{CaptionsBy} InDyne, Inc. {LastEditor} Anita Barrett {ScannedBy} Seven/Still Photo Imaging {author} NASA or National Aeronautics and Space Administration {date} 07-Dec-2000 {description} A flatbed trailer begins moving the Integrated Truss Structure S3 from the Shuttle Landing Facility to the Operations and Checkout Building. The S3 arrived aboard a Super Guppy aircraft. The second starboard truss segment of the International Space Station, the S3 truss is scheduled to be added to the Station in April 2003. {highres} 2670 x 1612 {highsize} 549396 {hightype} JPEG {lowres} 320 x 193 {lowsize} 88102 {lowtype} GIF {mediumres} 1024 x 618 {mediumsize} 79762 {mediumtype} JPEG {number} KSC-00PP-1871 {slideres} 172 x 141 {slidesize} 34928 {slidetype} GIF {tinyres} 100 x 60 {tinysize} 9168 {tinytype} GIF {title} The S3 truss begins move to the O&C {type} Image {end}