & 00:18 # CELIAS MTOF MAIN Vf Initial Turn On # 59 & 00:18 # CELIAS Configuration before S/C maneuvers # TBD 76 & 04:18 # CELIAS Reconfiguration after S/C maneuvers # TBD 114 & 00:18 # CELIAS CTOF HV Turn Off # For HOI 114 & 00:48 # CELIAS MTOF HV Turn Off # For HOI 114 & 01:18 # CELIAS STOF HV and SEM Turn Off # For HOI 120 & 04:18 # CELIAS CTOF Reconfiguration after HOI # Normal Ops 125 & 00:18 # CELIAS MTOF Reconfiguration after HOI # 125 & 03:48 # CELIAS STOF Reconfiguration and SEM On after HOI # Normal Ops 126 & 00:18 # CELIAS MTOF HPS Re-Turn On Continues # For several days 130 & 00:18 # CELIAS MTOF HPS Re-Turn On Continues # Normal Ops ; End of file