Weekly Meeting Minutes
July 26, 2005
Patricia
Fernandez
Patricia set up the remainder of the Shutter presentations – Cindy
& Lisa will give their presentation on Tuesday, August 2, after our
meeting, Dean & Bruno will present on August 16, Rod will give his
presentation on the Front Ends on the 23rd and Rick will give his
presentation on September 6.
PSS GEN 3 training – Kevin will arrange the training for August 9, 2005.
Work Request System – Randy Flood will give the presentation and Mohan
will explain the changes at the meeting today at 2:00 p.m. in the 435
LOM Conference Room.
Patti sent Patricia all the broken links that she found on the APS Home
Page, the information was sent on to Chris Klaus who will fix the
breaks. Patricia asked that the FCs when they have time to
continue going through pages as time permits.
Patricia spoke with Ralu Divan – clean room optics shop – when someone
is working alone they will post on the outer door the scope of work and
if they are alone, if something is needed to call the on-call FC.
At CAT Chat it was brought up about the rules of hutches, keeping area
cleared for easy access, please remind your beam line personnel to keep
this up and if needed, please help them.
One of the HP techs walked into a laser beam area while the experiment
was going on. Please remind everyone to be aware of where they
are walking and what is going on.
Elroy will be going to Buildings 435 & 436 to do his inspections,
tag along if you have the time.
Patricia asked JoAnne to set up a meeting with Kevin, Jeff, Lisa and
Dean in regards to the 24-ID incident.
John
Quintana
Friday Mohan noticed Sector 32’s ray tracings were not quite
accurate. He will be addressing this matter with beamline staff.
Tom Barkolow is working on the OAI audit comments. It was stated that
we need some type of corrective action tracking system, something on
the order of the COATS system.
Cindy
Chaffee
Working on labs and fume hoods, checking if getting enough air exchange
in the room.
Cindy is also working on the Utility drawings for Bill Wesolowski; Troy
finished the drawings for Mohan.
Rod Salazar
LS-CAT is ready to go; GMCA-CAT – beam studies/loss of beam not
returned to the same; ray trace modifications, Rod will be meeting with
Mohan today.
Mitigation at Sector 26; several labyrinths not right.
Bruno
Fieramosca
Bruno is helping Cindy with the Utility drawings.
Dean
Wyncott
The deck on 7-ID is complete; need a couple receptacles around the
railing; needs to order their cryo lines and Shops is working on the
lift platform.
Ray Monroe
BCDA effort will be complete before September 30.