2005 Category A and B Transactions

The following is a list of the major projects approved by Ex-Im Bank's Board of Directors during 2005 that were categorized as either environmental Category A or B. The environmental factors associated with each project are summarized, as well as the time period for which the EIA was made available by Ex-Im Bank for each Category A project.

CATEGORY A TRANSACTIONS

CASE NO.
PROJECT COUNTRY
PROJECT NAME & LOCATION (Brief Description)
KEY ENVIRONMENTAL FACTORS CONSIDERED
AMOUNT FINANCED
PERIOD OF EIA AVAILABILITY
BOARD ACTION
AP081532 Brazil Roncador Offshore Oilfield "P-52 Platform" in the Campos Basin to replace former production platform Liquid effluents, waste discharge, adequacy of oil spill response plan. $21.1 million 39 Days Approved 5/9/05
AP078068 Egypt, Arab Rep Ammonia Plant located in the Sokhna port, south of Suez Air emissions, water usage, liquid  effluents. adequacy of local  public consultation, potential for impact on Gulf of Suez and any archaelogical sites  $225.7 million 510 Days Approved 2/3/05
AP081769 Mexico Peg III Gas Field Exploration & Development Onshore/Offshore Gas Fields, Bay of Campeche including development of some new fields Air emissions, water effluents, waste discharge, noise, social impacts, and potential impact on  ecologically protected areas. $300.0 million 117 Days Approved 9/28/05
MSM283762 Guatemala Procesos Industrial Maya Oil Refinery near Morazan, El Progresso Department Impact of air emissions on identified sensitive site located 10 Km from  project  (transaction less than SDR10 million) $3.3 million 137 Days Denied 11/4/05
AP081648 Qatar Qatargas 3  project that includes offshore gas production, pipeline and large, new onshore LNG  plant located at Ras Laffan Industrial City VOC and NOx emissions, waste disposal, wastewater management, and impact on nearshore and coastal wildlife $403.5 million 224 Days Approved 12/15/05

CATEGORY B TRANSACTIONS

CASE NO.
PROJECT/ COUNTRY
PROJECT NAME & LOCATION (Brief Description)
KEY ENVIRONMENTAL FACTORS
AMOUNT FINANCED
BOARD ACTION
AP080776 Israel Carmel Polypropylene Production expansion project near Haifa Air emissions, local permitting, and the potential to impact any  protected areas. $37.2 million Approved 2/3/05
AP081863 Mexico Oil & Gas field Services for extension of Pidiregas  Onshore & Offshore projects located in eastern Mexico and the western Gulf of Mexico to increase and/or maintain  production capacity of existing fields Flaring, waste disposal offshore, treatment of onshore and offshore wastewater effluents, potential ecological  impact from project activities and emergency spill response plans   $400.0 million Approved 9/29/05
AP081892 Mexico Oil & Gas field Services for the optimization of Cantarell Offshore Oil field Projects in the Bay of Campeche to further develop existing fields and maintain production level   Flaring, treatment of wastewater effluents and emergency spill  response plan  $300.0 million Approved 9/29/05
AP081158 Qatar Q-Chem II Petrochemical project in Mesaieed Industrial City, south of Doha to increase capacity and produce new products within existing petrochemical complex Air emissions and  effluent discharge levels $263.0 million Approved 7/14/05
AP081360 Qatar Almana Residential Compound in Doha Land use and increased burdens on existing infrastructure. $30.5 million Approved 7/19/05
MTR289256 Guatemala Chloro-alkali manufacturing facility in Santa Isabel Potential for impact from chlorine gas emissions on any populated or sensitive areas. (Transaction less than SDR10 million) $2.3 million Approved 12/22/05
AP081525 Turkey Bares II Wind Power Farm near Marmara Sea, in the district of Bandirma Potential impact on any migratory birds, and ambient  noise level $16.4 million Approved 7/14/05

 

 