Minutes of Interface Module Meeting 4/29-4/30/99 ------------------------------------------------ 4/29 meeting: Foglesong, Johnson, Matulik, Reay, Sidwell, Zverev Long discussion of resistive drops for power leads from sequencer to SVX. Right now total is projected to be 2.75 ohms: with 1 ohm on interface module, 1.1 ohm on 3M cable, 0.4 on flex circuit (lo mass cable), and 0.3 ohms on HDI pig tail. This leads to a 1.2 v projected drop on AVDD, and large swings on the chip digital power (DVDD). Goal: 1.5 ohms; and as close to 0.5V drop as possible. Separate power buss for low voltage was suggested by Marvin. Drawings- no new drawings yet. John had a power supply possibility with water-cooled enclosure which can handle up to 10 pods per set (40A ea?), and 5 pod sets. Looks good for LV and SVX power. Marvin is considering how to get sense back so we can remove the effect of resistive losses in the 3M cable. Crate layout proposal presented by Sidwell, and available from web page. Plan is that no modules see more than one detector type- this costs more modules, but seemed sensible to most people. Split bias voltages- requested by Lipton, briefly discussed. Unpopular with most poeple (HV connections double). Next Meeting agenda- 1) Drawings (JF)- issues of cable routing, space, card removal. Are there any show-stoppers? Is the cutout thru the muon iron big enough? 2) Photovoltaic relays (MM)- tested with +200, saw < 0.1 nA current draw. Asked to test with -200 also. These are used for HV (i.e. bias) voltage. Can we pick a part number, and make a decision to go ahead? 3) Output cables (NRS, w RAS). Design is stalled because we don't have a complete solution. NRS is asked to report on the situation next Thursday. 4) J1 backplane layout (Ben McD). How much room do we have? What have we forgotten? 5) Split bias voltage (Ron Lipton). Ron is urged to attend, and give the arguments for this. Cost is: a) double # HV lines and connects, b) double # of relays, c) 34 conductor cable per board instead of 16, d) does the plan make sense, and do we really extend the life of radiation-damaged silicon if we can't do a 50-50 split. 6) Consensus on termination. ----------------------------------------------------------- ----------------------------------------------------------- 4/30 Meeting regarding terminations and cross-talk ----------------------------------------------------- attendees: Johnson, Green, Utes, Zverev, DeMarteau, Lipton, Sidwell Purpose: settle on termination scheme for burn-in stands; also trial for next interface module. How to reduce cross talk, and get well-shaped signals in both directions. The current situation was reviewed including old green card, and test beam. I will not summarize discussion. Decisions: 1) For burn-in adopt Zverev proposal: --->>>DATA bus! <<<---- a) add 82 ohm resistor to ground in SASEQ and big sequencers b) on sequencer side of interface module, use Schottky pullup and pulldown diodes (no resistors). c) on HDI side - 75 ohm series resistor in series, and schottky diodes pullup and pulldown. 2) Need to get ready for low-mass cable tests. A box-full of adapters, cables, and boards are needed. Can the Speedy zig-zag flex circuits be used? Need short summary of logistics and parts (RAS or NRS?) 3) For Rev 3, leave in pads for series, pull-up, and pull-down terminators (whether diode or resistive) After the meeting there was a "show and tell" session with the oscilloscope. Some anomalies were observed in dvalid timing which are not understood. Of interest is trigger on D7, and look at dvalid, and clock. The timings are strange on current SASEQ and setup.