Cape Rise Special - User Selected MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 DEFICIENCIES REPORT - DETAILED Report Date: 02/26/04 Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 1 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Rise C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-PTM - Portsmouth, VA R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: VJC - Vince J. Canepa SM/GA...: KEY - Keystone Shipping Company COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== G020T 05/23/02 SMTD REG30 0100-00000-000 0100 10/01/03 05/31/02 03 04-03-B-02 03 $6000.00 $6000.00 SP 09/30/03 02KEYRIS04S021 DESCRIPTION: BIANNUAL FORKLIFT SERVICE ***SAFETY ITEM*** 1.0 ABSTRACT: This intent of this item is to perform bi-annual maintenance service of the ship's forklift. 2.0 REFERENCES: NISSAN Forklift Repair Manual 3.0 ITEM LOCATION: Main trailer deck 4.0 OWNER FURNISHED MATERIAL/EQUIPMENT/SERVICES None 5.0 STATEMENT OF WORK 5.1 Contractor shall provide labor, materials and tools to perform the following: Inspect all moving parts of the forklift. Inspection shall be conducted in accordance with the NISSAN Repair Manual. As a minimum, the following inspections shall be carried out: 5.1.1 Check Brake fluid level. 5.1.2 Check brake pedal travel. 5.1.3 Check brake linings for wear. 5.1.4 Check all other hydraulic systems for leaks. 5.1.5 Check all moving components for fractures, distortions and wear. 5.1.6 Check lights 5.1.7 Check audible warning devices. 5.1.8 Check cutout switches. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 2 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Rise C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-PTM - Portsmouth, VA R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: VJC - Vince J. Canepa SM/GA...: KEY - Keystone Shipping Company COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== 5.2 Submit a condition report detailing all recommended repairs and replenishment required. REFERENCE: F:\vcanepa\specifications\cape rise 03.* Deferred due to OIF. Moved to FY04. Funds deobligated from T.O 021 & reprogrammed to FY03 DSN H036R - Procure covered lifeboats.* Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 3 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Rise C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-PTM - Portsmouth, VA R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: VJC - Vince J. Canepa SM/GA...: KEY - Keystone Shipping Company COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== G184R 07/01/03 MSVC MNT10 - - 0117 10/01/03 07/01/03 03 04-03-B-03 03 $109647.00 $0.00 SP / / DESCRIPTION: ROS VESSEL BUNKERS/FUELS (FY04) Procure bunkers/fuels in quantities as required to support the annual maintenance activations, sea/dock trials and scheduled P4P light-offs. Bunkers shall be maintained onboard in sufficient quantity for five (5) days full power operation AND as may be necessary to maintain stability. Bunkers (Propulsion) Required.........................: 4,560 BBLS 5 day supply............: 2,510 BBLS Sea Trials..............: 1,168 BBLS Scheduled P4P Light-Offs: 882 BBLS Type: 5.6 cSt @ 40c Price: $27.47/BBL Other Fuel (Auxiliaries) Required.........................: 1,954 BBLS 5 day supply............: 240 BBLS Sea Trials..............: 188 BBLS Boiler(150d for heating): 1,093 BBLS Scheduled P4P Light-Offs: 433 BBLS Type: 5.6 cSt @ 40c Price: $27.47/BBL Total requirement (Propulsion + Auxiliaries): 6,514 BBLS Total on board as of 10/01/03: 2,750 BBLS To be ordered: 3,764 BBLS COST ESTIMATE: 3,764 BBLS x $27.47/BBL : $103,397 Barge costs (based on delivery of 500mt): 5,500 Fuel testing services: 250 Independent gauging services: 500 Note: Indicate if the amount of fuel being purchased is to satisfy a "minimum" required for the mode of delivery or a discount price. REFERENCE: Marts DSN.* Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 4 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Rise C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-PTM - Portsmouth, VA R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: VJC - Vince J. Canepa SM/GA...: KEY - Keystone Shipping Company COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== H035R 05/17/02 MSVC HAB00 - - 1401 10/01/04 06/25/02 04 05-03-C-02 03 $5000.00 $0.00 SP / / DESCRIPTION: RENEW DECK COVERING IN LAUNDRY ROOM 1.0 ABSTRACT: This intent of this item is to replace the flooring in Laundry Room. Existing flooring is an epoxy terrazzo material, which has begun to crack and has lifted from the steel deck over a large area. 2.0 REFERENCES: MARAD Coating Guidelines 3.0 ITEM LOCATION: Located on the 02 level mid-ships forward. 4.0 OWNER FURNISHED MATERIAL / EQUIPMENT / SERVICES None 5.0 STATEMENT OF WORK 5.1 Contractor to provide qualified labor, tools and materials to perform the following: 5.1.1 Remove existing flooring and machine tool cleaning the steel base floor and cove base siding to bare metal. Machine tool steel base floor and cove base siding to SPC SP3 specification. 5.1.2 New epoxy base terrazzo will be applied as a sub-floor, with a final epoxy overlayment. The overlayment will be sealed as per manufacturer's specifications. 5.1.3 Final color and pattern shall be as selected by the crew. 5.1.4 Apply two coats of sealer in accordance with manufacturer's specifications. 5.1.5 Area shall be through cleaned and all debris and supplies removed. REFERENCE: F:\vcanepa\specifications\cape rise 03.* Moved from FY03 to FY05.* Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 5 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Rise C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-PTM - Portsmouth, VA R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: VJC - Vince J. Canepa SM/GA...: KEY - Keystone Shipping Company COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== H047T 05/23/02 SMTD MNT20 0100-00000-000 0129 10/01/03 05/31/02 03 04-03-B-02 03 $7000.00 $7000.00 SP 09/30/03 02KEYRIS04S021 DESCRIPTION: FIRE SCREEN DOORS & FRAMES REPAIRS 1.0 ABSTRACT Procure & install a steel door opening into Main Trailer Deck starboard aft ladder well. 2.0 REFERENCE 2.1 None 3.0 ITEM LOCATION/DESCRIPTION 3.1 Main Trailer Deck starboard aft ladder well. 4.0 OWNER FURNISHED MATERIAL / EQUIPMENT / SERVICES 4.1 None 5.0 STATEMENT OF WORK 5.1 Contractor shall provide labor, materials and tools to fabricate and install a steel door in way of the Main Trailer Deck starboard aft ladder well. 5.2 Door measures 6' X 4' and shall be made of 3/8" steel. 5.1.1 Mount door. 5.1.2 Provide all hinges and latching mechanisms. Prime with surface tolerant epoxy and apply two coats of surface tolerant epoxy, with final coat to match the surrounding. REFERENCE: F:\vcanepa\specifications\cape rise 03.* Deferred due to OIF. Moved to FY04. Funds deobligated from T.O. 021 & reprogrammed to FY03 DSN H036R - Procure covered lifeboats.* Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 6 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Rise C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-PTM - Portsmouth, VA R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: VJC - Vince J. Canepa SM/GA...: KEY - Keystone Shipping Company COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== H052T 05/09/03 SMTD SAF60 8115-22591-002 8115 10/01/03 05/09/03 03 04-03-A-01 03 $235000.00 $0.00 KY / / DESCRIPTION: CO2 BOTTLES, 12 YEAR INSP (FY04 SY) 1.0 ABSTRACT 1.1 The intent of this item is to remove the vessels 100 lb CO2 bottles, perform hydrostatic test and certify system. 2.0 REFERENCE 2.1 Engineering manual section 2.2 46CFR Ch. 1118.410 par. (J), (I), (ii) and (iii) 3.0 ITEM LOCATION/DESCRIPTION 3.1 Located on CO2 flat between frames 176 -224. 3.2 Two hundred twenty-seven (227) - 100lb CO2 cylinders 4.0 OWNER FURNISHED MATERIAL / EQUIPMENT / SERVICES 4.1 None 5.0 STATEMENT OF WORK 5.1 Contractor shall provide qualified labor, materials and tools to perform the following: 5.1.1 Ensure that all safety measures pertaining to the disconnecting, connecting and movement of pressurized CO2 bottles are observed. 5.1.2 Provide services for cutting and removal of bulkheads, including certification by marine chemist for burning. Provide fire watches. 5.1.3 Provide crane service to remove & reinstall bottles to and from vessel. 5.1.4 Provide transportation to and from repair facility. 5.1.5 Service each of the heads with new "o" rings and gaskets. Hydrostatically test all bottles. Stamp the bottles with the date and certify all bottles in accordance with regulatory requirements. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 7 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Rise C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-PTM - Portsmouth, VA R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: VJC - Vince J. Canepa SM/GA...: KEY - Keystone Shipping Company COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== 5.1.6 Stop all work and submit a detailed condition report to the port engineer. Identify all problems as well as costs of repairs. No work will proceed until condition is submitted and received by the port engineer. A purchase order modification will be made to the original purchase order to cover items needing to be repaired or replaced. 5.1.7 Provide a 24-hour check point to the port engineer to inspect bottles for re-certification. 5.1.8 Return bottles to vessel and re-install bottles. 5.1.9 Install bulkheads. Provide ABS services for fit up and welding approval. 5.1.10 Reinstall all interferences and insulation. Prime and coat all disturbed areas. 5.1.11 Provide the Master and the Port Engineer with copies of all re-certification documents. REFERENCE: Marts DSN.* Hydrostatic test due FY06. Doing bottles concurently with FY04 Drydocking reduecs readiness exposure in FY06. Estimate based on contractor quote to perform work at Portsmouth, VA. layberth. Spec incorrectly states number of bottles as 227; should be 722.* Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 8 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Rise C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-PTM - Portsmouth, VA R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: VJC - Vince J. Canepa SM/GA...: KEY - Keystone Shipping Company COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== H055T 07/23/03 SMTD HUL00 - - 1617 10/01/03 07/23/03 04 04-03-C-02 03 $20000.00 $0.00 SP / / DESCRIPTION: REPLACE DOORS TO BOAT DECK (FY04) 1.0 ABSTRACT 1.1 The intent of this item is to replace the exterior doors and frame leading from the passageway outside the galley to the boat deck and SPAR deck. 2.0 REFERENCE 2.1 None 3.0 ITEM LOCATION/DESCRIPTION 3.1 On Boat Deck leading to the Spar Deck adjacent to the galley. 4.0 OWNER FURNISHED MATERIAL 4.1 None 5.0 STATEMENT OF WORK Contractor shall provide qualified labor, materials, tools and fire watch to perform the following: 5.1 Contractor shall measure and procure exterior doors to replace existing double hung doors leading out to the Boat Deck. Doors shall be installed with door new heavy duty commercial grade door closures. 5.2 Contractor shall submit choice of doors to the port engineer to approve prior to procurement. (Color to be determined by Chief Engineer.) 5.3 Remove all interferences, existing door and frame. Prepare and re-inforce door opening as needed to properly install new doors. 5.4 Mount and weld door frame to opening. 5.5 Test operate door to the satisfaction of the Chief Engineer. Door shall swing freely and close upon the latch with ease. Door shall unlatch with ease. Door shall be weather tight. No air gaps are permitted. REFERENCE: Marts DSN.* Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 9 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Rise C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-PTM - Portsmouth, VA R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: VJC - Vince J. Canepa SM/GA...: KEY - Keystone Shipping Company COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== M052T 07/14/03 SMTD - - 2510 10/01/03 07/14/03 03 04-03-B-02 03 $10000.00 $0.00 SP / / DESCRIPTION: 50 TON UPPER LIFT RAMP WAYS (FY04) NOTE: ITEM WAS PART OF FY03 DSN:M044T. THIS PART OF M044T WORK WAS NOT COMPLETED DUE TO OPERATION IRAQI FREEDOM. 1.0 ABSTRACT 1.1 The intent of this item is to isolate and repair all leaks around cargo lift workstations. Recondition the workstands 2.0 REFERENCE 2.1 H-86 (1/3), H-86 (3/3) pg 110, 3.0 ITEM LOCATION/DESCRIPTION 3.1 Starboard control stand for 50 ton upper cargo lift ramp-ways on main trailer deck. 3.2 Control valves are manufactured by Rexroth, type H-4WMM226601 4.0 OWNER FURNISHED MATERIAL / EQUIPMENT / SERVICES 4.1 Crew will assist to isolate and tag out the system. 4.2 Crew will assist in operation 5.0 STATEMENT OF WORK 5.1 Contractor shall provide labor, materials and tools to operate and troubleshoot the hydraulic control system for the 50 ton upper cargo lift ramp-ways. 5.1.1 Disassemble each control stand including adjacent connecting piping. 5.1.2 Inspect all internal components for wear. 5.1.3 Tighten loose external fittings and hoses. 5.1.4 Identify and replace leaky fittings and hoses. 5.1.5 Replace all seals, gaskets and "O" rings. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 10 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Rise C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-PTM - Portsmouth, VA R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: VJC - Vince J. Canepa SM/GA...: KEY - Keystone Shipping Company COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== 5.1.6 Submit a detailed condition report to the port engineer identifying any items not covered in this work package with recommendations and costs of repairs. 5.1.7 Operate and demonstrate leak-free operation and proper control. 5.1.8 Machine tool clean stands. Prime with one (1) coat surface tolerant epoxy primer and two coats of surface tolerant epoxy paint. Final coat shall be machinery yellow. REFERENCE: Marts DSN.* Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 11 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Rise C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-PTM - Portsmouth, VA R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: VJC - Vince J. Canepa SM/GA...: KEY - Keystone Shipping Company COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== M055T 07/16/03 SMTD CGO50 2002-S5548-001 2002 10/01/03 07/16/03 03 04-03-B-02 03 $10000.00 $0.00 SP / / DESCRIPTION: SIDE RAMP HYD CONTROL STAND (FY04) 1.0 ABSTRACT 1.1 The intent of this item is to overhaul the hydraulic control stand for the side ramp. 2.0 REFERENCE 2.1 Vessel's technical manual H-81 «, in and around pg 126 3.0 ITEM LOCATION/DESCRIPTION 3.1 Main trailer deck, starboard side near frame thirty 4.0 OWNER FURNISHED MATERIAL / EQUIPMENT / SERVICES 4.1 Crew will isolate and tag out the circuits. 4.2 Crew will assist in operation of control stand. 5.0 STATEMENT OF WORK 5.1 Contractor shall provide qualified hydraulic technicians, materials and tools to perform the following. 5.1.1 Verify system is isolated, secured and tagged out. 5.1.2 Drain system oil into clean receptacles for re-use. 5.1.3 Remove associated piping from stand to a lineal distance of approximately five (5) feet from stand or nearest flange. 5.1.4 Remove control valve assembly. 5.1.5 Take all equipment to certified hydraulic shop for disassembly and measuring. 5.1.6 Hydro test piping to one and one-half times (1.5 X) working pressure. 5.1.7 Submit condition report to port engineer on findings. 5.1.8 Blast exterior of valve bodies and piping to SSPC SP3 specification. Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 12 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Rise C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-PTM - Portsmouth, VA R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: VJC - Vince J. Canepa SM/GA...: KEY - Keystone Shipping Company COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== 5.1.9 Prime with one coat of surface tolerant epoxy primer DFT 4 mils. 5.1.10 Coat with two coats of surface tolerant epoxy DFT 4 mils per coat, final coat to be yellow. 5.1.11 Thoroughly degrease and blast control stand to SSPC SP3 specification. 5.1.12 Prime with one coat of surface tolerant epoxy primer DFT 4 mils. 5.1.13 Coat with two coats of surface tolerant epoxy DFT 4 mils per coat, final coat to be yellow. 5.1.14 Reassemble control valves using suitable seals. 5.1.15 Hydro control valves to one and one-half times working pressure. 5.1.16 Test operate valves in shop. 5.1.17 Re-install control valves, stand, and piping. 5.1.18 Fill system with oil using contractor supplied filter cart meeting manufacture's minimum specifications. 5.1.19 Test operate system to satisfaction of Chief or Port Engineer. REFERENCE: Marts DSN.* Rpt Date MAINTENANCE AND REPAIR TRACKING SYSTEM 02.02.05.01 PAGE: 13 02/26/04 DEFICIENCIES REPORT - DETAILED Special - User Selected ---------------------------------------------------------------------------------------------------------------------------------- Vessel..: Cape Rise C-Rating: C2 - Deficiencies CORRECTABLE Within R-Status Location: O-PTM - Portsmouth, VA R-Status: 5/ROS - 5 Day (Outported)(9-men ROS Crew) Region..: SAR - South Atlantic Region Surveyor: VJC - Vince J. Canepa SM/GA...: KEY - Keystone Shipping Company COTR....: AJS - Anthony J. Salemi ---------------------------------------------------------------------------------------------------------------------------------- DSN DIS DATE POC SAC EQN MEI SDT DATE SPEC RCD PRI BDGT CODE STA EST COST OBLG/ACT MTC CORR DATE TO REF ====================================================================================================================================================== Total of Estimated Costs...: $ 402,647.00 Total of OBLG/ACT Costs......: $ 0.00 Total Cost of Printed Items: $ 402,647.00 **** End of Report ****