General Decision Number: ND080006 09/05/2008 ND6 Superseded General Decision Number: ND20070006 State: North Dakota Construction Type: Building Counties: Adams, Billings, Bottineau, Bowman, Burke, Divide, Dunn, Golden Valley, Grant, Hettinger, McHenry, McKenzie, McLean, Mercer, Mountrail, Oliver, Renville, Sioux, Slope, Stark and Williams Counties in North Dakota. BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family fomes and apartments up to and including 4 stories) Modification Number Publication Date 0 02/08/2008 1 05/16/2008 2 05/23/2008 3 08/08/2008 4 08/15/2008 5 09/05/2008 BRND0004-001 05/01/2008 Rates Fringes BRICKLAYER.......................$ 24.48 7.60 ---------------------------------------------------------------- * ELEC0714-001 07/01/2007 Rates Fringes ELECTRICIAN CABLE SPLICER...............$ 24.41 7.62+11% ELECTRICIAN.................$ 24.01 7.62+11% ---------------------------------------------------------------- PLUM0300-011 06/02/2008 ADAMS, BILLINGS, BOWMAN, DUNN, GOLDEN VALLEY, GRANT, HETTINGER, McLEAN MERCER, OLIVER, SIOUX, SLOPE & STARK COUNTIES: Rates Fringes PLUMBER PLUMBERS(including HVAC piping).....................$ 32.96 10.45 ---------------------------------------------------------------- PLUM0300-012 06/02/2008 BOTTINEAU, BURKE, DIVIDE, McKENZIE, MOUNTRIAL, RENVILLE, WARD & WILLIAMS COUNTIES Rates Fringes PLUMBER PLUMBERS(including HVAC piping).....................$ 32.96 10.45 ---------------------------------------------------------------- SHEE0010-039 06/02/2008 Rates Fringes Sheet Metal Worker SHEET METAL WORKERS(installing HVAC duct & setting the unit only).......................$ 19.20 10.29 ---------------------------------------------------------------- SUND2000-002 03/23/2000 Rates Fringes CARPENTER CARPENTERS (including the installation of cabinets, drywall, form work, & drywall finishing, excluding the installation of bleachers, heat and frost insulation, soft floor laying, gypcrete flooring & the erection of metal buildings)............$ 11.94 2.64 CEMENT MASON/CONCRETE FINISHER CEMENT MASONS (excluding form work, Gypcrete flooring & rebar)...........$ 11.17 .32 Heat and Frost Insulator.........$ 8.12 .43 Laborers: LABORERS (including the installation of rebar & excluding form work)........$ 9.51 MASON TENDER................$ 10.83 PAINTER PAINTER (including paper hanging & excluding drywall finishing)..........$ 13.61 Power equipment operators: Backhoe.....................$ 10.75 1.79 Crane.......................$ 15.55 5.10 Skid Steer..................$ 9.64 ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 10.64 Sheet Metal Worker SHEET METAL MECHANIC (Exclud. HVAC)..............$ 16.76 2.24 TILE SETTER......................$ 11.50 .22 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION