DONUT WORK LIST ----------------- January 6, 2004 At the end of the collaboration meeting in Athens we agreed to the following work list: 1. Check MC and Data after the SFT code fix (Bruce). 2. Redecode/rematch and refit to DCs all (125) events. Compare to evlist (Bruce) 3. Send "not-found" list to Bruce/Gina for (re)prediction (Nonaka). 3a. Send results back to Nonaka with recommendartions for re-scan (CS netscan). 4. Redo ANN with new code (Niki). 5. Re-measure momentum with MS for rest of events (15), daughter for short decay on muon track (Komatsu). 6. Post spectrometer muon momenta with errors (Gina). 6a. All other spectrometer tracks after re-decoding (Gina). 7. Plot of SFT/emulsion matching as a function of momentum (Gina). 8. Kinematic Calculation for Charm(Vittorio). 8a. Event probabilities on charm events (Emily). 9. Long decay search (continue) (Takahashi) 9a. Secondary interaction study, inelastic/elastic ratio (Nonaka). 10. Short paper draft (Ken). 11. Neutrino flux calculation studies (George, Komatsu, Vittorio). 12. Decay finding efficiency check (Komatsu).